CAME FE4024, FE4024V Installation Manual

Page 1
OPERATOR FOR SWING GATES
Installation manual
FE4024 - FE4024V
English
EN
119DV39EN
Page 2
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Foreword
• This product should only be used for the purpose for which it was explicitly designed. Any other use is considered dangerous. CAME S.p.A. is not liable for any damage resulting from improper, wrongful or unreasonable use • Keep these warnings with the installation and use manuals issued with the auto­mation system.
Before installing
(preliminary check: in case of a negative outcome, do not proceed until you have complied with the safety requirements)
• Check that the part you intend to automate is in good mechanical condition, balanced and aligned, and that it opens and closes properly. Make sure that proper mechanical stops are already in place • If the operator will be installed at a height of less than 2.5 m from the ground or other access level, check whether you will need any protections and/or warnings • Any gate leaves fi tted with pedestrian entrances onto which you will install an operator must have a blocking mechanism when the gate is in motion • Make sure that the opening of the automated gate is not an entrapment hazard as regards any surrounding fi xed parts • Do not mount the operator upside down or onto any elements that may fold under its weight. If needed, add suitable reinforcements at the points where it is secured • Do not install onto gates not on level ground • Check that any lawn watering devices will not wet the operator from the bottom up.
Installation
• Carefully section o the entire site to prevent unauthorised access, espe­cially by minors and children • Be careful when handling operators that weigh more than 20 kg. In such cases, use proper weight handling safety equipment
• All opening commands (e.g. buttons, key selector switches, magnetic detec­tors etc.) must be installed at least 1.85 m from the gate’s area of operation perimeter - or where they cannot be reached from the outside of the gate. Also, the direct commands (buttons, touch commands etc.) must be installed at a height of at least 1.5 m and must not be accessible to the public • All ‘hold-to-run’ commands must be placed where the moving gate leaves, transit areas and driveways are completely visible • If missing, apply a permanent label that shows the position of the release mechanism • Before delivering to the user, check that the system is EN 12453 (impact test) standard compliant. Make sure that the operator has been properly adjusted and that the safety and protection devices as well as the manual release are working properly • Where necessary and in plain sight, apply the Warning Signs (e.g. gate plate)
Special instructions and advice for users
• Keep the gate’s area of operation clean and clear of any obstacles. Check that there is no vegetation in the area of operation of the photocells and that there are no obstacles in the area of operation of the operator • Do not allow children to play with the fi xed command devices, or in the gate’s area of ope­ration. Keep any remote control devices (i.e. transmitters) or any control devi­ces away from children as well, to prevent the operator from being activated accidentally •The operator is not designed to be used by persons (including children) whose physical, sensorial or mental capacities are limited, or who are lacking in experience or knowledge, unless said persons can be supervised or given instructions regarding using the operator by a person responsible for their safety • Frequently check the system, to see whether any anomalies or signs of wear and tear appear on the moving parts, on the component parts, on the securing points, on the cables and any accessible connections. Keep any joints (i.e. hinges) lubricated and clean, and do the same where friction may occur (i.e. slide rails) • Perform functional tests on photocells and sensitive edges every six months. To check that the photocells work, pass an object in front of them during closing. If the operator reverses the direction of movement or comes to a halt, the photocells work correctly. This is the only maintenan­ce operation that must be carried out while the operator is live. Ensure that the glass on the photocells is kept clean (use a cloth slightly moistened with water; do not use solvents or any other chemicals as these could damage the devices) • If the system requires repairs or modifi cations, release the opera­tor and do not use it until safety conditions have been restored • Cut o the power supply before releasing the operator for manual openings and before any other operation, to prevent dangerous situations. Read the instructions • If the power cable is damaged, it must be replaced by the manufacturer or
the technical assistance service or by a person with a similar qualifi cation so as to prevent any risks • It is STRICTLY FORBIDDEN for users to perform OPERATIONS THEY ARE NOT EXPLICITLY REQUIRED AND ASKED to do in the manuals. For repairs, adjustments and extraordinary maintenance, CONTACT THE SPECIALIST TECHNICAL SERVICE CENTRE • On the periodic maintenance log, note down the checks you have done.
