The German perfect industrial design, beauty and quality of experience
The new Cayken marks a new beginning in industrial grade drill machine
aesthetic design and manufacturing process. It follows the consistent style
of the leaders, with a forward-looking design ideas and the perfect ergonomic design, opened up a new era of drilling industry.
Germany Cayken authorized manufacturer: shanghai chengxiang mechanical and electric equipment co.,ltd
Please strictly abide by the procedures in the process of trial, to avoid electric
shock and fire,The stand is only for the professional user, please do not let
other people to operate, if you have any personal injury caused by violation
of manual operating rules, our company will not be held any responsibility!
The stand is only to experienced maintenance staff to maintain it!
THANKS TO YOUR PURCHASE
Thanks very much for your purchase drill stand series products from our company,
please read this manual carefully before operation.
The right operation, will make you fully experience the better performance of our
company products.
Please put this manual at safe place for your reference.
Hope our products can let you satisfy and accompany with you for a long time.
ABOUT THIS MANUAL
This manual describes the stand model as follows:
Mod.: 200F/400F/650F/280F/580F/850F
SAFETY OF INSTRUCTION
1、The workplace must be keep clean and shining, mussily and disorderly or dark work
-place is easy to cause accident.
2、Can't be work in the in the flammable liquid, gas or dust workplace.
3、Pls don't allow the chirlder or bystander close to the workplace when operating the
machine, if the distraction for third party interference may lead to operate out of control.
4、Be sure to concentrate when you are working, not only to keep our head on out rat-nal
operation. pls don't operate the machine when you are tired, drank or take drugs,
medicines.
5、Wear your personal protective equipment and wear protective goggles. wear approp-
riate protective equipment according to the machine you use,such as dust mask, slide
overalls, safety helmet or earmuffs, all these ca n reduce the risk of injury.
6、Wear suitable clothes.pls don't wear the looser clothes when working, also don't wear
jewelry.Can't let a hair, clothes and gloves close to the machine rotating part, loose
clothing, long hair or jewelry are easy to be involved into the rotating parts.
7、Don't let the machine carrying heavy load.According to the nature of work to choose
the appropriate electric tools, choose the right electric tool can be more efficient and
safe to operate the machine within the prescribed scope of power.
8、Please pull out the plug from the socket when adjusting the machine, replacement parts,
or don't use machine, to avoid accidentally start the electric tools.
9、Pls keep stand in children cannot be obtained when didn't use it.Don't let the pers-on
who is not familiar with the operation machine and any person who didn't read this
manual use this stand, inexperienced people is easy to operate the accidents.
Please check the model by nameplate of stand.
Warning: the company shall not be held responsiblefortheaccidents
because of the fixed not firm.
12
Page 4
PRODUCT MODEL AND PARAMETER
ITEM
Largestdri ll
200F400F
200m m
400m m
650F
650m m
280F580F
220m m
480m m
850F
750m m
If you still not clear for the operational process after checking the this manual,
Pls consult the professional person.
If you have any question about operating this machine, pls contact with your
dealer.
We will always on you with all sincerity to ensure your efficiency and safety .
N.W
Adjustable angle
20Kg
0-45 °
21Kg
0-45 °
24Kg
0-45 °
22Kg
0-45 °
24Kg
0-45 °
26Kg
0-45 °
In order to continuously improve products, the company reserves the right
of the technical data and the right parts to change without prior notice.
SAFETY PRECAUTION
1、Please power off before any adjustment of the machine. unexpected start is the result
of accident.
2、Please assure the correct assembly of the drilling frame before install the machi-ne.
This is important for avoiding the collapse.
3、Please fix the machine to the firm drilling frame before starting the machine. The
movement of the machine on the stand will lead the lack of control.
4、Please put the drilling stand on stable and flight floor. It will be hard to control the
machine safely when the stand moveable or rockable .
5、Please do not overload the stand or using ladder scaffold. The overload of the stand
top will lead to the falling.
6、Please clear up the site and assure enough stable space. And pls pay attention to the
unexpected movement of any obstacle.
7、When doing deep drilling (from one side to the other), please check the other side
where the drill head will out of. pls fix and segregate this area to assure no harm to any
body or material.
8、Please be equipped with the following accessories when proceeding.
head-protection cap
ear-protection device.
goggle or dust-proof mask.
respirator / protection glove
Cloth keep you move freely.
boots with steel toe protection
First-aid box should be stand-by. pay attention to the cloth, long hair and jewelry
that could be twist into the moving part.
INSTALL THE STAND
There have two ways to install the stand
Using vacuum suction plate fixation
Using expansion bolts or anchor fixation
Warning: the vacuum suction plate can't used in the ceiling or wall
drilling.it may result in serious or fatal injury with negligence or improper use, if the use of vacuum suction plate, to ensure the bearing
surface is not porous, and its thick loose, make sure that the vacuum
pump have enough suction to the fixed vacuum suction plate.
