SECTION 2
INSTALLATION OF FIRE
2.1 UNPACKING THE FIRE
Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List - Coal Fuelbed Models
1off Fire tray / burner assembly
1off Boxed ceramic base, L/H & R/H ceramic front rails plus coals
1off
Coals bag, containing, 3 medium square coals, 2 small square, 1
1
small coals & 7 large coals - total of 23 coals packed in ceramics box
1off Loose items bag.
1off
Installation / User book (Combined)
2.2 INSTALLING THE TRAY
Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715. (minimum effective flue height 3 metres)
125mm (5 inch) diameter brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715. (minimum effective flue height 4 metres)
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
To Install the Fire Proceed as follows :-
a)
Carefully place the burner tray in the opening in the tiled cast iron fascia
(if applicable)
b) Trial fit the two front ceramic rails onto the burner front ceramic support
- see page 12, section a). Then fit the front bars of the tiled fascia (if
applicable). This will allow you to ascertain the the position of the
burner tray. Mark the centres of the two fixing holes, which are located
in the front flange, below the control knob / piezo button on the burner
tray. Mark the centres of the two fixing holes, which are located in the
front flange, below the control knob / piezo button on the burner tray.
c) Whilst the fire is in position, decide which side the gas supply is to enter
the fire from and plan accordingly. The inlet elbow can be loosened and
rotated if necessary. See Fig. 3 & 4 overpage for suggested pipe routes.
9