Carrier 58RAV050-12, 58RAV050-08, 58RAV070-08, 58RAV070-12, 58RAV095-12 Installation, Start-up, And Operating Instructions Manual

...
Page 1
Downflow/Horizontal
Induced-Combustion Furnaces
Visit www.carrier.com
Installation, Start-Up, and Operating Instructions
Sizes 050-135, Series 170 and 180
NOTE: Read the entire instruction manual before starting the
installation. This symbol → indicates a change since the last issue. Index Page
SAFETY CONSIDERATIONS.....................................................1
Dimensional Drawing...............................................................2
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
PROCEDURE...........................................................................2
INTRODUCTION.......................................................................3-4
Clearances From Combustible Materials.................................3
General......................................................................................4
Location Relative to Cooling Equipment ................................4
Hazardous Locations.................................................................4
AIR FOR COMBUSTION AND VENTILATION...................4-5
Unconfined Space..................................................................4-5
Confined Space.........................................................................5
General Requirements...............................................................5
Ductwork Acoustical Treatment...............................................6
Supply-Air Connections............................................................6
Return-Air Connections............................................................6
DOWNFLOW INSTALLATION..................................................7
HORIZONTAL ATTIC INSTALLATION...................................7
Construct a Working Platform .................................................7
Install Furnace .......................................................................7-9
HORIZONTAL CRAWLSPACE INSTALLATION....................9
FILTER ARRANGEMENT...........................................................9
ELECTRICAL CONNECTIONS...........................................10-11
115-v Wiring...........................................................................10
24-v Wiring.............................................................................11
Accessories..............................................................................11
START-UP, ADJUSTMENT, AND SAFETY CHECK............13
General....................................................................................13
Sequence Of Operation...........................................................13
Heating Mode..........................................................................13
Cooling Mode .........................................................................13
Continuous Blower Mode.......................................................13
Heat Pump Mode....................................................................14
Start-up Procedures.................................................................15
Adjustments.............................................................................15
Set Gas Input Rate ............................................................15-18
Set Temperature Rise........................................................18-19
Set Thermostat Heat Anticipator ......................................19-20
Check Safety Controls............................................................20
Checklist..................................................................................20
SAFETY CONSIDERATIONS
Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and qualified person­nel should install, repair, or service heating equipment.
REGISTERED QUALITY SYSTEM
Untrained personnel can perform basic maintenance functions such as cleaning and replacing air filters. All other operations must be performed by trained service personnel. When working on heating equipment, observe precautions in the literature, on tags, and on labels attached to or shipped with the unit and other safety precautions that may apply.
In the United States, follow all safety codes including the National Fuel Gas Code (NFGC) NFPA 54-1999/ANSI Z223.1-1999 and the Installation Standards, Warm Air Heating and Air Condition­ing Systems (NFPA 90B) ANSI/NFPA 90B.
In Canada, refer to the CAN/CGA-B149.1- and .2-M95 National Standard of Canada, Natural Gas and Propane Installation Codes (NSCNGPIC).
Wear safety glasses and work gloves. Have fire extinguisher available during start-up and adjustment procedures and service calls.
Recognize safety information. This is the safety-alert symbol When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.
Understand the signal words DANGER, WARNING, CAUTION, and NOTE. These words are used with the safety-alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies a hazard which could result in personal injury or death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.
These instructions cover minimum requirements and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept up with changing residen­tial construction practices. We require these instructions as a minimum for a safe installation.
ama
58RAV
CERTIFIED
.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4 Tab 6a 8a
PC 101 Catalog No. 535-767 Printed in U.S.A. Form 58RA-16SI Pg 1 10-00 Replaces: 58RA-14SI
Page 2
13
⁄16″
39 7⁄8″
11
⁄16″
28 1⁄2″
″
20
INLET
7
⁄8″
ACCESSORY
3
⁄4″
1
GAS ENTRY
NOTE:
DIA
DIA HOLE
OUTLET
″
19
ADDITIONAL 7⁄8″ LOCATED IN THE TOP PLATE AND BOTTOM PLATE
VENT CONNECTION
13
⁄16″
1
⁄8″
9
1
⁄4″
10
1
⁄16″
1
1
⁄8″
2
1
⁄4″
8
11
⁄16″
DIA K.O. ARE
D
E
A
AIRFLOW
1
⁄2″
″
2
4 3⁄16″
15
⁄16″
2
1
⁄16″
16
5
⁄16″
13
1
⁄4″
10
11
⁄16″
DIMPLES TO DRILL HOLES FOR HANGER BOLTS (4 PLACES) IN HORIZONTAL POSITION
THERMOSTAT WIRE ENTRY
7
⁄8″
DIA
ACCESSORY
7
⁄8″
DIA HOLE
POWER ENTRY
1 1⁄2″
DIA
R.H. GAS ENTRY
7
⁄8″
DIA
ACCESSORY
1
⁄16″
1
1
⁄8″
2
DIA
1″ TYP
5
⁄8″
TYP
NOTES:
1. Two additional 7⁄8-in. dia holes are located in the top plate.
2. Minimum return-air openings at furnace, based on metal duct. If flex duct is used, see flex duct manufacturer's recommendations for equivalent diameters. a. For 800 CFM–16-in. round or 141⁄2 x 12-in. rectangle. b. For 1200 CFM–20-in. round or 141⁄2 x 191⁄2-in. rectangle. c. For 1600 CFM–22-in. round or 141⁄2 x 231⁄4-in. rectangle. d. For airflow requirements above 1800 CFM, must use entire return air opening.
Fig. 1—Dimensional Drawing
Table 1—Dimensions (In.)
UNIT SIZE A D E VENT CONN SHIP. WT (LB)
050-08 14-3/16 12-9/16 12-11/16 4 121 050-12 14-3/16 12-9/16 12-11/16 4 130 070-08 14-3/16 12-9/16 12-11/16 4 129 070-12 14-3/16 12-9/16 12-11/16 4 137 095-12 17-1/2 15-7/8 16 4 148 095-16 17-1/2 15-7/8 16 4 151 115-16 17-1/2 15-7/8 16 4 158 115-20 21 19-3/8 19-1/2 4 176 135-20 24-1/2 22-7/8 23 5 192
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS
PROCEDURE
3. After touching the chassis you may proceed to service the control or connecting wires as long as you do nothing that recharges your body with static electricity (for example; DO NOT move or shuffle your feet, DO NOT touch ungrounded
Electrostatic discharge can affect electronic components. Take precautions during furnace installation and servicing to protect the furnace electronic control. Precautions will pre­vent electrostatic discharges from personnel and hand tools which are held during the procedure. These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace, the control, and the person at the same electrostatic potential.
objects, etc.).
4. If you touch ungrounded objects (recharge your body with static electricity), firmly touch furnace again before touching control or wires.
5. Use this procedure for installed and uninstalled (ungrounded) furnaces.
6. Before removing a new control from its container, discharge your body’s electrostatic charge to ground to protect the
1. Disconnect all power to the furnace. DO NOT TOUCH THE
CONTROL OR ANY WIRE CONNECTED TO THE CON­TROL PRIOR TO DISCHARGING YOUR BODY’S ELEC­TROSTATIC CHARGE TO GROUND.
2. Firmly touch a clean, unpainted, metal surface of the furnace chassis which is close to the control. Tools held in a person’s hand during grounding will be satisfactorily discharged.
control from damage. If the control is to be installed in a furnace, follow items 1 through 5 before bringing the control or yourself into contact with the furnace. Put all used AND new controls into containers before touching ungrounded objects.
7. An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.
2
A99109
Page 3
MINIMUM INCHES CLEARANCE TO COMBUSTIBLE CONSTRUCTION
This forced air furnace is equipped for use with natural
gas at altitudes0-10,000 ft (0-3,050m).
An accessory kit, supplied by the manufacturer,shall be used to convert to propane gas use or m ay be req uired for somenatural gas applicatio ns.
This furnace is for indoor installation in a building constructedonsite.
This furnace may be installed on combustible flooring in alcove or closet at minimum clearance from comb ustible material.
This furnace may be used with a Type B-1 Vent and may be ventedin commonwithother gas-fired appliances.
For installation on non-combustiblefloorsonly.
†
For installation on combustibleflooring only when installedon special base, Part No. KGASB0201ALL, Coil Assembly, Part No. CD5 or CK5,or Coil Casing, Part No. KCAKC.
For furnaces wider than 14.25 inches (362mm) may
#
be 0 inches.
18 inchesfront clearance requiredfor alcove.
Ø
Indicates supplyor returnsides when furnace is in
*
the horizontal position. Linecontact only permissible betweenlinesformed by intersectionsof the Top and two Sides of the furnace jacket, andbuildingjoists, studs or framing.
For single wall vent type 6 inches.
##
For Type B-1vent type3 inches.
††
Clearance toBack 0 inches indownflow and horizontal (attic/alcove & crawlspace) positionsand 3 inches in horizontalcloset positions.
Fig. 2—Clearances to Combustibles
This f ur nace is approved for DOWNFLOWand HORIZONTAL installations.
Clearance arrows do not change with furnace orientati on.
0"
†
†
B
A
C
K
E
D
I
S
1" #
*
Clearance in inches
1"
TOP / PLENUM
E
C
A
N
R
U
F
†
T
N
O
R
F
S
F
R
O
N
T
##
Ø
BOTTOM
#
"
1
1"
#
E
*
D
I
S
E
R
V
I
C
E
30"
Vent Clearanceto combustibles:
For Single Wall vents 6 inches. For Type B-1 vent type 1 inch .
