Carrier 58RAV, 58RAV050-08, 58RAV050-12, 58RAV070-08, 58RAV070-12 Installation, Start-up, And Operating Instructions Manual

...
Page 1
Downflow/Horizontal
Induced-Combustion Furnaces
Installation, Start-Up, and Operating Instructions
Sizes 050-135, Series 151
NOTE: Read the entire instruction manual before starting the
installation. This symbol → indicates a change since the last issue. Index Page
SAFETY CONSIDERATIONS..................................................1-2
Clearances From Combustible Materials.................................1
Dimensional Drawing...............................................................2
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
PROCEDURE........................................................................2-3
General......................................................................................3
Location Relative to Cooling Equipment ................................3
Hazardous Locations.................................................................3
AIR FOR COMBUSTION AND VENTILATION...................3-5
Unconfined Space.....................................................................4
Confined Space......................................................................4-5
SUPPLY-AIR PLENUM INSTALLATION (DOWNFLOW)..5-6
Installation On a Concrete Slab ...............................................5
Installation On a Combustible Floor ....................................5-6
HORIZONTAL ATTIC INSTALLATION...................................6
Construct a Working Platform .................................................6
Install Furnace...........................................................................6
HORIZONTAL CRAWLSPACE INSTALLATION....................6
FILTER ARRANGEMENT .......................................................6-7
GAS PIPING...............................................................................7-8
ELECTRICAL CONNECTIONS..................................................8
115-v Wiring.............................................................................8
24-v Wiring...............................................................................8
Accessories................................................................................8
START-UP, ADJUSTMENT, AND SAFETY CHECK.........9-15
General.................................................................................9-10
Sequence Of Operation .....................................................10-12
Heating Mode..........................................................................10
Cooling Mode .........................................................................10
Continuous Blower Mode.......................................................10
Heat Pump Mode....................................................................10
Start-up Procedures............................................................10-12
Adjustments .......................................................................12-14
Set Gas Input Rate..................................................................12
Set Temperature Rise........................................................12-14
Set Thermostat Heat Anticipator............................................14
Check Safety Controls.......................................................14-15
Checklist..................................................................................15
SAFETY CONSIDERATIONS
Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and qualified person­nel should install, repair, or service heating equipment.
Untrained personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on
®
heating equipment, observe precautions in the literature, on tags, and on labels attached to or shipped with the unit and other safety precautions that may apply.
Table 1—Clearances From Combustible
UNIT SIZE 050 AND 070 096-135
DOWNFLOW (In Alcove or Closet)
Sides Single-Wall Vent 1 0
Type B-1 Double-Wall Vent 0 0
Back 00
Top 11
Front Single-Wall Vent 6† 6†
Type B-1 Double-Wall Vent 3† 3†
Vent Single-Wall Vent 6 6
Type B-1 Double-Wall Vent 1 1
HORIZONTAL (Attic, Alcove, or Crawlspace)
Sides * 10
Back 00
Top Single-Wall Vent 1 1
Type B-1 Double-Wall Vent 1 1
Front‡ Single-Wall Vent 6† 6†
Type B-1 Double-Wall Vent 3† 3†
Vent Single-Wall Vent 6 6
Type B-1 Double-Wall Vent 1 1
HORIZONTAL (In Closet)
Sides * 11
Back 00
Top Single-Wall Vent 2 2
Type B-1 Double-Wall Vent 2 2
Front Single-Wall Vent 6 6
Type B-1 Double-Wall Vent 3 3
Vent Single-Wall Vent 6 6
Type B-1 Double-Wall Vent 1 1
* Indicates supply or return sides when furnace is in the horizontal position. † Clearance shown is for outlet end. The inlet end must maintain 6-in. minimum clearance from the vent to combustible materials when using single-wall vent. ‡ Minimum 18-in. front clearance required for alcove.
NOTES:
1. Provide 30-in. front clearance for servicing. An open door in front of the furnace can meet this requirement.
2. A minimum clearance of 3 in. must be provided in front of the furnace for combustion air and proper operation.
3. Line contact is permitted as shown in Fig. 7.
Follow all safety codes. In the United States, follow all safety codes including the National Fuel Gas Code (NFGC) NFPA No. 54-1992/ANSI Z223.1-1992. In Canada, refer to the current
ama
Materials (In.)
58RAV
CANADIAN GAS ASSOCIATION
APPROVED
R
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4 Tab 6a 8a
PC 101 Catalog No. 565-863 Printed in U.S.A. Form 58RA-10SI Pg 1 8-95 Replaces: 58RA-9SI
Page 2
13
⁄16″
39 7⁄8″
20″
INLET
ACCESSORY
3
1
⁄4″ DIA HOLE
GAS ENTRY
28 1⁄2″
7
⁄8″ DIA
VENT CONNECTION
13
⁄16″
9 1⁄8″
10 1⁄4″
1
⁄2″ DIA
D
4 3⁄16″
2 15⁄16″
16 1⁄16″
2″
THERMOSTAT  WIRE ENTRY
7
⁄8″ DIA
ACCESSORY
7
⁄8″ DIA HOLE
POWER ENTRY
1 1⁄2″ DIA R.H. GAS ENTRY
7
⁄8″ DIA
ACCESSORY
″ TYP
1
11
⁄16″
OUTLET
19″
ADDITIONAL 7⁄8″ DIA K.O. ARE
NOTE:
LOCATED IN THE TOP PLATE AND BOTTOM PLATE
1 1⁄16″ 2 1⁄8″ 8 1⁄4″
E
11
⁄16″
A
AIRFLOW
13 5 ⁄16″
10 1⁄4″
11
⁄16″
DIMPLES TO DRILL HOLES FOR HANGER BOLTS (4 PLACES) IN HORIZONTAL POSITION
1 1⁄16″
2 1⁄8″
Fig. 1—Dimensional Drawing
Table 2—Dimensions (In.)
UNIT SIZE A D E VENT CONN SHIP. WT (LB)
050-08 14-3/16 12-9/16 12-11/16 4 124 050-12 14-3/16 12-9/16 12-11/16 4 127 070-08 14-3/16 12-9/16 12-11/16 4 141 070-12 14-3/16 12-9/16 12-11/16 4 145 096-12 17-1/2 15-7/8 16 4 154 096-16 17-1/2 15-7/8 16 4 154 115-16 17-1/2 15-7/8 16 4 171 115-20 21 19-3/8 19-1/2 4 181 135-20 24-1/2 22-7/8 23 5 192
edition of the National Standard of Canada CAN/CGA-B149.1­and .2-M91 Natural Gas and Propane Installation Codes (NSC­NGPIC). Wear safety glasses and work gloves. Have fire extin­guisher available during start-up and adjustment procedures and service calls.
Recognize safety information. This is the safety-alert symbol When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.
Understand the signal words DANGER, WARNING, and CAU­TION. These words are used with the safety-alert symbol. DAN­GER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies a hazard which could result in personal injury or death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.
These instructions cover minimum requirements and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept up with changing residen­tial construction practices. We require these instructions as a minimum for a safe installation.
.
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
PROCEDURE
Electrostatic discharge can affect electronic components. Take precautions during furnace installation and servicing to protect the furnace electronic control. Precautions will pre­vent electrostatic discharges from personnel and hand tools which are held during the procedure. These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace, the control, and the person at the same electrostatic potential.
1. Disconnect all power to the furnace. DO NOT TOUCH THE
CONTROL OR ANY WIRE CONNECTED TO THE CON­TROL PRIOR TO DISCHARGING YOUR BODY’S ELEC­TROSTATIC CHARGE TO GROUND.
2. Firmly touch a clean, unpainted, metal surface of the furnace chassis which is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.
