Installing and servicing heating equipment can be hazardous due to
gas and electrical components. Only trained and qualified personnel should install, repair, or service heating equipment.
REGISTERED QUALITY SYSTEM
Untrained personnel can perform basic maintenance functions
such as cleaning and replacing air filters. All other operations must
be performed by trained service personnel. When working on
heating equipment, observe precautions in the literature, on tags,
and on labels attached to or shipped with the unit and other safety
precautions that may apply.
In the United States, follow all safety codes including the National
Fuel Gas Code (NFGC) NFPA 54-1999/ANSI Z223.1-1999 and
the Installation Standards, Warm Air Heating and Air Conditioning Systems (NFPA 90B) ANSI/NFPA 90B.
In Canada, refer to the CAN/CGA-B149.1- and .2-M95 National
Standard of Canada, Natural Gas and Propane Installation Codes
(NSCNGPIC).
Wear safety glasses and work gloves. Have fire extinguisher
available during start-up and adjustment procedures and service
calls.
Recognize safety information. This is the safety-alert symbol
When you see this symbol on the unit and in instructions or
manuals, be alert to the potential for personal injury.
Understand the signal words DANGER, WARNING, CAUTION,
and NOTE. These words are used with the safety-alert symbol.
DANGER identifies the most serious hazards which will result in
severe personal injury or death. WARNING signifies a hazard
which could result in personal injury or death. CAUTION is used
to identify unsafe practices which would result in minor personal
injury or product and property damage. NOTE is used to highlight
suggestions which will result in enhanced installation, reliability,
or operation.
These instructions cover minimum requirements and conform to
existing national standards and safety codes. In some instances,
these instructions exceed certain local codes and ordinances,
especially those that may not have kept up with changing residential construction practices. We require these instructions as a
minimum for a safe installation.
ama
58RAV
CERTIFIED
.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101Catalog No. 535-767Printed in U.S.A.Form 58RA-16SIPg 110-00Replaces: 58RA-14SI
Page 2
13
⁄16″
39 7⁄8″
11
⁄16″
28 1⁄2″
″
20
INLET
7
⁄8″
ACCESSORY
3
⁄4″
1
GAS ENTRY
NOTE:
DIA
DIA HOLE
OUTLET
″
19
ADDITIONAL 7⁄8″
LOCATED IN THE TOP PLATE
AND BOTTOM PLATE
VENT CONNECTION
13
⁄16″
1
⁄8″
9
1
⁄4″
10
1
⁄16″
1
1
⁄8″
2
1
⁄4″
8
11
⁄16″
DIA K.O. ARE
D
E
A
AIRFLOW
1
⁄2″
″
2
4 3⁄16″
15
⁄16″
2
1
⁄16″
16
5
⁄16″
13
1
⁄4″
10
11
⁄16″
DIMPLES TO DRILL HOLES
FOR HANGER BOLTS (4 PLACES)
IN HORIZONTAL POSITION
THERMOSTAT
WIRE ENTRY
7
⁄8″
DIA
ACCESSORY
7
⁄8″
DIA HOLE
POWER ENTRY
1 1⁄2″
DIA
R.H. GAS ENTRY
7
⁄8″
DIA
ACCESSORY
1
⁄16″
1
1
⁄8″
2
DIA
1″ TYP
5
⁄8″
TYP
NOTES:
1. Two additional 7⁄8-in. dia holes are located in the top plate.
2. Minimum return-air openings at furnace, based on metal duct. If flex duct is used,
see flex duct manufacturer's recommendations for equivalent diameters.
a. For 800 CFM–16-in. round or 141⁄2 x 12-in. rectangle.
b. For 1200 CFM–20-in. round or 141⁄2 x 191⁄2-in. rectangle.
c. For 1600 CFM–22-in. round or 141⁄2 x 231⁄4-in. rectangle.
d. For airflow requirements above 1800 CFM, must use entire return air opening.
3. After touching the chassis you may proceed to service the
control or connecting wires as long as you do nothing that
recharges your body with static electricity (for example; DO
NOT move or shuffle your feet, DO NOT touch ungrounded
Electrostatic discharge can affect electronic components.
Take precautions during furnace installation and servicing to
protect the furnace electronic control. Precautions will prevent electrostatic discharges from personnel and hand tools
which are held during the procedure. These precautions will
help to avoid exposing the control to electrostatic discharge
by putting the furnace, the control, and the person at the same
electrostatic potential.
objects, etc.).
4. If you touch ungrounded objects (recharge your body with
static electricity), firmly touch furnace again before touching
control or wires.
5. Use this procedure for installed and uninstalled (ungrounded)
furnaces.
6. Before removing a new control from its container, discharge
your body’s electrostatic charge to ground to protect the
1. Disconnect all power to the furnace. DO NOT TOUCH THE
CONTROL OR ANY WIRE CONNECTED TO THE CONTROL PRIOR TO DISCHARGING YOUR BODY’S ELECTROSTATIC CHARGE TO GROUND.
2. Firmly touch a clean, unpainted, metal surface of the furnace
chassis which is close to the control. Tools held in a person’s
hand during grounding will be satisfactorily discharged.
control from damage. If the control is to be installed in a
furnace, follow items 1 through 5 before bringing the control
or yourself into contact with the furnace. Put all used AND
new controls into containers before touching ungrounded
objects.
7. An ESD service kit (available from commercial sources) may
also be used to prevent ESD damage.
2
A99109
Page 3
MINIMUM INCHES CLEARANCE TO COMBUSTIBLE CONSTRUCTION
This forced air furnace is equipped for use with natural
gas at altitudes0-10,000 ft (0-3,050m).
An accessory kit, supplied by the manufacturer,shall be
used to convert to propane gas use or m ay be req uired for
somenatural gas applicatio ns.
This furnace is for indoor installation in a building
constructedonsite.
This furnace may be installed on combustible flooring in
alcove or closet at minimum clearance from comb ustible
material.
This furnace may be used with a Type B-1 Vent and may
be ventedin commonwithother gas-fired appliances.
For installation on non-combustiblefloorsonly.
†
For installation on combustibleflooring only when
installedon special base, Part No. KGASB0201ALL,
Coil Assembly, Part No. CD5 or CK5,or Coil Casing,
Part No. KCAKC.
For furnaces wider than 14.25 inches (362mm) may
#
be 0 inches.
18 inchesfront clearance requiredfor alcove.
Ø
Indicates supplyor returnsides when furnace is in
*
the horizontal position. Linecontact only permissible
betweenlinesformed by intersectionsof the Top and
two Sides of the furnace jacket, andbuildingjoists,
studs or framing.
For single wall vent type 6 inches.
##
For Type B-1vent type3 inches.
††
Clearance toBack 0 inches indownflow and
horizontal (attic/alcove & crawlspace) positionsand
3 inches in horizontalcloset positions.
Fig. 2—Clearances to Combustibles
This f ur nace is approved for DOWNFLOWand HORIZONTAL
installations.
Clearance arrows
do not change with
furnace orientati on.
0"
†
†
B
A
C
K
E
D
I
S
1" #
*
Clearance in inches
1"
TOP / PLENUM
E
C
A
N
R
U
F
†
T
N
O
R
F
S
F
R
O
N
T
##
Ø
BOTTOM
#
"
1
1"
#
E
*
D
I
S
E
R
V
I
C
E
30"
Vent Clearanceto combustibles:
For Single Wall vents 6 inches.
For Type B-1 vent type 1 inch .
322286-101REV.F (LIT)
MIN
A99262
INTRODUCTION
The model 58RAV Series 170 and 180 Furnaces are available in
sizes 46,000 through 135,000 Btuh input capacities.
The design of the downflow/horizontal gas-fired furnace is CSA
(A.G.A. and C.G.A.) certified for natural and propane gases and
for installation on noncombustible flooring. The furnace is factoryshipped for use with natural gas. A factory accessory gas conversion kit, as listed on the furnace rating plate is required to convert
furnace for use with propane gas.
