Cambridge Engineering S Series, S400, S800, S950, S1600 Technical Manual

...
S-SERIES
®
DIRECT GAS-FIRED
INDUSTRIAL BLOW-THRU® SPACE HEATER
TECHNICAL MANUAL
Improper installation, adjustment, alteration, service or maintenance can cause property dam­age, injury or death. Read the installation, operating, and maintenance instructions thoroughly before installing or servicing this equipment.
FOR YOUR SAFETY
The use and storage of gasoline or other flammable vapors and liquids in open containers in the vicinity of this appliance is hazardous.
FOR YOUR SAFETY
If you smell gas:
1. Open windows.
2. Don’t touch electrical switches.
3. Extinguish any open flame.
4. Immediately call your gas supplier.
Made in the USA
ASHRAE
ASHRAE
90.1
COMPLIANT
COMPLIANT
®
S-TM7-02-18
S400-S3200 REV. F
LIMITED WARRANTY
Cambridge Engineering's Limited Warranty is included within the Terms and Conditions that are sent with every Order Acknowledgement. For questions regarding Limited Warranty, contact Cambridge Engineering's Customer Service Group at 1-800-473-4569.
S-SERIES
BLOW-THRU
®
SPACE HEATER
Contents
Hazard Summary ..............................................................................................................2
Typical System Overview ................................................................................................. 3
Accessory Identication .................................................................................................. 3
Heater Operation ............................................................................................................. 4
Heater Conguration ....................................................................................................... 4
Installation Instructions ..................................................................................................... 5
Uncrating Instructions ..................................................................................................... 5
Mounting Location ..........................................................................................................5
Roof Top Mounting - Curb / Stand / Rail .......................................................................6
Roof Top / Thru Wall Mounting - Stand / Rail ...............................................................7
Under Roof Mounting - Curb .........................................................................................7
Roof Top Mounting .........................................................................................................8
Thru Wall Mounting ...................................................................................................... 10
Roof Top / Thru Wall Mounting ...................................................................................12
Under Roof Mounting ................................................................................................... 14
Vertical Indoor Mounting .............................................................................................. 16
Vertical Outdoor Mounting ...........................................................................................18
Rain Hood Inlet Skirt ................................................................................................... 20
Unit Inlet Skirt ..............................................................................................................21
Gas Piping ..................................................................................................................... 22
Electrical Wiring .......................................................................................................... 23
Start-Up Instructions ....................................................................................................... 24
Calibration Procedures ................................................................................................... 29
Operating Instructions ..................................................................................................... 32
Operating Sequence ......................................................................................................32
Electronic Thermostat ................................................................................................... 33
TSS Controller .............................................................................................................35
Maintenance Instructions ................................................................................................ 44
Troubleshooting Instructions ..........................................................................................48
Troubleshooting Guide..................................................................................................48
Damper Motor Replacement & Adjustment .................................................................54
Reference ........................................................................................................................56
Electrical Control Enclosure Isometric Drawing .......................................................... 56
Electrical Wiring Diagrams .......................................................................................... 57
Electrical Connection Diagram .................................................................................... 62
Gas Train Drawings ......................................................................................................63
Individual Component Descriptions .............................................................................67
ANSI/ASHRAE/IESNA Standard 90.1 ........................................................................73
TECHNICAL MANUAL
Copyright 2018 Cambridge Engineering, Inc. All Rights Reserved
Cambridge Engineering, Inc. 760 Long Road Crossing Dr.
Chesterfield, MO. 63005
Phone: (636) 532-2233, (800) 899-1989
Fax: (636) 530-6133
www.cambridge-eng.com
HAZARD SUMMARY
Hazard Identification
Warnings and Cautions appear at appropriate sections throughout this manual. Read these carefully.
mWARNING: Indicates a potentially hazardous situation which could result in
death or serious injury.
CAUTION: Indicates a situation that may result in accidents with equipment or
mCAUTION: Indicates a potentially hazardous situation which may result in
minor or moderate injury. It may also be used to alert against unsafe practices.
property damage only.
The following safety precautions apply to the instal­lation, operation, and maintenance of the equipment described by this technical manual.
Any unauthorized modification of this equipment shall void the warranty.
Only qualified personnel should attempt instal­lation, service, and repair of this equipment. Use extreme caution and observe safety regulations at all times.
Recirculation of room air is not permitted.
Adequate building relief must be provided so as to not over pressurize the building when the heating system is operating at its rated capacity. It should be noted that this can be accomplished by taking into account, through standard engineering methods, the structure’s designed infiltration rate, by providing properly sized relief openings, or by interlocking a powered exhaust system, or by a combination of these methods.
If the failure or malfunction of this heater creates a hazard to other fuel burning equipment in the build­ing, (e.g. when the heater is providing the make-up air to a boiler room), the unit is to be interlocked to open inlet air dampers or other such devices.
If the heater is installed such that an inlet duct is utilized, the duct system must be purged with at least four air changes prior to an ignition attempt.
Installation in Aircraft Hangars
Refer to the Standard for Aircraft Hangars, ANSI/NFPA 409, for specific information on the installation requirements for these heaters in air­craft hangars.
Installation in Parking Garages
Refer to the Standard for Parking Structures, ANSI/ NFPA 88A, or the Standard for Repair Garages, ANSI/NFPA 88B, for specific information on the installation requirements for these heaters in public
garages.
Installation in Car Wash Facilities
A non-recirculating, S-Series Space Heater used in a Car Wash tunnel application may be designated as a T-Series Heater on the nameplate.
This S-Series Technical Manual also applies to all T-Series Heaters.
IMPORTANT
If in doubt regarding installation application, con­tact Cambridge Customer Service Group at 1-800­473-4569 during the hours of 8:00 a.m. to 5:00 p.m. Central Time, Monday through Friday.
Cambridge Engineering, Inc. 2 S-Series Technical Manual
TYPICAL SYSTEM OVERVIEW
RH-RT
MDD
DT
UNIT
DE
DE
DE
IP
ISU
ACCESSORY IDENTIFICATION
Under Roof Mounting
RH-TW
ISR
Roof Top Mounting
AMS
MR
DD
DE
Thru Wall Mounting
MC
ID
DT
MC
MDD
IE
UNIT
Outdoor Vertical Mounting
MDD
DT
DT
MDD
UNITFS
UNIT
WALL SLEEVE (BY OTHERS)
DT
DE
Roof Top / Thru Wall Mounting
RH-RT
AMS
Component Identification
AMS Adjustable Mounting Stand DD Discharge Duct DE Directional Elbows DT Downturn FS Filter Section ID Inlet Duct IE Inlet Elbow IP Inlet Plenum ISR Inlet Skirt-Rain Hood ISU Inlet Skirt-Unit MC Mounting Curb MDD Motorized Discharge Damper MR Mounting Rail RH-RT Rain Hood-Roof Top RH-TW Rain Hood-Thru Wall
UNIT
MDD
MR
WALL SLEEVE (BY OTHERS)
DT
DE
Indoor Vertical Mounting
DT
DT
UNIT
RH-TW
IE
ISR
S-Series Technical Manual 3 Cambridge Engineering, Inc.
TYPICAL SYSTEM OVERVIEW
HEATER OPERATION
Cambridge S-Series Blow-Thru® heaters are utilized to meet the space heating requirements of commercial or industrial buildings. The control system is typically designed to cycle the heaters on and off in response to the rise and fall of the space temperature. The heater will discharge air at the temperature selected (up to
HEATER CONFIGURATION
160ºF). The operating thermostat is typically located near the perimeter of the building in a location which is out of the direct path of the heated discharge air, insulated from cold surfaces, and shielded from cold drafts created by air infiltrating the building.
IGNITER & FLAMEROD
BURNER ASSEMBLY
DAMPER MOTOR
DISCHARGE TEMPERATURE SENSOR
ELECTRICAL CONTROL ENCLOSURE
HINGED ACCESS DOOR
PORT FOR MEASURING MANIFOLD PRESSURE
MODULATING GAS VALVE
SAFETY SHUT-OFF VALVE
LEAK TEST PORT
SHUT-OFF VALVE
DISCHARGE AIR TEMPERATURE SAMPLING BOX
MANUAL SHUT-OFF VALVE BURNER VIEWPORT
HIGH LIMIT
DAMPER BLADES
REGULATOR
Cambridge Engineering, Inc. 4 S-Series Technical Manual
INSTALLATION INSTRUCTIONS
UNCRATING INSTRUCTIONS
1. Verify that the number of items on the Bill of Lading matches the number of items received.
2. Check for shipping damage. Take photographs of any damage.
IMPORTANT
If damage is found, immediately file a claim with the carrier before proceeding further.
3. Check the items received to make sure they agree with the ordering information including verification of data on the unit nameplate.
IMPORTANT
Do not discard any components or accessories.
MOUNTING LOCATION
Verify feasibility of the installation location selected with respect to accessibility to the heater for service and maintenance functions. Ensure the positioning of the heater does not inhibit fork truck operation, stor­age rack locations, or other operations within the facil­ity. Ensure the heater inlet and outlet are not blocked or severely restricted in any way that would affect the rated airflow through the heater or affect the desired air distribution pattern of the heater.
It is the responsibility of the installer to communicate any potential problems with the installation to the per­son or persons responsible for providing the installa­tion instructions or drawings prior to proceeding with the installation.
IMPORTANT
Where the mounting height of the heater is a con­sideration, work platforms or service lifts should be provided for accessibility to the equipment for ser­vice and maintenance activities.
IMPORTANT
Field constructed intake accessories should be de­signed to minimize the entry of snow and rain.
IMPORTANT
The minimum clearance from the face of the elec­trical control enclosure to surrounding grounded surfaces for service activities is 42". Adequate clear­ance of 42" for burner removal is also required. Access for service functions is also required on the side of the unit opposite the control enclosure for a distance of 24".