322286-101REV.F (LIT)
MIN
A99262
INTRODUCTION
The model 58RAV Series 170 and 180 Furnaces are available in sizes 46,000 through 135,000 Btuh input capacities.
The design of the downflow/horizontal gas-fired furnace is CSA (A.G.A. and C.G.A.) certified for natural and propane gases and for installation on noncombustible flooring. The furnace is factory­shipped for use with natural gas. A factory accessory gas conver­sion kit, as listed on the furnace rating plate is required to convert furnace for use with propane gas.
These furnaces SHALL NOT be installed directly on carpeting, tile, or any other combustible material other than wood flooring. In downflow installations, a factory accessory floor base, as listed on the furnace rating plate MUST be used when installed on com­bustible materials and wood flooring. A factory floor base is not required when this furnace is installed on manufacturer’s Coil Assembly Part No. CD5 or CK5, or when Coil Box Part No. KCAKC is used. This furnace is for installation in alcoves, attics, crawlspaces, basements, closets, or utility rooms. The design of this furnace line is not CSA (A.G.A. and C.G.A.) certified for installation in mobile homes, recreation vehicles, or outdoors.
Before installing the furnace in the United States, refer to the current edition of the NFGC and the NFPA 90B. For copies of the NFGC and NFPA 90B, contact the National Fire Protection Association Inc., Batterymarch Park, Quincy, MA 02269; or for only the NFGC contact the American Gas Association, 400 N. Capitol St., NW, Washington DC 20001.
Before installing the furnace in Canada, refer to the NSCNGPIC. For a copy of the NSCNGPIC, contact Standard Sales, CSA International, 178 Rexdale Boulevard, Etobicoke (Toronto), On­tario, M9W 1R3, Canada.
Installation must comply with regulations of serving gas supplier and local building, heating, plumbing or other codes in effect in the area in which installation is made. In absence of local building codes, installation must comply with NFGC in the United States and the NSCNGPIC and all authorities having jurisdiction in Canada.
These instructions cover minimum requirements for a safe instal­lation and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept pace with changing residential construction practices. We require these instructions as a minimum for a safe installation.
Application of this furnace should be indoors with special attention given to vent sizing and material, gas input rate, air temperature rise, and unit sizing. Improper installation or misapplication of the furnace can require excessive servicing or cause premature component failure.
This furnace is designed for a minimum continuous return-air temperature of 60°F db or intermittent operation down to 55°F db such as when used with a night setback thermostat. Return-air temperature must not exceed a maximum of 85°F db.
3
Page 4
FRONT
°F °F
RETURN AIR
MAX 85°F MIN 55°F
A99075
Improper installation, adjustment, alteration, service, mainte­nance, or use can cause carbon monoxide poisoning, explo­sion, fire, electrical shock, or other conditions which may cause personal injury, loss of life, or property damage. Consult a qualified installer, service agency, local gas sup­plier, or your distributor or branch for information or assis­tance. The qualified installer or agency must use only factory-authorized and listed kits or accessories when modi­fying this product. Failure to follow this warning could result in electrical shock, fire, personal injury, or death.
Locate the furnace as close to the chimney/vent and as near the center of the air distribution system as possible. The furnace should be installed as level as possible.
Provide ample space for servicing and cleaning. Always comply with the minimum fire protection clearances shown on the unit rating plate. This furnace shall not be installed directly on carpeting, tile, or any combustible material other than wood flooring. The furnace may be installed on combustible flooring when installed with the accessory downflow subbase, which is available from your distributor or branch when required.
LOCATION RELATIVE TO COOLING EQUIPMENT — The cooling coil must be installed parallel with or on the downstream side of the furnace to avoid condensation in the heat exchangers. When installed parallel with a furnace, dampers or other means used to control the flow of air must prevent chilled air from entering the unit. If the dampers are manually operated, they must be equipped with means to prevent operation of either unit unless the damper is in the full-heat or full-cool position.
HAZARDOUS LOCATIONS
For accessory installation details, refer to the applicable installa­tion literature.
NOTE: Remove all shipping brackets and materials before oper­ating the furnace.
Step 1—Location
GENERAL
Do not install furnace in a corrosive or contaminated atmo­sphere. Make sure all combustion and circulating air require­ments are followed, in addition to all local codes and ordinances.
Do not use this furnace during construction when adhesives, sealers, and/or new carpets are being installed. If the furnace is required during construction, use clean outside air for combustion and ventilation. Compounds of chlorine and fluorine when burned with combustion air form acids which cause corrosion of the heat exchangers and metal vent system. Some of these compounds are found in paneling and dry wall adhesives, paints, thinners, masonry cleaning materials, and many other solvents commonly used in the construction process. Excessive exposure to contaminated combustion air will result in safety and performance related problems.
This furnace must be installed so the electrical components are protected from water.
18-IN. MINIMUM
TO BURNERS
When furnace is installed in a residential garage, it must be installed so that burners and ignition sources are located a minimum of 18 in. above floor. The furnace must be located or protected to avoid physical damage by vehicles. When furnace is installed in a public garage, airplane hangar, or other building having a hazardous atmosphere, unit must be installed in accordance with requirements of National Fire Protection Association, Inc.
Step 2—Air For Combustion and Ventilation
Provisions for adequate combustion and ventilation air must be provided in accordance with Section 5.3 of the NFGC, Air for Combustion and Ventilation, or applicable provisions of the local building codes.
Air for combustion must not be contaminated by halogen compounds, which include fluoride, chloride, bromide, and iodide. These elements are found in aerosol sprays, deter­gents, bleaches, cleaning solvents, salts, air fresheners, and other household products.
4
A93044
Page 5
The operation of exhaust fans, kitchen ventilation fans, clothes dryers, or fireplaces could create a NEGATIVE PRESSURE CONDITION at the furnace. Make-up air MUST be provided for the ventilation devices, in addition to that required by the furnace.
The requirements for combustion and ventilation air depend upon whether the furnace is located in an unconfined or confined space.
If the unconfined space is of unusually tight construction, air for combustion and ventilation MUST come from either the outdoors or spaces freely communicating with the outdoors. Combustion and ventilation openings must be sized the same as for a confined space as defined below. Return air must not be taken from the room unless an equal or greater amount of air is supplied to the room.
For Example:
58RAV FURNACE
INPUT BTUH
46,000 307 69,000 460
92,000 613 115,000 767 135,000 920
MINIMUM SQ FT
WITH
7-1/2 FT CEILING
CONFINED SPACE A confined space is defined as a space whose volume is less than
2.) NOTE: In determining free area of an opening, the blocking
effect of louvers, grilles, and screens must be considered. If free area of louver or grille design is unknown, assume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area. Screens, when used, must not be smaller than 1/4-in. mesh. Louvers and grilles must be constructed so they cannot be closed.
1. All air from inside the structure requires 2 openings (for structures not usually tight):
a. Each opening MUST have at least 1 sq in. of free area per
1000 Btuh of total input for all equipment within the confined space, but not less than 100 sq in. per opening. (See Fig. 3 and Table 2.) The minimum dimension of air openings shall not be less than 3 in.
b. If building is constructed unusually tight, a permanent
opening directly communicating with the outdoors shall be provided. See item 2 below.
c. If furnace is installed on a raised platform to provide a
return-air plenum, and return air is taken directly from hallway or space adjacent to furnace, all air for combustion must come from outdoors.
2. Air from outside the structure requires 1 of the following methods:
a. If combustion air is taken from outdoors through 2 vertical
ducts, the openings and ducts MUST have at least 1 sq in. of free area per 4000 Btuh of total input for all equipment within the confined space. (See Fig. 4 and Table 2.)
b. If combustion air is taken from outdoors through 2 hori-
zontal ducts, the openings and ducts MUST have at least 1 sq in. of free area per 2000 Btuh of total input for all equipment within the confined space. (See Fig. 4 and Table
2.)
c. If combustion air is taken from outdoors through a single
opening or duct (horizontal or vertical) commencing within 12 in. of the top of the confined space, opening and duct MUST have at least 1 sq in. of free area per 3000 Btuh of the total input for all equipment within the confined space and not less than the sum of the areas of all vent connectors in the confined space. (See Fig. 4 and Table 2.) Equipment clearances to the structure shall be at least 1 in. from the sides and back and 6 in. from the front of the appliances.
When ducts are used, they must be of the same cross-sectional area as the free area of the openings to which they connect. The minimum dimension of ducts must not be less than 3 in. (See Fig.
4.)
AIR DUCTS
Never connect return-air ducts to the side or back of the furnace. A failure to follow this warning can cause a fire, personal injury, or death.
Step 1—General Requirements
The duct system should be designed and sized according to accepted national standards such as those published by: Air Conditioning Contractors Association (ACCA), Sheet Metal and Air Conditioning Contractors National Association (SMACNA) or American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE). Or consult factory The Air Systems Design Guidelines reference tables available from your local distributor. The duct system should be sized to handle the required system design CFM at the design static pressure.
When a furnace is installed so that the supply ducts carry air to areas outside the space containing the furnace, the return air must also be handled by a duct(s) sealed to the furnace casing and terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used. Seal supply- and return-air duct connections to furnace with code approved tape or duct sealer.
Flexible connections should be used between ductwork and furnace to prevent transmission of vibration. Ductwork passing through unconditioned space should be insulated to enhance system performance. When air conditioning is used, a vapor barrier is recommended.
Maintain a 1-in. clearance from combustible materials to supply air ductwork for a distance of 36 in. horizontally from the furnace. See NFPA 90B or local code for further requirements.