These furnaces SHALL NOT be installed directly on carpeting,
tile, or any other combustible material other than wood flooring. In
downflow installations, a factory accessory floor base, as listed on
the furnace rating plate MUST be used when installed on combustible materials and wood flooring. A factory floor base is not
required when this furnace is installed on manufacturer’s Coil
Assembly Part No. CD5 or CK5, or when Coil Box Part No.
KCAKC is used. This furnace is for installation in alcoves, attics,
crawlspaces, basements, closets, or utility rooms. The design of
this furnace line is not CSA (A.G.A. and C.G.A.) certified for
installation in mobile homes, recreation vehicles, or outdoors.
Before installing the furnace in the United States, refer to the
current edition of the NFGC and the NFPA 90B. For copies of the
NFGC and NFPA 90B, contact the National Fire Protection
Association Inc., Batterymarch Park, Quincy, MA 02269; or for
only the NFGC contact the American Gas Association, 400 N.
Capitol St., NW, Washington DC 20001.
Before installing the furnace in Canada, refer to the NSCNGPIC.
For a copy of the NSCNGPIC, contact Standard Sales, CSA
International, 178 Rexdale Boulevard, Etobicoke (Toronto), Ontario, M9W 1R3, Canada.
Installation must comply with regulations of serving gas supplier
and local building, heating, plumbing or other codes in effect in the
area in which installation is made. In absence of local building
codes, installation must comply with NFGC in the United States
and the NSCNGPIC and all authorities having jurisdiction in
Canada.
These instructions cover minimum requirements for a safe installation and conform to existing national standards and safety codes.
In some instances, these instructions exceed certain local codes
and ordinances, especially those that may not have kept pace with
changing residential construction practices. We require these
instructions as a minimum for a safe installation.
Application of this furnace should be indoors with special
attention given to vent sizing and material, gas input rate, air
temperature rise, and unit sizing. Improper installation or
misapplication of the furnace can require excessive servicing
or cause premature component failure.
This furnace is designed for a minimum continuous return-air
temperature of 60°F db or intermittent operation down to 55°F db
such as when used with a night setback thermostat. Return-air
temperature must not exceed a maximum of 85°F db.
3
Page 4
FRONT
°F°F
RETURN
AIR
MAX 85°F MIN 55°F
A99075
Improper installation, adjustment, alteration, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may
cause personal injury, loss of life, or property damage.
Consult a qualified installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified installer or agency must use only
factory-authorized and listed kits or accessories when modifying this product. Failure to follow this warning could result
in electrical shock, fire, personal injury, or death.
Locate the furnace as close to the chimney/vent and as near the
center of the air distribution system as possible. The furnace
should be installed as level as possible.
Provide ample space for servicing and cleaning. Always comply
with the minimum fire protection clearances shown on the unit
rating plate. This furnace shall not be installed directly on
carpeting, tile, or any combustible material other than wood
flooring. The furnace may be installed on combustible flooring
when installed with the accessory downflow subbase, which is
available from your distributor or branch when required.
LOCATION RELATIVE TO COOLING EQUIPMENT — The
cooling coil must be installed parallel with or on the downstream
side of the furnace to avoid condensation in the heat exchangers.
When installed parallel with a furnace, dampers or other means
used to control the flow of air must prevent chilled air from
entering the unit. If the dampers are manually operated, they must
be equipped with means to prevent operation of either unit unless
the damper is in the full-heat or full-cool position.
HAZARDOUS LOCATIONS
For accessory installation details, refer to the applicable installation literature.
NOTE: Remove all shipping brackets and materials before operating the furnace.
Step 1—Location
GENERAL
Do not install furnace in a corrosive or contaminated atmosphere. Make sure all combustion and circulating air requirements are followed, in addition to all local codes and
ordinances.
Do not use this furnace during construction when adhesives,
sealers, and/or new carpets are being installed. If the furnace
is required during construction, use clean outside air for
combustion and ventilation. Compounds of chlorine and
fluorine when burned with combustion air form acids which
cause corrosion of the heat exchangers and metal vent system.
Some of these compounds are found in paneling and dry wall
adhesives, paints, thinners, masonry cleaning materials, and
many other solvents commonly used in the construction
process.
Excessive exposure to contaminated combustion air will
result in safety and performance related problems.
This furnace must be installed so the electrical components are
protected from water.
18-IN. MINIMUM
TO BURNERS
When furnace is installed in a residential garage, it must be
installed so that burners and ignition sources are located a
minimum of 18 in. above floor. The furnace must be located
or protected to avoid physical damage by vehicles. When
furnace is installed in a public garage, airplane hangar, or
other building having a hazardous atmosphere, unit must be
installed in accordance with requirements of National Fire
Protection Association, Inc.
Step 2—Air For Combustion and Ventilation
Provisions for adequate combustion and ventilation air must be
provided in accordance with Section 5.3 of the NFGC, Air for
Combustion and Ventilation, or applicable provisions of the local
building codes.
Canadian installations must be installed in accordance with NSCNGPIC and all authorities having jurisdiction.
Air for combustion must not be contaminated by halogen
compounds, which include fluoride, chloride, bromide, and
iodide. These elements are found in aerosol sprays, detergents, bleaches, cleaning solvents, salts, air fresheners, and
other household products.
4
A93044
Page 5
The operation of exhaust fans, kitchen ventilation fans,
clothes dryers, or fireplaces could create a NEGATIVE
PRESSURE CONDITION at the furnace. Make-up air MUST
be provided for the ventilation devices, in addition to that
required by the furnace.
All fuel-burning equipment must be supplied with air for combustion of the fuel. Sufficient air MUST be provided to ensure there
will not be a negative pressure in the equipment room or space. In
addition, a positive seal MUST be made between the furnace
cabinet and the return-air duct to avoid pulling air from the burner
area and blocked vent safeguard opening.
The requirements for combustion and ventilation air depend upon
whether the furnace is located in an unconfined or confined space.
UNCONFINED SPACE — An unconfined space must have at
least 50 cu ft for each 1000 Btuh of input for all the appliances
(such as furnaces, clothes dryer, water heaters, etc.) in the space.
If the unconfined space is of unusually tight construction, air for
combustion and ventilation MUST come from either the outdoors
or spaces freely communicating with the outdoors. Combustion
and ventilation openings must be sized the same as for a confined
space as defined below. Return air must not be taken from the
room unless an equal or greater amount of air is supplied to the
room.
For Example:
58RAV FURNACE
INPUT BTUH
46,000307
69,000460
92,000613
115,000767
135,000920
MINIMUM SQ FT
WITH
7-1/2 FT CEILING
CONFINED SPACE
A confined space is defined as a space whose volume is less than
50 cu ft per 1000 Btuh of total input ratings of all appliances
installed in that space. A confined space MUST have provisions
for supplying air for combustion, ventilation, and dilution of flue
gases using 1 of the following methods. (See Fig. 3, 4, and Table
2.)
NOTE: In determining free area of an opening, the blocking
effect of louvers, grilles, and screens must be considered. If free
area of louver or grille design is unknown, assume that wood
louvers have a 20 percent free area and metal louvers or grilles
have a 60 percent free area. Screens, when used, must not be
smaller than 1/4-in. mesh. Louvers and grilles must be constructed
so they cannot be closed.
The size of the openings depends upon whether air comes from
outside of the structure or an unconfined space inside the structure.
1. All air from inside the structure requires 2 openings (for
structures not usually tight):
a. Each opening MUST have at least 1 sq in. of free area per
1000 Btuh of total input for all equipment within the
confined space, but not less than 100 sq in. per opening.
(See Fig. 3 and Table 2.) The minimum dimension of air
openings shall not be less than 3 in.
b. If building is constructed unusually tight, a permanent
opening directly communicating with the outdoors shall be
provided. See item 2 below.
c. If furnace is installed on a raised platform to provide a
return-air plenum, and return air is taken directly from
hallway or space adjacent to furnace, all air for combustion
must come from outdoors.