S-Series Technical Manual 5 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
ROOF TOP MOUNTING - CURB / STAND / RAIL
STAND DETAIL
2 x 6 TREATED LUMBER
(BY OTHERS)
NOTES
1
TREATED TIMBER AS REQUIRED UNDER MOUNTING CURB, RAIL AND STAND TO SECURE AND LEVEL UNIT.
2
SECURE MOUNTING STAND TO TIMBER WITH WOOD LAG SCREWS AS SHOWN.
3
SECOND MOUNTING ASSEMBLY IS REQUIRED ONLY ON
6
10½"
7
DOWNTURN / CURB
WITH FLASHING
ROOF INSULATION
UNITS WITH FILTER SECTIONS.
4
MOUNTING STAND CONSTRUCTION: 12 GA. GALVANIZED STEEL
5
MOUNTING RAIL CONSTRUCTION:
18 GA. GALVANIZED STEEL
6
REMOVE HANGER BRACKET AND REPLACE SCREWS
7
ADJUSTABLE ± 3¾"
24"
REF.
2
1
2 X 6 TREATED LUMBER
Model A B C
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
24"
TYP.
C
MOUNTING STAND
MOUNTING RAIL
B
65½" 33¼" 25 3/8"
78 5/8" 33¼" 42"
90¼" 36¼" 47 1/8"
4
5
A
CURB SECTION
3
2.5"
1 5/8"
FLASHING
2 x 2 WOOD NAILER (PROVIDED)
INSULATION
Cambridge Engineering, Inc. 6 S-Series Technical Manual
INSTALLATION INSTRUCTIONS
ROOF TOP / THRU WALL MOUNTING - STAND / RAIL
STAND DETAIL
2 x 6 TREATED LUMBER
(BY OTHERS)
2
1
24"
TYP.
NOTES
1
TREATED TIMBER AS REQUIRED UNDER MOUNTING RAIL AND STAND TO SECURE AND LEVEL UNIT.
2
SECURE MOUNTING STAND TO TIMBER WITH WOOD LAG SCREWS AS SHOWN.
3
THIRD MOUNTING ASSEMBLY IS REQUIRED ONLY ON
6
10½"
7
ROOF INSULATION
UNITS WITH FILTER SECTIONS.
4
MOUNTING STAND CONSTRUCTION: 12 GA. GALVANIZED STEEL
5
MOUNTING RAIL CONSTRUCTION:
18 GA. GALVANIZED STEEL
6
REMOVE HANGER BRACKET AND REPLACE SCREWS
7
STAND IS ADJUSTABLE ±3¾"
C
MOUNTING STAND
MOUNTING RAIL
4
5
2 X 6 TREATED LUMBER
B
3
UNDER ROOF MOUNTING - CURB
CURB
24"
REF.
A
Model A B C
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
57 7/8" 33¼" 25 3/8"
69 7/8" 33¼" 42"
75¾" 36¾ " 47 1/8"
CURB SECTION
2 x 2 WOOD NAILER (PROVIDED)
INSULATION
2.5" 1 5/8"
ROOF INSULATION
S-Series Technical Manual 7 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
ROOF TOP MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer and the roof manufacturer before install­ing this equipment.
IMPORTANT
Before proceeding with the installation, verify the feasibility of the location selected with respect to accessibility for service and maintenance functions.
IMPORTANT
To minimize snow and rain ingestion, position the heater inlet opposite the prevailing winds.
mCAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process ex­haust, sewer stacks, or other sources that would allow contaminants to be drawn into the heater. Consult local codes for additional references.
1. Prepare roof penetration to the dimensions below. See page 6 for Roof Top Mounting - Curb/Stand/ Rail drawing.
IMPORTANT
Accurate measurements are critical and will affect the installation process. Verify that the roof opening aligns with the curb opening.
2. Secure the mounting curb and mounting rail(s) per the structural engineer and roof manufacturer’s rec­ommendations.
Cambridge recommends mounting the heater a mini­mum of 24" off the roof surface in areas where snow accumulation could impact heater operations.
3. Attach the mounting stands to the heater while the heater is on the ground. Adjust the height of the stands so the heater inlet is slightly (1/8” below level) lower than the discharge. This allows any ingested moisture to drain out of the heater, through weep holes located at the inlet of the heater, onto the roof surface.
4. Lower the discharge duct through the mounting curb and the roof opening and secure the counter­flashing to the mounting curb.
5. Use a crane or comparable lifting device to raise and position the equipment. Use a spreader bar to prevent damage and connect slings to the lifting brackets.
Do not attach lifting means to heater accessories. Make connections to heater only.
IMPORTANT
Inlet accessories may be attached on the ground or on the roof depending on the method chosen by the installer.
6. Caulk all the joints between the heater and the accessories with silicone caulk to prevent water leaks.
IMPORTANT
Do not caulk the downturn/counterflashing for the curb interface.
7. Seal all roof penetrations to prevent roof leaks.
IMPORTANT
The roof curb and mounting rail(s) should be installed so that the heater will mount level.
Model L W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
* Dimensions allow for ¾" clearance on each side
Weight
550 lbs. 13" 24¾"
800 lbs. 15" 41½"
1500 lbs. 24¼" 46½"
8. Install the directional elbows. Consult the job lay­out for the orientation of the elbows.
Roof Opening*
Cambridge Engineering, Inc. 8 S-Series Technical Manual
TYPICAL INSTALLATION ROOF TOP MOUNTING
RAIN HOOD
FILTER SECTION (OPTIONAL)
UNIT
ADJUSTABLE MOUNTING STAND
MOUNTING RAIL
ELECTRICAL CONTROL ENCLOSURE
(PROVIDED WITH EXTERNAL GAS TRAIN)
EXTERNAL GAS TRAIN WITH ENCLOSURE
(APPLICABLE TO SOME FM AND XL GAPS OPTIONS)
XL GAPS: FORMERLY IRI (INDUSTRIAL RISK INSURERS)
ELECTRICAL JUNCTION BOX
FM: FACTORY MUTUAL
CURB / RAIL / STAND DETAIL
DOWNTURN
NOTE: DO NOT CAULK THIS JOINT
COUNTERFLASHING
MOUNTING CURB
DISCHARGE DUCT
DIRECTIONAL ELBOWS
2 X 6 TREATED LUMBER
2 X 4 TREATED LUMBER
(BY OTHERS)
(PROVIDED)
TREATED LUMBER
(BY OTHERS)
TREATED LUMBER (THICKNESS OF ROOF INSULATION) AS REQUIRED UNDER MOUNTING STANDS AND CURB TO SECURE AND LEVEL THE UNIT AND TO SPREAD THE LOAD. (BY OTHERS)
10½"
12"
TREATED LUMBER
(BY OTHERS)
24"
ROOF
OPENING
S-Series Technical Manual 9 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
THRU WALL MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer before installing this equipment.
IMPORTANT
Before proceeding with the installation, verify the feasibility of the location selected with respect to accessibility to the equipment for service and main­tenance functions.
mCAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process exhaust, sewer stacks, or other sources that would allow contami­nants to be drawn into the heater. Consult local codes for additional references.
1. Prepare wall penetration to the dimensions below.
2. Connect inlet accessories to the unit including filter section (optional) and rain hood prior to lift­ing the heater in place. Note the inlet skirt for rain hood (optional) is installed from the outside of the building (page 20).
3. Install hanging rods to adequate ceiling supports and align with the hanging brackets on the unit. Refer to hanging rod size shown on table below. Locate the hanging rods so that the weep holes provided in the rain hood are located a minimum of 3" beyond the outside wall surface.
5. Use a forklift or comparable lifting device to raise and position the heater. Take precautions to pre­vent equipment damage (dents and/or scratches) when the heater is being lifted into position.
6. Use washers and double lock nuts to secure the unit on the hanging rods.
IMPORTANT
The discharge end of the heater should be raised slightly (1/8" above level). This allows any ingested moisture to drain out of the heater through weep holes located in the rain hood to the exterior of the building.
7. Apply shims, by others, at the bottom of the rain hood to take up slack in the opening, leaving a small joint between the top of the rain hood and the wall.
8. Install fiberglass insulation in the gaps around the wall opening and the rain hood. Apply enough material to accommodate the full thickness of the wall.
9. Install finish trim pieces (by others) to the top, sides and bottom of the rain hood on both the inside and outside wall surfaces.
10. Apply silicone caulk at the joint between the top of the rain hood and the outside wall surface. Make certain this is a continuous bead and that it runs the entire width of the rain hood. Caulk all other exposed joints.
11. Install the directional elbows. Consult the job lay­out for the orientation of the elbows.
4. Remove the lag bolts used to fasten the unit to the skid. Do not remove the hanging brackets from the side of the heater. On S400/S800 model heaters,
rotate the mounting brackets 180˚ and retighten
the securing hardware.