3. After touching the chassis you may proceed to service the control or connecting wires as long as you do nothing that recharges your body with static electricity (for example; DO NOT move or shuffle your feet, DO NOT touch ungrounded objects, etc.).
5
⁄8″ TYP
A88324
2
Page 3
4. If you touch ungrounded objects (recharge your body with static electricity), firmly touch furnace again before touching control or wires.
5. Use this procedure for installed and uninstalled (ungrounded) furnaces.
6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 5 before bringing the control or yourself into contact with the furnace. Put all used AND new controls into containers before touching ungrounded objects.
7. An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.
INTRODUCTION
The model 58RAV Series 151 Furnaces are available in sizes
→
50,000 through 135,000 Btuh input capacities. The design of the downflow/horizontal gas-fired furnace is
A.G.A./C.G.A. certified for natural and propane gas and for installation on noncombustible flooring. The furnace may be installed on combustible flooring when installed with the acces­sory downflow subbase. This furnace is for installation in alcoves, attics, crawlspaces, basements, closets, or utility rooms. The design of this furnace line is not A.G.A./C.G.A. certified for installation in mobile homes, recreation vehicles, or outdoors.
Before installing the furnace, refer to the current edition of the NFGC. Canadian installations must be installed in accordance NSCNGPIC and all authorities having jurisdiction. For further information, the NFGC is available from National Fire Protection Association Inc. Batterymarch Park, Quincy, MA 02269; Ameri­can Gas Association, 1515 Wilson Boulevard, Arlington, VA 22209; or from Literature Distribution.
Application of this furnace should be indoors with special attention given to vent sizing and material, gas input rate, air temperature rise, and unit sizing. Improper installation or misapplication of the furnace can require excessive servicing or cause premature component failure.
This furnace is designed for a minimum continuous return-air temperature of 60°F db or intermittent operation down to 55°F db such as when used with a night setback thermostat. Return-air temperature must not exceed a maximum of 85°F db.
Improper installation, adjustment, alteration, service, mainte­nance, or use can cause carbon monoxide poisoning, explo­sion, fire, electrical shock, or other conditions which may cause personal injury, loss of life, or property damage. Consult a qualified installer, service agency, local gas sup­plier, or your distributor or branch for information or assis­tance. The qualified installer or agency must use only factory-authorized and listed kits or accessories when modi­fying this product. Failure to follow this warning could result in electrical shock, fire, personal injury, or death.
For accessory installation details, refer to the applicable installa­tion literature.
NOTE: Remove all shipping brackets and materials before oper­ating the furnace.
Step 1—Location
GENERAL
Do not install furnace in a corrosive or contaminated atmo­sphere. Make sure all combustion and circulating air require­ments are followed, in addition to all local codes and ordinances.
Do not use this furnace during construction when adhesives, sealers, and/or new carpets are being installed. If the furnace is required during construction, use clean outside air for combustion and ventilation. Compounds of chlorine and fluorine when burned with combustion air form acids which cause corrosion of the heat exchangers and metal vent system. Some of these compounds are found in paneling and dry wall adhesives, paints, thinners, masonry cleaning materials, and many other solvents commonly used in the construction process.
This furnace must be installed so the electrical components are protected from water.
Locate the furnace as close to the chimney/vent and as near the center of the air distribution system as possible. The furnace should be installed as level as possible.
When a furnace is installed so that the supply ducts carry air to areas outside the space containing the furnace, the return air must also be handled by a duct(s) sealed to the furnace casing and terminating outside the space containing the furnace.
Provide ample space for servicing and cleaning. Always comply with the minimum fire protection clearances shown on the unit rating plate. This furnace shall not be installed directly on carpeting, tile, or any combustible material other than wood flooring. The furnace may be installed on combustible flooring when installed with the accessory downflow subbase, which is available from your distributor or branch when required.
LOCATION RELATIVE TO COOLING EQUIPMENT — The cooling coil must be installed parallel with or on the downstream side of the furnace to avoid condensation in the heat exchangers. When installed parallel with a furnace, dampers or other means used to control the flow of air must prevent chilled air from entering the unit. If the dampers are manually operated, they must be equipped with means to prevent operation of either unit unless the damper is in the full-heat or full-cool position.
HAZARDOUS LOCATIONS — When the furnace is installed in a residential garage, it must be installed so that the burners and ignition source are located at least 18 in. above the floor. The furnace should be protected from physical damage by vehicles.
When a furnace is installed in public garages, airplane hangars, or other buildings having hazardous atmospheres, the unit must be installed in accordance with the recommended good practice requirements of the National Fire Protection Association, Inc.
Step 2—Air For Combustion and Ventilation
Provisions for adequate combustion and ventilation air must be provided in accordance with Section 5.3 of the NFGC, Air for Combustion and Ventilation, or applicable provisions of the local building codes.
Canadian installations must be installed in accordance with NSC­NGPIC and all authorities having jurisdiction.
3
Page 4
Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements are found in aerosol sprays, deter­gents, bleaches, cleaning solvents, salts, air fresheners, and other household products.
The operation of exhaust fans, kitchen ventilation fans, clothes dryers, or fireplaces could create a NEGATIVE PRESSURE CONDITION at the furnace. Make-up air MUST be provided for the ventilation devices, in addition to that required by the furnace.
The requirements for combustion and ventilation air depend upon whether the furnace is located in an unconfined or confined space.
For Example:
58RAV FURNACE
INPUT BTUH
46,000 307 69,000 460
92,000 613 115,000 767 135,000 920
MINIMUM SQ FT
WITH
7-1/2 FT CEILING
If the unconfined space is constructed unusually tight, air for combustion and ventilation MUST come from either the outdoors or spaces freely communicating with the outdoors. Combustion and ventilation openings must be sized the same as for a confined space. A minimum opening with a total of at least 1 sq in. per 5000 Btuh of total input rating for all equipment must be provided. Return air must not be taken from the room unless an equal or greater amount of air is supplied to the room.
CONFINED SPACE — A confined space has volume less than 50 cu ft per 1000 Btuh of the total input ratings of all appliances installed in that space. A confined space MUST have 2 permanent openings, 1 within 12 in. of the ceiling, and the other within 12 in. of the floor. (See Fig. 2.)
NOTE: In determining the free area of an opening, the blocking effect of the louvers, grilles, and screens must be considered. If the free area of a louver or grille design is unknown, assume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area. Screens, when used, must not be smaller than 1/4-in. mesh. Louvers and grilles must be constructed so they cannot be closed.
1. All air from inside the structure: a. Each opening MUST have at least 1 sq in. of free area per
1000 Btuh of the total input for all equipment within the confined space, but not less than 100 sq in. per opening. (See Fig. 2.)
INTERIOR
HEATED
SPACE
SUPPLY AIR
* Minimum opening size is 100 square in. with minimum dimensions of 3-In.
†
Minimum of 3-In. when type B-1 vent is used.
Fig. 2—Air for Combustion and Ventilation
For Example:
58RAV FURNACE
INPUT BTUH
46,000 100 69,000 100
92,000 100 115,000 115 135,000 138
b. If the building is constructed unusually tight, a permanent
opening directly communicating with the outdoors should be provided. This opening should have a minimum free area of 1 sq in. per 5000 Btuh of total input rating for all equipment in the enclosure.
c. If the furnace is installed on a raised platform to provide a
return-air plenum, and return air is taken directly from the hallway or space adjacent to the furnace, all air for combustion must come from outdoors. (See Fig. 3.)
