CB2 Facade Assembly Instructions Manual

facade BED - QUEEN
Thank you for purchasing the Facade Queen Bed. This page Please take the time to identify the hardware as well as the individual components unpack and prepare for assembly, place the contents on a carpeted or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
lists all the contents included in the box.
to this product. As you
hardware
39 - screws 2 - spacers
Missing hardware? Please call 800.606.6387 for replacements.
tools required
phillips head screwdriver
(We recommend the use of hand tools instead of power tools)
components
1 - headboard
1 - footboard
2 - side rails
(1 left, 1 right)
2 - center support legs
13 - slats
1 - center support
Made in USA - r07 Page 1 of 3
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
facade BED - QUEEN
headboard
footboard
right side rails
left side rail
right side rail
With the assistance of another adult, lift both ends of side rail so it is the same distance from the floor. At this point, insert pegs of each side rail into corresponding holes in each bracket of headboard as shown. Push down firmly at each bracket until
1 2
it locks into position.
slat
center support
left side rails
Attach brackets of left/right side rails into corresponding brackets of footboard as shown.
center support assembly
center support leg
Attach 2 slats to center support with 1 screw per slat as shown. Secure, but do not over tighten,
3
screw with a phillips head screwdriver.
Made in USA - r07 Page 2 of 3
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
Attach 2 center support legs to center support assembly as shown. Turn each support leg
4
clockwise to secure.
facade BED - QUEEN
Align slats so they are parallel to the headboard and footboard. Secure assembly with 4 screws as shown. Make sure center support is securely supported by each support leg.
5 6
spacer
Attach remaining 11 slats to center support rail with 3 screws per slat as shown. Before securing each screw to side rails and center support, use the spacer to determine spacing between slats as shown. Assembly is now complete.
CLEANING AND CARE
Fabric cleaning code S: to prevent overall soil, frequent vacuuming
or light brushing to remove dust and grime is recommended.  Spot clean using a mild water-free solvent or dry cleaning product. 
Clean only in a well ventilated room and avoid any product
containing carbontetra-chloridewhich ishighlytoxic.  Pretest small area before proceeding. 
Cleaning by a professional cleaning service is recommended.
Made in USA - r07 Page 3 of 3
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
Loading...