![](/html/44/4403/4403c5ca804879429d630e411d4b577326a9ac2f76fed1f6b17e2cfa73457766/bg2.png)
Turn on the tap from the water mains and switch the power ON by pressing the “I.G “ main switch.
seconds the software version: Example ( VER 4.10 ) (E2 model)
This operation will automatically stop when the level of the probe is reached
heating up phase the display show
During this phase heating of the boiler starts, wait about 20 minutes to reach the set
This operation will automatically stop when the boiler temperature is reached, the display shows :
Check the delivery pressure in the pump gauge by fitting
the filter holder filled with properly ground, pressed coffee
The display will show for few
HOT WATER
I.G. LEGEND:
Re-filling the boiler.
I= ON
O= OFF
STARTING UP
CARIMALI IMC
CENTO50 VX.XX
DISPLAY
.
FILLING UP
During this phase all the keypad LED
Heating the boiler.
During the
PLEASE NOTE:
DURING THIS STAGE, K
FROM THE BOILER
order to deliver at 8/9 bars.
simultaneously.
s the boiler temperature and all the keypad LEDs
HEATING BOILER
XXX °C
temperature.
SELECT DRINK
XXX °C
OPEN FOR A FEW SECO
from right to left.
WILL RELEASE THE AIR
dose in
Pag. 2