Hanging Rods Wall Opening**
Model Qty. Size A B* C H W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
*For optional lter section
** Dimensions allow for 1" clearance on each side
Weight
550 lbs. 4 (6*) 3/8" dia. 57 7/8" 33¼" 27 7/8" 26" 25½"
800 lbs. 4 (6*) 3/8" dia. 69 7/8" 33¼" 43 7/8" 29" 42¼"
1500 lbs. 4 (6*) 1/2" dia. 75¾" 36¾" 48 7/8" 38¾" 47¼"
Cambridge Engineering, Inc. 10 S-Series Technical Manual
TYPICAL INSTALLATION THRU WALL MOUNTING
RAINHOOD
EXTERIOR WALL TRIM
(BY OTHERS)
INTERIOR WALL TRIM
(BY OTHERS)
ELECTRICAL CONTROL ENCLOSURE
(LOCATE MIN. 10 FT. FROM INTAKE)
VENT w/SCREEN
VENT PIPE TO OUTDOORS
INCOMING POWER
(BY OTHERS)
CONTROL WIRING CONDUIT
(BY OTHERS)
REMOTE CONTROL STATION
INLET GAS PIPE
FILTER SECTION
(OPTIONAL)
UNIT
HANGING BRACKET
LOW PRESSURE SHUT-OFF VALVE
HIGH PRESSURE REGULATOR (HPR)
HIGH PRESSURE SUPPLY TAP
HIGH PRESSURE SHUT-OFF VALVE
HANGING ROD
(BY OTHERS)
DOWNTURN
DIRECTIONAL ELBOWS
(OPTIONAL)
SEDIMENT TRAP
(BY OTHERS)
HANGING ROD DETAILHANGING BRACKET DETAIL
HANGING ROD
NUT
WASHER
DOUBLE LOCK NUTS
SHIPPING POSITION
WASHER
HANGING RODS, NUTS AND WASHERS BY OTHERS
L BRACKET
FOR S400 - S800 UNITS
HANGING ROD
NUT
WASHER
DOUBLE LOCK NUTS
WASHER
C BRACKET
FOR S950 - S3200 UNITS
S-Series Technical Manual 11 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
ROOF TOP / THRU WALL MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer and the roof manufacturer before install­ing this equipment.
IMPORTANT
Before proceeding with the installation, verify the fea-
sibility of the location selected with respect to acces-
sibility to the equipment for service and maintenance
functions.
IMPORTANT
To minimize snow and rain ingestion, position the heater inlet opposite the prevailing winds.
mCAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process exhaust, sewer stacks, or other sources that would allow contaminants to be drawn into the heater. Consult local codes for additional references.
1. Prepare wall penetration to the dimensions below. See page 7 for Roof Top/Thru Wall Mounting Stand/Rail drawing.
IMPORTANT
Accurate measurements are critical and will affect installation process.
2. Secure the mounting rails per the structural engi-
neer and roof manufacturer’s recommendations.
IMPORTANT
The mounting rails should be installed so that the heater will mount level. Cambridge recommends mounting the heater a minimum of 24" off the roof surface in areas where snow accumulation could impact heater operations
3. Attach the mounting stands to the heater while the heater is on the ground. Adjust the height of the stands so the heater inlet is slightly (1/8” below level) lower than the discharge. This allows any ingested moisture to drain out of the heater, through weep holes located at the inlet of the heater, onto the roof surface.
4. Use a crane or comparable lifting device to raise and position equipment. Use a spreader bar to prevent damage and connect slings to the lifting brackets.
Do not attach lifting means to heater accessories. Make connections to heater only.
IMPORTANT
Inlet accessories may be attached on the ground or on the roof depending on the method chosen by the installer.
5. Install the wall sleeve to the heater discharge.
6. Install fiberglass insulation in gaps around the wall opening and wall sleeve. Apply enough mate­rial to accommodate the full thickness of the wall.
7. Install finish trim pieces (by others) to top, sides and bottom of the wall sleeve on both the inside and outside wall surfaces.
8. Apply silicone caulk at the joint between the top of the wall sleeve and the outside wall surface. Make certain this is a continuous bead and that it runs the entire width of the wall sleeve. Caulk all other exposed joints.
9. Seal all roof penetrations to prevent roof leaks.
10. Install the downturn and directional elbows. Consult the job layout for the orientation of the elbows.
Wall Opening*
Model H W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
* Dimensions allow for 1½" clearance on each side
Weight
550 lbs. 16" 28¼"
800 lbs. 18" 45"
1500 lbs. 27½" 50"
Cambridge Engineering, Inc. 12 S-Series Technical Manual
TYPICAL INSTALLATION ROOF TOP / THRU WALL MOUNTING
RAIN HOOD
ADJUSTABLE MOUNTING STAND
MOUNTING RAIL
FILTER SECTION (OPTIONAL)
UNIT
WALL SLEEVE
EXTERIOR WALL TRIM
(BY OTHERS)
INTERIOR WALL TRIM
(BY OTHERS)
ELECTRICAL CONTROL ENCLOSURE
(PROVIDED WITH EXTERNAL GAS TRAIN)
EXTERNAL GAS TRAIN WITH ENCLOSURE
(APPLICABLE TO SOME FM AND XL GAPS OPTIONS)
ELECTRICAL JUNCTION BOX
STAND DETAIL
2 X 6 TREATED LUMBER
2 X 4 TREATED LUMBER
(BY OTHERS)
(PROVIDED)
10½"
12"
DOWNTURN
DIRECTIONAL ELBOWS
TREATED LUMBER
(BY OTHERS)
S-Series Technical Manual 13 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
UNDER ROOF MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer and the roof manufacturer before install­ing this equipment.
IMPORTANT
Before proceeding with the installation, verify the feasibility of the location selected with respect to accessibility to the equipment for service and main­tenance functions.
m CAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process exhaust, sewer stacks, or other sources that would allow contaminants to be drawn into the heater. Consult local codes for additional references.
1. Prepare roof penetration to the dimensions below. See page 7 for Under Roof Mounting - Curb drawing
IMPORTANT
Accurate measurements are critical and will affect the installation process. Verify that the roof opening aligns with the curb opening.
IMPORTANT
The mounting curb or mounting structure should be installed such that the heater’s inlet plenum will mount level.
3. Seal all roof penetrations to prevent roof leaks.
4. Lower the inlet duct through the mounting curb and the roof opening.
5. Secure the inlet plenum to the curb.
6. Connect inlet accessories to the heater including filter section (optional) and inlet elbow prior to lifting the heater in place.
7. Install hanging rods to adequate ceiling supports and align with the hanging brackets on the heater. Refer to hanging rod size shown on table below.
8. Remove the lag bolts used to fasten the unit to the skid. Do not remove the hanging brackets from the side of the heater. On S400/S800 model heaters,
rotate the hanging brackets 180˚, and retighten the
securing hardware.
9. Use a forklift or comparable lifting device to raise and position the heater. Take precautions to pre­vent equipment damage (dents and/or scratches) when the heater is being lifted into position.
10. Use washers and double lock nuts to secure equip­ment on the hanging rods.
2. Install the mounting curb and the mounting struc­ture per the structural engineer and roof manufac­turer’s recommendations.
Model Qty. Size A B* C L W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
*For optional lter section
** Dimensions allow for ¾" clearance on each side
Weight
550 lbs. 4 (6*) 3/8" dia. 57 7/8" 33¼" 27 7/8" 25" 25"
800 lbs. 4 (6*) 3/8" dia. 69 7/8" 33¼" 43 7/8" 30" 41¼"
1500 lbs. 4 (6*) 1/2" dia. 75¾" 36¾" 48 7/8" 37¼" 46¾"
11. Install the directional elbows. Consult the job lay­out for the orientation of the elbows.
Hanging Rods Roof Opening**
Cambridge Engineering, Inc. 14 S-Series Technical Manual
TYPICAL INSTALLATION UNDER ROOF MOUNTING
FILTER SECTION (OPTIONAL)
CURB DETAIL
TREATED LUMBER (THICKNESS OF ROOF INSULATION) AS REQUIRED UNDER MOUNTING CURB TO SECURE AND LEVEL THE UNIT AND TO SPREAD THE LOAD. (BY OTHERS)
HANGING ROD DETAILHANGING BRACKET DETAIL
HANGING ROD
NUT
WASHER
DOUBLE LOCK NUTS
SHIPPING POSITION
WASHER
HANGING RODS, NUTS AND WASHERS BY OTHERS
L BRACKET
FOR S400 - S800 UNITS
HANGING ROD
NUT
WASHER
DOUBLE LOCK NUTS
WASHER
C BRACKET
FOR S950 - S3200 UNITS
S-Series Technical Manual 15 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
VERTICAL INDOOR MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer before installing this equipment.
IMPORTANT
Before proceeding with the installation, verify the feasibility of the location selected with respect to accessibility to the equipment for service and main­tenance functions.
m CAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process exhaust, sewer stacks, or other sources that would allow contaminants to be drawn into the heater. Consult local codes for additional references.
1. Prepare wall penetration to the dimensions below.
2. Connect the inlet accessories to the heater including the filter section (optional), the inlet elbow and the rain hood prior to standing the heater upright. Note the inlet skirt for the rain hood (optional) is installed from the outside of the building (page 20).
3. Install hanging rods to adequate ceiling and/or wall supports per the structural engineer’s recommenda­tions and align with the hanging brackets on the heater. Refer to the hanging rod size shown on the table below. Locate the hanging rods so that the weep holes provided in the rain hood are located a minimum of 3" beyond the outside wall surface.
4. Remove the lag bolts used to fasten the unit to the skid. Rotate the hanging brackets for the vertical application and retighten the securing hardware.
5. Utilizing the lifting brackets on the front of the heater, use a forklift or comparable lifting device to raise and position the heater. Take precautions to prevent equipment damage (dents and/or scratches) when the heater is being lifted into position.
6. Use washers and double lock nuts to secure equip­ment on hanging rods.
IMPORTANT
The rain hood should be sloped slightly (1/8" off level). This allows any ingested moisture to drain out of the heater through weep holes located in the rain hood to the exterior of the building.
7. Apply shims at the bottom of the rain hood to take up slack in the opening, leaving a minimal joint between the top of the rain hood and the wall.
8. Install fiberglass insulation in the gaps around the wall opening and the rain hood. Apply enough mate­rial to accommodate the full thickness of the wall.
9. Install finish trim pieces (by others) to the top, sides and bottom of the rain hood on both the inside and outside wall surfaces.
10. Apply silicone caulk at the joint between the top of the rain hood and the outside wall surface. Make certain this is a continuous bead and that it runs the entire width of the rain hood. Caulk all other exposed joints.