2. All air from outside the structure: a. If combustion air is taken from outdoors through vertical
ducts, the openings and ducts MUST have at least 1 sq in. of free area per 4000 Btuh of the total input for all equipment within the confined space.
b. If combustion air is taken from the outdoors through
horizontal ducts, the openings and ducts MUST have at least 1 sq in. of free area per 2000 Btuh of the total input for all equipment within the confined space.
c. When ducts are used, they must be of the same cross-
sectional area as the free area of the openings to which they connect. The minimum dimension of rectangular ducts must not be less than 3 in. (See Fig. 3.)
4
RETURN
AIR
(Inside Air)
VENT THROUGH ROOF (CATEGORY I)
12″ MAX
1 SQ IN. PER 1000 BTUH* IN DOOR OR WALL
UNCONFINED SPACE
6″ MIN (FRONT)
1 SQ IN. PER 1000 BTUH* IN DOOR OR WALL
FREE AREA PER
OPENING (SQ IN.)
†
12″ MAX
A93387
Page 5
DUCTS TO
OUTDOORS
1 SQ IN. PER 4000 BTUH
*
A
12″ MAX
1 SQ IN. PER 2000 BTUH
*
DUCTS
TO
OUTSIDE
1 SQ IN. PER 2000 BTUH
*
12″ MAX
SUPPLY AIR
Minimum dimensions of 3-In.
*
Use any of the following
NOTE:
combinations of openings: A & B C & D D & E F & G
RETURN
A
B
AIR
D
VENT THROUGH ROOF (CATEGORY I)
CONFINED
E
C
DUCT
TO
OUTDOORS
F
SPACE
G
12″ MAX
1 SQ IN. PER 4000 BTUH
Fig. 3—Air for Combustion and Ventilation
(Outside Air)
12″
MAX
1 SQ IN. PER 4000 BTUH
*
OUTDOORS 1 SQ IN.
PER 4000 BTUH
*
12″
MAX
A93388
HOLE IN
FLOOR
B
A73382
Fig. 4—Floor Opening for Concrete Slab
Table 3—Opening Dimensions (In.)
FURNACE CASING
WIDTH 14-3/16 13-1/8 19-5/8 19-7/16
17-1/2 16-7/16 19-5/8 19-7/16
21 19-7/8 19-5/8 19-7/16
24-1/2 23-7/16 19-5/8 19-7/16
* These dimensions apply when a model CB or CD Evaporator Coil casing is to be installed.
A
Heat-Only Heat/Cool*
B
For Example:
58RAV FURNACE
INPUT BTUH
46,000 11.5 4 69,000 17.3 5
92,000 23.0 6 115,000 28.8 7 135,000 34.5 7
FREE AREA PER
OPENING (SQ IN.)
ROUND PIPE
(IN. DIA)
For Example:
58RAV FURNACE
INPUT BTUH
46,000 23.0 6
69,000 34.3 7
92,000 46.0 8 115,000 57.6 9 135,000 69.0 10
FREE AREA PER
OPENING (SQ IN.)
ROUND PIPE
(IN. DIA)
Step 3—Supply-Air Plenum Installation (Downflow)
INSTALLATION ON A CONCRETE SLAB
1. Construct hole in floor per dimensions in Fig. 4 and Table 3.
2. Install plenum and furnace as shown in Fig. 5.
INSTALLATION ON A COMBUSTIBLE FLOOR
1. Cut and frame hole in floor per dimensions in Installation Instructions packaged with downflow subbase.
FURNACE
PLENUM
A73383
Fig. 5—Furnace on a Concrete Slab
(Non-Garage Installation)
2. When completed, downflow subbase, plenum, and furnace (or coil casing when used) should be installed as shown in Fig. 6.
5
Page 6
FURNACE
(OR COIL CASING
WHEN USED)
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
A78651
Fig. 6—Furnace, Plenum, and Subbase Installed on
a Combustible Floor
Step 4—Horizontal Attic Installation
CONSTRUCT A WORKING PLATFORM
Construct working platform on location where all required furnace clearances are met. (See Table 1 and Fig. 7.)
INSTALL FURNACE
1. Position furnace in desired location.
2. Connect gas supply pipe. See Fig. 7 for typical piping entry.
3. Install field-supplied filter retainers as indicated in Fig. 8 and Table 4 before connecting return-air duct to furnace.
4. Connect supply- and return-air ducts.
5. Install 24- X 24-in. sheet metal shield on platform in front of louvered control panel as shown in Fig. 7.
Step 5—Horizontal Crawlspace Installation
The furnace can be installed horizontally with either the LH or RH side up. In a crawlspace, the furnace can either be hung from the floor joist or installed on suitable blocks or pad. The furnace can be suspended from each corner by hanger bolts (4 each 3/8-in. all-thread rod) cut to desired length, 1- X 3/8-in. flat washer, 3/8-in. lockwasher, and 3/8-in. nut. Dimples are provided for hole locations. (See Fig. 1.)
Since horizontal crawlspace installation is very similar to the attic installation, refer to Step 4. The installation of a sheet metal shield in front of the louvered control panel is covered in Step 4. For a crawlspace installation, this same sheet metal shield must be installed above the louvered control panel. Extend the sheet metal shield over the furnace top far enough to cover the gas pipe entry hole.
Step 6—Filter Arrangement
Do not install the furnace on its back; safety control operation will be adversely affected. Never connect return-air ducts to the sides or back of the furnace. Failure to follow this warning could result in fire, personal injury, or death.
The furnace can be installed horizontally on either the left-hand (LH) or right-hand (RH) side. A typical attic installation is shown in Fig. 7.
LINE CONTACT ONLY PERMISSIBLE BETWEEN LINES FORMED BY INTERSECTIONS OF THE TOP AND TWO SIDES OF THE FURNACE JACKET AND BUILDING JOISTS, STUDS, OR FRAMING.
SHEET METAL
GAS ENTRY
24
Never operate unit without a filter or with filter access door removed. Failure to follow this warning could result in fire, personal injury, or death.
The 2 factory-supplied filters are shipped in the blower compart­ment. After the return-air duct has been connected to the furnace, install the filters in a V-formation inside the return-air plenum. See
FLUE VENT
MIN
″
24
6
″
″
30-IN. MIN WORK AREA
SEDIMENT TRAP
A82178
Fig. 7—Typical Attic Installation
6
Page 7
Fig. 8 and Table 4 for horizontal applications. Horizontal filter



retainers must be field supplied. See Fig. 9 for downflow applica­tions.
AIRFLOW
12″
4″
FIELD-SUPPLIED FILTER RETAINERS
D
A82173
Fig. 8—Horizontal Filter Arrangement
Table 4—Filter Retainer (In.)
FURNACE
CASING WIDTH
14-3/16 (2) 14 X 20 X 1 14-3/8
17-1/2 (2) 14 X 20 X 1 13-3/8
21 (2) 16 X 20 X 1 11-5/8
24-1/2 (2) 16 X 20 X 1 10-1/4
FILTER SIZE
AND QUANTITY
D
Canadian installations must be installed in accordance with NSC­NGPIC and all authorities having jurisdiction.
Table 5—Maximum Capacity of Pipe *
NOMINAL IRON
PIPE SIZE
(IN.)
1/2 0.622 175 120 97 82 73 3/4 0.824 360 250 200 170 151
1 1.049 680 465 375 320 285 1-1/4 1.380 1400 950 770 660 580 1-1/2 1.610 2100 1460 1180 990 900
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref: Table 10-2 NFPA 54/ANSI Z223.1-1992.
If a flexible connector is required or allowed by the authority having jurisdiction, black iron pipe shall be installed at the gas valve and extend a minimum of 2 in. outside the furnace casing.
Use the proper length of pipes to avoid stress on the gas control manifold. Failure to follow this warning could result in a gas leak, causing fire, explosion, personal injury, or death.