Using vacuum suction plate fixation
First install the vacuum seal on the pedestal, then connecte vacuum pump to
vacuum pressure fast connection, take the base on the desired location, start
the vacuum pump, must achieve to the minimum pressure :635 mm hg (25
inches),so that the base can seal on the surface.
Using expansion bolts or anchor fixation
Drill a hole at the position of determining by expansion bolt or anchor, tighten the firm base, and then check carefully whether the expansion bolt fixed
correctly, can use spanner to adjust the base screw adjust the base according
to the basement.
Note: if you need to fixed on the wall, it is better to take out the
head for installation and fixed stand, installed on the rack after
the stand fixed, please make sure installed the head on the stand
and screw has been tightened.(if need help, with spiral crane
transferred to the appropriate length to fixed)
3
4
Page 5
When you are using a large drill bit, need to install a connection block, to make a
distance between the bit and stand. the specifications of the connection block have 30mm,
60mm,100 mm for your reference, sometimes you can use multiple connections in order to
achieve the required distance. need four bolts to connect piece fixed on lifting, please
remeber tighten the bolt .then connect the motor assembly fixed on the block.
Warning: please tighen all the bolt before use the machine.
Consumerscan enjoy free maintenance and warranty service within six months of buy
the machine from our company, if the machine and the parts have any manufacturing
process or components of product have trouble with the normal use. please take the
original invoice, stamp dealers and fill in the warranty certificate to the company or the
company designated repair station enjoy free services.
Warning: in any case, not approved by the manufacturer, shall be the
original design and modification of thismachine, please use the origi
-nal accessories, unauthorized modification or use of unauthorized
Adjustable hand le
Clamp
Clamp
Rec ta ng le key
Fixation assembly
Inner hexagon scr ew
Inner hexagon scr ew
Wed ge
Inner hexagon scr ew
Lift in g
Level v ia l
Lock nut
Spa ce r
Wheel shaf t
Eccentric sha ft
Bearing
Wheel
Bearing
Spa ce r
Lock nut
Fas tener plastic
Lock scre w
Screw s he ll
Lock scre w
Circl ip
Gear lif ti ng
Pinion hub
Pin
Bearing
Circl ip
Rubber ba ll
Pinion shaft
Roc ker
Rack
Hexagonal scr ew f la t
Handgrip
Inner hexagon scr ew
Inner hexagon scr ew
Aluminum alloy ro d
Spa nn er
Ste p pad
Str ut
Small van e
Connection bloc k
Str ut
Carriage scre w
Carriage scre w
Drill operating
Fixing scre ws f or w he el
Screw s fo r ba se me nt
Nut
Screw f or b as em en t
Nut
Spa ce r
Hexagonal scr ew
Outer h ex ag on s cr ew
Inner hexagon scr ew
Handle
Basement
Lock nut
Lock nut
Scaleplate
Adjustab le h an dl e
Clamp
Clamp
Rec ta ng le key
Fixation a ss em bl y
Inner hexa go n sc re w
Inner hexa go n sc re w
Wed ge
Inner hexa go n sc re w
Lift in g
Level vial
Lock nut
Spa cer
Wheel shaf t
Eccentri c sh af t
Bearing
Wheel
Bearing
Spa cer
Lock nut
Fas te ne r pl as ti c
Lock screw
Screw shell
Lock screw
Circlip
Gear lif ti ng
Pinion hub
Pin
Bearing
Circlip
Rubber ball
Pinion sha ft
Roc ker
Rack
Hexagona l sc re w fl at
Handgrip
Inner hexa go n sc re w
Inner hexa go n sc re w
Alumin um a ll oy r od
Spa nner
Ste p pad
Str ut
Small vane
Connecti on b lo ck
Str ut
Carriage s crew
Carriage s crew
Drill oper at in g
Fixing screws fo r wh ee l
Screws for basement
Nut
Screw for basement
Nut
Spa cer
Hexagona l sc re w
Outer hexago n sc re w
Inner hexa go n sc re w
Handle
Basement
Lock nut
Lock nut
Scalepla te
Str ap
Screw (M6*10 -4)
Gaske t
Base
Nut(M1 0)
Screw(M10* 60 -4 )
Screw(M8*1 6- 1)
Fix Screw(M6 *1 2- 6)
Pin
Metal Gasket
Screw(M6*1 2- 6)
Sponge Gas ket
Screw(M6*1 2)
Clips
Suctio n No zz le
EP conne ct io n
Pre ssure Gage
Pin(5* 12 -2 )
Screw(M8*1 6- 1)
Holder
Pin
Snap Rin g
Gaske t
Screw(M8*1 6)
Gaske t
Screw(M8*1 6- 2)
Gaske t
Screw(M4*1 0- 2)
Cover
Handle
Side Han dl e
Gaske t
Left S li de r
Main Sli de r
Right Slid er
Gaske t
Hex Screw
Wheel Ca rr ie r
Snap Rin g
Gaske t
Wheel