2. Air from outside the structure requires 1 of the following
methods:
a. If combustion air is taken from outdoors through 2 vertical
ducts, the openings and ducts MUST have at least 1 sq in.
of free area per 4000 Btuh of total input for all equipment
within the confined space. (See Fig. 4 and Table 2.)
b. If combustion air is taken from outdoors through 2 hori-
zontal ducts, the openings and ducts MUST have at least 1
sq in. of free area per 2000 Btuh of total input for all
equipment within the confined space. (See Fig. 4 and Table
2.)
c. If combustion air is taken from outdoors through a single
opening or duct (horizontal or vertical) commencing within
12 in. of the top of the confined space, opening and duct
MUST have at least 1 sq in. of free area per 3000 Btuh of
the total input for all equipment within the confined space
and not less than the sum of the areas of all vent connectors
in the confined space. (See Fig. 4 and Table 2.) Equipment
clearances to the structure shall be at least 1 in. from the
sides and back and 6 in. from the front of the appliances.
When ducts are used, they must be of the same cross-sectional area
as the free area of the openings to which they connect. The
minimum dimension of ducts must not be less than 3 in. (See Fig.
4.)
AIR DUCTS
Never connect return-air ducts to the side or back of the
furnace. A failure to follow this warning can cause a fire,
personal injury, or death.
Step 1—General Requirements
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE). Or consult factory The Air Systems DesignGuidelines reference tables available from your local distributor.
The duct system should be sized to handle the required system
design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-air duct connections to furnace with code
approved tape or duct sealer.
Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.
Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.
5
Page 6
VENT THROUGH ROOF
(CATEGORY I)
DUCTS TO
OUTDOORS
1 SQ IN.
PER 4000
BTUH
*
RETURN
AIR
INTERIOR
HEATED
SPACE
SUPPLY AIR
* Minimum opening size is 100 sq in. with
minimum dimensions of 3 in.
†
Minimum of 3 in. when type B-1 vent is used.
12″ MAX
1 SQ IN.
PER 1000
BTUH* IN DOOR
OR WALL
UNCONFINED
SPACE
6″
MIN
(FRONT)
1 SQ IN.
PER 1000
BTUH* IN DOOR
OR WALL
†
12″ MAX
A93387
Fig. 3—Confined Space: Air for Combustion and
Ventilation from an Unconfined Indoor Space
12″ MAX
1 SQ IN.
PER 2000
BTUH
*
DUCTS
TO
OUTSIDE
1 SQ IN.
PER 2000
BTUH
*
12″
MAX
SUPPLY AIR
Minimum dimensions of 3 in.
*
Use any of the following
NOTE:
combinations of openings:
A & B C & D D & E F & G
RETURN
A
B
AIR
D
VENT
THROUGH
ROOF
(CATEGORY I)
CONFINED
C
DUCT
TO
OUTDOORS
F
SPACE
G
E
12″ MAX
12″
MAX
1 SQ IN.
PER 4000
BTUH
OUTDOORS
1 SQ IN.
PER 4000
BTUH
12″
MAX
1 SQ IN.
PER 4000
BTUH
*
*
A93388
Fig. 4—Confined Space: Air for Combustion and
Ventilation from Outdoors
→Table 2—Minimum Free Area Of Combustion Air Opening
Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
Step 3—Supply Air Connections
DOWNFLOW FURNACES
Connect supply-air duct to supply-air opening (outlet) on furnace.
(See Fig. 1.) The supply-air duct attachment must ONLY be
connected to furnace supply/outlet or air conditioning coil casing
(when used), when installed on non-combustible material. When
installed on combustible material, supply-air duct attachment must
ONLY be connected to an accessory subbase or factory approved
OUTDOOR AIR THROUGH
VERTICAL DUCTS
Free Area of
Opening and Duct
(Sq In.)
Round
Pipe
(In. Dia)
OUTDOOR AIR THROUGH
HORIZONTAL DUCTS
Free Area of
Opening and Duct
(Sq In.)
Round
Pipe
(In. Dia)
OUTDOOR AIR THROUGH
SINGLE DUCT
Free Area of
Opening and Duct
(Sq In.)
air conditioning coil casing. DO NOT cut main furnace casing to
attach supply side air duct, humidifier, or other accessories. All
accessories MUST be connected external to furnace main casing.
HORIZONTAL FURNACES
Connect supply-air duct to supply-air (outlet) opening on furnace.
(See Fig. 1.) The supply-air duct attachment must ONLY be
connected to furnace supply/outlet or air conditioning coil casing
(when used). DO NOT cut main furnace casing to attach supply
side air duct, humidifier, or other accessories. All accessories
MUST be connected external to furnace main casing.
Step 4—Return Air Connections
DOWNFLOW AND HORIZONTAL FURNACES
The return-air duct must be connected to return-air opening (inlet)
provided as shown in Fig. 1. DO NOT cut into casing sides or back
to attach any portion of return-air duct. Bypass humidifier connections should be made at ductwork or coil casing sides exterior to
furnace.
6
Round
Pipe
(In. Dia)
Page 7
FURNACE
CASING
WIDTH
14-3/16
17-1/2
21
24-1/2
A
PLENUM
OPENING
B
OPENING
D
FLOOR
C
Fig. 5—Floor and Plenum Opening Dimensions
Table 3—Opening Dimensions (In.)
APPLICATION
Non-Combustible Flooring12-11/161913-3/819-5/8
Combustible Flooring Using KGASB Subbase11-13/161913-7/1620-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring161916-5/819-5/8
Combustible Flooring Using KGASB Subbase15-1/81916-3/420-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring19-1/21920-1/819-5/8
Combustible Flooring Using KGASB Subbase18-5/81920-1/420-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring231923-5/819-5/8
Combustible Flooring Using KGASB Subbase22-1/81923-3/420-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
PLENUM OPENINGFLOOR OPENING
ABCD
12-5/161913-5/1620
15-1/21916-1/220
19192020
22-1/21923-1/220
A96283
Step 5—Downflow Furnace Installation
NOTE: This furnace is approved for use on combustible materials
or wood flooring. A factory accessory floor base, as listed on the
furnace rating plate, MUST be used. A factory accessory floor
base is not required when this furnace is installed on manufacturer’s Coil Assembly Part No. CD5 or CK5, or Coil Box Part No.
KCAKC is used.
1. Determine application being installed from Table 3.
2. Construct hole in floor per dimensions specified in Table 3
and Fig. 5.
3. Construct plenum to dimensions specified in Table 3.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 6.
If coil assembly CD5, CK5, or Coil Box KCAKC is used,
install as shown in Fig. 7.
Step 6—Horizontal Furnace Attic Installation
Do not install the furnace on its back; safety control operation
will be adversely affected. Never connect return-air ducts to
the sides or back of the furnace. Failure to follow this warning
could result in fire, personal injury, or death.
The furnace can be installed horizontally on either the left-hand
(LH) or right-hand (RH) side. A typical attic installation is shown
in Fig. 8.
CONSTRUCT A WORKING PLATFORM
Construct working platform on location where all required
furnace clearances are met. (See Fig. 2 and 8.)
INSTALL FURNACE
1. Position furnace in desired location.
2. Connect gas supply pipe. See Fig. 8 for typical piping entry.
3. Install field-supplied filter retainers as indicated in Fig. 11 and
Table 4 before connecting return-air duct to furnace.
7
Page 8
FURNACE
(OR COIL CASING
WHEN USED)
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
A96285
Fig. 6—Furnace, Plenum, and Subbase Installed
on a Combustible Floor
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
A96284
Fig. 7—Furnace, Plenum, and Coil Assembly or
Coil Box Installed on a Combustible Floor
LINE CONTACT ONLY PERMISSIBLE BETWEEN
LINES FORMED BY INTERSECTIONS OF
THE TOP AND TWO SIDES OF THE FURNACE
JACKET AND BUILDING JOISTS,
STUDS, OR FRAMING.