Special instructions and advice for all
• Avoid working near the hinges or moving mechanical parts • Stay clear of the gate’s area of operation when in motion • Do not resist the direction of movement of the gate; this may present a safety hazard • At all times be extremely careful about dangerous points that must be indicated by proper pictograms and/or black and yellow stripes • When using a selector or com­mand in ‘hold-to-run’ mode, keep checking that there are no people in the area of operation of the moving parts. Do this until you release the command • The gate may move at any time without warning • Always cut the power when cleaning or performing maintenance.
Danger of hand crushing
Danger - live parts
No transit during the manoeuvre
CAUTION!
important personal safety instructions:
READ CAREFULLY!
Danger of crushing feet
Page 3
5
14
9
7
6
4
2
3
1
11 12
13
1922 21
20
10
16
17
23
30
29
24
8
15
18
25
28
27
26
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
KEY
This symbol indicates parts to read carefully.
This symbol indicates parts about safety.
This symbol tells you what to say to the end users.
DESCRIPTION
The gearmotor consists of die cast aluminium casing with a worm screw and spiral ring gear system inside. Permanent liquid grease lubrication.
Intended use
The FE4024/FE4024V gearmotor has been designed and built by CAME S.p.A. in compliance with current safety standards to motorise swing gates for residential or condominium use.
Any installation and operation that differs from what is set out in this manual is prohibited.
Limits of use
With articulated arm and max leaf opening of 90°:
Type FE4024 - FE4024V
Gate leaf width (m) 4 3,5 3 2,5 2
Gate leaf weight (kg) 400 450 500 600 800
Packing list
1. 1 x gearmotor
2. 1 x pillar bracket
3. 1 x gate bracket
4. 1 x cover
5. 1 x right side cover
6. 1 x left side cover
7. 1 x installation manual
8. 1 x transmission arm
9. 1 x driven arm
10. 1 x UNI5933 M6x20 screw
11. 1 x UNI5739 M8x16 screw
12. 2 x UNI5931 M8x120 screws
13. 4 x UNI6954 3.9x16 screws
14. 1 x UNI5737 M12x50 screw
15. 2 x UNI6957 2.9x19 screws
16. 2 x UNI6954 2.9x9.5 screws
17. 2 x UNI6954 3.9x19 screws
18. 2 customised door keys
19. 1 x UNI7774 M12 nut
20. 2 x UNI5588 M8 nuts
21. 1 x washer
22. 1 x washer
23. 1 x side panel for transmission arm passage
24. 1 x release handle
25. 4 x UNI8112 M3x6 screws
26. 2 x cams
27. 1 x arm bushing
28. 1 x U-bolt
29. 2 x special M4x20 screws for fixing side covers
30. 1 x side panel for cable passage
With straight arm (OPTIONAL) and max leaf opening to 90°:
Type FE4024 - FE4024V
Gate leaf width (m) 2,5 2 1,5
Gate leaf weight (kg) 300 500 550
W
e suggest you always
fit
an electrolock onto swing gates for a more reliable closure. Fitting electrolocks onto reversible operators makes for anti-intrusion securit y.
Y
ou must install electrolocks onto irreversible operators with gate leaves
exceeding 2.5 m.
Page 4
3
1
4
2
5
6
6
7
8
9
11
10
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Description of the components
1. Pillar bracket
2. End run
3. Gearmotor
4. Side panels
5. Cover
6. Side covers
7. Transmission arm
8. Driven arm
9. Gate bracket
10. Release handle
11. OPTIONAL straight telescopic arm (FERNI-BSX / FERNI-BDX)
Technical data
Type FE4024 FE4024V
Protection rating (IP) 44 44
Power supply (V - 50/60 Hz) 230 AC 230 AC
Motor power supply (V - 50/60 Hz) 24 DC 24 DC
Power draw (A) 7 max. 5 max.
Power (W ) 130 150
Torque (Nm) 360 max. 360 max.