5
Page 6
VENT THROUGH ROOF (CATEGORY I)
DUCTS TO
OUTDOORS
1 SQ IN. PER 4000 BTUH
*
RETURN
AIR
INTERIOR
HEATED
SPACE
SUPPLY AIR
* Minimum opening size is 100 sq in. with minimum dimensions of 3 in.
†
Minimum of 3 in. when type B-1 vent is used.
12″ MAX
1 SQ IN. PER 1000 BTUH* IN DOOR OR WALL
UNCONFINED SPACE
6″
MIN
(FRONT) 1 SQ IN.
PER 1000 BTUH* IN DOOR OR WALL
†
12″ MAX
A93387
Fig. 3—Confined Space: Air for Combustion and
Ventilation from an Unconfined Indoor Space
12″ MAX
1 SQ IN. PER 2000 BTUH
*
DUCTS
TO
OUTSIDE
1 SQ IN. PER 2000 BTUH
*
12″
MAX
SUPPLY AIR
Minimum dimensions of 3 in.
*
Use any of the following
NOTE:
combinations of openings: A & B C & D D & E F & G
RETURN
A
B
AIR
D
VENT THROUGH ROOF (CATEGORY I)
CONFINED
C
DUCT
TO
OUTDOORS
F
SPACE
G
E
12″ MAX
12″
MAX
1 SQ IN. PER 4000 BTUH
OUTDOORS 1 SQ IN.
PER 4000 BTUH
12″
MAX
1 SQ IN. PER 4000 BTUH
*
*
A93388
Fig. 4—Confined Space: Air for Combustion and
Ventilation from Outdoors
→Table 2—Minimum Free Area Of Combustion Air Opening
58RAV
FURNACE
INPUT
(BTUH)
46,000 100 11.50 4 23.0 6 15.33 5 69,000 100 17.25 5 34.5 7 23.00 6
92,000 100 23.00 6 46.0 8 30.67 7 115,000 115 28.75 7 57.5 9 38.33 7 135,000 135 33.75 7 67.5 10 45.00 8
AIR FROM INDOOR
UNCONFINED SPACE
Free Area
of Opening
(Sq In.)
Step 2—Ductwork acoustical treatment
Metal duct systems that do not have a 90 degree elbow and 10 ft of main duct to the first branch take-off may require internal acoustical lining. As an alternative, fibrous ductwork may be used if constructed and installed in accordance with the latest edition of SMACNA construction standard on fibrous glass ducts. Both acoustical lining and fibrous ductwork shall comply with NFPA 90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
Step 3—Supply Air Connections
DOWNFLOW FURNACES Connect supply-air duct to supply-air opening (outlet) on furnace.
(See Fig. 1.) The supply-air duct attachment must ONLY be connected to furnace supply/outlet or air conditioning coil casing (when used), when installed on non-combustible material. When installed on combustible material, supply-air duct attachment must ONLY be connected to an accessory subbase or factory approved
OUTDOOR AIR THROUGH
VERTICAL DUCTS
Free Area of
Opening and Duct
(Sq In.)
Round
Pipe
(In. Dia)
OUTDOOR AIR THROUGH
HORIZONTAL DUCTS
Free Area of
Opening and Duct
(Sq In.)
Round
Pipe
(In. Dia)
OUTDOOR AIR THROUGH
SINGLE DUCT
Free Area of
Opening and Duct
(Sq In.)
HORIZONTAL FURNACES Connect supply-air duct to supply-air (outlet) opening on furnace.
(See Fig. 1.) The supply-air duct attachment must ONLY be connected to furnace supply/outlet or air conditioning coil casing (when used). DO NOT cut main furnace casing to attach supply side air duct, humidifier, or other accessories. All accessories MUST be connected external to furnace main casing.
Step 4—Return Air Connections
DOWNFLOW AND HORIZONTAL FURNACES The return-air duct must be connected to return-air opening (inlet)
provided as shown in Fig. 1. DO NOT cut into casing sides or back to attach any portion of return-air duct. Bypass humidifier connec­tions should be made at ductwork or coil casing sides exterior to furnace.
6
Round
Pipe
(In. Dia)
Page 7
FURNACE
CASING
WIDTH
14-3/16
17-1/2
21
24-1/2
A
PLENUM
OPENING
B
OPENING
D
FLOOR
C
Fig. 5—Floor and Plenum Opening Dimensions
Table 3—Opening Dimensions (In.)
APPLICATION
Non-Combustible Flooring 12-11/16 19 13-3/8 19-5/8
Combustible Flooring Using KGASB Subbase 11-13/16 19 13-7/16 20-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring 16 19 16-5/8 19-5/8
Combustible Flooring Using KGASB Subbase 15-1/8 19 16-3/4 20-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring 19-1/2 19 20-1/8 19-5/8
Combustible Flooring Using KGASB Subbase 18-5/8 19 20-1/4 20-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
Non-Combustible Flooring 23 19 23-5/8 19-5/8
Combustible Flooring Using KGASB Subbase 22-1/8 19 23-3/4 20-3/8
Combustible Flooring with CD5 or CK5 Coil Assembly or
KCAKC Coil Box
PLENUM OPENING FLOOR OPENING
ABCD
12-5/16 19 13-5/16 20
15-1/2 19 16-1/2 20
19 19 20 20
22-1/2 19 23-1/2 20
A96283
Step 5—Downflow Furnace Installation NOTE: This furnace is approved for use on combustible materials
or wood flooring. A factory accessory floor base, as listed on the furnace rating plate, MUST be used. A factory accessory floor base is not required when this furnace is installed on manufactur­er’s Coil Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is used.
1. Determine application being installed from Table 3.
2. Construct hole in floor per dimensions specified in Table 3 and Fig. 5.
3. Construct plenum to dimensions specified in Table 3.
4. If downflow subbase (KGASB) is used, install as shown in Fig. 6.
If coil assembly CD5, CK5, or Coil Box KCAKC is used, install as shown in Fig. 7.
Step 6—Horizontal Furnace Attic Installation
Do not install the furnace on its back; safety control operation will be adversely affected. Never connect return-air ducts to the sides or back of the furnace. Failure to follow this warning could result in fire, personal injury, or death.
The furnace can be installed horizontally on either the left-hand (LH) or right-hand (RH) side. A typical attic installation is shown in Fig. 8.
CONSTRUCT A WORKING PLATFORM
Construct working platform on location where all required furnace clearances are met. (See Fig. 2 and 8.)
INSTALL FURNACE
1. Position furnace in desired location.
2. Connect gas supply pipe. See Fig. 8 for typical piping entry.
3. Install field-supplied filter retainers as indicated in Fig. 11 and Table 4 before connecting return-air duct to furnace.
7
Page 8
FURNACE
(OR COIL CASING
WHEN USED)
FURNACE
CD5 OR CK5
COIL ASSEMBLY
OR KCAKC
COIL BOX
COMBUSTIBLE
FLOORING
DOWNFLOW
SUBBASE
SHEET METAL
PLENUM
FLOOR
OPENING
A96285
Fig. 6—Furnace, Plenum, and Subbase Installed
on a Combustible Floor
COMBUSTIBLE
FLOORING
SHEET METAL
PLENUM
FLOOR
OPENING
A96284
Fig. 7—Furnace, Plenum, and Coil Assembly or
Coil Box Installed on a Combustible Floor
LINE CONTACT ONLY PERMISSIBLE BETWEEN LINES FORMED BY INTERSECTIONS OF THE TOP AND TWO SIDES OF THE FURNACE JACKET AND BUILDING JOISTS, STUDS, OR FRAMING.
MANUAL SHUTOFF
GAS VALVE
SEDIMENT
TRAP
Fig. 8—Typical Attic Installation
SHEET METAL
GAS ENTRY
24
8
24
TYPE-B VENT
6″ MIN
″
″
30-IN. MIN WORK AREA
A97516
Page 9
4. Connect supply- and return-air ducts.
5. Install 24- X 24-in. sheet metal shield on platform in front of louvered control panel as shown in Fig. 8.
Step 7—Horizontal Furnace Crawlspace Installation
Do not install the furnace on its back; safety control operation will be adversely affected. Never connect return-air ducts to the sides or back of the furnace. Failure to follow this warning could result in fire, personal injury, or death.
FRONT
B A C K
BACK
FRONT
install the filters in a V-formation inside the return-air plenum. See Fig. 11 and Table 4 for horizontal applications. Horizontal filter retainers must be field supplied. See Fig. 12 for downflow applications.
Step 9—Gas Piping
Gas piping must be installed in accordance with national and local codes. Refer to the current edition of the NFGC.
If a flexible connector is required or allowed by the authority having jurisdiction, black iron pipe shall be installed at the gas valve and extend a minimum of 2 in. outside the furnace casing.
Use the proper length of pipes to avoid stress on the gas control manifold. Failure to follow this warning could result in a gas leak, causing fire, explosion, personal injury, or death.
A93043
The furnace can be installed horizontally with either the LH or RH side up. In a crawlspace, the furnace can either be installed on suitable blocks or pad (see Fig. 9.) or hung from the floor joist. (See Fig. 10). The furnace can be suspended from each corner by hanger bolts (4 each 3/8-in. all-thread rod) cut to desired length, 1 X 3/8-in. flat washer, 3/8-in. lockwasher, and 3/8-in. nut. Dimples are provided for hole locations. (See Fig. 1.)
Since horizontal crawlspace installation is very similar to the attic installation, refer to Step 6. The installation of a sheet metal shield in front of the louvered control panel is covered in Step 6. For a crawlspace installation, this same sheet metal shield must be installed above the louvered control panel. Extend the sheet metal shield over the furnace top far enough to cover the gas pipe entry hole.