11. Install the second downturn and directional elbows. Consult the job layout for the orientation of the elbows.
Hanging Rods Wall Opening*
Model Qty. Size A B H W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
* Dimensions allow for 1" clearance on each side
Weight
650 lbs. 4 3/8" dia. 23 3/8" 27 7/8" 26" 25½"
950 lbs. 4 3/8" dia. 26" 43 7/8" 29" 42¼"
1750 lbs. 4 1/2" dia. 34 7/8" 48 7/8" 38¾" 47¼"
Cambridge Engineering, Inc. 16 S-Series Technical Manual
TYPICAL VERTICAL INDOOR INSTALLATION
STRUCTURAL KNEE BRACE (BY OTHERS)
The primary structural support element of a vertically mounted heater is the base. Any support to the heater cabinet should be con­sidered secondary, only as a means to help stabilize the heater.
HANGING ROD DETAIL
SECOND DOWNTURN (OPTIONAL)
DOWNTURN
SECOND DOWNTURN (OPTIONAL)
GAS TRAIN WIRING
(FIELD CONNECTED)
DIRECTIONAL ELBOWS
GAS TRAIN
HANGING ROD (BY OTHERS)
UNIT
BASE OF HEATER
ELECTRICAL CONTROL ENCLOSURE
FILTER SECTION (OPTIONAL)
INLET ELBOW
DOWNTURN
SHIPPING POSITION
MOUNTING POSITION
FOR S400 - S800 UNITS
DOUBLE LOCK NUTS
L BRACKET
HANGING BRACKET DETAIL
HANGING RODS, NUTS AND WASHERS BY OTHERS
HANGING ROD
NUT
WASHER
WASHER
DOUBLE LOCK NUTS
RAIN HOOD
HANGING ROD
NUT
WASHER
WASHER
INTERIOR WALL TRIM
(BY OTHERS)
EXTERIOR WALL TRIM
(BY OTHERS)
SHIPPING POSITION
MOUNTING POSITION
C BRACKET
FOR S950 - S3200 UNITS
S-Series Technical Manual 17 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
VERTICAL OUTDOOR MOUNTING
Due to the size and weight of this equipment, it is recommended the heater mounting structure be reviewed and approved by a qualified structural engineer before installing this equipment.
IMPORTANT
Before proceeding with the installation, verify the feasibility of the location selected with respect to accessibility to the equipment for service and main­tenance functions.
mCAUTION
To prevent contaminated air from being drawn into the heater, install the heater’s inlet at least 10 feet from any building exhaust, process exhaust, sewer stacks, or other sources that would allow contaminants to be drawn into the heater. Consult local codes for additional references.
1. Prepare wall penetration to the dimensions below.
6. Secure the heater in place with contractor supplied hardware.
7. Install the wall sleeve to the downturn.
8. Install fiberglass insulation in the gaps around the wall opening and the wall sleeve. Apply enough material to accommodate the full thickness of the wall.
9. Install finish trim pieces (by others) to the top, sides and bottom of the wall sleeve on both the inside and outside wall surfaces.
10. Apply silicone caulk at the joint between the wall sleeve and the outside wall surface. Make certain this is a continuous bead and that it runs the entire width of the wall sleeve. Caulk all other exposed joints.
11. Mount the gas train enclosure to the wall structure and connect gas piping between the heater and the enclosure.
2. Connect the inlet accessories to the heater includ­ing the filter section (optional).
3. Install structural uprights and associated wall sup­ports per structural engineers recommendations.
4. Remove the lag bolts used to fasten the unit to the skid.
5. Utilizing the lifting brackets on the front of the heater, use a forklift or comparable lifting device to raise and position the heater. Take precau­tions to prevent equipment damage (dents and/ or scratches) when the heater is being lifted into position.
Model A B C H W
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
* Dimensions allow for 1½" clearance on each side
Weight
500 lbs. 57 7/8" 33¼" 27 7/8" 16" 25¼"
750 lbs. 69 7/8" 33¼" 43 7/8" 18" 42½"
1500 lbs. 75¾" 36¾" 48 7/8" 27½" 47¾"
12. Install the inlet skirt to the heater inlet and attach the skirt extension to the exterior wall (page 21).
13. Install wall sleeve, second downturn and direc-
tional elbows. Consult the job layout for the orien­tation of the elbows.
Mounting Holes Wall Opening*
Cambridge Engineering, Inc. 18 S-Series Technical Manual
TYPICAL VERTICAL OUTDOOR INSTALLATION
INTERIOR WALL FLASHING
(BY OTHERS)
EXTERIOR WALL FLASHING
(BY OTHERS)
DOWNTURN
UNIT
The primary structural support element of a vertically mounted heater is the base. Any support to the heater cabinet should be con­sidered secondary, only as a means to help stabilize the heater.
WALL SLEEVE
SECOND DOWNTURN (OPTIONAL)
DIRECTIONAL ELBOWS
GAS TRAIN WIRING
(FIELD CONNECTED)
GAS TRAIN ENCLOSURE
GAS TRAIN
ELECTRICAL CONTROL ENCLOSURE
BASE OF HEATER
INLET SKIRT
(FIELD ASSEMBLED)
MOUNTING DETAIL
DOWNTURN
FILTER SECTION
(OPTIONAL)
CHANNEL SUPPORT
(BY OTHERS)
SECURE STRUCTURAL CHANNEL TO WALL (AS REQUIRED)
(BY OTHERS)
BUILDING WALL
BUILDING FOOTING
S-Series Technical Manual 19 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
RAIN HOOD INLET SKIRT
1. Assemble the lower skirt section with the sheet metal screws provided.
2. Assemble the upper skirt section with the sheet metal screws provided.
3. Attach the upper skirt assembly to the lower skirt assembly with the sheet metal screws provided.
4. Hang the upper skirt portion from the rear lip of the rain hood and rotate forward into place. Secure with the sheet metal screws provided.
5. Clamp the skirt extensions on the inside of the inlet skirt (as shown) so that the skirt extension is flush to the exterior wall. Secure the extension to the rain hood with the sheet metal screws provid­ed. Secure the extension to the building exterior with hardware provided by others. (Typical both sides.)
6. Caulk all seams with silicone caulk.
Cambridge Engineering, Inc. 20 S-Series Technical Manual
INSTALLATION INSTRUCTIONS
UNIT INLET SKIRT
1. Attach the front panel of the inlet skirt to the unit top with the sheet metal screws provided.
2. Attach the side panels to the unit sides with the sheet metal screws provided. (Typical both sides.)
3. Secure the front panel to the side panels with the sheet metal screws provided through the clearance holes in the front panel.
4. Clamp skirt on the inside of the side panel (as shown) so that the skirt extension is flush to the exterior wall. Secure the extension to the side panel with the sheet metal screws provided. Secure the extension to the building exterior with hardware provided by others. (Typical both sides.)
5. Caulk all seams with silicone caulk.
S-Series Technical Manual 21 Cambridge Engineering, Inc.
INSTALLATION INSTRUCTIONS
GAS PIPING
IMPORTANT
Refer to the heater name plate for determining the minimum gas supply pressure for obtaining the maximum gas capac­ity for which this heater is specified. Any field-installed components including, but not limited to, meters, regula­tors, strainers and external gas trains must be installed such that the minimum operating supply pressure for ob­taining the maximum gas capacity is provided.
IMPORTANT
Units with external gas trains must be installed so that the equivalent distance from the outlet of the gas train to the inlet of the heater does not exceed 4 feet.
.1. Check with the local utility or gas supplier to determine
the gas supply pressure.
CAUTION:
If the gas supply pressure is in excess of the maximum standing pressure indicated (14” WC, or 1 PSIG, or 2 PSIG, or 5 PSIG) on the heater nameplate, a separate positive shutoff high pressure regulator must be added upstream of the heater’s individual manual shutoff valve. This regulator must be vented to the outside of the building at least 10 feet from any intake opening. The vent pipe should be designed to prevent the entry of water, snow, insects or other foreign mate­rial that could cause blockage. There must be no reduc-
tion in size of the vent piping. Depending on the length and the configuration of the vent piping the pipe size may need to be increased. Refer to the applicable codes for proper sizing.
2. Properly size the gas supply piping for the rated input capacity, per local codes, and/or the National Fuel Gas Code, NFPA 54/ANSI 223.1 or the CAN/CSA B149 Installation Codes.
3. Make sure the supply piping is free of foreign matter and purged.
4. Verify that the gas piping, when installed, will not restrict or block the unit access door from fully opening.
5. Install the gas piping to the unit in accordance with local codes or, in their absence, in accordance with the National Fuel Gas Code, NFPA 54, NFPA 54/ANSI
223.1 or the CAN/CSA B149 Installation Codes.
IMPORTANT
A 1/8" NPT tap is supplied with the heater for measuring the gas supply pressure. If the gas supply pressure exceeds that indicated on the nameplate, the installer must install a 1/8" NPT tap and high pressure manual shutoff valve up­stream of the high gas pressure regulator.
mCAUTION:
An adequate sediment trap must be installed upstream of all gas controls for the heater and as close to the gas inlet connection of the heater as practical.
IMPORTANT
Many gas train components are equipped with Listed
Vent Limiters as atmospheric bleeds, however, local codes may require that these vents and bleeds be vented to the outdoors. If so, the vent piping should be designed to pre­vent the entry of water, snow, insects or other foreign mate­rials that could cause blockage.
6. Apply test pressure to the supply piping system and check for leaks. Use liquid gas detector.
Do not use flame for leak checking.
mCAUTION:
If the test pressure is in excess of 1/2 PSIG (3.45 KPA), the heater and its manual shutoff valve must be disconnected from the gas supply system dur­ing pressure testing. Failure to comply will void war­ranty.
