CARR 301861 HD 18 Tube Step User Manual

H
D 18” Tube
Step Installation Instructions
Diagram
3
Part No’s: 301860 / 301861
1. Remove all of the plastic carpet covers at the door jam
before starting. Refer to diagram 1. ELECTRICAL
CAUTION: The passenger side has an electrical wire
Diagram 1
CARPETING
PLASTIC
CARPET COVER
REMOVE SCREWS
harness underneath the plastic carpet cover. The wire harness is protected by a plastic cover. However, when drilling, be very careful not to drill through the plastic cover into the wire harness.
Wire Harness
BODY METAL
2. Place the black mounting castings in the open ends of the
tube. Line up the holes and securely fasten the castings to the tube with hardware provided. See Detail A.
3. Assemble the Mounting Feet to the step as shown in the Master drawing, but only hand tighten.
4. Take only two steel brackets with the hardware provided (be sure only to use the 5/16" bolts
provided) and bolt each steel bracket to each mounting foot. Tap each steel bracket into position until the steel brackets are straight on each mounting foot. (Refer to diagram 2)
5. On the passenger side only, there are air-conditioning
Diagram 2
lines and rear heater lines on the bottom inside face of the rocker panel that run along the length of both doors. (Refer to diagram 3). There are four rubber clamping brackets that hold all four lines in place. Take a 10mm socket and socket wrench and back out
Body Metal Contour
Hex
Head
Screw
the screws ONLY half way to loosen the lines up. NOTE: (If the screws are
Rubber
Clamping
Bracket
Rubber Coated AC And Heater Lines
NOTE: PASSENGER SIDE ONLY
removed, they
will be extremely difficult to reinstall.)
6. From underneath your vehicle, place your step in desired position with the feet of the steel brackets
laying on top of the pinch weld. You may have to slightly move your step forward or backward to avoid the rubber clamping brackets and the front body mount.
7. While securely holding the step in place, mark the top hole of each steel bracket and mark lines all
along each side of the steel bracket on the body metal. Remove the step from underneath the vehicle.
8. Center-punch the two top marked holes. (REFER TO THE ELECTRICAL CAUTION ABOVE!)
Take a drill motor and a sharp 1/8" drill bit and drill out the center punched holes. Go back with a sharp 5/16" drill bit and enlarge the 1/8" holes. (Caution: do not allow the drill to wander when drilling. This will result in a mis-alignment of the drilled holes.)
9. *Take an unused steel bracket and place in the same spot as where the drilled hole and lines are.
(Also note Step 24)
H
D 18” Tube
Step Installation Instructions
Part No’s: 301860 / 301861
10. Put one of the 5/16“ bolts through the body metal from
the open door side and through the steel bracket. Line
Diagram 4
up the bracket with the marked lines. Mark two more lines on the outside of the pinch weld that line up with the lines inside of the pinch weld. Also, using the edge of the pinch weld as a guide, mark another line across the bottom of the foot of the steel bracket (refer to diagram 4).
11. Take the 5/16 bolt out and remove the steel bracket.
Measure the distance from the marked line across the
PENCIL LINE ON UNDERSIDE OF STEEL BRACKET BOTTOM FLANGE
PENCIL LINES ON
PINCH WELD
foot of the steel bracket and the center of the hole.
12. Take the dimension from step 10 and measure the same distance from the pinch weld. Mark a line
on the body metal centered between the other outside lines.
13. Measure across the outside lines and mark another line that will cross the line you marked in Step
11.
14. Center punch where the lines cross.
15. Stuff a rag between the body metal and the A/C and rear heater lines to push the lines up out of the
way while drilling.
16. Before drilling, take the steel bracket and slip it between the body metal and the A/C and rear
heater lines for protection when drilling.
17. With a sharp 1/8" drill bit, drill out the center punched area. Go back and drill out the 1/8" hole
with a 5/16" drill bit.
18. Place the steel bracket back into place. Put a 5/16" bolt in both holes to see if the holes in the body
metal line up with the holes in the steel bracket. If the holes do not line up, take a round file or a power grinder and enlarge the hole until the bolts fit.
19. Repeat the steps for drilling out the holes for the other
steel bracket.
Diagram 5
20. With all the holes drilled, place your step back into
position. Use the 5/16" hardware provided and hand tighten the front steel bracket to the vehicle. (Refer to Diagram 5).
21. Take additional hardware and hand tighten the rear
steel bracket to the vehicle. NOTE: (if the rear bracket holes do not line up, loosen the bolts on mounting foot. This should give enough play to get the holes to line up.)
22. With everything in its proper place, go back and
securely tighten all the hardware.
23. Remove the rags used for drilling.
24. Tighten the loosened screws on the rubber clamps for the A/C and rear heater lines.
25. *Follow the same steps for installing the other step on the driver’s side of the vehicle. However,
since there are none, skip over all directions that refer to A/C and rear heater lines. *Also, after
Loading...
+ 2 hidden pages