Step 8—Filter Arrangement
Never operate unit without a filter or with filter access door removed. Failure to follow this warning could result in fire, personal injury, or death.
The 2 factory-supplied filters are shipped in the blower compart­ment. After the return-air duct has been connected to the furnace,
A95235
Fig. 9—Horizontal Installation on Blocks
Connect the gas pipe to the furnace using a backup wrench to avoid damaging gas controls.
Never purge a gas line into a combustion chamber. Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution to check for gas leaks. Failure to follow this warning could result in fire, explosion, personal injury, or death.
Joint compounds (pipe dope) should be applied sparingly and only to the male threads of the joints. This pipe dope must be resistant to the action of propane gas.
An accessible manual shutoff valve MUST be installed upstream of the furnace gas controls and within 72 in. of the furnace. A 1/8-in. NPT plugged tapping, accessible for test gage connection, MUST be installed immediately upstream of the gas supply connection to the furnace and downstream of the manual shutoff valve. Place a ground joint union between the gas control manifold and the manual shutoff.
Install a sediment trap in the riser leading to the furnace. The trap can be installed by connecting a tee to the riser leading from the furnace. Connect a capped nipple into the lower end of the tee. The capped nipple should extend below the level of the gas controls. (See Fig. 13.)
Piping should be pressure tested in accordance with local and national plumbing and gas codes before the furnace has been attached. If the pressure exceeds 0.5 psig (14-in. wc), the gas supply pipe must be disconnected from the furnace and capped before the pressure test. If the test pressure is equal to or less than
0.5 psig (14-in. wc), turn off electric shutoff switch located on the gas valve before the test. It is recommended that the ground joint union be loosened before pressure testing.
After all connections have been made, purge the lines and check for gas leakage with regulated gas supply pressure.
9
Page 10
ANGLE
,
,,,
,,,,,
,,,,,,
IRON OR EQUIVALENT
(B)
(A)
ROD LOCATION USING DIMPLE LOCATORS (SEE DIMENSIONAL DWG FOR LOCATIONS)
3
/8-IN. HEX NUT
& WASHER (4)
REQD PER ROD
(A) PREFERRED ROD LOCATION (B) ALTERNATE ROD LOCATION
Fig. 10—Horizontal Crawlspace Installation on Hanger Rods
Step 10—Electrical Connections
115-V WIRING Refer to the unit rating plate or Table 6 for equipment electrical
requirements. The control system requires an earth ground for proper operation.
(B)
(A)
(A)
(B)
NOTES:
3
⁄8-IN. ROD
(A)
(B)
1. A 1 In. clearance minimum between top of furnace and combustible material.
2. The entire length of furnace must be supported when furnace is used in horizontal position.
A96633
Do not connect aluminum wire between disconnect switch and furnace. Use only copper wire.
Make all electrical connections in accordance with the current edition of the National Electrical Code (NEC) ANSI/NFPA 70-1999, and any local codes or ordinances that might apply. For Canadian installations, all electrical connections must be made in accordance with Canadian Electrical Code CSA C22.1, or authori­ties having jurisdiction.
NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control center status code indicator light will flash rapidly and furnace will not operate.
10
AIRFLOW
12″
4″
D
FIELD-SUPPLIED FILTER RETAINERS
Fig. 11—Horizontal Filter Arrangement
→Table 4—Filter Retainer (In.)
FURNACE
CASING WIDTH
14-3/16 (2) 16 X 20 X 1 14-3/8
17-1/2 (2) 16 X 20 X 1 13-3/8
21 (2) 16 X 20 X 1 11-5/8
24-1/2 (2) 16 X 20 X 1 10-1/4
FILTER SIZE
AND QUANTITY
A82173
D
Page 11
AIRFLOW
INSTALLATION
POSITION
OF FILTERS
RETURN-AIR
PLENUM
ACCESS DOOR
A88486
Fig. 12—Downflow Filter Arrangement
Table 5—Maximum Capacity of Pipe *
NOMINAL IRON
PIPE SIZE
(IN.)
1/2 0.622 175 120 97 82 73 3/4 0.824 360 250 200 170 151
1 1.049 680 465 375 320 285 1-1/4 1.380 1400 950 770 660 580 1-1/2 1.610 2100 1460 1180 990 900
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas). Ref: Table 10-2 NFPA 54/ANSI Z223.1-1999.
INTERNAL DIAMETER
(IN.)
LENGTH OF PIPE (FT)
10 20 30 40 50
GAS
SUPPLY
MANUAL SHUTOFF VALVE (REQUIRED)
SEDIMENT TRAP
UNION
Fig. 13—Typical Gas Pipe Arrangement
ACCESSORIES
1. Electronic air cleaner (EAC) Two quick-connect terminals, marked EAC-1 and EAC-2, are
provided for EAC connection. (See Fig. 14.) These terminals are energized with 115v (1.0-amp maximum) during blower motor operation.
2. Humidifier (HUM) Quick-connect terminal (HUM) and screw terminal (C
24V) are provided for 24-v humidifier connection. The termi­nals are energized with 24V (0.5-amp maximum) after inducer motor prepurge period.
DO NOT connect furnace control HUM terminal to HUM (humidifier) terminal on Thermidistat™, Zone Controller, or similar device. See Thermidistat, Zone Controller, thermostat, or controller manufacturer’s instructions for proper connec­tion. A failure to follow this warning could result in fire.
A89414
OM-
The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70-1999 and Canadian Elec­trical Code CSA C22.1 or local codes to minimize personal injury if an electrical fault should occur. This may consist of electrical wire or conduit approved for electrical ground when installed in accordance with existing electrical codes. Do not use gas piping as an electrical ground. Failure to follow this warning could result in electrical shock, fire, or death.
24-V WIRING Make field 24-v connections at the 24-v terminal strip. (See Fig.
14.) Connect terminal Y as shown in Fig. 15 for proper operation in cooling mode. Use AWG No. 18 color-coded wire only.
The 24-v circuit contains an automotive-type, 3-amp fuse located on the main control board. Any direct shorts during installation, service, or maintenance could cause this fuse to blow. If fuse replacement is required, use ONLY a 3-amp fuse of identical size.
NOTE: A field-supplied, 115-v controlled relay connected to EAC terminals may be added if humidifier operation is desired during blower operation.
Step 11—Venting
Refer to the national or local installation code such as NFGC in the United States, or the NSCNGPIC in Canada for proper vent sizing and installation requirements. Use the enclosed Installation In­structions (Single-Stage Vent Tables for Category I Fan-Assisted Furnaces) for a quick, easy reference.
After fully assembling the vent connector to the furnace flue collar, securely fasten the vent connector to the collar with two field­supplied, corrosion-resistant, sheet metal screws located 180° apart and midway up the collar.
The horizontal portion of the venting system shall maintain a minimum of 1/4-in. upward slope per linear ft and it shall be rigidly supported every 5 ft or less with hangers or straps to ensure that there will be no movement after installation.
11
Page 12
GRYW
24-V THERMOST AT TERMINALS
TEST/TWIN
3-AMP FUSE
115-VAC (L1)
POWER SUPPLY
HOT SURFACE
IGNITOR CONNECTOR
SEC-1
COOL
HEAT
OM
C
HUM
24V
HUMIDIFIER TERMINAL (24-VAC 0.5 AMP MAX)
LED OPERATION & DIAGNOSTIC LIGHT
HARNESS CONNECTOR
24-V TRANSFORMER SEC-2 SP ARE-1 BLOWER SPEED
SELECTION TERMINALS SP ARE-2
EAC-1 EAC-ELECTRONIC AIR CLEANER
TERMINALS (115-VAC 1.0 AMP MAX) EAC-2
115-VAC (L2) NEUTRAL CONNECTION
INDUCER MOTOR CONNECTOR
Fig. 14—Furnace Control
A99255
BLK
WHT
WHT
GND
115-V
FIELD-SUPPLIED
DISCONNECT
THREE-WIRE
BLK
AUXILIARY J-BOX
FIELD 24-V WIRING FIELD 115-, 208/230-, 460-V WIRING FACTORY 24-V WIRING FACTORY 115-V WIRING
FIVE
WIRE
NOTE 2
WCR GY
THERMOSTAT TERMINALS
FIELD-SUPPLIED DISCONNECT
HEATING-
ONLY
W
R
GND
CONTROL
BOX
FURNACE
G
C Y
24-V
TERMINAL
BLOCK
NOTE 1
CONDENSING UNIT
TWO WIRE
NOTES: Connect Y-terminal as shown for proper operation.
1.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use same type or equivalent wire.
Fig. 15—Heating and Cooling Application Wiring Diagram
208/230- OR 460-V THREE PHASE
208/230-V SINGLE PHASE
GND
A98209
12
Page 13
Table 6—Electrical Data
UNIT SIZE
050-08 115—60—1 127 104 6.6 14 42 15 050-12 115—60—1 127 104 8.1 14 34 15 070-08 115—60—1 127 104 6.7 14 42 15 070-12 115—60—1 127 104 8.4 14 33 15 095-12 115—60—1 127 104 9.2 14 30 15 095-16 115—60—1 127 104 10.2 14 28 15 115-16 115—60—1 127 104 10.1 14 28 15 115-20 115—60—1 127 104 13.3 12 33 20 135-20 115—60—1 127 104 14.3 12 31 20
* Permissible limits of the voltage range at which the unit will operate satisfactorily. † Time-delay type is recommended. ‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
VOLTS— HERTZ—
PHASE
OPERATING VOLTAGE RANGE
Maximum* Minimum*
MAXIMUM
UNIT AMPS
MINIMUM
WIRE GAGE
MAXIMUM WIRE
LENGTH FT‡
FUSE OR CKT BKR
MAXIMUM
AMPS†
Step 12—Start-up, Adjustment, and Safety Check
GENERAL NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control center status indicator light will flash rapidly and furnace will not operate.