If the test pressure is less than or equal to 1/2 PSIG (3.5 KPA), the heater must be isolated from the gas supply piping by closing its manual shutoff valve during pressure testing.
Do not attempt to start unit at this time. Premature start­up can result in damage to equipment and components.
Cambridge Engineering, Inc. 22 S-Series Technical Manual
INSTALLATION INSTRUCTIONS
ELECTRICAL WIRING
IMPORTANT
Before attempting electrical installation, review the following instructions and the wiring and connection diagrams to make sure you have a thorough under­standing of the requirements.
High voltage electrical input to this equipment is required. Extreme caution should be exercised. This equipment must be electrically grounded in accordance with local codes or in accordance with National Electrical Code ANSI/NFPA No. 70 or the Canadian Electrical Code C22.1.
1. Check the heater nameplate to determine the volt­age and amperage requirements.
IMPORTANT
Do not proceed with installation unless the sup­ply voltage agrees with the nameplate voltage. If supply voltage does not agree with nameplate volt­age, check with your local agent or Cambridge Engineering’s Customer Service Group at 1-800- 473-4569 to determine what changes are required.
2. Install the supply wiring and adequate Branch Circuit Protection in accordance with National Electric Code ANSI/NFPA 70 or Canadian Electrical Code C22.1.
3. Mount the remote control station. This panel should be located inside of the building and convenient to the operator without being susceptible to damage.
mCAUTION:
Observe special notes and instructions on Wiring and Connection Diagrams regarding sensor instal­lation:
The wiring for any temperature sensors or set point controls mounted remotely from the remote control station must be shielded, twisted-pair wiring and must be run separately from other AC line voltage wiring. This also applies to other remotely mounted controls utilized in the EDSM and EDR control systems.
If the thermistor is not mounted remotely from the remote control station, trim the excess wire length from the thermistor, as required.
Shielded wire which is routed to the heater’s electri­cal control enclosure should extend beyond the high voltage section of the enclosure before the shielding is removed and the wiring is distributed to its ultimate des­tination.
Shielding must be grounded at the remote control sta­tion end only.
5. Wire the remote control station and other tempera­ture control options using Class 2 wiring per the Cambridge wiring diagram and National Electrical Code Article 725 or Canadian Electrical Code C22.1 section 16 or local codes.
6. Connect the supply wiring to the disconnect switch inside of the heater’s electrical enclosure per National Electrical Code, Article 430, ANSI/NFPA 70 or Canadian Electrical Code C22.1 Sections 12 and 28.
4. Any temperature sensors should be located along a perimeter wall and out of the direct path of the discharge air or air infiltration. Consult the design drawing and/or Cambridge’s Customer Service Group for placement assistance. Do not locate remote mounted temperature sensors immediately adjacent to overhead doors because infiltration air can affect the sensor when the door is closed and the sensor may not adequately sense the temperature when the door is open. In this application, the sen­sor should be located on the first column in from the outside wall when feasible.
Power and control wiring inlets on all outdoor units must be sealed with silicone caulk (see page 56).
7. Return the wiring diagram to the manual holder. Replace and fasten all access covers.
Do not attempt to start unit at this time. Premature start-up can result in damage to equipment and components.
IMPORTANT
S-Series Technical Manual 23 Cambridge Engineering, Inc.
START-UP INSTRUCTIONS
START-UP PROCEDURE
1. Visual Inspection Of Equipment
(page 24)
2. Electrical Supply Voltage Verification
(page 24)
3. Gas Supply Pressure Verification
(page 24)
1. VISUAL INSPECTION OF EQUIPMENT
a. Check for any physical damage from shipping or
installation that could render the heater inoperable.
b. Verify that all heater accessories and filters (if
applicable) have been properly installed.
c. Check for loose components (belts, plugs, screws,
blower wheel lugs, etc.).
d. On units with external gas trains, verify that the
distance from the last safety shut-off valve to the heater does not exceed four feet.
4. Blower Rotation Check
(page 25)
5. Motor Amp Draw Check
(page 25)
6. Burner Manifold Pressure Adjustment
(page 25)
7. Minimum Fire Adjustment
(page 26)
8. Calibration Check
(page 27)
9. Gas Train Leak Check
(page 27)
10. Gas Valve Leak Check
(page 28)
11. Remote Control Station Check
(page 28)
12. Final Heater Preparation
(page 29)
After start-up, please complete and fax the S-Series Start Up Checklist to the Cambridge Customer Service Group. Receipt of a completed checklist will extend the start date for your warranty period to the date of the start-up but not to exceed six months from date of shipment.
e. Verify that the field wiring, both primary and con-
trol, has been installed according to the Cambridge wiring diagram, National Electrical Code, and local electrical codes.
f. Verify that a sediment trap has been installed
upstream of all gas controls.
g. Verify that the high pressure regulator, if applica-
ble, has been vented to the outside at least 10' from the heater intake.
h. Verify that the unions in the gas piping located at
the burner and just external to the heater housing, are tight.
2. ELECTRICAL SUPPLY VOLTAGE VERIFICATION
Check the electrical supply voltage at the disconnect switch.
IMPORTANT
Do not proceed with start-up unless the supply voltage agrees with the nameplate voltage. If the supply voltage does not agree with the nameplate voltage, check with your local agent or Cambridge Engineering’s Customer Service Group at 1-800- 473-4569 to determine what changes are required.
3. GAS SUPPLY PRESSURE VERIFICATION
IMPORTANT
Read the following instructions carefully. Any un­authorized modifications to or deviations from these instructions will void the warranty.
Check the gas supply pressure.
IMPORTANT
Do not proceed with start-up unless the gas supply pressure agrees with nameplate pressure require­ments. If the gas supply pressure is in excess of the maximum pressure indicated, a separate positive
Cambridge Engineering, Inc. 24 S-Series Technical Manual
shut-off high pressure regulator must be added upstream of the heater’s individual low pressure manual shut-off valve. If a high pressure regulator is needed and has not been installed, check with your local agent or Cambridge Engineering’s Customer Service Group at 1-800-473-4569 to determine the size and capacity requirements.
When disconnect switch is activated with enclo­sure open, live power is present. Only experienced technicians with knowledge and respect for live power should proceed beyond this point.
4. BLOWER ROTATION CHECK
a. Open the access door on the electrical control
enclosure side and turn the disconnect switch to the “ON” position.
b. Turn the blower service switch to the “LOCAL”
position. Blower motor will start after the motor­ized damper opens. Then, turn the blower service switch to the “OFF” position and verify the blower is rotating clockwise from the control enclosure side.
IMPORTANT
On a three phase system, the rotation direction of the blower may be reversed by switching any two wires located on the downstream side of the motor starter. The electrical supply to the heater must be turned off prior to switching the wiring.
IMPORTANT
Indications of loose belts include barking or squeal­ing when the blower starts. If these symptoms occur, please refer to the Belt Tensioning instructions (page 45)
IMPORTANT
The damper will remain in the open position as long as the blower service switch is not returned to the “REMOTE” position or the Low Temperature Cutout (LTC) function has not timed out.
5. MOTOR AMP DRAW CHECK
b. Check motor current at the overload on all three
legs.
c. Turn the blower service switch to the “OFF” posi-
tion.
IMPORTANT
The average amps must not exceed 103% of the Motor Nameplate FLA. High amperage may indicate excessive blower RPM.
6. BURNER MANIFOLD PRESSURE ADJUSTMENT
a. Turn the disconnect switch to the “OFF” position.
b. For EDL, EDR, EDSM, and EDSM/TP control
systems, remove the wire from terminal #3 on the amplifier (see Figure 1). This will drive the modu­lating valve to full open.
Figure 1
c. Remove the 1/8" plug from the manual shut-off
valve located just prior to the burner, and connect a manometer for the purpose of measuring the mani­fold pressure.
d. Refer to the heater nameplate for the Manifold
Differential Pressure (MDP) and record below.
e. Turn the disconnect switch to the “ON” position.
f. Turn the blower service switch to the “LOCAL”
position. The blower motor will start. Observe the pressure reading on the manometer and record below. (Note whether the reading is positive or negative.)
g. Using the formula below, determine the required
manifold pressure reading for the manometer.
IMPORTANT
The heater access doors must be closed for this test.
a. Turn the blower service switch to the “LOCAL”
position and let the motor warm up.
Nameplate MDP _______ " WC
Manifold Static Pressure (Blower Only) + _______ " WC
Manifold Pressure Reading = _______ " WC
S-Series Technical Manual 25 Cambridge Engineering, Inc.
IMPORTANT
A negative manifold static (blower only) will cause the manifold pressure reading to be lower than the nameplate manifold differential pressure.
IMPORTANT
The high limit may trip on warm days. If this oc­curs turn the blower on to allow the high limit to cool. Turn the blower and burner service switches to the "OFF" position. Access high limit and manu­ally reset. Close the unit access doors and turn the blower and burner service switches to the "LOCAL" position.
h. Turn the burner service switch to the “LOCAL”
position. After a delay for prepurge and igniter warm-up, the burner will light. Allow 15 seconds for the low fire start to time out.
a. Turn the blower service switch to the “LOCAL”
position and monitor the discharge temperature.
b. On EDL, EDR and EDSM applications, remove the
wire from terminal #8 on the amplifier. This will cause the burner to light on low fire and then fall to minimum fire.
c. Turn the burner service switch to the “LOCAL”
position. After a delay for prepurge and igniter warm-up, the burner will light. Allow 15 seconds for the low fire start to time out.
d. Monitor the discharge temperature and flame sig-
nal. Subtract the temperature from step "7a" above to determine the temperature rise. If the minimum fire does not require adjustment, proceed to step "7h".
i. Observe the manometer reading and compare to the
manifold pressure determined above in Step 6.g. If the manifold pressure reading does not equal this value, adjust the control regulator until the proper manifold pressure is obtained.
j. Turn the blower and burner service switches to the
“OFF” position.
k. Reconnect the wire to terminal #3 on the amplifier.
l. When performing a start-up proceed to the next
step, otherwise perform Final Heater Preparation (page 29).