Opening time to 90° (sec) adjustable adjustable
Duty cycle Intensive use Intensive use
Operating temperature (°C) -20 - +55 -20 - +55
Motor thermal protection (°C) 150 150
Insulation class I I
Weight (kg) 12,60 12,60
Page 5
140
390
172
48
185
32
248
285 105
73
4
2
3
3
6
8
9
5
1
7
7
10
10
1
10
11
11
7
7
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Dimensions (mm)
Example of a system
1. Gearmotor
2. Control panel
3. Junction box
4. Antenna
5. Flashing light
6. Selector
7. Photocells
8. Inspection chamber
9. Electric lock
10. Mechanical stops
11. Photocell column
Page 6
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Connection Cable type
Cable length
1 < 10 m
Cable length
10 < 20 m
Cable length
20 < 30 m
230 VAC board power supply
FROR CEI
20-22
IEC EN
50267-2-1
3G x 1.5 mm
3G x 1.5 mm
3G x 2.5 mm
24 VDC motor power supply 2G x 1.5 mm
2G x 1.5 mm
2G x 2.5 mm
Flashing light 2 x 1.5 mm
2 x 1.5 mm
2 x 1.5 mm
Photocell transmitters 2 x 0.5 mm
2 x 0.5 mm
2 x 0.5 mm
Photocell receivers 4 x 0.5 mm
4 x 0.5 mm
4 x 0.5 mm
Control and safety devices 2 x 0.5 mm
2 x 0.5 mm
2 x 0.5 mm
Antenna RG58 max. 10 m
Encoder TWISTED max. 30 m
N.B.: If the cables differ in length compared to what is shown in the table, the cable cross-section is determined according to the actual current draw of the devices connected and according to the provisions of the IEC EN 60204-1 standard. For connections that require several, sequential loads, the sizes given on the table must be re-evaluated based on actual power draw and distances. When
connecting products that are not specified in this manual, please refer to the documentation provided with said products.
Types of cables and minimum thicknesses
GENERAL INSTALLATION INSTRUCTIONS
Installation must be carried out by qualified and experienced personnel in compliance with applicable regulations.
Preliminary checks
Before starting installation:
• Provide a suitable single-pole disconnection device, with a maximum of 3 mm between the contacts, to disconnect the power supply ;
• Prepare suitable piping and ducts for routing the electrical cables, ensuring protection against mechanical damage ;
Make sure that any connections within the container (made to ensure the continuity of the protection circuit) are fitted with additional insulation
compared to the other internal conductor parts;
Make sure the gate structure is sturdy enough, that the hinges are in proper working order and that there is no friction between the moving and fixed parts;
Make sure there are opening and closing mechanical stops.
Tools and materials
Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with current standards and regulations. The figure shows some examples of installer’s tools.
Page 7
450
A
B
110
min. 290
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
INSTALLATION
⚠ Thefollowingillustrationsareonlyexamples,giventhatthespaceforsecuringtheoperatorandaccessoriesvaries dependingontheoveralldimensions.Theinstallationtechnicianisresponsibleforchoosingthemostsuitablesolution.
Installing corrugated tubes
Set up corrugated tubes for the connections coming from the junction box. N.B. the number of tubes depends on the type of system installed and any accessories.
Securing the brackets
N.B. the drawings refer to installation of the left-hand gearmotor. The installation of the right-hand gearmotor is symmetrical. Determine the fixing point for the gate bracket and calculate the fixing point of the pillar bracket, respecting the values shown in the drawings and table.
Gate bracket
Pillar bracket
Application size (mm)
Leaf opening (°) A B
90° 150 0 - 380 120° 200 0
Page 8
80
137,5
137,5
80
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Drill the marked points.
Insert the anchors or use suitable inserts for holding the brackets. N.B. the illustrations are mere examples, it is up to the installer to choose the most suitable solution depending on leaf type and thickness.
Mark the fixing points on the pillar bracket and gate bracket, respecting the values shown in the drawing.
Page 9
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Position and secure the brackets as shown in the drawing.
Side panel for cable
passage
Side panel for
transmission arm
passage
Slot
Insert the gearmotor into the bracket and secure it with screws and nuts.
UNI 5588 M8 nut
UNI 5931 M8x120 screw
Securing the gearmotor
Insert the side panels in the pillar bracket slots. One is used for passing through the cables, the other for passing through the gearmotor arm. N.B. before inserting the panel for passing through the cables, assemble a cable gland suitable forthe cables to be used.
UNI 6954 2.9x9.5 screw
Page 10
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Release the gearmotor (see figure) and secure the drive arm to the gate bracket with the screw and nut.
Secure the drive arm to the transmission arm using the screw and washer.
UNI 7774 M12
nut
UNI 5933 M6x20 screw
Washer
UNI 5739 M8x16 screw
Washer
UNI 5737 M12x50 screw
Securing the transmission arms
Insert the transmission arm with the bushing in the motor shaft and secure it with the washer and screw.
Bushing
Page 11
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Fully open the leaf and turn the other cam clockwise until the opening microswitch is activated. Secure the cam with the screws.