The furnace must have a 115-v power supply properly connected and grounded. Proper polarity must be maintained for correct operation. Thermostat wire connections at R, W, C, and Y must be made at the 24-v terminal block on the control board. The gas service pressure must not exceed 0.5 psig (14-in. wc), but must be no less than 0.16 psig (4.5-in. wc).
Before operating the furnace, check each manual reset switch for continuity. If necessary, press the button to reset the switch.
The blower compartment door must be in place to complete the 115-v circuit to the furnace.
This furnace is equipped with 2 manual reset limit switches in the gas control area. The switches will open and shut off power to the gas valve if a flame rollout or an overheating condition occurs in the gas control area. DO NOT bypass the switches. Correct inadequate combustion air supply problem and reset the switches.
SEQUENCE OF OPERATION Using the schematic diagram shown in Fig. 16, follow the
sequence of operation through the different modes. Read and follow the wiring diagram very carefully.
Furnace control must be grounded for proper operation or control will lockout. Control is grounded through green wire routed to gas valve and burner bracket screw.
NOTE: If there is a power interruption and any thermostat call, the control will initiate a 90-sec blower only on period before starting another cycle.
1. Heating mode When the thermostat "calls for heat," R-W circuit closes. The
furnace control performs a self-check, verifies the pressure switch contacts are open, and starts the inducer motor. a. Prepurge period—As the inducer motor comes up to speed,
the pressure switch contacts close to begin a 15-sec prepurge period.
b. Igniter warm-up—At the end of the prepurge period, the
igniter is energized for a 17-sec igniter warm-up period.
c. Ignition sequence—When the igniter warm-up period is
completed, the gas valve opens, permitting gas flow to the burners where it is ignited. After 5 sec, the igniter is de-energized and a 2-sec flame-sensing period begins.
d. HUM terminal is energized with the gas valve. See
Accessories in Electrical Connections section.
e. Flame-sensing—When burner flame is sensed, the control
begins the blower on delay period and continues holding the gas valve open. If burner flame is not sensed, the control closes the gas valve and repeats the ignition cycle.
NOTE: Ignition sequence will repeat 3 additional times before a lockout occurs. Lockout automatically resets after 3 hrs, or can be manually reset by turning 115v off (not at thermostat) for 3 sec minimum, then on again.
f. Blower on delay—Forty-five sec after burner flame is
proven, the blower motor is energized on heating speed. Simultaneously, the humidifier and electronic air cleaner terminals (HUM and C
OM-24V for humidifier, EAC-1 and
EAC-2 for electronic air cleaner) are energized.
g. Blower off delay—When the thermostat is satisfied, the
circuit between R and W is broken, de-energizing the gas valve and stopping gas flow to the burners. The blower motor, and EAC remain energized for 135 sec.
h. Post-purge—The inducer motor remains energized 5 sec
after the burners are extinguished.
2. Cooling mode When the thermostat "calls for cooling," R-G and R-Y circuits
close. The R-Y circuit starts the outdoor condensing unit and combined R-Y and R-G circuits start the furnace blower motor on cooling speed. The EAC-1 terminal is energized with 115v whenever the blower is operating on cooling speed. When the thermostat is satisfied, R-G and R-Y circuits are broken. Furnace blower and EAC continue operating on cooling speed for an additional 90 sec.
3. Continuous blower mode
NOTE: EAC-1 terminal is energized with 115v whenever blower is operating.
When the R-G circuit is made, the blower motor operates on heating speed. During a call for heat, the blower stops, allowing the furnace heat exchangers to heat up more quickly, then restarts at the end of the 45-sec blower on delay period. The blower reverts to continuous operation after the heating cycle is completed. When the thermostat "calls for cooling," the blower operates on cooling speed. When the thermostat is satisfied, the blower operates an additional 90 sec before reverting back to con­tinuous operation on heating speed.
13
Page 14
→Fig. 16—Furnace Wiring Diagram
A00304
PCB
BLOWER OFF DELAY
SELECTION CHART
90 SEC 135 SEC 180 SEC 225 SEC
GVR
HI/LO
RELAY
SEC-1
SEC-2
PL1
321 6
5
4
9
87
LED
TEST/TWIN
BLOWER
OFF
DELAY
G R Y W C
HUM
HSIR IDR BLWR
BLOWER
SPEED
SELECT
FU1
COOL
HEAT
L2
PL3
PL2
VAC
120
L1
PR1
1 2
1 2 3
PR2
24 VAC-3A
FUSE
SPARE-2
SPARE-1
EAC-1
EAC-2
C
1.5 AMP
12
PL5
WHT
BLK
WHT
WHT
BLK
BLK
HSI
BLK
WHT
WHT (COM)
RED (LO)
BLU (MED LO)
NOTE #7
OL
START
BLWM
YEL (MED HI)
BLK (HI)
BRN
BRN
TRAN
BLU
RED
BLK
WHT
WHT (COM)
CAP
RED
RED
ORN
FUSED DISCONNECT
SWITCH (WHEN REQ’D)
NOTE #4
FU2
BLK WHT
JB
LEGEND
ALS AUXILIARY LIMIT SWITCH, OVERTEMP. -MANUAL RESET, SPST-(N.C.) BLWR BLOWER MOTOR RELAY, SPST-(N.O.) BLWM BLOWER MOTOR BVSS BLOCKED VENT SHUTOFF SWITCH, SPST - (N .C.) CAP CAPACITOR CPU MICROPROCESSOR AND CIRCUITRY DSS DRAFT SAFEGUARD SWITCH EAC-1 ELECTRONIC AIR CLEANER CONNECTION (115 VAC 1.5 AMP MAX.) EAC-2 ELECTRONIC AIR CLEANER CONNECTION (COMMO N) FL FUSIBLE LINK FRS FLAM E R OL LOUT SW . -MANU AL R ESET, SPST-(N.C.) FSE FLAME PROVING ELECTRODE FU1 FUSE, 3 AMP, AUT OM OTIVE BLADE TYPE, FACTORY INSTALLED FU2 FUSE OR CIRCUIT BREAKER CURRENT INTERRUPT DEVICE
(FIELD INSTALLED & SUPPLIED) GV GAS VALVE-REDUNDANT OPERA TORS GVR GAS VALVE RELAY , DPST -(N.O.) HI/LO BLOWER MOTOR SPEED CHANGE R ELAY, SPDT HSI HOT SURFACE IGNITOR (115 VAC) HSIR HOT SURFACE IGNITOR RELAY, SPST-(N.O.) HUM 24VAC HUMIDIFIER CONNECTION (.5 AMP. MAX.) IDM INDUCED DRAFT MOTOR IDR INDUCED DRAFT RELAY, SPST-(N.O.) ILK BLOWER ACCESS PANEL INTERLOCK SWITCH, SPST-(N.O.) JB JUNCTION BOX LED LIGHT-EMITTING DIODE FOR STATUS CODES LGPS LOW G AS PRESSURE SW ITCH, SPST-(N.O.) LS LIMIT SWITCH, AUTO RESET, SPST(N.C.) OL AUTO-RESET INTERNAL MOTOR OVERLOAD TEMP. SW.
PCB PRINTED CIRCUIT BOARD PL1 9-CIRCUIT CONNECTOR PL2 2-CIRCUIT PCB CONNECTOR PL3 3-CIRCU IT ID M CONN E C T O R PL5 2-CIRCUIT HSI/PCB CONNECTOR PRS PRESSURE SWITCH, SPST-(N.O.) TEST/TWIN COMPONENT TEST & TWIN TERMINAL TRAN TRANSFORMER-115VAC/24VAC
JUNCTION UNMARKED TERMI NAL PCB TERMINAL FACTORY WIRING (115VAC) FACTORY WIRING (24VAC) FIELD WIRING (115VAC) FIELD WIRING (24VAC) CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE
L1
L2
L1
BLWR
HI/LO
TO 115VAC FIELD DISCONNECT
NOTE #4
EQUIPMENT GROUND
SPARE-2
HEAT
SPARE-1
COOL
NOTE #7
COM
HSIR
EAC-1
START
OL
COM
HI
MED HI
MED LO
LO
BLWM
SCHEMATIC DIAGRAM
(NATURAL GAS & PRO PANE)
EAC-2
1
1
HSI
2
PL52
PL2
3
PL3
PR2
115VA C
PR1
TRAN
24VAC
1
2
IDR
TEST/TWIN
FU1
NOTE #6
CAP
L2
PL1
8
FSE
9
6
5
CPU
HSIR
IDR
BLWR
Y
G
C
R
W
GVR-2
SEC-1
HI/LO
GVR
SEC-2
NOTES:
322869-101 REV. H
1. If any of the original equipment wire is replaced use wire rated for 105°C.
2. Inducer (IDM) and blower (BLWM) motors contain internal auto-reset therm al overload switches (OL).
3. Blower motor speed selections are for average conditions, see installation instructions for details on optimum speed selection.