MANUAL SHUTOFF
GAS VALVE
SEDIMENT
TRAP
Fig. 8—Typical Attic Installation
SHEET
METAL
GAS
ENTRY
24
8
24
TYPE-B
VENT
6″ MIN
″
″
30-IN. MIN
WORK AREA
A97516
Page 9
4. Connect supply- and return-air ducts.
5. Install 24- X 24-in. sheet metal shield on platform in front of
louvered control panel as shown in Fig. 8.
Step 7—Horizontal Furnace Crawlspace Installation
Do not install the furnace on its back; safety control operation
will be adversely affected. Never connect return-air ducts to
the sides or back of the furnace. Failure to follow this warning
could result in fire, personal injury, or death.
FRONT
B
A
C
K
BACK
FRONT
install the filters in a V-formation inside the return-air plenum. See
Fig. 11 and Table 4 for horizontal applications. Horizontal filter
retainers must be field supplied. See Fig. 12 for downflow
applications.
Step 9—Gas Piping
Gas piping must be installed in accordance with national and local
codes. Refer to the current edition of the NFGC.
Canadian installations must be installed in accordance with NSCNGPIC and all authorities having jurisdiction.
Refer to Table 5 for recommended gas pipe sizing. Risers should
be used to connect to the furnace and to the meter.
If a flexible connector is required or allowed by the authority
having jurisdiction, black iron pipe shall be installed at the
gas valve and extend a minimum of 2 in. outside the furnace
casing.
Use the proper length of pipes to avoid stress on the gas
control manifold. Failure to follow this warning could result
in a gas leak, causing fire, explosion, personal injury, or
death.
A93043
The furnace can be installed horizontally with either the LH or RH
side up. In a crawlspace, the furnace can either be installed on
suitable blocks or pad (see Fig. 9.) or hung from the floor joist.
(See Fig. 10). The furnace can be suspended from each corner by
hanger bolts (4 each 3/8-in. all-thread rod) cut to desired length, 1
X 3/8-in. flat washer, 3/8-in. lockwasher, and 3/8-in. nut. Dimples
are provided for hole locations. (See Fig. 1.)
Since horizontal crawlspace installation is very similar to the attic
installation, refer to Step 6. The installation of a sheet metal shield
in front of the louvered control panel is covered in Step 6. For a
crawlspace installation, this same sheet metal shield must be
installed above the louvered control panel. Extend the sheet metal
shield over the furnace top far enough to cover the gas pipe entry
hole.
Step 8—Filter Arrangement
Never operate unit without a filter or with filter access door
removed. Failure to follow this warning could result in fire,
personal injury, or death.
The 2 factory-supplied filters are shipped in the blower compartment. After the return-air duct has been connected to the furnace,
A95235
Fig. 9—Horizontal Installation on Blocks
Connect the gas pipe to the furnace using a backup wrench to
avoid damaging gas controls.
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition to check
for gas leakage. Use a soap-and-water solution to check for
gas leaks. Failure to follow this warning could result in fire,
explosion, personal injury, or death.
Joint compounds (pipe dope) should be applied sparingly and only
to the male threads of the joints. This pipe dope must be resistant
to the action of propane gas.
An accessible manual shutoff valve MUST be installed upstream
of the furnace gas controls and within 72 in. of the furnace. A
1/8-in. NPT plugged tapping, accessible for test gage connection,
MUST be installed immediately upstream of the gas supply
connection to the furnace and downstream of the manual shutoff
valve. Place a ground joint union between the gas control manifold
and the manual shutoff.
Install a sediment trap in the riser leading to the furnace. The trap
can be installed by connecting a tee to the riser leading from the
furnace. Connect a capped nipple into the lower end of the tee. The
capped nipple should extend below the level of the gas controls.
(See Fig. 13.)
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before the furnace has been
attached. If the pressure exceeds 0.5 psig (14-in. wc), the gas
supply pipe must be disconnected from the furnace and capped
before the pressure test. If the test pressure is equal to or less than
0.5 psig (14-in. wc), turn off electric shutoff switch located on the
gas valve before the test. It is recommended that the ground joint
union be loosened before pressure testing.
After all connections have been made, purge the lines and check
for gas leakage with regulated gas supply pressure.
9
Page 10
ANGLE
,
,,,
,,,,,
,,,,,,
IRON OR
EQUIVALENT
(B)
(A)
ROD LOCATION
USING DIMPLE
LOCATORS
(SEE DIMENSIONAL
DWG FOR
LOCATIONS)
3
/8-IN. HEX NUT
& WASHER (4)
REQD PER ROD
(A) PREFERRED ROD LOCATION
(B) ALTERNATE ROD LOCATION
Fig. 10—Horizontal Crawlspace Installation on Hanger Rods
Step 10—Electrical Connections
115-V WIRING
Refer to the unit rating plate or Table 6 for equipment electrical
requirements. The control system requires an earth ground for
proper operation.
(B)
(A)
(A)
(B)
NOTES:
3
⁄8-IN. ROD
(A)
(B)
1. A 1 In. clearance minimum between top of
furnace and combustible material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position.
A96633
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
Make all electrical connections in accordance with the current
edition of the National Electrical Code (NEC) ANSI/NFPA
70-1999, and any local codes or ordinances that might apply. For
Canadian installations, all electrical connections must be made in
accordance with Canadian Electrical Code CSA C22.1, or authorities having jurisdiction.
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center status code indicator light will
flash rapidly and furnace will not operate.
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a
pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref: Table
10-2 NFPA 54/ANSI Z223.1-1999.
INTERNAL
DIAMETER
(IN.)
LENGTH OF PIPE (FT)
1020304050
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 13—Typical Gas Pipe Arrangement
ACCESSORIES
1. Electronic air cleaner (EAC)
Two quick-connect terminals, marked EAC-1 and EAC-2, are
provided for EAC connection. (See Fig. 14.) These terminals
are energized with 115v (1.0-amp maximum) during blower
motor operation.
2. Humidifier (HUM)
Quick-connect terminal (HUM) and screw terminal (C
24V) are provided for 24-v humidifier connection. The terminals are energized with 24V (0.5-amp maximum) after inducer
motor prepurge period.
DO NOT connect furnace control HUM terminal to HUM
(humidifier) terminal on Thermidistat™, Zone Controller, or
similar device. See Thermidistat, Zone Controller, thermostat,
or controller manufacturer’s instructions for proper connection. A failure to follow this warning could result in fire.
A89414
OM-
The cabinet MUST have an uninterrupted or unbroken ground
according to NEC ANSI/NFPA 70-1999 and Canadian Electrical Code CSA C22.1 or local codes to minimize personal
injury if an electrical fault should occur. This may consist of
electrical wire or conduit approved for electrical ground when
installed in accordance with existing electrical codes. Do not
use gas piping as an electrical ground. Failure to follow this
warning could result in electrical shock, fire, or death.
24-V WIRING
Make field 24-v connections at the 24-v terminal strip. (See Fig.
14.) Connect terminal Y as shown in Fig. 15 for proper operation
in cooling mode. Use AWG No. 18 color-coded wire only.
The 24-v circuit contains an automotive-type, 3-amp fuse located
on the main control board. Any direct shorts during installation,
service, or maintenance could cause this fuse to blow. If fuse
replacement is required, use ONLY a 3-amp fuse of identical size.
NOTE: A field-supplied, 115-v controlled relay connected to
EAC terminals may be added if humidifier operation is desired
during blower operation.
Step 11—Venting
Refer to the national or local installation code such as NFGC in the
United States, or the NSCNGPIC in Canada for proper vent sizing
and installation requirements. Use the enclosed Installation Instructions (Single-Stage Vent Tables for Category I Fan-Assisted
Furnaces) for a quick, easy reference.
After fully assembling the vent connector to the furnace flue collar,
securely fasten the vent connector to the collar with two fieldsupplied, corrosion-resistant, sheet metal screws located 180° apart
and midway up the collar.