Close the leaf fully and turn the cam anti-clockwise until the closing microswitch is activated. Secure the cam with the screws.
Opening mi-
croswitch
Closing microswitch
End run
Cams
Cam guide
⚠ Caution:iftherearenoendstops,endrunsmustbefitted.
UNI6957 Ø2.9X19 screw
Securing the end runs and determining the end run points
For left-hand gearmotor. Secure the end run to the gearmotor and insert the cams on the guide.
Page 12
1
2
1
2
N.C.
N.O.
C.
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
For right-hand gearmotor. Secure the end run to the gearmotor, invert the microswitch cables and insert the cams on the guide.
Opening mi-
croswitch
Closing microswitch
End run
Fully open the leaf and turn the other cam anti-clockwise until the opening microswitch is activated. Secure the cam with the screws.
Close the leaf fully and turn the cam clockwise until the closing microswitch is activated. Secure the cam with the screws.
Cams
Rail
UNI6957 Ø2.9X19
screw
Page 13
M
N
N
M
M1 N1 E1 + E -
M2 N2 E2
+ E -
CFCCFAM N
+E -
ADT06
CFCCFAM N
+E -
ADT06
­E +
+ E
-
M N E + E -
1
5
2
3
4
4
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
For electrical connection operations, use the chamber and the junction boxes. For further information regarding functions and adjustment, refer to the technical documentation for the control panel.
24 V DC gearmotor with delaying opening action
1. Control
panel
2. Left-hand gearmotor.
3. Right-hand gearmotor.
4. Junction box
5. Inspection chamber
24 V DC gearmotor with delaying closing action
ELECTRICAL CONNECTIONS
002ZLJ14 control panel terminal block
002ZLJ24 control panel terminal block
Page 14
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Connect the earth wire to the motor. Put on the cover.
Hole for the left-hand motor release rod
Hole for the right-hand motor release rod
Place the side covers on the sides of the middle cover.
Secure the side covers on the pillar bracket using two screws on each side and one on the top.
M4x20 special
screw
UNI 6954 3.9x16
screw
Ø12 mm
FINAL OPERATIONS
Securing the covers
When the connections and adjustments have been made, drill the cover at the point marked at the top for the left-hand gearmotor and at the bottom for the right-hand gearmotor.
Page 15
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Releasing the gearmotor
RELEASING
LOCKING
LEFT
RIGHT
RELEASINGLOCKING
UNI 6592 4.3x9 washer
UNI 6954 3.9x9.5 screw
Securing the release knobs
Insert the knob onto the release rod and secure it using the washer and the screw.
Page 16
110
< 290
B
A
450
B
A
450
120°
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
End run
Cams
Cam guide
UNI6957 Ø2.9X19 screw
Securing the brackets
N.B. the drawings refer to installation of the left-hand gearmotor. The installation of the right-hand gearmotor is symmetrical. Determine the fixing point for the gate bracket and calculate the fixing point of the pillar bracket, respecting the values shown in the drawings and table.
Gate bracket
Pillar bracket
INSTALLING AND CONNECTIONS FOR OUTWARD-OPENINGS
Below are the only procedures that vary compared to standard installations:
⚠ Caution:iftherearenoendstops,endrunsmustbefitted.
Securing the end runs and determining the end run points
For left-hand gearmotor. Secure the end run to the gearmotor and insert the cams on the guide.
Application size
Leaf opening A B
90° 150
0 120
120° 150
0 60
Page 17
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Opening microswitch
Closing microswitch
Open the leaf fully and turn the cam anti-clockwise until the opening microswitch is activated. Secure the cam with the screws.
Close the leaf fully and turn the other cam clockwise until the closing microswitch is activated. Secure the cam with the screws.
Page 18
1
2
1
2
N.C.
N.O.
C.
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
For right-hand gearmotor. Secure the end run to the gearmotor, invert the microswitch cables and insert the cams on the guide.
End run
Cams
Rail
UNI6957 Ø2.9X19
screw
Opening microswitch
Open the leaf fully and turn the cam clockwise until the opening microswitch is activated. Secure the cam with the screws.
Page 19
M
N
N
M
M1 N1 E1 + E -
M2 N2 E2 + E -
CFCCFAM N
+E -
ADT06
CFCCFAM N
+E -
ADT06
­E +
+ E
-
M N E + E -
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
24 V DC gearmotor with delaying opening action
24 V DC gearmotor with delaying closing action
002ZLJ14 control panel terminal block
002ZLJ24 control panel terminal block
Closing microswitch
For electrical connection operations, use the chamber and the junction boxes. For further information regarding functions and adjustment, refer to the technical documentation for the control panel.