4. Use only copper wire between the disconne ct s witch and the furnace junction box (JB).
5. This wire must be connected to furnace she etm etal for control to detect flame.
6. Replace only with a 3 amp fuse.
7. Yellow lead not on all motors.
8. Blower-on delay, gas heating 45 seconds, cooling or heat pump 2 seconds.
9. Blower-off delay, gas heating 90 , 135, 180 or 2 25 sec on ds, co oling or he at pum p 90 se co nds . (135 seconds only on some models)
10. Ignition-lockout will occ u r a f te r f o u r c onsecutive u nsuccess f u l t ria ls -f o r -ig n iti o n . Control will auto-reset after thre e hours.
11. When used, auxiliar y limit switch (ALS) is on s o me down f lo w models o n ly . When us e d, FL is on upflow models only.
12. Some models may have sp ad e quic k co nn e ct terminals.
13. Factory connected when LGPS is not used.
14. Factory connected when BVSS is not used. BVSS used when C himney Adapter Accessory Kit is installed.
15. Gas valve leads are interchangeable on single stage valves .
BLK
OM
SW2
SW1
OM
3
4
7 1
OM
HUM
IDM
ILK
DSS
BVSS
PRS
ILK
L1
NEUTRAL
IDM
(WHEN USED)
NOTE #14
NOT USED NOT USED
NOT USED
FSE
BLU
PRS
DSS
BVSS
(WHEN USED)
NOTE #14
WHT
LS
FL
(NOT ON ALL MODELS)
NOTE #9
FRS1
FRS2
LS
FL
NOTE #12
ORN
ORN
ORN
ALS
(WHEN USED)
ORN
NOTE #11
LGPS
(WHEN USED)
NOTE #13
NOTE #14
NOTE #11
2
GVR-1
NOTE #14
ALS
(WHEN USED)
(WHEN USED)
NOTE #13
LGPS
(WHEN USED)
NOTE #13
YEL
FRS1
FRS2
(WHEN USED) NOTE #11
GRN/YEL
GRN/YEL
GND
NOTE #5
GRN/YEL
NOTE #5
GRN/YEL
NOTE #15
NOTE #15
GV
GV
14
Page 15
4. Heat pump mode When installed with a heat pump, the furnace control auto-
matically changes the timing sequence to avoid long blower off time during demand defrost cycles. When the W-Y or W-Y-G thermostat inputs are received at the same time, the control changes the blower to heating speed or starts the blower if it was off, and begins a heating cycle. The blower remains on until the end of the prepurge period, then shuts off until the end of the ignition warm up and trial for ignition periods (a total of 24 sec). The blower then comes back on at heating speed.
When the W input signal disappears, the control begins the normal inducer post-purge period and the blower changes to cooling speed after a 1-sec delay. If the W-Y-G signals disappear at the same time, the blower remains on for the selected heating blower off delay period and the inducer goes through its normal post-purge period. If the W-Y inputs should disappear, leaving the G signal input, the control goes into continuous blower and the inducer remains on for the normal post-purge period.
Anytime the control senses false flame, the control locks out of the heating mode. This occurs because the control cannot sense the W input due to the false flame signal and, as a result, sees only the Y input and goes into cooling mode blower off delay. All other control functions remain in standard format.
NOTE: EAC-1 terminal is energized whenever blower operates. HUM terminal is only energized when gas valve is energized.
START-UP PROCEDURES
1. Purge gas lines—After all connections have been made, purge the lines and check for leaks.
Never purge a gas line into a combustion chamber. Never use matches, candles, flame, or other sources of ignition to check for gas leakage. Use a soap-and-water solution to check for gas leaks. Failure to follow this warning could result in fire, explosion, personal injury, or death.
2. Component test—The furnace control allows all components, except gas valve, to be run for a short period of time.
This feature helps diagnose a system problem in case of a component failure. To initiate component test procedure, short (jumper) the TEST 3/16-in. quick connect terminal on control (adjacent to diagnostic light) and the C
OM-24V terminal on
furnace thermostat connection block for approximately 2 sec. (See Fig. 14.)
NOTE: Component test feature will not operate if any thermostat signal is present at control.
Component test sequence is as follows. a. Momentarily jumper TEST and C
OM-24V terminals until
LED goes off. b. LED will display previous status 4 times. c. Inducer motor starts and continues to run for entire com-
ponent test. d. Hot surface igniter is energized for 15 sec, then de-
energized. e. Blower motor operates on cooling speed for 10 sec, then
stops. f. Blower motor operates on heating speed for 10 sec, then
stops.
g. Inducer motor stops.
3. To operate furnace, follow procedures on operating instruction label attached to furnace.
4. With furnace operating, set thermostat below room tempera­ture and observe that furnace goes off. Set thermostat above room temperature and observe that furnace restarts.
ADJUSTMENTS
1. Set gas input rate Furnace gas input rate on rating plate is for installations at
altitudes up to 2000 ft. Furnace input rate must be within ±2 percent of input on furnace rating plate.
a. Determine natural gas orifice size and manifold pressure
for correct input. (1.) Obtain average yearly gas heat value (at installed
altitude) from local gas supplier.
(2.) Obtain average yearly gas specific gravity from local
gas supplier.
(3.) Verify furnace model. Table 8 can only be used for
model 58RAV Furnaces.
(4.) Find installation altitude in Table 8.
NOTE: For Canada altitudes of 2000 to 4500 ft, use U.S.A. altitudes of 2001 to 3000 ft in Table 8.
(5.) Find closest natural gas heat value and specific gravity
in Table 8.
(6.) Follow heat value and specific gravity lines to point of
intersection to find orifice size and manifold pressure settings for proper operation .
EXAMPLE: (0—2000 ft altitude) Heating value = 1050 Btu/cu ft Specific gravity = 0.62 Therefore: Orifice No. 43*
Manifold pressure 3.6-in. wc * Furnace is shipped with No. 43 orifices. In this example all main burner orifices are the correct size and do not need to be changed to obtain proper input rate.
(7.) Check and verify burner orifice size in furnace.
NEVER ASSUME ORIFICE SIZE. ALWAYS CHECK AND VERIFY.
b. Adjust manifold pressure to obtain input rate.
(1.) Remove regulator adjustment seal cap. (See Fig. 17.) (2.) Turn adjusting screw, counterclockwise (out) to de-
crease manifold pressure or clockwise (in) to increase manifold pressure.
Table 7—Altitude Derate Multiplier for U.S.A.
ALTITUDE
(FT)
0—2000 0 1.00 2001—3000 8—12 0.90 3001—4000 12—16 0.86 4001—5000 16—20 0.82 5001—6000 20—24 0.78 6001—7000 24—28 0.74 7001—8000 28—32 0.70 8001—9000 32—36 0.66
9001—10,000 36—40 0.62
* Derate multiplier factor is based on midpoint altitude for altitude range.
%OF
DERATE
DERATE MULTIPLIER
FACTOR FOR U.S.A*
15
Page 16
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
0 925 42 3.4 42 3.5 42 3.6 42 3.7 42 3.8
to 975 43 3.7 43 3.8 42 3.2 42 3.3 42 3.4
2000 1025 43 3.3 43 3.4 43 3.6 43 3.7 43 3.8
U.S.A. and Canada
ALTITUDE
RANGE
(FT)
U.S.A 775 42 3.7 42 3.8 41 3.5 41 3.6 41 3.8
Altitudes 800 42 3.4 42 3.6 42 3.7 42 3.8 41 3.5
2001 825 42 3.2 42 3.3 42 3.5 42 3.6 42 3.7
to 850 43 3.7 43 3.8 42 3.3 42 3.4 42 3.5
3000 875 43 3.5 43 3.6 43 3.7 42 3.2 42 3.3
or 900 43 3.3 43 3.4 43 3.5 43 3.7 43 3.8
Canada 925 43 3.1 43 3.2 43 3.4 43 3.5 43 3.6
Altitudes 950 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4
U.S.A. and Canada
2000 975 43 2.8 43 2.9 43 3.0 43 3.1 43 3.2
to 1000 43 2.7 43 2.8 43 2.9 43 3.0 43 3.1
4500 1025 43 2.6 43 2.6 43 2.7 43 2.8 43 2.9
ALTITUDE
RANGE
(FT)
3001 825 43 3.5 43 3.6 43 3.7 43 3.8 42 3.2
to 875 43 3.1 43 3.2 43 3.3 43 3.4 43 3.5
U.S.A. Only
4000 925 43 2.8 43 2.9 43 3.0 43 3.0 43 3.1
ALTITUDE
RANGE
(FT)
4001 800 43 3.2 43 3.3 43 3.5 43 3.6 43 3.7
to 850 43 2.9 43 3.0 43 3.1 43 3.2 43 3.3
U.S.A. Only
5000 900 43 2.6 43 2.6 43 2.7 43 2.8 43 2.9
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc. † Orifice sizes shown in BOLD are factory installed.