The horizontal portion of the venting system shall maintain a
minimum of 1/4-in. upward slope per linear ft and it shall be
rigidly supported every 5 ft or less with hangers or straps to ensure
that there will be no movement after installation.
11
Page 12
GRYW
24-V THERMOST AT
TERMINALS
TEST/TWIN
3-AMP FUSE
115-VAC (L1)
POWER SUPPLY
HOT SURFACE
IGNITOR CONNECTOR
SEC-1
COOL
HEAT
OM
C
HUM
24V
HUMIDIFIER TERMINAL
(24-VAC 0.5 AMP MAX)
LED OPERATION &
DIAGNOSTIC LIGHT
HARNESS CONNECTOR
24-V TRANSFORMER SEC-2
SP ARE-1
BLOWER SPEED
SELECTION TERMINALS
SP ARE-2
EAC-1
EAC-ELECTRONIC AIR CLEANER
TERMINALS (115-VAC 1.0 AMP MAX)
EAC-2
115-VAC (L2) NEUTRAL
CONNECTION
INDUCER MOTOR
CONNECTOR
Fig. 14—Furnace Control
A99255
BLK
WHT
WHT
GND
115-V
FIELD-SUPPLIED
DISCONNECT
THREE-WIRE
BLK
AUXILIARY
J-BOX
FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-V WIRING
FIVE
WIRE
NOTE 2
WCRGY
THERMOSTAT
TERMINALS
FIELD-SUPPLIED
DISCONNECT
HEATING-
ONLY
W
R
GND
CONTROL
BOX
FURNACE
G
C
Y
24-V
TERMINAL
BLOCK
NOTE 1
CONDENSING
UNIT
TWO
WIRE
NOTES:Connect Y-terminal as shown for proper operation.
1.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
Fig. 15—Heating and Cooling Application Wiring Diagram
* Permissible limits of the voltage range at which the unit will operate satisfactorily.
† Time-delay type is recommended.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
VOLTS—
HERTZ—
PHASE
OPERATING VOLTAGE RANGE
Maximum*Minimum*
MAXIMUM
UNIT AMPS
MINIMUM
WIRE GAGE
MAXIMUM WIRE
LENGTH FT‡
FUSE OR CKT BKR
MAXIMUM
AMPS†
Step 12—Start-up, Adjustment, and Safety Check
GENERAL
NOTE: Proper polarity must be maintained for 115-v wiring. If
polarity is incorrect, control center status indicator light will flash
rapidly and furnace will not operate.
The furnace must have a 115-v power supply properly connected
and grounded. Proper polarity must be maintained for correct
operation. Thermostat wire connections at R, W, C, and Y must be
made at the 24-v terminal block on the control board. The gas
service pressure must not exceed 0.5 psig (14-in. wc), but must be
no less than 0.16 psig (4.5-in. wc).
Before operating the furnace, check each manual reset switch for
continuity. If necessary, press the button to reset the switch.
The blower compartment door must be in place to complete the
115-v circuit to the furnace.
This furnace is equipped with 2 manual reset limit switches in
the gas control area. The switches will open and shut off
power to the gas valve if a flame rollout or an overheating
condition occurs in the gas control area. DO NOT bypass the
switches. Correct inadequate combustion air supply problem
and reset the switches.
SEQUENCE OF OPERATION
Using the schematic diagram shown in Fig. 16, follow the
sequence of operation through the different modes. Read and
follow the wiring diagram very carefully.
Furnace control must be grounded for proper operation or
control will lockout. Control is grounded through green wire
routed to gas valve and burner bracket screw.
NOTE: If there is a power interruption and any thermostat call,
the control will initiate a 90-sec blower only on period before
starting another cycle.
1. Heating mode
When the thermostat "calls for heat," R-W circuit closes. The
furnace control performs a self-check, verifies the pressure
switch contacts are open, and starts the inducer motor.
a. Prepurge period—As the inducer motor comes up to speed,
the pressure switch contacts close to begin a 15-sec
prepurge period.
b. Igniter warm-up—At the end of the prepurge period, the
igniter is energized for a 17-sec igniter warm-up period.
c. Ignition sequence—When the igniter warm-up period is
completed, the gas valve opens, permitting gas flow to the
burners where it is ignited. After 5 sec, the igniter is
de-energized and a 2-sec flame-sensing period begins.
d. HUM terminal is energized with the gas valve. See
Accessories in Electrical Connections section.
e. Flame-sensing—When burner flame is sensed, the control
begins the blower on delay period and continues holding
the gas valve open. If burner flame is not sensed, the
control closes the gas valve and repeats the ignition cycle.
NOTE: Ignition sequence will repeat 3 additional times before a
lockout occurs. Lockout automatically resets after 3 hrs, or can be
manually reset by turning 115v off (not at thermostat) for 3 sec
minimum, then on again.
f. Blower on delay—Forty-five sec after burner flame is
proven, the blower motor is energized on heating speed.
Simultaneously, the humidifier and electronic air cleaner
terminals (HUM and C
OM-24V for humidifier, EAC-1 and
EAC-2 for electronic air cleaner) are energized.
g. Blower off delay—When the thermostat is satisfied, the
circuit between R and W is broken, de-energizing the gas
valve and stopping gas flow to the burners. The blower
motor, and EAC remain energized for 135 sec.
h. Post-purge—The inducer motor remains energized 5 sec
after the burners are extinguished.
2. Cooling mode
When the thermostat "calls for cooling," R-G and R-Y circuits
close. The R-Y circuit starts the outdoor condensing unit and
combined R-Y and R-G circuits start the furnace blower motor
on cooling speed. The EAC-1 terminal is energized with 115v
whenever the blower is operating on cooling speed.
When the thermostat is satisfied, R-G and R-Y circuits are
broken. Furnace blower and EAC continue operating on
cooling speed for an additional 90 sec.
3. Continuous blower mode
NOTE: EAC-1 terminal is energized with 115v whenever blower
is operating.
When the R-G circuit is made, the blower motor operates on
heating speed. During a call for heat, the blower stops,
allowing the furnace heat exchangers to heat up more quickly,
then restarts at the end of the 45-sec blower on delay period.
The blower reverts to continuous operation after the heating
cycle is completed.
When the thermostat "calls for cooling," the blower operates
on cooling speed. When the thermostat is satisfied, the blower
operates an additional 90 sec before reverting back to continuous operation on heating speed.
13
Page 14
→Fig. 16—Furnace Wiring Diagram
A00304
PCB
BLOWER OFF DELAY
SELECTION CHART
90 SEC
135 SEC
180 SEC
225 SEC
GVR
HI/LO
RELAY
SEC-1
SEC-2
PL1
321
6
5
4
9
87
LED
TEST/TWIN
BLOWER
OFF
DELAY
G
R
Y
W
C
HUM
HSIR IDR BLWR
BLOWER
SPEED
SELECT
FU1
COOL
HEAT
L2
PL3
PL2
VAC
120
L1
PR1
1
2
1
2
3
PR2
24 VAC-3A
FUSE
SPARE-2
SPARE-1
EAC-1
EAC-2
C
1.5 AMP
12
PL5
WHT
BLK
WHT
WHT
BLK
BLK
HSI
BLK
WHT
WHT (COM)
RED (LO)
BLU (MED LO)
NOTE #7
OL
START
BLWM
YEL (MED HI)
BLK (HI)
BRN
BRN
TRAN
BLU
RED
BLK
WHT
WHT (COM)
CAP
RED
RED
ORN
FUSED DISCONNECT
SWITCH (WHEN REQ’D)
NOTE #4
FU2
BLK
WHT
JB
LEGEND
ALS AUXILIARY LIMIT SWITCH, OVERTEMP. -MANUAL RESET, SPST-(N.C.)
BLWR BLOWER MOTOR RELAY, SPST-(N.O.)
BLWM BLOWER MOTOR
BVSS BLOCKED VENT SHUTOFF SWITCH, SPST - (N .C.)