INTERNAL
DIAMETER
(IN.)
LENGTH OF PIPE (FT)
10 20 30 40 50
AIRFLOW
INSTALLATION
POSITION
OF FILTERS
RETURN-AIR
PLENUM
ACCESS DOOR
A88486
Fig. 9—Downflow Filter Arrangement
Step 7—Gas Piping
Gas piping must be installed in accordance with national and local codes. Refer to the current edition of the NFGC.
Connect the gas pipe to the furnace using a backup wrench to avoid damaging gas controls.
Never purge a line into a combustion chamber. Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution to check for gas leaks. Failure to follow this warning could result in fire, explosion, personal injury, or death.
Joint compounds (pipe dope) should be applied sparingly and only to the male threads of the joints. This pipe dope must be resistant to the action of propane gas.
Install an accessible manual shut-off valve upstream of the furnace gas controls and within 72 in. of the furnace. A 1/8-in. NPT plugged tapping, accessible for test gage connection, must be installed immediately upstream of the gas supply connection to the furnace and downstream of the manual shut-off valve. Place a ground joint union between the gas control manifold and the manual shut-off.
Install a sediment trap in the riser leading to the furnace. The trap can be installed by connecting a tee to the riser leading from the furnace. Connect a capped nipple into the lower end of the tee. The capped nipple should extend below the level of the gas controls. (See Fig. 10.)
Piping should be pressure tested in accordance with local and national plumbing and gas codes before the furnace has been attached. If the pressure exceeds 0.5 psig (14-in. wc), the gas supply pipe must be disconnected from the furnace and capped before the pressure test. If the test pressure is equal to or less than
7
Page 8
GAS
SUPPLY
MANUAL SHUTOFF VALVE
SEDIMENT TRAP
UNION
A89414
Fig. 10—Typical Gas Pipe Arrangement
0.5 psig (14-in. wc), close the manual shut-off valve located on the gas valve before the test. It is recommended that the ground joint union be loosened before pressure testing.
After all connections have been made, purge the lines and check for gas leakage with regulated gas supply pressure.
Step 8—Electrical Connections
115-V WIRING Refer to the unit rating plate or Table 6 for equipment electrical
requirements. The control system requires an earth ground for proper operation.
Do not connect aluminum wire between disconnect switch and furnace. Use only copper wire.
Make all electrical connections in accordance with the current edition of the National Electrical Code (NEC) ANSI/NFPA 70-1993, and any local codes or ordinances that might apply. For Canadian installations, all electrical connections must be made in accordance with Canadian Electrical Code CSA C22.1, or authori­ties having jurisdiction.
NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control center fault code indicator light will flash rapidly and furnace will not operate.
The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70-1990 and Canadian Elec­trical Code CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur. This may consist of electrical wire or conduit approved for electrical ground when installed in accordance with existing electrical codes. Do not use gas piping as an electrical ground. Failure to follow this warning could result in electrical shock, fire, or death.
24-V WIRING — Make field 24-v connections at the 24-v termi­nal strip. (See Fig. 11.) Connect terminal Y as shown in Fig. 12 for proper operation in cooling mode. Use AWG No. 18 color-coded wire only.
The 24-v circuit contains an automotive-type, 3-amp fuse located on the main control board. Any direct shorts during installation, service, or maintenance could cause this fuse to blow. If fuse replacement is required, use ONLY a 3-amp fuse of identical size.
ACCESSORIES
1. Electronic air cleaner (EAC) Two quick-connect terminals, marked EAC-1 and EAC-2, are
provided for EAC connection. (See Fig. 11.) These terminals are energized with 115v (1.5-amp maximum) during blower motor operation.
2. Humidifier (HUM) Quick-connect terminal (HUM) and screw terminal (Com) are
provided for 24-v humidifier connection. The terminals are energized with 24v (0.5-amp maximum) after inducer motor prepurge period.
NOTE: A field-supplied, 115-v controlled relay connected to EAC terminals may be added if humidifier operation is desired during blower operation.
Step 9—Venting
Refer to the enclosed Installation Instructions, GAMA Venting Tables for Category I Furnaces and Venting Tables for Category I Fan-Assisted Furnaces. The horizontal portion of the venting system shall maintain a minimum of 1/4-in. upward slope per linear ft and it shall be rigidly supported every 5 ft or less with hangers or straps to ensure that there will be no movement after installation.
UNIT SIZE
050-08 115—60—1 127 104 6.6 14 42 15 050-12 115—60—1 127 104 8.1 14 34 15 070-08 115—60—1 127 104 6.7 14 42 15 070-12 115—60—1 127 104 8.4 14 33 15 096-12 115—60—1 127 104 9.2 14 30 15 096-16 115—60—1 127 104 10.2 14 28 15 115-16 115—60—1 127 104 10.1 14 28 15 115-20 115—60—1 127 104 13.3 12 33 20 135-20 115—60—1 127 104 14.3 12 31 20
* Permissible limits of the voltage range at which the unit will operate satisfactorily. † Time-delay fuse is recommended. ‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
VOLTS— HERTZ—
PHASE
OPERATING VOLTAGE RANGE
Maximum* Minimum*
Table 6—Electrical Data
MAXIMUM
UNIT AMPS
8
MINIMUM
WIRE GAGE
MAXIMUM WIRE
LENGTH FT‡
MAXIMUM
FUSE OR HACR-
TYPE CKT BKR
AMPS†
Page 9
GRYW
24-V THERMOSTAT TERMINALS
TEST/TWIN
3-AMP FUSE
115-VAC (L1)
POWER SUPPLY
HOT SURFACE
IGNITOR CONNECTOR
SEC-1
COOL
HEAT
OM
C
HUM
24V
HUMIDIFIER TERMINAL (24-VAC 0.5 AMP MAX)
LED OPERATION & DIAGNOSTIC LIGHT
HARNESS CONNECTOR
24-V TRANSFORMER SEC-2 SPARE-1 BLOWER SPEED
SELECTION TERMINALS SPARE-2
EAC-1 EAC-ELECTRONIC AIR CLEANER
TERMINALS (115-VAC 1.5 AMP MAX) EAC-2
115-VAC (L2) NEUTRAL CONNECTION
INDUCER MOTOR CONNECTOR
Fig. 11—Control Board
A95086
BLK
WHT
GND
115-VOLT FIELD-
SUPPLIED
FUSED
DISCONNECT
THREE-WIRE
BLK
WHT
AUXILIARY J-BOX
FIELD 24-VOLT WIRING FIELD 115-, 208/230-, 460-VOLT WIRING FACTORY 24-VOLT WIRING FACTORY 115-VOLT WIRING
FIVE
WIRE
NOTE 2
WCR GY
THERMOSTAT TERMINALS
FIELD-SUPPLIED FUSED DISCONNECT
HEATING-
ONLY
W
R
GND
CONTROL
BOX
FURNACE
G
C Y
24-VOLT
TERMINAL
BLOCK
NOTE 1
CONDENSING UNIT
TWO WIRE
NOTES: Connect Y-terminal as shown for proper operation.
1.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.
Fig. 12—Heating and Cooling Application Wiring Diagram
GND
208/230- OR 460-VOLT THREE PHASE
208/230- VOLT SINGLE PHASE
A95241
Step 10—Start-up, Adjustment, and Safety Check
GENERAL NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control center fault indicator light will flash rapidly and furnace will not operate.
The furnace must have a 115-v power supply properly connected and grounded. Proper polarity must be maintained for correct operation. Thermostat wire connections at R, W, C, and Y must be made at the 24-v terminal block on the control board. The gas service pressure must not exceed 0.5 psig (14-in. wc), but must be no less than 0.16 psig (4.5-in. wc).