AVG GAS
HEAT VALUE
AT ALTITUDE
(BTU/CU FT)
850 41 3.6 41 3.7 41 3.8 40 3.6 40 3.8 875 42 3.8 41 3.5 41 3.6 41 3.7 41 3.8 900 42 3.5 42 3.7 42 3.8 41 3.5 41 3.6
950 42 3.2 42 3.3 42 3.4 42 3.5 42 3.6
1000 43 3.5 43 3.6 43 3.7 42 3.2 42 3.3
1050 43 3.2 43 3.3 43 3.4 43 3.5 43 3.6 1075 44 3.5 44 3.6 43 3.2 43 3.3 43 3.4 1100 44 3.3 44 3.4 44 3.5 43 3.2 43 3.3
AVG GAS
HEAT VALUE
AT ALTITUDE
(BTU/CU FT)
AVG GAS
HEAT VALUE
AT ALTITUDE
(BTU/CU FT)
750 42 3.4 42 3.6 42 3.7 42 3.8 41 3.5 775 42 3.2 42 3.3 42 3.5 42 3.6 42 3.7 800 43 3.7 43 3.8 42 3.2 42 3.3 42 3.4
850 43 3.3 43 3.4 43 3.5 43 3.6 43 3.7
900 43 2.9 43 3.0 43 3.1 43 3.2 43 3.3
950 43 2.6 43 2.7 43 2.8 43 2.9 43 3.0 975 43 2.5 43 2.6 43 2.7 43 2.7 43 2.8
1000 43 2.4 43 2.4 43 2.5 43 2.6 43 2.7
AVG GAS
HEAT VALUE
AT ALTITUDE
(BTU/CU FT)
725 42 3.2 42 3.3 42 3.5 42 3.6 42 3.7 750 43 3.7 43 3.8 42 3.2 42 3.3 42 3.4 775 43 3.4 43 3.6 43 3.7 43 3.8 42 3.2
825 43 3.0 43 3.1 43 3.2 43 3.4 43 3.5
875 43 2.7 43 2.8 43 2.9 43 3.0 43 3.1
925 43 2.4 43 2.5 43 2.6 43 2.7 43 2.8 950 43 2.3 43 2.4 43 2.5 43 2.5 43 2.6
0.58 0.60 0.62 0.64 0.66
Orifice
Orifice
Orifice
Orifice
Manifold
No.
Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
No.
Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
No.
Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
No.
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
SPECIFIC GRAVITY OF NATURAL GAS
Manifold Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold Pressure
Manifold Pressure
Manifold Pressure
Manifold Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
16
Page 17
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input (Continued)
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
5001 800 43 2.8 43 2.9 43 3.0 43 3.1 43 3.2
to 850 43 2.5 43 2.6 43 2.7 43 2.8 43 2.8
U.S.A. Only
6000 900 43 2.2 43 2.3 43 2.4 43 2.5 43 2.5
ALTITUDE
RANGE
(FT)
6001 725 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4
to 775 43 2.6 43 2.7 43 2.8 43 2.9 43 3.0
U.S.A. Only
7000 825 43 2.3 43 2.4 43 2.5 43 2.5 43 2.6
ALTITUDE
RANGE
(FT)
7001 700 43 2.7 43 2.8 43 2.9 43 3.0 43 3.1
to 750 43 2.4 43 2.5 43 2.6 43 2.6 43 2.7
U.S.A. Only
8000 800 43 2.1 43 2.2 43 2.2 43 2.3 43 2.4
ALTITUDE
RANGE
(FT)
8001 650 43 2.7 43 2.8 43 2.9 43 3.0 43 3.1
to 700 43 2.4 43 2.4 43 2.5 43 2.6 43 2.7
U.S.A. Only
9000 750 43 2.0 43 2.1 43 2.2 43 2.3 43 2.3
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc. † Orifice sizes shown in BOLD are factory installed.
AVG GAS HEAT VALUE AT ALTITUDE
(BTU/CU FT)
700 43 3.7 43 3.8 42 3.2 42 3.3 42 3.4 725 43 3.4 43 3.6 43 3.7 43 3.8 42 3.2 750 43 3.2 43 3.3 43 3.4 43 3.5 43 3.6 775 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4
825 43 2.7 43 2.7 43 2.8 43 2.9 43 3.0
875 43 2.4 43 2.4 43 2.5 43 2.6 43 2.7
925 43 2.1 43 2.2 43 2.3 43 2.3 43 2.4 950 48 3.8 43 2.1 43 2.1 43 2.2 43 2.3 975 48 3.6 48 3.7 43 2.0 43 2.1 43 2.2
1000 48 3.4 48 3.5 48 3.6 48 3.7 43 2.1
AVG GAS HEAT VALUE AT ALTITUDE
(BTU/CU FT)
650 43 3.7 43 3.8 42 3.2 42 3.3 42 3.5 675 43 3.4 43 3.5 43 3.7 43 3.8 42 3.2 700 43 3.2 43 3.3 43 3.4 43 3.5 43 3.6
750 43 2.8 43 2.9 43 3.0 43 3.1 43 3.2
800 43 2.4 43 2.5 43 2.6 43 2.7 43 2.8
850 43 2.2 43 2.2 43 2.3 43 2.4 43 2.5 875 43 2.0 43 2.1 43 2.2 43 2.3 43 2.3
AVG GAS HEAT VALUE AT ALTITUDE
(BTU/CU FT)
625 43 3.4 43 3.6 43 3.7 43 3.8 42 3.2 650 43 3.2 43 3.3 43 3.4 43 3.5 43 3.6 675 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4
725 43 2.6 43 2.6 43 2.7 43 2.8 43 2.9
775 43 2.2 43 2.3 43 2.4 43 2.5 43 2.5
825 48 3.7 43 2.0 43 2.1 43 2.2 43 2.2 850 48 3.5 48 3.6 48 3.7 43 2.1 43 2.1
AVG GAS HEAT VALUE AT ALTITUDE
(BTU/CU FT)
600 43 3.2 43 3.3 43 3.4 43 3.5 43 3.6 625 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4
675 43 2.5 43 2.6 43 2.7 43 2.8 43 2.9
725 43 2.2 43 2.3 43 2.3 43 2.4 43 2.5
775 48 3.6 48 3.7 43 2.1 43 2.1 43 2.2 800 48 3.4 48 3.5 48 3.6 48 3.7 43 2.0
0.58 0.60 0.62 0.64 0.66
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
Pressure
0.58 0.60 0.62 0.64 0.66 Manifold
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
SPECIFIC GRAVITY OF NATURAL GAS
Manifold
Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold
Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold
Pressure
SPECIFIC GRAVITY OF NATURAL GAS
Manifold
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Orifice
No.
Orifice
No.
Orifice
No.
Orifice
No.
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
Manifold
Pressure
17
Page 18
Table 8—Model 58RAV Orifice Size† and Manifold Pressure for Correct Input (Continued)
(Tabulated Data Based on 23,000 BTUH Per Burner, Derated 4 Percent per 1000 Ft Above Sea Level)*
ALTITUDE
RANGE
(FT)
9001 625 43 2.5 43 2.6 43 2.7 43 2.8 43 2.8
to 675 43 2.1 43 2.2 43 2.3 43 2.4 43 2.4
U.S.A. Only
10,000 725 48 3.5 48 3.6 48 3.7 43 2.1 43 2.1
* For size 135-20 only, input is 22,500 Btuh per burner. Deduct 0.1-in. wc from manifold pressure shown in table. Change orifice size if manifold pressure falls below
3.2-in. wc on altitudes up to 2000 ft, otherwise change orifice size if manifold pressure falls below 2.0-in. wc. † Orifice sizes shown in BOLD are factory installed.
AVG GAS
HEAT VALUE
AT ALTITUDE
(BTU/CU FT)
575 43 3.0 43 3.1 43 3.2 43 3.3 43 3.4 600 43 2.7 43 2.8 43 2.9 43 3.0 43 3.1
650 43 2.3 43 2.4 43 2.5 43 2.6 43 2.6
700 48 3.8 43 2.1 43 2.1 43 2.2 43 2.3
750 49 3.8 48 3.4 48 3.5 48 3.6 48 3.7 775 49 3.6 49 3.7 49 3.8 48 3.4 48 3.5
0.58 0.60 0.62 0.64 0.66
Orifice
No.
Manifold
Pressure
Orifice
No.
SPECIFIC GRAVITY OF NATURAL GAS
Manifold Pressure
Orifice
No.
Manifold
Pressure
Orifice
No.
Manifold Pressure
Orifice
No.
Manifold
Pressure
NOTE: This furnace has been approved for a manifold pressure of 3.2-in. wc to 3.8-in. wc when installed at altitudes up to 2000 ft. For altitudes above 2000 ft, the manifold pressure can be adjusted from 2.0-in. wc to 3.8-in. wc.
DO NOT bottom out gas valve regulator adjusting screw. This can result in unregulated manifold pressure and result in excess overfire and heat exchanger failures.
NOTE: If orifice hole appears damaged or it is suspected to have been redrilled, check orifice hole with a numbered drill bit of correct size. Never redrill an orifice. A burr-free and squarely aligned orifice hole is essential for proper flame characteristics.
BURNER
ORIFICE
(4.) Burner flame should be clear blue, almost transparent.
(See Fig. 18.)
c. Verify natural gas input rate by clocking gas meter.
NOTE: High-Altitude Adjustment United States At installation altitudes above 2000 ft, this furnace has been
approved for a 4 percent derate for each 1000 ft above sea level. See Table 7 for derate multiplier factor.
EXAMPLE: 92,000 Btuh input furnace installed at 4300 ft.
Furnace Input
Rate at
Sea Level
92,000 X 0.82 = 75,440
X
Derate
Multiplier
Factor
Furnace Input Rate
=
at Installation
Altitude
Canada At installation altitudes from 2000 to 4500 ft, this furnace must be
derated 10 percent by an authorized Gas Conversion Station. To determine correct input rate for altitude, see example above and use 0.90 as derate multiplier factor.
a. Turn off all other gas appliances and pilots. b. Start furnace and let operate for 3 minutes. c. Measure time (in sec) for gas meter test dial to complete 1
revolution. d. Refer to Table 9 for cu ft of gas per hr. e. Multiply gas rate (cu ft/hr) X heating value (Btu/cu ft)
using natural gas heating value from local gas
utility/supplier.
DO NOT redrill orifices. Improper drilling (burrs, out-of­round holes, etc.) can cause excessive burner noise and misdirection of burner flames. This can result in flame impingement of burners and heat exchangers, causing fail­ures..