CAP CAPACITOR
CPU MICROPROCESSOR AND CIRCUITRY
DSS DRAFT SAFEGUARD SWITCH
EAC-1 ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.5 AMP MAX.)
EAC-2 ELECTRONIC AIR CLEANER CONNECTION (COMMO N)
FLFUSIBLE LINK
FRS FLAM E R OL LOUT SW . -MANU AL R ESET, SPST-(N.C.)
FSE FLAME PROVING ELECTRODE
FU1 FUSE, 3 AMP, AUT OM OTIVE BLADE TYPE, FACTORY INSTALLED
FU2 FUSE OR CIRCUIT BREAKER CURRENT INTERRUPT DEVICE
(FIELD INSTALLED & SUPPLIED)
GV GAS VALVE-REDUNDANT OPERA TORS
GVR GAS VALVE RELAY , DPST -(N.O.)
HI/LO BLOWER MOTOR SPEED CHANGE R ELAY, SPDT
HSI HOT SURFACE IGNITOR (115 VAC)
HSIR HOT SURFACE IGNITOR RELAY, SPST-(N.O.)
HUM 24VAC HUMIDIFIER CONNECTION (.5 AMP. MAX.)
IDM INDUCED DRAFT MOTOR
IDR INDUCED DRAFT RELAY, SPST-(N.O.)
ILK BLOWER ACCESS PANEL INTERLOCK SWITCH, SPST-(N.O.)
JBJUNCTION BOX
LED LIGHT-EMITTING DIODE FOR STATUS CODES
LGPS LOW G AS PRESSURE SW ITCH, SPST-(N.O.)
LSLIMIT SWITCH, AUTO RESET, SPST(N.C.)
OL AUTO-RESET INTERNAL MOTOR OVERLOAD TEMP. SW.
PCBPRINTED CIRCUIT BOARD
PL19-CIRCUIT CONNECTOR
PL22-CIRCUIT PCB CONNECTOR
PL33-CIRCU IT ID M CONN E C T O R
PL52-CIRCUIT HSI/PCB CONNECTOR
PRSPRESSURE SWITCH, SPST-(N.O.)
TEST/TWIN COMPONENT TEST & TWIN TERMINAL
TRANTRANSFORMER-115VAC/24VAC
JUNCTION
UNMARKED TERMI NAL
PCB TERMINAL
FACTORY WIRING (115VAC)
FACTORY WIRING (24VAC)
FIELD WIRING (115VAC)
FIELD WIRING (24VAC)
CONDUCTOR ON PCB
FIELD WIRING TERMINAL
FIELD GROUND
EQUIPMENT GROUND
FIELD SPLICE
PLUG RECEPTACLE
L1
L2
L1
BLWR
HI/LO
TO 115VAC FIELD DISCONNECT
NOTE #4
EQUIPMENT GROUND
SPARE-2
HEAT
SPARE-1
COOL
NOTE #7
COM
HSIR
EAC-1
START
OL
COM
HI
MED HI
MED LO
LO
BLWM
SCHEMATIC DIAGRAM
(NATURAL GAS & PRO PANE)
EAC-2
1
1
HSI
2
PL52
PL2
3
PL3
PR2
115VA C
PR1
TRAN
24VAC
1
2
IDR
TEST/TWIN
FU1
NOTE #6
CAP
L2
PL1
8
FSE
9
6
5
CPU
HSIR
IDR
BLWR
Y
G
C
R
W
GVR-2
SEC-1
HI/LO
GVR
SEC-2
NOTES:
322869-101 REV. H
1. If any of the original equipment wire is replaced use wire rated for 105°C.
2. Inducer (IDM) and blower (BLWM) motors contain internal auto-reset therm al overload switches (OL).
3. Blower motor speed selections are for average conditions, see installation instructions for details on
optimum speed selection.
4. Use only copper wire between the disconne ct s witch and the furnace junction box (JB).
5. This wire must be connected to furnace she etm etal for control to detect flame.
6. Replace only with a 3 amp fuse.
7. Yellow lead not on all motors.
8. Blower-on delay, gas heating 45 seconds, cooling or heat pump 2 seconds.
9. Blower-off delay, gas heating 90 , 135, 180 or 2 25 sec on ds, co oling or he at pum p 90 se co nds .
(135 seconds only on some models)
10. Ignition-lockout will occ u r a f te r f o u r c onsecutive u nsuccess f u l t ria ls -f o r -ig n iti o n . Control will auto-reset
after thre e hours.
11. When used, auxiliar y limit switch (ALS) is on s o me down f lo w models o n ly . When us e d, FL is on
upflow models only.
12. Some models may have sp ad e quic k co nn e ct terminals.
13. Factory connected when LGPS is not used.
14. Factory connected when BVSS is not used. BVSS used when C himney Adapter Accessory Kit is
installed.
15. Gas valve leads are interchangeable on single stage valves .
BLK
OM
SW2
SW1
OM
3
4
7
1
OM
HUM
IDM
ILK
DSS
BVSS
PRS
ILK
L1
NEUTRAL
IDM
(WHEN USED)
NOTE #14
NOT USED
NOT USED
NOT USED
FSE
BLU
PRS
DSS
BVSS
(WHEN USED)
NOTE #14
WHT
LS
FL
(NOT ON ALL MODELS)
NOTE #9
FRS1
FRS2
LS
FL
NOTE #12
ORN
ORN
ORN
ALS
(WHEN USED)
ORN
NOTE #11
LGPS
(WHEN USED)
NOTE #13
NOTE #14
NOTE #11
2
GVR-1
NOTE #14
ALS
(WHEN USED)
(WHEN USED)
NOTE #13
LGPS
(WHEN USED)
NOTE #13
YEL
FRS1
FRS2
(WHEN USED) NOTE #11
GRN/YEL
GRN/YEL
GND
NOTE #5
GRN/YEL
NOTE #5
GRN/YEL
NOTE #15
NOTE #15
GV
GV
14
Page 15
4. Heat pump mode
When installed with a heat pump, the furnace control auto-
matically changes the timing sequence to avoid long blower
off time during demand defrost cycles. When the W-Y or
W-Y-G thermostat inputs are received at the same time, the
control changes the blower to heating speed or starts the
blower if it was off, and begins a heating cycle. The blower
remains on until the end of the prepurge period, then shuts off
until the end of the ignition warm up and trial for ignition
periods (a total of 24 sec). The blower then comes back on at
heating speed.
When the W input signal disappears, the control begins the
normal inducer post-purge period and the blower changes to
cooling speed after a 1-sec delay. If the W-Y-G signals
disappear at the same time, the blower remains on for the
selected heating blower off delay period and the inducer goes
through its normal post-purge period. If the W-Y inputs
should disappear, leaving the G signal input, the control goes
into continuous blower and the inducer remains on for the
normal post-purge period.
Anytime the control senses false flame, the control locks out
of the heating mode. This occurs because the control cannot
sense the W input due to the false flame signal and, as a result,
sees only the Y input and goes into cooling mode blower off
delay. All other control functions remain in standard format.
NOTE: EAC-1 terminal is energized whenever blower operates.
HUM terminal is only energized when gas valve is energized.
START-UP PROCEDURES
1. Purge gas lines—After all connections have been made, purge
the lines and check for leaks.
Never purge a gas line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition to check
for gas leakage. Use a soap-and-water solution to check for
gas leaks. Failure to follow this warning could result in fire,
explosion, personal injury, or death.
2. Component test—The furnace control allows all components,
except gas valve, to be run for a short period of time.
This feature helps diagnose a system problem in case of a
component failure. To initiate component test procedure, short
(jumper) the TEST 3/16-in. quick connect terminal on control
(adjacent to diagnostic light) and the C
OM-24V terminal on
furnace thermostat connection block for approximately 2 sec.
(See Fig. 14.)
NOTE: Component test feature will not operate if any thermostat
signal is present at control.