7. MINIMUM FIRE ADJUSTMENT PROCEDURE
The minimum fire setting is preset at the factory at approximately 20°F rise. This minimum fire setting is not critical in space heating applications where the heater is cycled in response to the space temperature sensed by an operating thermostat. In this case, the heater should operate at the maximum discharge tem­perature, far from the minimum fire setpoint.
IMPORTANT
If a temperature rise of less than 15°F is desired, a DC microammeter is required to monitor flame signal during the adjustment procedure. Ensure the flame current remains steady and of sufficient strength to maintain burner operation for both con­sistent ignition at minimum fire and locking in the flame safeguard relay. Do not allow the flame signal to drop below 2.0 microamps DC.
e. On the MR212 modulating/regulating valve,
remove the housing cover and loosen the lock screw (C).
f. Remove the cap (A) exposing the minimum fire
adjusting screw. Turn the adjusting screw (B) to obtain the desired minimum fire setting.
g. Replace the cap (A).
On the MR212 modulating/regulating valve, tighten the lock screw (C) and replace the housing cover.
h. Turn blower and burner service switches to the
“OFF” position.
i. Reconnect the wire to terminal #8 on the amplifier.
j. When performing a start-up proceed to the next
Cambridge Engineering, Inc. 26 S-Series Technical Manual
step, otherwise perform Final Heater Preparation (page 29).
IMPORTANT
The heater access doors must be closed for the re­maining portion of this test.
8. CALIBRATION CHECK
The discharge temperature control system has been calibrated at the factory to the specified airflow, static pressure, and temperature rise. The actual operating conditions may require minor adjustments to the con­trol settings to ensure the heater functions within the operating parameters of its listing.
a. Remove the cover of the discharge air temperature
sampling box. Refer to the Heater Configuration (page 4) for the discharge air temperature sam­pling box location, and the Individual Component Description Section (page 67) for additional infor­mation. Install a thermocouple in the grommet inside the discharge air temperature Sampling Box, and then reinstall the cover. Route the thermocouple wire to a meter located outside of the unit.
b. On EDL control systems, the discharge tempera-
ture should match the temperature shown on the dial located on the amplifier. The dial should be set to 160°F.
On EDSM and EDSM/TP control systems, the
discharge temperature should match the tempera­ture shown on the MAX dial on the amplifier when the Space Temperature Selector (STS) is set to its highest setting. If the space temperature is warm, a test resistance of 7,500 ±250 should be con­nected in the circuit in place of the STS. The MAX dial on the amplifier should be set to 160°F.
c. Turn the burner service switch to the “LOCAL”
position. After a delay for prepurge and igniter warm-up, the burner will light. Allow 15 seconds for the low fire start to time out.
d. Monitor the discharge temperature until it stabi-
lizes. Do not rush through this step.
e. The discharge temperature should be 130 ± 3°F for
heaters setup for 130°F, or 160 +0/-5°F for heat­ers setup for 160°F. If the discharge temperature complies with this requirement, no calibration is required. If the discharge temperature does not equal the expected value, proceed to Calibration Procedures (page 29).
f. Remove any jumpers that were installed previously.
g. When performing a start-up proceed to the next
step, otherwise perform Final Heater Preparation (page 29).
9. GAS TRAIN LEAK CHECK
a. On EDL, EDR, EDSM, and EDSM/TP control
systems, remove the wire from terminal #3 on the
amplifier. This will drive the modulating valve to full open.
b. Turn the blower service switch to the “LOCAL”
position. Blower motor will start after the motor­ized discharge damper opens.
On EDR control systems, jumper terminals 20 and
22 and turn the dial on the remote heat adjust RHA to its highest setting to utilize the full temperature range of the control system. On heaters with a single temperature selection dial on the face of the control (Maxitrol part number TD114), set the dial to 90°F and verify that the override temperature selector dial, which is visible from the top of the control, is set at 40°F. The combination of these two settings should control the discharge tempera­ture to 130°F. On heaters with dual temperature selection dials on the face of the control, set the Space Heat dial to 160°F.
c. Turn the burner service switch to the “LOCAL”
position. After a delay for prepurge and igniter warm-up, the burner will light. Allow 15 seconds for the low fire start to time out.
d. With the burner operating, spray the complete gas
train with leak detector solution, checking all pipe connections and plugs.
mCAUTION:
Do not allow leak detector solution to come in contact with electrical components.
S-Series Technical Manual 27 Cambridge Engineering, Inc.
Any gas leak detected must be repaired before unit is placed into service.
e. Turn the blower and burner service switches to the
“OFF” position.
than 0" WC, refer to the Maintenance Instruction Section for information on Gas Valve Cleaning for the shut-off gas valve farthest from the burner (SOV) and retest. If the reading is 0" WC, remove the manometer and reinstall the pipe plug.
11. FINAL HEATER PREPARATION
f. Reconnect the wire to terminal #3 on the amplifier
g. When performing a start-up proceed to the next
step, otherwise perform Final Heater Preparation (page 29).
10. GAS VALVE LEAK CHECK
All heaters should be evaluated for the gas tightness of the gas valve seat. Heaters rated over 400,000 Btu/hr are equipped with a leak test facility to assist in checking this seal. A momentary switch and a gas port for measuring pressure between the valves are provided for leak testing. Refer to the Individual Component Description Section for more information regarding the leak test switch (page 70).
a. Connect a 0-10" WC manometer to the 1/8" NPT
fitting on the manual shut-off valve located just prior to the burner and verify the manometer is properly zeroed.
a. On EDSM and EDSM/TP control systems, if the
ambient temperature is at or above the Entering Air Thermostat (EAT) set point and the Remote Control Station Check has not been performed, then the EAT must be adjusted in the heater. Note the set point position and pull the jumper off the temperature set point (EAT Enabled Mode) and reinstall it sideways on the terminal block (Bypass Mode) as shown in Figure 1. Refer to the Individual Component Description section for additional infor­mation.
Figure 1
b. Ensure the discharge temperature setting(s)
comply(ies) with the application specifications.
b. On single redundant valve applications (heaters
rated less than or equal to 400,000 Btu/hr), close the manual burner shut-off valve and wait 30 sec­onds to read the manometer. If the reading is great­er than 0" WC, replace the gas valve and retest. If the reading is 0" WC, remove the manometer and reinstall the pipe plug.
On separate redundant valve applications, close
the manual burner shut-off valve, hold the momentary leak test switch in the closed position and wait 30 sec­onds to read the manometer. If the reading is great­er than 0" WC, refer to the Maintenance Instruction Section for information on Gas Valve Cleaning for the safety shut-off gas valve closest (SSV) to the burner and retest. If the reading is 0" WC, remove the manometer and reinstall the pipe plug.
To check the gas tightness of the SOV shut-off
valve in the gas train, connect the manometer to the leak test port between the valves and wait 30 sec­onds to read the manometer. If the reading is greater
c. If inlet ducting is utilized, determine the time
required to purge it with four (4) air changes and select a pre-purge time that will accommodate this time. Refer to Individual Component Description for additional information on the multi-functional PC board.
d. Perform a visual inspection of all wiring and gas
valve plugs to ensure they have been properly replaced.
e. Return the Technical Manual and the Wiring
Diagram to the manual holder.
f. Turn the blower and burner service switches to the
“REMOTE” position.
All safety controls must be returned to normal operating conditions.
Cambridge Engineering, Inc. 28 S-Series Technical Manual
g. Replace and fasten all covers and panels. Close the
control enclosure and latch the door.
f. Adjust the temperature control system and verify
the heater output changes correspondingly.
h. Turn the disconnect switch to the “ON” position.
IMPORTANT
If technical assistance is needed, call the Cambridge Customer Service Group at 1-800-473-4569 during the hours of 8:00 a.m. to 5:00 p.m. Central Time, Monday through Friday.
12. REMOTE CONTROL STATION CHECK
a. On EDSM and EDSM/TP control systems, if the
ambient temperature is at or above the Entering Air Thermostat (EAT) set point the EAT must be adjusted in the heater. Note the set point position and pull the jumper off the temperature set point (EAT Enabled Mode) and reinstall it sideways on the terminal block (Bypass Mode) as shown in Figure 1. Refer to the Individual Component Description section for additional information.
For EDSM, adjust the Space Temperature Selector.
For EDR, adjust the Remote Heat Adjust.
g. Reset the operating thermostat, if applicable, and
the temperature control system, if applicable, to the desired temperature. If the Entering Air Thermostat was adjusted, reset to its previous setting.
h. Turn the mode selector switch to the “SUMMER
VENTILATION” position. Verify the blower oper­ates. In TSS applications, the override timer may need to be activated to initiate operation.
i. Turn the mode selector switch to the desired operat-
ing mode.
CALIBRATION PROCEDURES
EDL CONTROL SYSTEMS (MAXITROL SERIES 14)
Figure 1
b. Insert key
switch and urn the mode selector switch to the “HEATING” position.
c. Set the operating thermostat, if applicable, to its
highest setting or activate that part of the control system which will initiate blower and burner opera­tion.
For Remote Control Station - Security (RCS-S),
refer to the Operating Instructions for the Operating Electronic Thermostat (OET) (page 33).
For Temperature Setback System (TSS), refer to
the Operating and Programming Instructions for the TSS Controller (page 35).
I f another interlock device controls the operation of
the heater, activate this device.
1. Turn the burner service switch to the “OFF” posi­tion and allow the Discharge Air Temperature Sampling Box time to cool.