9
Page 10
Before operating the furnace, check each manual reset switch for continuity. If necessary, press the button to reset the switch.
The blower compartment door must be in place to complete the 115-v circuit to the furnace.
This furnace is equipped with 2 manual reset limit switches in the gas control area. The switches will open and shut off power to the gas valve if a flame rollout or an overheating condition occurs in the gas control area. DO NOT bypass the switches. Correct inadequate combustion air supply problem and reset the switches.
SEQUENCE OF OPERATION
Furnace control must be grounded for proper operation or control will lockout. Control is grounded through green wire routed to gas valve and burner bracket screw.
Using the schematic diagram shown in Fig. 13, follow the sequence of operation through the different modes. Read and follow the wiring diagram very carefully.
NOTE: If there is a power interruption and any thermostat call, the control will initiate a 90-sec blower only on period before starting another cycle.
1. Heating mode When the thermostat "calls for heat," R-W circuit closes. The
furnace control performs a self-check, verifies the pressure switch contacts are open, and starts the inducer motor.
a. Prepurge period—As the inducer motor comes up to speed,
the pressure switch contacts close to begin a 15-sec prepurge period.
b. Ignitor warm-up—At the end of the prepurge period, the
ignitor is energized for a 17-sec ignitor warm-up period.
c. Ignition sequence—When the ignitor warm-up period is
completed, the gas valve opens, permitting gas flow to the burners where it is ignited. After 5 sec, the ignitor is de-energized and a 2-sec flame-sensing period begins.
d. HUM terminal is energized with the gas valve. See
Accessories in Electrical Connections section.
e. Flame-sensing—When burner flame is sensed, the control
begins the blower on delay period and continues holding the gas valve open. If burner flame is not sensed, the control closes the gas valve and repeats the ignition cycle.
NOTE: Ignition sequence will repeat 3 additional times before a lockout occurs. Lockout automatically resets after 3 hrs, or can be manually reset by turning 115v off (not at thermostat) for 3 sec minimum, then on again.
f. Blower on delay—Forty sec after burner flame is proven,
the blower motor is energized on heating speed. Simulta­neously, the humidifier and electronic air cleaner terminals (HUM and Com for humidifier, EAC-1 and EAC-2 for electronic air cleaner) are energized.
g. Blower off delay—When the thermostat is satisfied, the
circuit between R and W is broken, de-energizing the gas valve and stopping gas flow to the burners. The blower motor, and EAC remain energized for 135 sec.
h. Post-purge—The inducer motor remains energized 5 sec
after the burners are extinguished.
2. Cooling mode When the thermostat "calls for cooling," R-G and R-Y circuits
close. The R-Y circuit starts the outdoor condensing unit and combined R-Y and R-G circuits start the furnace blower motor on cooling speed. The EAC-1 terminal is energized with 115v whenever the blower is operating on cooling speed.
When the thermostat is satisfied, R-G and R-Y circuits are broken. Furnace blower and EAC continue operating on cooling speed for an additional 90 sec.
3. Continuous blower mode
NOTE: EAC-1 terminal is energized with 115v whenever blower is operating.
When the R-G circuit is made, the blower motor operates on heating speed. During a call for heat, the blower stops, allowing the furnace heat exchangers to heat up more quickly, then restarts at the end of the 40-sec blower on delay period.
The blower reverts to continuous operation after the heating cycle is completed.
When the thermostat "calls for cooling," the blower operates on cooling speed. When the thermostat is satisfied, the blower operates an additional 90 sec before reverting back to con­tinuous operation on heating speed.
4. Heat pump mode When installed with a heat pump, the furnace control auto-
matically changes the timing sequence to avoid long blower off time during demand defrost cycles. When the W-Y or W-Y-G thermostat inputs are received at the same time, the control changes the blower to heating speed or starts the blower if it was off, and begins a heating cycle. The blower remains on until the end of the prepurge period, then shuts off until the end of the ignition warm up and trial for ignition periods (a total of 24 sec). The blower then comes back on at heating speed.
When the W input signal disappears, the control begins the normal inducer post-purge period and the blower changes to cooling speed after a 1-sec delay. If the W-Y-G signals disappear at the same time, the blower remains on for the selected heating blower off delay period and the inducer goes through its normal post-purge period. If the W-Y inputs should disappear, leaving the G signal input, the control goes into continuous blower and the inducer remains on for the normal post-purge period.
Anytime the control senses false flame, the control locks out of the heating mode. This occurs because the control cannot sense the W input due to the false flame signal and, as a result, sees only the Y input and goes into cooling mode blower off delay. All other control functions remain in standard format.
NOTE: EAC-1 terminal is energized whenever blower operates. HUM terminal is only energized when gas valve is energized.
START-UP PROCEDURES
1. Purge gas lines—After all connections have been made, purge the lines and check for leaks.
Never purge a line into a combustion chamber. Never use matches, candles, flame or other sources of ignition to check for gas leakage. Use a soap-and-water solution to check for gas leaks. Failure to follow this warning could result in fire, explosion, personal injury, or death.
2. Component test—The furnace control allows all components, except gas valve, to be run for a short period of time.
10
Page 11
SCHEMATIC DIAGRAM
(NATURAL GAS & PROPANE)
NOTE #4
TO 115VAC FIELD DISCONNECT
NEUTRAL
L1
PRS
ALS
NOTE #12
(WHEN USED)
DSS
GRY
SW2
OFF
BLOWER
NOTE #9
PCB
ORN
EQUIPMENT GROUND
DELAY
W
SW1
L2
ILK
OM
C
(NOT ON ALL MODELS)
LO
MED LO
SPARE-1
YEL
HUM
SELECTION CHART
BLOWER OFF DELAY
START
HI
MED HI
HEAT
SPARE-2
BLU
LED
TEST/TWIN
90 SEC
OL
NOTE #8
HI/LO
BLWR
L1
CAP
COOL
FRS1 FRS2
RED
135 SEC
COM
3-P
1-M
BLWM
COM
1
2
3
PL1
180 SEC
EAC-1
GV
LS
WHT
HSIR
FL
(WHEN USED)
FSE
4 5 6
225 SEC
EAC-2
RED
87 9
2-C
HSI
1
1
GRN
GVR
FL
1.5 AMP
120
PRS
NOTE #11
ALS
LS
(WHEN USED
1
R
RED (LO)
EAC-2
OM
C
2
1
PR1 L1
PL1
4
GVR
HI/LO
BLWR
IDR
HSIR
W
NOTE #4
FUSED DISCONNECT
SWITCH (WHEN REQ’D)
JB
BLK
ILK
WHT
WHT (COM)
WHT BLK
BLK
BLK
WHT
PL5
12
WHT
2-C
(WHEN USED)
GV
DSS
3-P
1-M
2
3
GVR-1
CPU
L1
NEUTRAL
FU2
GRN
WHT
BLK
GRN
IDM
BLK
HSI
IDM
FRS1 FRS2
NOT USED
PL3
1
2
PR2
PL52
PL2
IDR
NOTE #5
WHT
BLK
TRAN
RED
BLU
SEC-2
SEC-1
HI/LO
RELAY
2
3
24VAC
115VAC
TRAN
PR1
GRN
WHT (COM)
BRN
OL
BLK (HI)
YEL (MED HI)
SPARE-1
FUSE
24 VAC-3A
COOL
FU1
SPEED
BLOWER
TEST/TWIN
CAP
START
NOTE #8
SELECT
7
SEC-2
SEC-1
GVR-2
NOTE #6
FU1
HUM
NOTE #12
BRN
BLWM
BLU (MED LO)
SPARE-2
EAC-1
HEAT
L2
PR2 123
PL3
PL2
VAC
HSIR I DR BLWR
8
Y
NOTE #5
FSE
6
5
G
PCB PRINTED CIRCUIT BOARD
PL1 9-CIRCUIT CONNECTOR
PL2 2-CIRCUIT PCB CONNECTOR
ALS AUXILIARY LIMIT SWITCH, OVERTEMP. -MANUAL RESET, SPST-(N.C.)