Component test sequence is as follows.
a. Momentarily jumper TEST and C
OM-24V terminals until
LED goes off.
b. LED will display previous status 4 times.
c. Inducer motor starts and continues to run for entire com-
ponent test.
d. Hot surface igniter is energized for 15 sec, then de-
energized.
e. Blower motor operates on cooling speed for 10 sec, then
stops.
f. Blower motor operates on heating speed for 10 sec, then
stops.
g. Inducer motor stops.
3. To operate furnace, follow procedures on operating instruction
label attached to furnace.
4. With furnace operating, set thermostat below room temperature and observe that furnace goes off. Set thermostat above
room temperature and observe that furnace restarts.
ADJUSTMENTS
1. Set gas input rate
Furnace gas input rate on rating plate is for installations at
altitudes up to 2000 ft. Furnace input rate must be within ±2
percent of input on furnace rating plate.
a. Determine natural gas orifice size and manifold pressure
for correct input.
(1.) Obtain average yearly gas heat value (at installed
altitude) from local gas supplier.
(2.) Obtain average yearly gas specific gravity from local
gas supplier.
(3.) Verify furnace model. Table 8 can only be used for
model 58RAV Furnaces.
(4.) Find installation altitude in Table 8.
NOTE: For Canada altitudes of 2000 to 4500 ft, use U.S.A.
altitudes of 2001 to 3000 ft in Table 8.
(5.) Find closest natural gas heat value and specific gravity
in Table 8.
(6.) Follow heat value and specific gravity lines to point of
intersection to find orifice size and manifold pressure
settings for proper operation .
EXAMPLE: (0—2000 ft altitude)
Heating value = 1050 Btu/cu ft
Specific gravity = 0.62
Therefore: Orifice No. 43*
Manifold pressure 3.6-in. wc
* Furnace is shipped with No. 43 orifices. In this example
all main burner orifices are the correct size and do not need
to be changed to obtain proper input rate.
(7.) Check and verify burner orifice size in furnace.
NEVER ASSUME ORIFICE SIZE. ALWAYS
CHECK AND VERIFY.
b. Adjust manifold pressure to obtain input rate.
(1.) Remove regulator adjustment seal cap. (See Fig. 17.)
(2.) Turn adjusting screw, counterclockwise (out) to de-
crease manifold pressure or clockwise (in) to increase
manifold pressure.
* Derate multiplier factor is based on midpoint altitude for altitude range.
%OF
DERATE
DERATE MULTIPLIER
FACTOR FOR U.S.A*
15
Page 16
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
0925423.4423.5423.6423.7423.8
to975433.7433.8423.2423.3423.4
20001025433.3433.4433.6433.7433.8
U.S.A. and Canada
ALTITUDE
RANGE
(FT)
U.S.A775423.7423.8413.5413.6413.8
Altitudes800423.4423.6423.7423.8413.5
2001825423.2423.3423.5423.6423.7
to850433.7433.8423.3423.4423.5
3000875433.5433.6433.7423.2423.3
or900433.3433.4433.5433.7433.8
Canada925433.1433.2433.4433.5433.6
Altitudes950433.0433.1433.2433.3433.4
U.S.A. and Canada
2000975432.8432.9433.0433.1433.2
to1000432.7432.8432.9433.0433.1
45001025432.6432.6432.7432.8432.9
ALTITUDE
RANGE
(FT)
3001825433.5433.6433.7433.8423.2
to875433.1433.2433.3433.4433.5
U.S.A. Only
4000925432.8432.9433.0433.0433.1
ALTITUDE
RANGE
(FT)
4001800433.2433.3433.5433.6433.7
to850432.9433.0433.1433.2433.3
U.S.A. Only
5000900432.6432.6432.7432.8432.9
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc.
† Orifice sizes shown in BOLD are factory installed.
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input(Continued)
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
5001800432.8432.9433.0433.1433.2
to850432.5432.6432.7432.8432.8
U.S.A. Only
6000900432.2432.3432.4432.5432.5
ALTITUDE
RANGE
(FT)
6001725433.0433.1433.2433.3433.4
to775432.6432.7432.8432.9433.0
U.S.A. Only
7000825432.3432.4432.5432.5432.6
ALTITUDE
RANGE
(FT)
7001700432.7432.8432.9433.0433.1
to750432.4432.5432.6432.6432.7
U.S.A. Only
8000800432.1432.2432.2432.3432.4
ALTITUDE
RANGE
(FT)
8001650432.7432.8432.9433.0433.1
to700432.4432.4432.5432.6432.7
U.S.A. Only
9000750432.0432.1432.2432.3432.3
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc.
† Orifice sizes shown in BOLD are factory installed.
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input(Continued)
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
9001625432.5432.6432.7432.8432.8
to675432.1432.2432.3432.4432.4
U.S.A. Only
10,000725483.5483.6483.7432.1432.1
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc.
† Orifice sizes shown in BOLD are factory installed.
NOTE: This furnace has been approved for a manifold pressure
of 3.2-in. wc to 3.8-in. wc when installed at altitudes up to 2000 ft.
For altitudes above 2000 ft, the manifold pressure can be adjusted
from 2.0-in. wc to 3.8-in. wc.
DO NOT bottom out gas valve regulator adjusting screw.
This can result in unregulated manifold pressure and result in
excess overfire and heat exchanger failures.
NOTE: If orifice hole appears damaged or it is suspected to have
been redrilled, check orifice hole with a numbered drill bit of
correct size. Never redrill an orifice. A burr-free and squarely
aligned orifice hole is essential for proper flame characteristics.
BURNER
ORIFICE
(4.) Burner flame should be clear blue, almost transparent.
(See Fig. 18.)
c. Verify natural gas input rate by clocking gas meter.
NOTE: High-Altitude Adjustment
United States
At installation altitudes above 2000 ft, this furnace has been
approved for a 4 percent derate for each 1000 ft above sea level.
See Table 7 for derate multiplier factor.
EXAMPLE:
92,000 Btuh input furnace installed at 4300 ft.
Furnace Input
Rate at
Sea Level
92,000X0.82=75,440
X
Derate
Multiplier
Factor
Furnace Input Rate
=
at Installation
Altitude
Canada
At installation altitudes from 2000 to 4500 ft, this furnace must be
derated 10 percent by an authorized Gas Conversion Station. To
determine correct input rate for altitude, see example above and
use 0.90 as derate multiplier factor.
a. Turn off all other gas appliances and pilots.
b. Start furnace and let operate for 3 minutes.
c. Measure time (in sec) for gas meter test dial to complete 1
revolution.
d. Refer to Table 9 for cu ft of gas per hr.
e. Multiply gas rate (cu ft/hr) X heating value (Btu/cu ft)
using natural gas heating value from local gas
utility/supplier.
DO NOT redrill orifices. Improper drilling (burrs, out-ofround holes, etc.) can cause excessive burner noise and
misdirection of burner flames. This can result in flame
impingement of burners and heat exchangers, causing failures..
(3.) After correct manifold pressure is obtained, replace
gas valve regulator adjustment screw cap and verify
adjusted gas input rate using method outlined in item
c.
A93059
EXAMPLE: (0—2000 ft altitude)
Btu heating input = Btu/cu ft X cu ft/hr
Heating value of gas = 1050 Btu/cu ft
Time for 1 revolution of 2-cu ft dial = 82 sec
Gas rate = 88 cu ft/hr (from Table 9)
Btu heating input = 88 X 1050 = 92,400 Btuh
In this example, the orifice size and manifold pressure
adjustment is within ±2 percent of the furnace input rate.
2. Set temperature rise.
Furnace must operate within range of temperature rise speci-
fied on the unit rating plate. Determine the air temperature rise
as follows.