Electrical connections
Close the leaf fully and turn the other cam anti-clockwise until the closing microswitch is activated. Secure the cam with the screws.
Page 20
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
MAINTENANCE
Before any maintenance, disconnect power to prevent any possible dangerous situations that can be caused by accidental movement of the operator.
Periodic maintenance
It is advisable to check lubrication periodically and check that the operator fixing screws are tight. In the event of abnormal vibrations or squeaking, lubricate the joints with grease, as shown in the figure below. Make sure there is no vegetation within the operating range of the photocells, and that there are no obstacles in the operating range of the gate.
Date Notes Signature
Periodic maintenance log to be completed by the user (every six months)
Page 21
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
Extraordinary maintenance log
Extraordinary maintenance
The table below is used to note any extraordinary maintenance, repairs or improvements carried out by specialist companies.
N.B.: Extraordinary maintenance must be carried out by specialist technicians.
Installation technician stamp Operator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________ __________________________________________________________________________________________________ _________________________________________________________________________________________________ ____
Installation technician stamp Operator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________ __________________________________________________________________________________________________ _________________________________________________________________________________________________ ____
Installation technician stamp Operator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________ __________________________________________________________________________________________________ _________________________________________________________________________________________________ ____
Installation technician stamp Operator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________ __________________________________________________________________________________________________ _________________________________________________________________________________________________ ____
Installation technician stamp Operator name
Date of intervention
Technician signature
Customer signature
Intervention carried out _________________________________________________________________________________ __________________________________________________________________________________________________ _________________________________________________________________________________________________ ____
Page 22
Page 22 - Manual code:
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
DISMANTLING AND DISPOSAL
CAME S.p.A. implements an EN ISO 14001-certified and compliant Environmental Management System at its plants, to ensure environmental protection. Please continue our efforts to protect the environment, something that CAME considers to be one of the foundations in developing its business and market strategies, simply by observing brief recommendations as regards disposal:
DISPOSAL OF PACKAGING Packaging components (cardboard, plastic etc.) can be disposed of together with normal household waste without any difficulty, by simply separating the different types of waste and recycling them. Before proceeding, it is always advisable to check specific regulations in force in the place of installation. DISPOSE OF PROPERLY!
DISPOSAL OF THE PRODUCT Our products are made with different materials. Most of them (aluminium, plastic, iron, electrical cables) can be disposed of together with normal household waste. They can be recycled if collected, sorted and sent to authorised centres. Other components (circuit boards, transmitter batteries etc.), on the other hand, may contain pollutants. They should therefore be removed and handed over to companies authorised to recover and recycle them. Before proceeding, it is always advisable to check specific regulations in force in the place of disposal. DISPOSE OF PROPERLY!
PROBLEM POSSIBLE CAUSES CHECKS AND REMEDIES
The gate does not open or close
• No power
• The gearmotor is unlocked
• The transmitter battery is flat
• The transmitter is broken
• The stop button is stuck or broken.
• The opening/closing button or the key selector switch are stuck
• Check for mains power
• Contact service
• Replace the battery
• Contact service
• Contact service
• Contact service
The gate opens but does not close
• The photocells are engaged • Check that the photocells are clean and work correctly
• Contact service
TROUBLESHOOTING
REGULATORY REFERENCES
The product in question complies with the regulations referred to in the declaration of conformity.
Page 23
Page 23 - Manual code:
119DV39EN
119DV39EN
vers.
5
05/2016 © CAME S.p.A . - The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p. A.
PAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK
Page 24
www. came.com
www. came.com
CAME S.p.A.
CAME S.p.A.
Via Martiri Della Libertà, 15 Via Cornia, 1/b - 1/c
31030
Dos son d i Cas ier
Dosson di Casier
Treviso
Treviso - Italy
33079
Sesto al Reghena
Sesto al Reghena
Pordenone
Pordenone - Italy
(+39) 0422 4940 (+39) 0422 4941
(+39) 0434 698111
(+39) 0434 698434
Engl is h
119DV39EN
119DV39EN vers.
5
05/2016 © CAME S.p. A.
The data and information provided in this manual are subject to change at any time without prior notice by CAME S.p.A .