BLWR BLOWER MOTOR RELAY, SPST-(N.O.)
BLWM BLOWER MOTOR
LEGEND
322869-101 REV. B
NOT USED
NOT USED
9
OM
C
NOTES:
PL3 3-CIRCUIT IDM CONNECTOR
PL5 2-CIRCUIT HSI/PCB CONNEC TOR
PRS PRESSURE SWITCH, SPST-(N.O.)
optimum speed selection.
1. If any of the original equipment wire is replaced use wire rated for 105°C.
2. Inducer (IDM) and blower (BLWM) motors contain internal auto-reset thermal overload switches (OL).
3. Blower motor speed selections are for average conditions, see installation instructions for details on
4. Use only copper wire between the disconnect switch and the furnace junction box (JB).
5. This wire must be connected to furnace sheetmetal for control to detect flame.
JUNCTION
UNMARKED TERMINAL
PCB TERMINAL
FACTORY WIRING (115VAC)
FACTORY WIRING (24VAC)
TEST/TWIN COMPONENT TEST & TWIN TERMINAL
TRAN TRANSFORMER-115VAC/24VAC
(135 seconds only on some models)
after three hours.
6. Replace only with a 3 amp fuse.
7. Yellow lead not on all motors.
8. Blower-on delay, gas heating 45 seconds, cooling or heat pump 2 seconds.
9. Blower-off delay, gas heating 90, 135, 180 or 225 seconds, cooling or heat pump 90 seconds.
FIELD WIRING (115VAC)
FIELD WIRING (24VAC)
CONDUCTOR ON PCB
models only.
10. Ignition-lockout will occur after four consecutive unsuccessful trials-for-ignition. Control will auto-reset
11. When used auxiliary limit switch (ALS) is on downflow models only. When used FL is on upflow
FIELD WIRING TERMINAL
FIELD GROUND
EQUIPMENT GROUND
FIELD SPLICE
PLUG RECEPTACLE
A95335
12. Some models may have spade quick connect terminals.
→ Fig. 13—Unit Wiring Diagram
(FIELD INSTALLED & SUPPLIED)
CAP CAPACITOR
CPU MICROPROCESSOR AND CIRCUITRY
DSS DRAFT SAFEGUARD SWITCH
EAC-1 ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.5 AMP MAX.)
EAC-2 ELECTRONIC AIR CLEANER CONNECTION (COMMON)
FL FUSIBLE LINK
FRS FLAME RO LLOUT SW. -MANUAL RESET, SPST-(N.C.)
FSE FLAME PROVING ELECTRODE
FU1 FUSE, 3 AMP, AUTOMOTIV E BLADE TYPE, FACTORY INSTALLED
FU2 FUSE OR CIRCUIT BREAKER CURRENT INTERR UP T DEVICE
GV GAS VALVE-REDUNDANT OPERATORS
GVR GAS VALVE RELAY, DPST-(N.O.)
HI/LO BLOWER MOTOR SPEED CHANGE RELAY, SPDT
HSI HOT SURFACE IGNITOR (115 VAC )
HSIR HOT SURFACE IGNITOR RELAY, SPST-(N.O.)
HUM 24VAC HUMIDIFIER CONNECTION (.5 AMP. MAX.)
IDM INDUCED DRAFT MOTOR
IDR INDUCED DRAFT RELAY, SPST- (N.O.)
ILK BLOWER ACCESS PANEL INTERLOCK SW I T CH, SPST-(N.O.)
JB JUNCTION BOX
LED LIGHT-EMITTING DIODE FOR STATUS CODES
LGPS LOW GAS PRESSURE SWITCH, SPST-(N.O.)
LS LIMIT SWITCH, AUTO RESET, SPST(N.C.)
OL AUTO-RESET INTERNAL MOTOR OVERLOAD TEMP. SW.
11
Page 12
This feature helps diagnose a system problem in case of a component failure. To initiate component test procedure, short (jumper) the TEST 1/4-in. quick connect terminal on control board (adjacent to diagnostic light) and the Com terminal on thermostat connection block for approximately 2 sec. (See Fig.
11.)
NOTE: Component test feature will not operate if any thermostat signal is present at control center.
Component test sequence is as follows. a. Momentarily jumper TEST and Com terminals until LED
goes off. b. LED will display previous fault 4 times. c. Inducer motor operates for 10 sec, then stops. d. Hot surface ignitor is energized for 15 sec, then de-
energized. e. Blower motor operates on cooling speed for 10 sec, then
stops. f. Blower motor operates on heating speed for 10 sec, then
stops.
3. To operate furnace, follow procedures on operating instruction label attached to furnace.
4. With furnace operating, set thermostat below room tempera­ture and observe that furnace goes off. Set thermostat above room temperature and observe that furnace restarts.
ADJUSTMENTS
1. Set gas input rate. There are 2 methods of adjusting the gas input rate. The
preferred method is by using Table 7 and following instruc­tions in item a. The second method is by clocking the gas meter and following instructions in item b.
The gas valve regulator has been nominally set at 3.5-in. wc for natural gas. When adjusting input rate, do not set manifold pressure above 3.8-in. wc or below 3.2-in. wc.
a. Check gas input rate using Table 7.
(1.) Obtain average yearly heat value for local gas supply. (2.) Obtain average yearly specific gravity for local gas
supply.
(3.) Verify furnace model. Table 7 can only be used for
model 58RAV Furnaces.
(4.) Check and verify orifice size in furnace. NEVER
ASSUME THE ORIFICE SIZE. ALWAYS CHECK AND VERIFY.
DO NOT redrill burner orifices. Improper drilling (burrs, out-of-round holes, etc.) can cause excessive burner noise and misdirection of burner flames. This can result in flame impingement of the burners and heat exchangers, causing failure.
(5.) Find natural gas heat value and specific gravity in
Table 7.
(6.) Follow heat value and specific gravity lines to point of
intersection. Find orifice size and manifold pressure settings for proper operation at given natural gas conditions.
EXAMPLE: Heat value 1070 Btu/cu ft Specific gravity 0.58 Therefore; Orifice No. 44 *
Manifold pressure 3.6-in. wc * The furnace is shipped with No. 43 orifices. Therefore, in this example all main burner orifices must be changed and the manifold pressure must be adjusted.
(7.) Proceed to item c to adjust manifold pressure.
b. Check gas input rate by clocking gas meter.
(1.) Obtain average yearly heat value for local gas supply. (2.) Check and verify orifice size in furnace. NEVER
ASSUME THE ORIFICE SIZE. ALWAYS CHECK
AND VERIFY. (3.) Turn off all other gas appliances and pilots. (4.) Start furnace and let run for 3 minutes. (5.) Measure time (in sec) for gas meter to complete 1
revolution. (6.) Refer to Table 8 for cu ft of gas per hr. (7.) Multiply gas rate (cu ft/hr) by heating value (Btu/cu
ft).
EXAMPLE: Btu heating input = Btu/cu ft X cu ft/hr Heating value of gas = 1070 Btu/cu ft Time for 1 revolution of 2-cu ft dial = 72 sec Gas rate = 100 X 1070 = 107,000 Btuh
(8.) Check to make sure that measured gas input does not
exceed gas input on unit rating plate. (9.) Proceed to item c to adjust manifold pressure.
c. Adjust gas input.
