Cambridge Industries Group ONT G-25E Hardware installation

C
AMBRIDGE
C
AMBRIDGE
Industries (Group) Co Ltd.
Industries (Group) Co Ltd.
CIG
CIG
ONT G-25E
Hardware Installation Manual
313-12201-02 Rev. B
www.cambridgeig.com
August 2007
ONT G-25E Hardware Installation Manual
Notice
The CIG name, the CIG logo, and all CIG product names are trademarks of Cambridge Industries Group Co. Ltd (CIG). All other brand and product names are trademarks of their respective holders. Specifications, products, and products names are subject to change without notice.
This document may not be reproduced in whole or in part without the express written permission of CIG. This document contains confidential, proprietary information belonging to CIG, and may not be used or disclosed except in accordance with applicable agreements.
Performance figures and data quoted in this document are typical and must be specifically confirmed in writing by CIG before they become applicable to any particular order or contract. The company reserves the right to make alterations or amendments to the detailed specification at its discretion.
Copyright 2006, 2007 Cambridge Industries Group Co. Ltd. All rights reserved.
Document History
Part Number Summary of Changes
-01, Rev. A Initial release
-02, Rev. B Bug fixing
313-12201-02 Rev. B: August 2007 Cambridge Industries Group Co. Ltd I
ONT G-25E Hardware Installation Manual
Product Information
To learn more about this product or CIG, contact your local sales representative or contact CIG Marketing at:
Address:
Hong Kong
25th Floor, Jardine House, 1 Connaught Place
Hong Kong, PRC
Phone: +852 2827 1778
Shanghai
Building 4, 3/F, Block D
889 Yishan Road
Shanghai 200233, China
Phone: +86 21 6121 3299
Fax: +86 21 6121 3277
Email: info@cambridgeig.com
Web URL: http://www.cambridgeig.com
Ordering
To order CIG components and documents, contact your local sales representative, or contact CIG at the address, telephone, fax number or e-mail address listed above.
313-12201-02 Rev. B: August 2007 Cambridge Industries Group Co. Ltd II
ONT G-25E Hardware Installation Manual
Technical Support
CIG offers technical support 24 hours a day, 7 days a week. To contact the CIG technical assistance center, use one of the following methods:
NOTE: For urgent support requests, please contact CIG by telephone. Delays caused by e­mail may result in a longer response time.
Telephone: +86 21 6121 3299
Email: support@cambridgeig.com
When you contact CIG, please have the following information ready:
z Product model name, part number, and serial number
z List of system hardware and software, including version
z Diagnostic error messages, if any
z Details about recent configuration changes, if applicable
313-12201-02 Rev. B: August 2007 Cambridge Industries Group Co. Ltd III
ONT G-25E Hardware Installation Manual
Compliance with CE Marking Certification (Class B)
The equipment was tested and found to comply with EN 60950-1:2001. The equipment is tested and only used with power adaptor included in the package.
The equipment complies with the requirements according to the following standard:
ETSI EN 300 386 V1.3.3: 2005 Electromagnetic compatibility and radio spectrum Matters (ERM); Telecommunication network equipment; Electromagnetic compatibility (EMC) requirements
EN 61000-6-1:2001: Electromagnetic compatibility (EMC) — Part 6-1: Generic standards Immunity for residential, commercial and light-industrial environments.
EN 61000-6-3:2001: Electromagnetic compatibility (EMC) — Part 6-3: Generic standards Emission standard for residential, commercial and light-industrial environments, which refers to the following basic standards:
EN 55 022+A1:2000+A2:2003: Information technology equipment – Radio disturbance characteristics Limits and methods of measurement.
EN 61000-4-2: 1995/+A1:1998/+A2:2001: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 2: electrostatic discharge immunity test
EN 61000-4-3: 2002/+A1:2002: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 3: radiated, radio frequency, electromagnetic field immunity test
EN 61000-4-4: 2004: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 4: electric fast transient/burst immunity test
EN 61000-4-5: 1995/+A1: 2001: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 5: surge immunity test
EN 61000-4-6: 1996/+A1:2001: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 6: immunity to conducted disturbance, induced by radio frequency field.
EN 61000-4-11:2004: Electromagnetic Compatibility (EMC) – Part 4: testing and measurement techniques – section 11: voltage dips, short interruption and voltage variations immunity test
EN 61000-3-2:2000/+A2:2005: Limits for harmonic current emissions (equipment input current <=16A per phase)
EN 61000-3-3:1995/+A1:2001/+A2:2005: Limitation of voltage fluctuations and flicker in low-voltage supply systems for equipment with rated current <=16A
313-12201-02 Rev. B: August 2007 Cambridge Industries Group Co. Ltd IV
ONT G-25E Hardware Installation Manual
Table of Contents
About This Document
Purpose ___________________________________________________________________________ VI Intended Audience _________________________________________________________________ VI Chapter Overview __________________________________________________________________ VI
1. Product Description
1.1 Introduction __________________________________________________________________ 1
1.2 Services ______________________________________________________________________ 1
1.3 Features______________________________________________________________________ 1
1.4 Specifications _________________________________________________________________ 2
2. Safety
2.1 Electrical Safety _______________________________________________________________ 4
2.2 Laser Safety___________________________________________________________________ 5
3. Installation
3.1 Site Preparation _______________________________________________________________ 6
3.1.1 Environmental Requirements __________________________________________________________6
3.1.2 Power Requirements _________________________________________________________________6
_____________________________________________________________________ 4
________________________________________________________________ 6
_________________________________________________________ VI
_________________________________________________________ 1
3.2 Connecting to Network _________________________________________________________ 6
3.3 Connecting Power _____________________________________________________________ 7
3.4 Connecting Telephone (POTS) Service ____________________________________________ 8
3.5 Connecting Ethernet Service_____________________________________________________ 8
3.6 Verify the Installation ___________________________________________________________ 9
3.6.1 Verifying ONT Status_________________________________________________________________9
3.6.2 Verifying Services ___________________________________________________________________10
4. Troubleshooting
4.1 ONT Status LEDs ____________________________________________________________ 11
4.2 Troubleshooting Procedures ____________________________________________________ 13
____________________________________________________________11
313-12201-02 Rev. B: August 2007 Cambridge Industries Group Co. Ltd V
Loading...
+ 14 hidden pages