2. Turn the blower service switch to the “OFF” posi­tion.
3. Open the unit access door on the control enclosure side.
4. Remove the access cover from the Discharge Air Temperature Sampling Box and remove the two mounting screws from the discharge temperature sensor DTS. Refer to the Individual Component Description Section (pages 67-72) for additional information.
5. Carefully remove the DTS from the sampling box, turn it over and adjust the DTS calibration potentiometer shown in the drawing. To raise the
discharge temperature, adjust the potentiometer 90˚
counterclockwise.
d. After the motorized discharge damper opens, the
blower motor will start.
e. After a delay for pre-purge and igniter warmup, the
burner will ignite.
S-Series Technical Manual 29 Cambridge Engineering, Inc.
6. Carefully reinstall the DTS. Replace the Discharge Air Temperature Sampling Box cover, and close the unit access doors.
7. Turn the blower and burner service switches to the
“LOCAL” position. After a delay for the prepurge and igniter warm-up, the burner will light. Allow 15 seconds for the low fire start to time out.
8. Wait for the discharge temperature and manifold
pressure to stabilize. Do not rush this step.
b. Turn the blower service switch to the “OFF”
position.
c. Open the unit access door on the control enclo-
sure side.
d. Remove the access cover from the Discharge
Air Temperature Sampling Box and remove the two mounting screws from the DTS. Refer to the Individual Component Description Section (pages 67-72) for additional information.
9. Repeat steps 1. through 8. pages 29-30 until the
manifold pressure and discharge temperature com­ply with the guidelines of the Calibration Check procedure step 8b. (page 27).
EDSM AND EDSM/TP CONTROL SYSTEMS (MAXITROL SERIES 44)
1. Remove the two mounting screws from the
Maxitrol A1044 Amplifier located in the Electrical Control Enclosure. Refer to the Electrical Control Enclosure Isometric Drawing (page 56) for addi­tional information.
2. Turn the amplifier over and adjust the amplifier
calibration potentiometer shown in the drawing. To raise the discharge temperature, use a Phillips screwdriver to adjust the potentiometer counter­clockwise. To lower the discharge temperature, adjust the potentiometer clockwise.
e. Carefully remove the DTS from the sampling
box, turn it over and adjust the DTS calibration potentiometer shown in the drawing. To raise the discharge temperature, adjust the potentiometer 90˚ counterclockwise.
f. Carefully reinstall the DTS. Replace the
Discharge Air Temperature Sampling Box cover, and close the unit access doors.
g. Turn the blower and burner service switches to
the “LOCAL” position. After a delay for the pre­purge and igniter warm-up, the burner will light.
h. Wait for the discharge temperature to stabilize.
Do not rush this step.
i. Repeat steps 4a through 4h until the manifold
pressure and discharge temperature comply with the guidelines of the Calibration Check procedure step "8b" (page 27).
3. Wait for the discharge temperature and manifold
pressure to stabilize after making adjustments. Do not rush this step.
4. In rare cases, the amplifier calibration potentiometer
will reach its adjustment limit before the proper dis­charge temperature is achieved. If this occurs, the Discharge Temperature Sensor (DTS) will need to be adjusted:
a. Turn the burner service switch to the “OFF” posi-
tion and allow the Discharge Air Temperature Sampling Box time to cool.
5. Reinstall the amplifier that was removed in step 1 (page 30).
EDR CONTROL SYSTEMS (MAXITROL SERIES 14)
1. Turn the burner and blower service switches to the “OFF” position.
2. Label and then remove the wires from terminals 1 through 3 of the Remote Heat Adjustment (RHA) in the remote control station.
3. Remove the RHA from the remote control station.
Cambridge Engineering, Inc. 30 S-Series Technical Manual
Take the RHA to the unit control enclosure. See Individual Component Description (page 70) for RHA details, and Heater Configuration (page 4) for electrical control enclosure location.
4. Remove the wires from terminals 21 and 22 of the right-hand side of Terminal Block #1 in the unit control enclosure. Connect these wires to terminals 1 and 3 of the RHA.
5. Place a jumper between terminals 2 and 3 of the RHA.
6. For the single dial RHA, the jumper activates the 0 to 40°F override dial. Verify the override tem­perature selector dial is set to 40°. Verify the dial on the face of the RHA is set to 90° to obtain a set­point of 130°.
For the dual dial RHA, the jumper activates the
Space Heat selector dial. Verify the Space Heat dial is set to 160°.
7. Turn the blower and burner service switches to the “LOCAL” position. After a delay for the prepurge and igniter warm-up, the burner will light.
8. Wait for the discharge temperature and manifold pressure to stabilize. Do not rush this step. Allow 15 seconds for the low fire start to time out.
9. For the single dial RHA, adjust the calibration potentiometer shown in the drawing. To raise the discharge temperature, adjust the potentiometer clockwise. To lower the discharge temperature, adjust the potentiometer counterclockwise.
For the dual dial RHA, adjust the calibration poten- tiometer shown in the drawing. To raise the discharge temperature, adjust the potentiometer clockwise. To lower the discharge temperature, adjust the potentiom­eter counterclockwise.
10. Allow the discharge temperature and manifold pressure to stabilize between adjustments until the manifold pressure and discharge temperature comply with the guidelines of the Calibration Check procedure step "8b" (page 27).
11. Turn the burner and blower service switches to the “OFF” position. Remove the wires from ter­minals 1 and 3 of the RHA that were connected in step 4. Reconnect the wires to terminal 21 and 22 of Terminal Block #1 in the unit control enclosure. Leave the jumper in place that was applied in step 5.
12. Return the RHA to the Remote Control Station. Reconnect the wires that were removed in step 2.
13. With the RHA reconnected in the Remote Control Station, repeat steps 7 through 10. A second technician and two-way communication may be required.
14. Turn the burner and blower service switches to the “OFF” position. Remove the jumper from terminals 2 and 3 of the RHA if one was added during step 5.
S-Series Technical Manual 31 Cambridge Engineering, Inc.
OPERATING INSTRUCTIONS
OPERATING SEQUENCE
POWER ON
1. Control transformer energized.
2. Operator must select “SUMMER VENTILATION” or “HEATING” mode.
SUMMER VENTILATION MODE
1. Mode switch in “SUMMER VENTILATION” position.
2. Optional TSS Controller schedule calls for ventilation.
3. Optional motorized damper opens.
4. Blower motor starts.
5. Unit continues to run until turned off.
HEATING MODE
1. Mode switch in “HEATING” position.
2. Thermostat or interlock calls for heat.
3. Optional motorized damper opens.
4. Blower motor starts.
5. Airflow switch closes.
6. Entering air thermostat closes when inlet temper­ature is below setpoint after the prepurge delay.
7. Igniter warm up timing.
8. Gas valve opens.
9. Burner lights.
10. Igniter is de-energized.
11. Low Fire Start is de-energized after 15 seconds.
12. Unit runs and modulates until operating thermo-
stat and/or interlock opens (heater shuts off).
13. Steps (2) through (12) repeat themselves auto-
matically as necessary.
Cambridge Engineering, Inc. 32 S-Series Technical Manual
OPERATING INSTRUCTIONS
ELECTRONIC THERMOSTAT
The Cambridge Engineering Operating Electronic Thermostat (OET) controls the heater’s ON/OFF operation in a space heating mode. It includes the following features:
• Digital LED display of current temperature and temperature settings.
• LED indication of status of output relay.
• Separate settings for HEAT ON and HEAT OFF settings.
• Temperature Calibration for accurate temperature control.
• EEPROM storage maintains temperature settings indefinitely in case of power loss.
The thermistor enclosure (SH-1) is packed inside the Remote Control Station for shipment. It can be mounted on the exterior sides or bottom of the Remote Control Station or a remote location within 500 feet of the Remote Control Station using 18 gauge stranded, twisted-pair, shielded cable. The thermistor is hard wired to the temperature sensor terminal block.
S-Series Technical Manual 33 Cambridge Engineering, Inc.
SETTING TEMPERATURES
TEMPERATURE CALIBRATION
The Operating Electronic Thermostat requires two tem­perature settings. When the temperature drops below the HEAT ON setting, the heater will turn on. When the heater raises the space temperature above the HEAT OFF setting, the heater will turn off. This difference provides an adjustable range of operation for the heater which minimizes temperature swings.
The minimum run time and off time for the heater regardless of temperature are both set at 2 minutes. The allowable temperature range is 40°F to 99°F. The HEAT OFF temperature can not be set lower than the HEAT ON temperature.
1. Press and hold the the
UP or the DOWN button until the desired tempera-
HEAT ON button while pressing
ture for the heater to turn ON is displayed.
To compensate for lead wire resistance, it may be neces­sary to make an adjustment to the displayed temperature to correct it to the temperature measured at the thermis­tor sensor. The calibration feature allows the displayed temperature to be offset either above or below the actual sensed temperature. Be sure to use an accurate tempera­ture meter for making this correction.
1. Press and hold the
HEAT ON and HEAT OFF buttons
while pressing the UP or the DOWN button until the correct temperature is displayed. ( A period [.] after the temperature will indicate the Calibration Mode).
2. Press and hold the HEAT OFF button while pressing the
UP or the DOWN button until the desired tempera-
ture for the heater to turn OFF is displayed.
2. Pressing the UP or the DOWN button will display the current calibration difference above or below (-) the measured temperature.
Cambridge Engineering, Inc. 34 S-Series Technical Manual
OPERATING INSTRUCTIONS
TSS CONTROLLER
The Cambridge Engineering TSS Controller provides several features to tailor the operation of the Cambridge heating system to particular applications.
• Seven day programmable clock.
• Separate temperature settings for Heating and Setback operation.