(3.) After correct manifold pressure is obtained, replace
gas valve regulator adjustment screw cap and verify adjusted gas input rate using method outlined in item c.
A93059
EXAMPLE: (0—2000 ft altitude) Btu heating input = Btu/cu ft X cu ft/hr Heating value of gas = 1050 Btu/cu ft Time for 1 revolution of 2-cu ft dial = 82 sec Gas rate = 88 cu ft/hr (from Table 9) Btu heating input = 88 X 1050 = 92,400 Btuh In this example, the orifice size and manifold pressure adjustment is within ±2 percent of the furnace input rate.
2. Set temperature rise. Furnace must operate within range of temperature rise speci-
fied on the unit rating plate. Determine the air temperature rise as follows.
18
Page 19
SECONDS
FOR 1
REVOLUTION
10 11 12 13 14
15 16 17 18 19
20 21 22 23 24
25 26 27 28 29
30 31 32 33 34
35 36 37 38 39
40 41 42 43 44
45 46 47 48 49
Table 9—Gas Rate (Cu Ft/Hr)
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
360
720 655 600 555 514
480 450 424 400 379
360 343 327 313 300
288 277 267 257 248
240 232 225 218 212
206 200 195 189 185
180 176 172 167 164
160 157 153 150 147
1800 1636 1500 1385 1286
1200 1125 1059 1000
947
900 857 818 783 750
720 692 667 643 621
600 581 563 545 529
514 500 486 474 462
450 439 429 419 409
400 391 383 375 367
327 300 277 257
240 225 212 200 189
180 171 164 157 150
144 138 133 129 124
120 116 113 109 106
103 100
97 95 92
90 88 86 84 82
80 78 76 75 73
SECONDS
FOR 1
REVOLUTION
50 51 52 53 54
55 56 57 58 59
60 62 64 66 68
70 72 74 76 78
80 82 84 86 88
90 92 94 96 98
100 102 104 106 108
110 112 116 120
SIZE OF TEST DIAL
1
cu ft2cu ft5cu ft
72
144 141 138 136 133
131 129 126 124 122
120 116 112 109 106
103 100
97 95 92
90 88 86 84 82
80 78 76 75 74
72 71 69 68 67
65 64 62 60
360 355 346 340 333
327 321 316 310 305
300 290 281 273 265
257 250 243 237 231
225 220 214 209 205
200 196 192 188 184
180 178 173 170 167
164 161 155 150
71 69 68 67
65 64 63 62 61
60 58 56 54 53
51 50 48 47 46
45 44 43 42 41
40 39 38 38 37
36 35 35 34 33
33 32 31 30
BURNER FLAME
BURNER
MANIFOLD
A89020
Fig. 18—Burner Flame
b. When thermometer readings stabilize, subtract return-air
temperature from supply-air temperature to determine tem­perature rise.
c. Adjust air temperature rise by adjusting blower speed.
Increase blower speed to reduce temperature rise. Decrease blower speed to increase temperature rise.
Disconnect the electrical power before changing the speed tap. Failure to follow this warning could result in personal injury.
d. To change blower motor speed selections for heating mode,
remove blower motor lead from control board HEAT terminal. (See Fig. 14.) Select desired blower motor speed lead from 1 of the other terminals and relocate it to HEAT terminal. See Table 10 for lead color identification. Recon­nect original lead on SPARE terminal.
Follow this same procedure for proper selection of COOL speed selection.
→Fig. 17—Redundant Automatic Gas Control
Valve
a. Place duct thermometers in return and supply ducts as near
furnace as possible. Be sure thermometers do not "see" heat exchangers so that radiant heat does not affect thermometer readings. This is particularly important with straight-run ducts.
A00238
Table 10—Speed Selector
COLOR SPEED
Black High COOL
Yellow
(When present)
Blue Medium-Low HEAT
Red Low SPARE
White Common L2/COM
Recheck temperature rise. It must be within limits specified on unit rating plate. Recommended operation is at midpoint of rise or above.
3. Set thermostat heat anticipator. The thermostat heat anticipator must be set to match the amp
draw of the electrical components in the R-W circuit. Accurate amp draw readings can be obtained at thermostat subbase terminals R and W. Fig. 19 illustrates an easy method of obtaining the actual amp draw. The amp reading should be taken after the blower motor has started. See the thermostat manufacturer’s instructions for adjusting the heat anticipator and for varying the heating cycle length.
19
FACTORY-
ATTACHED TO
Medium-High SPARE
Page 20
THERMOSTAT SUBBASE TERMINALS WITH THERMOSTAT REMOVED (ANITICIPATOR, CLOCK, ETC., MUST BE OUT OF CIRCUIT.)
HOOK-AROUND AMMETER
R Y W G
10 TURNS
FROM UNIT 24-V CONTROL TERMINALS
EXAMPLE:
5.0 AMPS ON AMMETER 10 TURNS AROUND JAWS
0.5 AMPS FOR THERMOSTAT
=
ANTICIPATOR SETTING
A96316
Fig. 19—Amp Draw Check With Ammeter
NOTE: When using an electronic thermostat, set cycle rate for 3
cycles per hr. CHECK SAFETY CONTROLS The flame sensor, gas valve, and pressure switch were all checked
in the Start-Up Procedures section as part of normal operation.
1. Check primary limit control. This control shuts off the combustion control system and
energizes the circulating-air blower motor if the furnace overheats.
The preferred method of checking the limit control is to gradually block off the return air after the furnace has been operating for a period of at least 5 minutes. As soon as the limit has shut off the burners, the return-air opening should be unblocked. By using this method to check the limit control, it can be established that the limit is functioning properly and operates if there is a motor failure.
2. Check blocked vent safeguard switch. The purpose of this control is to permit the safe shutdown of
the furnace during certain blocked vent conditions. a. Disconnect power to furnace and remove vent connector
from furnace outlet collar. Be sure to allow time for vent pipe to cool down before removing.
b. Restore power to furnace and set room thermostat above
room temperature.
c. After normal start-up, allow furnace to operate for 2
minutes, then block flue outlet 100 percent. Furnace should cycle off within 2 minutes.
d. Remove blockage and reconnect vent pipe to furnace outlet
collar.
e. Wait 5 minutes and then reset blocked vent safeguard
switch.
3. Check pressure switch. This control proves operation of draft inducer blower. a. Turn off 115-v power to furnace. b. Remove control door and disconnect inducer motor lead
wires from wire harness.
c. Turn on 115-v power to furnace.
→
d. Set thermostat to "call for heat" and wait 1 minute. When
pressure switch is functioning properly, hot surface igniter should NOT glow and control diagnostic light flashes a status code 31. If hot surface igniter glows when inducer motor is disconnected, shut down furnace immediately. Determine reason pressure switch did not function properly
and correct condition. e. Turn off 115-v power to furnace. f. Reconnect inducer motor wires, replace control door, and
turn on 115-v power to furnace.
4. Check auxiliary limits (when used). a. Turn off 115-v power to furnace. b. Remove blower access door. c. Disconnect red motor lead at blower speed selector. Mark
terminal for proper re-connection. d. Replace blower access door. e. Turn on 115-v power to furnace. Be sure room thermostat
is calling for heat. f. Allow furnace to operate until auxiliary limit activates, but
DO NOT operate furnace longer than 4 minutes.
g. If furnace operates for 4 minutes, check/replace limit
switch(es). h. Turn off 115-v power to furnace. i. Remove blower access door. j. Reconnect red motor lead, reset switch, and replace door. k. Turn on 115-v power to furnace.
CHECKLIST
1. Put away tools, instruments, and clean up debris.
2. Verify manual reset switches have continuity.
3. Ensure blower and control access doors are properly installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer’s instruc­tions.
6. Review User’s Manual with owner.
7. Leave literature packet near furnace.
20
Page 21
CHECKLIST—INSTALLATION
LOAD CALCULATION
____________ Heating Load (Btuh)
____________ Cooling Load (Btuh)
____________ Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________ Unconfined Space
____________ Confined Space
VENTING
____________ NFGC (United States)
____________ NSCNGPIC (Canada)
____________ Local Codes
____________ 1/4-in. Upward Slope
____________ Joints Secure
____________ See Attached Vent Table Instructions
CHECKLIST—START-UP
____________
____________ Temperature Rise Adjusted
____________ Thermostat Anticipator Setting Adjusted or
____________ Thermostat Cycle Rate (3 cycles per Hr)
CHECK SAFETY CONTROLS OPERATION
____________ Primary Limit
____________ Pressure Switches
____________ Draft Safeguard Switch
____________ Auxiliary Limit Switch(es)
Gas Input Rate (Set Within 2 percent of Rating Plate)
21
Page 22
22
Page 23
23
Page 24
SERVICE TRAINING
Packaged Service Training programs are an excellent way to increase your knowledge of the equipment discussed in this manual, including:
• Unit Familiarization • Maintenance
• Installation Overview • Operating Sequence A large selection of product, theory, and skills programs is available, using popular video-based formats and materials. All include video and/or slides, plus companion book.
Classroom Service Training plus "hands-on" the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting, fewer callbacks. Course descriptions and schedules are in our catalog.
CALL FOR FREE CATALOG 1-800-962-9212
[ ] Packaged Service Training [ ] Classroom Service Training
A94328
Copyright 2000 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231 58ra16si
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4 Tab 6a 8a
PC 101 Catalog No. 535-767 Printed in U.S.A. Form 58RA-16SI Pg 24 10-00 Replaces: 58RA-14SI
Loading...