18
Page 19
SECONDS
FOR 1
REVOLUTION
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
Table 9—Gas Rate (Cu Ft/Hr)
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
360
720
655
600
555
514
480
450
424
400
379
360
343
327
313
300
288
277
267
257
248
240
232
225
218
212
206
200
195
189
185
180
176
172
167
164
160
157
153
150
147
1800
1636
1500
1385
1286
1200
1125
1059
1000
947
900
857
818
783
750
720
692
667
643
621
600
581
563
545
529
514
500
486
474
462
450
439
429
419
409
400
391
383
375
367
327
300
277
257
240
225
212
200
189
180
171
164
157
150
144
138
133
129
124
120
116
113
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
73
SECONDS
FOR 1
REVOLUTION
50
51
52
53
54
55
56
57
58
59
60
62
64
66
68
70
72
74
76
78
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
116
120
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
72
144
141
138
136
133
131
129
126
124
122
120
116
112
109
106
103
100
97
95
92
90
88
86
84
82
80
78
76
75
74
72
71
69
68
67
65
64
62
60
360
355
346
340
333
327
321
316
310
305
300
290
281
273
265
257
250
243
237
231
225
220
214
209
205
200
196
192
188
184
180
178
173
170
167
164
161
155
150
71
69
68
67
65
64
63
62
61
60
58
56
54
53
51
50
48
47
46
45
44
43
42
41
40
39
38
38
37
36
35
35
34
33
33
32
31
30
BURNER FLAME
BURNER
MANIFOLD
A89020
Fig. 18—Burner Flame
b. When thermometer readings stabilize, subtract return-air
temperature from supply-air temperature to determine temperature rise.
c. Adjust air temperature rise by adjusting blower speed.
Increase blower speed to reduce temperature rise. Decrease
blower speed to increase temperature rise.
Disconnect the electrical power before changing the speed
tap. Failure to follow this warning could result in personal
injury.
d. To change blower motor speed selections for heating mode,
remove blower motor lead from control board HEAT
terminal. (See Fig. 14.) Select desired blower motor speed
lead from 1 of the other terminals and relocate it to HEAT
terminal. See Table 10 for lead color identification. Reconnect original lead on SPARE terminal.
Follow this same procedure for proper selection of COOL
speed selection.
→Fig. 17—Redundant Automatic Gas Control
Valve
a. Place duct thermometers in return and supply ducts as near
furnace as possible. Be sure thermometers do not "see" heat
exchangers so that radiant heat does not affect thermometer
readings. This is particularly important with straight-run
ducts.
A00238
Table 10—Speed Selector
COLORSPEED
BlackHighCOOL
Yellow
(When present)
BlueMedium-LowHEAT
RedLowSPARE
WhiteCommonL2/COM
Recheck temperature rise. It must be within limits specified
on unit rating plate. Recommended operation is at midpoint of
rise or above.
3. Set thermostat heat anticipator.
The thermostat heat anticipator must be set to match the amp
draw of the electrical components in the R-W circuit. Accurate
amp draw readings can be obtained at thermostat subbase
terminals R and W. Fig. 19 illustrates an easy method of
obtaining the actual amp draw. The amp reading should be
taken after the blower motor has started. See the thermostat
manufacturer’s instructions for adjusting the heat anticipator
and for varying the heating cycle length.
19
FACTORY-
ATTACHED TO
Medium-HighSPARE
Page 20
THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED
(ANITICIPATOR, CLOCK, ETC.,
MUST BE OUT OF CIRCUIT.)
HOOK-AROUND
AMMETER
R Y W G
10 TURNS
FROM UNIT 24-V
CONTROL TERMINALS
EXAMPLE:
5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS
0.5 AMPS FOR THERMOSTAT
=
ANTICIPATOR SETTING
A96316
Fig. 19—Amp Draw Check With Ammeter
NOTE: When using an electronic thermostat, set cycle rate for 3
cycles per hr.
CHECK SAFETY CONTROLS
The flame sensor, gas valve, and pressure switch were all checked
in the Start-Up Procedures section as part of normal operation.
1. Check primary limit control.
This control shuts off the combustion control system and
energizes the circulating-air blower motor if the furnace
overheats.
The preferred method of checking the limit control is to
gradually block off the return air after the furnace has been
operating for a period of at least 5 minutes. As soon as the
limit has shut off the burners, the return-air opening should be
unblocked. By using this method to check the limit control, it
can be established that the limit is functioning properly and
operates if there is a motor failure.
2. Check blocked vent safeguard switch.
The purpose of this control is to permit the safe shutdown of
the furnace during certain blocked vent conditions.
a. Disconnect power to furnace and remove vent connector
from furnace outlet collar. Be sure to allow time for vent
pipe to cool down before removing.
b. Restore power to furnace and set room thermostat above
room temperature.
c. After normal start-up, allow furnace to operate for 2
minutes, then block flue outlet 100 percent. Furnace should
cycle off within 2 minutes.
d. Remove blockage and reconnect vent pipe to furnace outlet
collar.
e. Wait 5 minutes and then reset blocked vent safeguard
switch.
3. Check pressure switch.
This control proves operation of draft inducer blower.
a. Turn off 115-v power to furnace.
b. Remove control door and disconnect inducer motor lead
wires from wire harness.
c. Turn on 115-v power to furnace.
→
d. Set thermostat to "call for heat" and wait 1 minute. When
pressure switch is functioning properly, hot surface igniter
should NOT glow and control diagnostic light flashes a
status code 31. If hot surface igniter glows when inducer
motor is disconnected, shut down furnace immediately.
Determine reason pressure switch did not function properly
and correct condition.
e. Turn off 115-v power to furnace.
f. Reconnect inducer motor wires, replace control door, and
turn on 115-v power to furnace.
4. Check auxiliary limits (when used).
a. Turn off 115-v power to furnace.
b. Remove blower access door.
c. Disconnect red motor lead at blower speed selector. Mark
terminal for proper re-connection.
d. Replace blower access door.
e. Turn on 115-v power to furnace. Be sure room thermostat
is calling for heat.
f. Allow furnace to operate until auxiliary limit activates, but
DO NOT operate furnace longer than 4 minutes.
g. If furnace operates for 4 minutes, check/replace limit
switch(es).
h. Turn off 115-v power to furnace.
i. Remove blower access door.
j. Reconnect red motor lead, reset switch, and replace door.
k. Turn on 115-v power to furnace.
CHECKLIST
1. Put away tools, instruments, and clean up debris.
2. Verify manual reset switches have continuity.
3. Ensure blower and control access doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instructions.
6. Review User’s Manual with owner.
7. Leave literature packet near furnace.
20
Page 21
CHECKLIST—INSTALLATION
LOAD CALCULATION
____________Heating Load (Btuh)
____________Cooling Load (Btuh)
____________Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________Unconfined Space
____________Confined Space
VENTING
____________NFGC (United States)
____________NSCNGPIC (Canada)
____________Local Codes
____________1/4-in. Upward Slope
____________Joints Secure
____________See Attached Vent Table Instructions
CHECKLIST—START-UP
____________
____________Temperature Rise Adjusted
____________Thermostat Anticipator Setting Adjusted or
____________Thermostat Cycle Rate (3 cycles per Hr)
CHECK SAFETY CONTROLS OPERATION
____________Primary Limit
____________Pressure Switches
____________Draft Safeguard Switch
____________Auxiliary Limit Switch(es)
Gas Input Rate
(Set Within 2 percent of Rating Plate)
21
Page 22
22
Page 23
23
Page 24
SERVICE TRAINING
Packaged Service Training programs are an excellent way to increase your
knowledge of the equipment discussed in this manual, including:
• Unit Familiarization• Maintenance
• Installation Overview• Operating Sequence
A large selection of product, theory, and skills programs is available, using popular
video-based formats and materials. All include video and/or slides, plus companion
book.
Classroom Service Training plus "hands-on" the products in our labs can mean
increased confidence that really pays dividends in faster troubleshooting, fewer
callbacks. Course descriptions and schedules are in our catalog.
CALL FOR FREE CATALOG 1-800-962-9212
[ ] Packaged Service Training[ ] Classroom Service Training
A94328
Copyright 2000 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 4623158ra16si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
Tab 6a 8a
PC 101Catalog No. 535-767Printed in U.S.A.Form 58RA-16SIPg 2410-00Replaces: 58RA-14SI
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.