Urbane II Basin Pop-up Waste Assembly
Installation Instructions
Plug and Waste Installation Procedure
1. Disassemble the Rubber Washer, Waste Nut and Wing
Nut as shown in Fig. 1.
2. Apply flexible sealant to the underside face of the Waste
Body as shown.
3. Fit Waste Body and Stud into basin waste hole and
centralise the Top Cap.
4. Fit Rubber Washer to the Waste Nut and slide onto the
Stud and centralise with the underside of the basin waste,
secure with Wing Nut and Metal Washer as detailed in
Fig.1. Important: Do not overtighten.
5. Disassemble the Top Cap from the Pop-up Waste
Mechanism as shown in Fig.1. The Top Cap assembly
can be unscrewed by hand.
6. Wipe away excessive sealant around the flange of the
Waste Body.
7. Screw the Top Cap assembly back onto the Pop-up
Waste Mechanism. Ensure the Pop-up assembly is
centralised with the basin waste.
Urbane II Pop-up Waste Assembly
Code No . 687330C
Pop-up Waste
Mechanism
Flexible sealant
applied to this
face
Chrome
Pop-up
waste
assembly
Top Cap
Stud
Basin waste
hole
Rubber
washer
Waste
nut
Issue No: 0
Date: 17.10.2019
Wing nut
Fig. 1