(1.) Remove regulator adjustment seal cap. (See Fig. 14.) (2.) Turn adjusting screw counterclockwise to decrease
input. Turn screw clockwise to increase input. DO NOT set manifold pressure less than 3.2-in. wc or more than 3.8-in. wc for natural gas. Make any major adjustments by changing main burner orifices.
(3.) When correct input is obtained, replace regulator
adjustment seal cap. Main burner flame should be clear blue, almost transparent. (See Fig. 15.)
d. High altitude—In the United States, gas input on unit rating
plate is for altitudes up to 2000 ft. Ratings for altitudes over 2000 ft must be 4 percent less for each 1000 ft above sea level. To obtain the adjusted altitude rating, adjust the manifold pressure, item c, and replace the main burner orifices as needed. Refer to NFGC Appendix F, Table F-4 for proper orifice sizing at high altitudes.
e. Canadian installations only—The Canadian ratings are
approved for altitudes up to 2000 ft for natural and propane gases. High-altitude ratings are from 2000 ft to 4500 ft above sea level. See Table 9 for nominal burner orifice size. High-altitude input ratings include a 10 percent derated as required by Canadian standards.
2. Set temperature rise. Furnace must operate within range of temperature rise speci-
fied on the unit rating plate. Determine the air temperature rise as follows.
12
Page 13
Table 7—Model 58RAV Orifice Size and Manifold Pressure for Correct Input Rate*
(Tabulated Data Based on Altitude Up to 2000 ft and 23,000 Btuh Per Burner)
SPECIFIC GRAVITY OF NATURAL GAS
GAS HEAT VALUE
(BTU/CU FT)
860
875
890
905
920
935
950
965
980
995
1010
1025
1035
1055
1070
1085
1100
*For size 135-20 only, deduct 0.1-in. wc from manifold pressure shown in table due to 22,500 Btuh per burner input. If resultant manifold pressure falls below 3.2-in. wc, change orifice size.
0.56 0.58 0.60 0.62 0.64 0.66 0.68 0.70 0.72
Orf
Mnfld
Orf
Mnfld
Orf
Mnfld
Orf
Mnfld
Orf
Mnfld
Orf
Mnfld
Orf
Mnfld
Orf
No.
Press.
40 41
—
— 41 42
— 41 42
—
— 42
—
— 42
42
—
— 42
—
—
— 43
—
— 43
—
— 43
—
— 43
—
— 43 44
— 43 44
—
— 44
—
— 44
—44—
—44—
No.
Press.
3.2
40 41 39
40 41
41 42
41 42
42 42
42
42
43
43
43
43
43 44
43 44
44
3.3
3.6 —
3.2
3.5
—
—
—
—
3.4
3.7
—
—
3.2
3.6
—
—
—
—
3.5
3.4
—
—
—
—
3.3
—
—
—
—
3.2
—
—
—
—
—
—
3.7
—
—
—
—
3.6
—
—
—
—
3.5
—
—
—
—
3.4
—
—
—
—
3.3
3.8
—
—
3.2
3.7
—
—
—
—
3.6
3.5 —
—
3.3
3.7 —
3.2
3.6 —
—
3.5 —
—
3.4
3.3 — —
3.2 — —
—
3.7 —
—
3.6 —
—
3.5 —
—
3.4 —
—
3.3
3.8 —
3.2
3.7 —
—
3.6 —
—
3.5
3.4—44—3.54344
3.3—44—3.4—44—3.54344
No.
40 41 39
40 41 —
40 41 —
— 41 42
— 41 42
42 — —
42 — —
42 — —
42 — —
— 43 —
— 43 —
— 43 —
— 43 —
— 43 44
— 43 44
Press.
3.4
3.7
3.2
3.3
3.6 —
3.2
3.5 —
—
3.4
3.7 —
3.2
3.6
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
3.8 —
—
3.6 —
—
3.5 —
—
3.4 —
—
3.3
3.8 —
3.3
3.7
3.2
3.64344
No.
40 41 39
40 41 39
40 41
—
40 41
—
— 41 42
42
— 41
42
—
— 42
—
— 42
—
— 42
—
—
— 43
—
— 43
—
— 43
—
— 43
—
— 43 44
Press.
3.5
3.8
3.3
3.4
3.7
3.2
3.3
3.6 —
3.2
3.5 —
—
3.4
3.7
3.6 —
3.2
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
3.6 —
—
3.7 —
—
3.6 —
—
3.5 —
—
3.4
3.8
3.3
3.743—
3.2
3.64344
No.
Press.
40 38 39
40 41 39
40 41 39
40 41
—
40 41 42
42
—
41 42
—
41 42
— —
42
— —
42
— —
42
— —
—
43
— —
43
— —
43
— —
43
—
No.
Press.
No.
Press.
3.7
40
3.8
—
3.2
38
3.4
3.5
3.8
3.3
3.4
3.7
3.2
3.3
3.6 —
3.2
3.5
3.8
3.7 —
3.4
3.6 —
3.2
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
3.8 —
—
3.7 —
—
3.6 —
—
3.5 —
3.4—43—3.5—43—3.6—43—3.7—43—3.8
3.3
3.743—
3.3
39
3.5
40
3.6
38
3.2
39
3.4
40
3.5
41
3.8
39
3.3
40
3.4
41
3.7
39
3.2
40
3.3
41
3.6
—
—
42
3.8
40
3.2
41
3.5
42
3.7
—
—
41
3.3
42
3.6
—
—
41
3.2
42
3.5
—
—
—
—
42
3.4
—
—
—
—
42
3.3
—
—
—
—
42
3.2
—
—
—
—
—
—
43
3.8
—
—
—
—
43
3.7
—
—
—
—
43
3.6
—
—
3.4—43—3.5—43—3.6—43—3.7
38 39
40 38 39
40 — 39
40 41 39
40 41 39
— 40 41
42 40 41
42 — 41
42 — 41
42
— —
42
— —
42
— —
42
— —
—
43
—
— 43 —
—
3.4
3.6
3.8
3.3
3.5
3.6 —
3.4
3.5
3.8
3.3
3.4
3.7
3.2 —
3.3
3.6
3.8
3.2
3.5
3.7 —
3.3
3.6 —
3.2
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
3.8 —
—
3.7 —
No.
37 38 39
— 38 39
40 38 39
40
— 39
40 41 39
39 40 41
— 40 41
42 40 41
42
— 41
42
—
41
42
—
—
42
—
—
42
—
—
42
—
—
— 43
—
Mnfld
Press.
3.2
3.5
3.8 —
3.4
3.6
3.7
3.2
3.5
3.6 —
3.4
3.5
3.8
3.3
3.2
3.4
3.7 —
3.3
3.6
3.8
3.2
3.4
3.7 —
3.3
3.6 —
3.2
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
3.8 —
Orf No.
37 38 —
— 38 39
40 38 39
40 38 39
40 — 39
39 40 41
39 40 41
— 40 41
42 44 41
42 — 41
42 — 41
42 — —
42 — —
42 — —
42 — —
Mnfld
Press.
3.2
3.6 —
—
3.4
3.7
3.8
3.3
3.6
3.7
3.2
3.5
3.6 —
3.4
3.3
3.5
3.8
3.2
3.4
3.7 —
3.3
3.5
3.8
3.2
3.4
3.7 —
3.3
3.6 —
3.2
3.5 — —
3.4 — —
3.3 — —
3.2 — —
—
—
a. Place duct thermometers in return and supply ducts as near
furnace as possible. Be sure thermometers do not "see" heat exchangers so that radiant heat does not affect thermometer readings. This is particularly important with straight-run ducts.
b. When thermometer readings stabilize, subtract return-air
temperature from supply-air temperature to determine tem­perature rise.
c. Adjust air temperature rise by adjusting blower speed.
Increase blower speed to reduce temperature rise. Decrease blower speed to increase temperature rise.
Disconnect the electrical power before changing the speed tap. Failure to follow this warning could result in personal injury.
d. To change blower motor speed selections for heating mode,
remove blower motor lead from control board HEAT terminal. (See Fig. 11.) Select desired blower motor speed lead from 1 of the other terminals and relocate it to HEAT terminal. See Table 10 for lead color identification. Recon­nect original lead on SPARE terminal.
Follow this same procedure for proper selection of COOL speed selection.
13
Page 14
SECONDS
FOR 1
REVOLUTION
10 11 12 13 14
15 16 17 18 19
20 21 22 23 24
25 26 27 28 29
30 31 32 33 34
35 36 37 38 39
40 41 42 43 44
45 46 47 48 49
Table 8—Gas Rate (Cu Ft/Hr)
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
360
720 655 600 555 514
480 450 424 400 379
360 343 327 313 300
288 277 267 257 248
240 232 225 218 212
206 200 195 189 185
180 176 172 167 164
160 157 153 150 147
1800 1636 1500 1385 1286
1200 1125 1059 1000
947 900
857 818 783 750
720 692 667 643 621
600 581 563 545 529
514 500 486 474 462
450 439 429 419 409
400 391 383 375 367
327 300 277 257
240 225 212 200 189
180 171 164 157 150
144 138 133 129 124
120 116 113 109 106
103 100
97 95 92
90 88 86 84 82
80 78 76 75 73
SECONDS
FOR 1
REVOLUTION
50 51 52 53 54
55 56 57 58 59
60 62 64 66 68
70 72 74 76 78
80 82 84 86 88
90 92 94 96 98
100 102 104 106 108
110 112 116 120
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
72
144 141 138 136 133
131 129 126 124 122
120 116 112 109 106
103 100
97 95 92
90 88 86 84 82
80 78 76 75 74
72 71 69 68 67
65 64 62 60
360 355 346 340 333
327 321 316 310 305
300 290 281 273 265
257 250 243 237 231
225 220 214 209 205
200 196 192 188 184
180 178 173 170 167
164 161 155 150
71 69 68 67
65 64 63 62 61
60 58 56 54 53
51 50 48 47 46
45 44 43 42 41
40 39 38 38 37
36 35 35 34 33
33 32 31 30
BURNER FLAME
BURNER
MANIFOLD
Fig. 15—Burner Flame
Table 9—Canadian Orifice Size
GAS
SEA LEVEL 0-2000
FT
Natural 43 44
Propane 54 55
HIGH ALTITUDE
2000-4500 FT
Table 10—Speed Selector
COLOR SPEED
Black High COOL
Yellow
(When present)
Medium-High SPARE
Blue Medium-Low HEAT
Red Low SPARE
White Common COM
FACTORY
ATTACHED TO
A89020
CONTROL KNOB
OFF
INLET PRESSURE TAP
MANIFOLD PRESSURE TAP
GAS PRESSURE REGULATOR ADJUSTMENT
A90044
Fig. 14—Redundant Automatic Gas Control Valve
Recheck temperature rise. It must be within limits specified on unit rating plate. Recommended operation is at midpoint of rise or above.
3. Set thermostat heat anticipator. The thermostat heat anticipation must be set to match the amp
draw of the electrical components in the R-W circuit. Accurate amp draw readings can be obtained at thermostat subbase terminals R and W. Fig. 16 illustrates an easy method of obtaining the actual amp draw. The amp reading should be taken after the blower motor has started. See the thermostat manufacturer’s instructions for adjusting the heat anticipator and for varying the heating cycle length.
NOTE: When using an electronic thermostat, set cycle rate for 3 cycles per hr.
CHECK SAFETY CONTROLS The flame sensor, gas valve, and pressure switch were all checked
in the Start-Up Procedures section as part of normal operation.
1. Check primary limit control. This control shuts off the combustion control system and
energizes the circulating-air blower motor if the furnace overheats.
The preferred method of checking the limit control is to gradually block off the return air after the furnace has been operating for a period of at least 5 minutes. As soon as the limit has shut off the burners, the return-air opening should be unblocked. By using this method to check the limit control, it can be established that the limit is functioning properly and operates if there is a motor failure.
2. Check draft safeguard switch. The purpose of this control is to permit the safe shutdown of
the furnace during certain blocked vent conditions.
14
Page 15
THERMOSTAT SUBBASE TERMINALS WITH THERMOSTAT REMOVED
HOOK-AROUND
VOLT/AMMETER
R Y W G
10 TURNS
FROM UNIT 24-VOLT TERMINAL BLOCK
EXAMPLE:
5.0 AMPS ON AMMETER 10 TURNS AROUND JAWS
= 0.5 AMPS FOR THERMOSTAT SETTING
Fig. 16—Amp Draw Check With Ammeter
a. Disconnect power to furnace and remove vent connector
from furnace outlet collar. Be sure to allow time for vent pipe to cool down before removing.
b. Restore power to furnace and set room thermostat above
room temperature.
c. After normal start-up, allow furnace to operate for 2
minutes, then block flue outlet 100 percent. Furnace should cycle off within 2 minutes.
d. Remove blockage and reconnect vent pipe to furnace outlet
collar.
e. Wait 5 minutes and then reset draft safeguard switch.
3. Check pressure switch. This control proves operation of draft inducer blower.
a. Turn off 115-v power to furnace. b. Remove control door and disconnect inducer motor lead
wires from wire harness.
A80201
c. Turn on 115-v power to furnace. d. Set thermostat to "call for heat" and wait 1 minute. When
pressure switch is functioning properly, hot surface ignitor should NOT glow and control center diagnostic light flashes a 31 fault. If hot surface ignitor glows when inducer motor is disconnected, shut down furnace immediately. Determine reason pressure switch did not function properly
and correct condition. e. Turn off 115-v power to furnace. f. Reconnect inducer motor wires, replace control door, and
turn on 115-v power to furnace.
4. Check auxiliary limits (when used). a. Turn off 115-v power to furnace. b. Remove blower access door. c. Disconnect red motor lead at blower speed selector. Mark
terminal for proper re-connection. d. Replace blower access door. e. Turn on 115-v power to furnace. Be sure room thermostat
is calling for heat. f. Allow furnace to operate until auxiliary limit activates, but
DO NOT operate furnace longer than 4 minutes.
g. If furnace operates for 4 minutes, check/replace limit
switch(es). h. Turn off 115-v power to furnace. i. Remove blower access door. j. Reconnect red motor lead, reset switch, and replace door. k. Turn on 115-v power to furnace.
CHECKLIST
1. Put away tools, instruments, and clean up debris.
2. Verify manual reset switches have continuity.
3. Ensure blower and control access doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instruc­tions.
6. Review User’s Manual with owner.
7. Leave literature packet near furnace.
15
Page 16
SERVICE TRAINING
Packaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, including:  • Unit Familiarization • Maintenance  • Installation Overview • Operating Sequence A large selection of product, theory, and skills programs is available, using popular video-based formats and materials. All include video and/or slides, plus companion book.  Classroom Service Training plus "hands-on" the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting, fewer callbacks. Course descriptions and schedules are in our catalog. 
CALL FOR FREE CATALOG 1-800-962-9212
[ ] Packaged Service Training [ ] Classroom Service Training
A94328
Copyright 1995 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231 58ra10si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4 Tab 6a 8a
PC 101 Catalog No. 565-863 Printed in U.S.A. Form 58RA-10SI Pg 16 8-95 Replaces: 58RA-9SI
Loading...