• Separate schedules for Summer Ventilation and Heating modes.
• Setback Override for temporary heating operation.
• Real-Time Clock with automatic adjustment for Daylight Saving Time.
• Nine Holiday Setback Periods for temporary setback operation.
• Temperature Calibration for accurate temperature control.
• Capacitor backup maintains current time and day of week for power loss of up to 96 hours.
• EEPROM storage maintains schedules and temperature settings indefinitely.
The thermistor enclosure (SH-1) is packed inside the Remote Control Station for shipment. It can be mounted on the exterior sides or bottom of the Remote Control Station or a remote location within 500 feet of the Remote Control Station using 18 gauge stranded, twisted-pair, shielded cable. The thermistor is hard wired to the tempera­ture sensor terminal block.
S-Series Technical Manual 35 Cambridge Engineering, Inc.
SETTING CURRENT DAY OF WEEK, TIME, MONTH/DAY, AND YEAR
For proper operation of the scheduler, the TSS Controller clock must be set to the correct day of week, time, month/day and year. In the event of power loss of more than 96 hours, these settings must be updated.
During normal operation, the TSS Controller display will alternate between the current space temperature and the current time and day of the week.
1. Press and hold the DAY OF WEEK button while pressing the UP or the DOWN button until the light for the current day is illuminated.
3. Press and hold the MONTH/DAY button while press­ing the UP or the DOWN button until the current date is displayed.
4. Press and hold the YEAR button while pressing the
UP or the DOWN button until the current year is dis-
played.
2. Press and hold the TIME button while pressing the
UP or the DOWN button until the current time is dis-
played.
SETTING AUTOMATIC ADJUSTMENT FOR DAYLIGHT SAVING TIME
The TSS Controller has the ability to automatically detect and adjust for daylight saving time. The default setting on the controller is to recognize daylight saving time.
Cambridge Engineering, Inc. 36 S-Series Technical Manual
SETTING TEMPERATURES
1. Press the SETBACK SCHEDULE/EXIT button to enter the scheduling program at the first ON cycle.
2. Press the UP button once to enter the daylight saving time setting ("d-SA" is displayed).
The TSS Controller has two temperature control modes with the keyswitch on the front of the enclosure in the HEATING position. The HEATING mode controls the heater when the ON time schedule is in effect. The SETBACK mode controls the heater when the OFF time schedule is in effect. (See SETTING SCHEDULES for instructions on setting the ON and OFF schedules). With the keyswitch in the SUMMER VENTILATION posi­tion the heater fan will run based on the time schedule with no temperature control.
HEATING MODE (ON Time Schedule)
The HEATING mode requires two temperature settings. When the temperature drops below the HEAT ON set­ting the heater will turn on. When the heater raises the space temperature above the HEAT OFF setting, the heater will turn off. This difference provides an adjust­able range of operation for the heater, which minimizes temperature swings. The minimum on time and off time for the heater regardless of temperature is 2 minutes. The allowable temperature range is 41°F to 99°F.
3. Press and hold the YEAR button while pressing the
UP or the DOWN button to scroll to "YES" if daylight
saving time should be recognized or "NO" if daylight saving time is not recognized.
The HEAT OFF temperature cannot be set lower than the HEAT ON temperature.
1. Press and hold the the UP or the DOWN button until the desired tempera­ture for the heater to turn ON is displayed.
HEAT ON button while pressing
4. Press the SETBACK SCHEDULE/EXIT button to exit the scheduling program.
S-Series Technical Manual 37 Cambridge Engineering, Inc.
2. Press and bold the HEAT OFF button while pressing the UP or the DOWN button until the desired tempera­ture for the heater to turn OFF is displayed.
SETBACK MODE (OFF Time Schedule)
The SETBACK mode requires setting only the ON tem­perature. The OFF temperature will be automatically set based on the temperature difference between HEAT ON and HEAT OFF programmed above for the HEAT mode.
1. Press and hold the pressing the UP or the DOWN button until the desired temperature for the heater to turn ON is displayed.
SETBACK TEMP. button while
ture setting and increase the space temperature to the HEAT ON and HEAT OFF temperature settings for the amount of time set on the OVERRIDE timer.
SETTING SCHEDULES
The TSS Controller has separate programmable daily schedules for the HEATING and the SUMMER VENTILATION modes. The schedule currently in effect is determined by the position of the keyswitch in the door of the enclosure. With the keyswitch in the HEATING or OFF position, the schedule for the Heating Mode is accessible. With the keyswitch in the SUMMER VENTILATION position, the schedule for the Ventilation Mode is accessible. (This will be indi­cated by the VENT MODE light on the TSS Controller being illuminated). Before attempting to program the schedule, determine the planned time periods for HEAT (ON) and SETBACK (OFF) for the HEATING mode and the planned ON and OFF time periods for the Ventilation mode. The time that it takes to recover from the SETBACK temperature to the HEAT temperature must also be taken into consideration for the ON time in the HEATING mode. The following charts can be filled in for a reference during the programming of the schedule. There are fifteen available ON and OFF program cycles for both HEATING and SUMMER VENTILATION. The first ON and OFF cycles are fixed for Monday through Friday and should only be used when the schedules for those days are identical. The fourteen additional numbered cycles can be programmed for any one day or successive days.
NOTE: Do not program the TSS controller with over­lapping schedules, as operational errors will occur. Whenever the heater is operating during a scheduled ON cycle and a subsequent overlapping program is encoun­tered, that program will be ignored.
A Holiday Setback Schedule is available for temporary operation in the Setback Mode of up to nine different holiday periods without affecting the current schedules. (See HOLIDAY SETBACK SCHEDULE section for instructions on using this feature).
SETBACK OVERRIDE
All unused program cycles should not contain any set-
In instances where temporary heat is desired when the scheduler is in the SETBACK mode, the OVERRIDE timer can be used. Setting this timer, located on the front of the TSS panel, will override the SETBACK tempera-
tings. Check all cycles after programming to assure that the display for unused cycles shows "--:--". If undesired settings have been entered, scroll the time display until "--:--" is displayed (between 11.59PM and 12.00AM for time settings; between 12.31 and 1.01 for date settings).
Cambridge Engineering, Inc. 38 S-Series Technical Manual
HEATING SCHEDULE
SUMMER VENTILATION SCHEDULE
Cycle Time AM/PM Day
On
Off
On 1
Off 1
On 2
Off 2
On 3
Off 3
On 4
Off 4
On 5
Off 5
On 6
Off 6
On 7
Off 7
On 8
Off 8
On 9
Off 9
On 10
Off 10
On 11
Off 11
On 12
Off 12
On 13
Off 13
On 14
Off 14
M-F
M-F
Cycle Time AM/PM Day
On
Off
On 1
Off 1
On 2
Off 2
On 3
Off 3
On 4
Off 4
On 5
Off 5
On 6
Off 6
On 7
Off 7
On 8
Off 8
On 9
Off 9
On 10
Off 10
On 11
Off 11
On 12
Off 12
On 13
Off 13
On 14
Off 14
M-F
M-F
S-Series Technical Manual 39 Cambridge Engineering, Inc.
1. Switch the keyswitch on the front of the enclosure to the desired operating mode. Allow ten seconds before proceeding.
2. Press the SETBACK SCHEDULE/EXIT button to enter the scheduling program at the first ON cycle.
3. Press and bold the TIME button while pressing the UP or the DOWN button to scroll to the desired ON time for Monday through Friday.
5. Press and bold the TIME button while pressing the UP or the DOWN button to scroll to the desired OFF time for Monday through Friday.
6. If Monday through Friday is the only schedule required, proceed to Step 14. If any additional pro­gramming is required, proceed with the following steps. Remember that subsequent program cycles must not overlap with the ON and OFF times set above.
4. Press the UP button once to step to the first OFF cycle.
7. Press the UP button once to step to the next ON cycle.
8. Press and bold the TIME button while pressing the UP or the DOWN button to scroll to the desired ON time.
9. Press and bold the DAY OF WEEK button while pressing the UP or the DOWN button until the light for the desired day is illuminated.
Cambridge Engineering, Inc. 40 S-Series Technical Manual
10. Press the UP button once to step to the next OFF cycle.
11. Press and hold. the TIME button while pressing the
UP or the DOWN button to scroll to the desired OFF
time.
12. Press and hold the DAY OF WEEK button while
pressing the UP or the DOWN button until the light for the desired day is illuminated.
13. Repeat steps 7-12 until all required program cycles have been entered.
14. Press the SETBACK SCHEDULE/EXIT button to exit the scheduling program.
15. Verify that the correct current time and light for day of the week are still displayed.
HOLIDAY SETBACK SCHEDULE
The Holiday Setback Schedule overrides the normal schedule and holds the space at the SETBACK tempera­ture. The TSS Controller allows up to nine holiday peri­ods (Holiday Start Date [HSD] and Holiday End Date [HED]) to be scheduled.
HOLIDAY SETBACK SCHEDULE
Cycle Date
HSD 1
HED 1
HSD 2
HED 2
HSD 3
HED 3
HED 4
HED 4
HSD 5
HED 5
HSD 6
HED 6
HSD 7
HED 7
HSD 8
HED 8
HSD 9
HED 9
S-Series Technical Manual 41 Cambridge Engineering, Inc.
1. Press the SETBACK SCHEDULE/EXIT button to enter the scheduling program at the first ON cycle.
4. Press the UP button once to step to the first holiday end date cycle (HEd1).
2. Press the UP button repeatedly to step to the first holi­day start date (HSd1).
3. Press and hold. the MONTH/DAY button while press­ing the desired holiday start date.
UP or the DOWN button to scroll to the
5. Press and hold the MONTH/DAY button while pressing the UP or the DOWN button to scroll to the desired holiday end date. (NOTE: Holiday end date must be at least one day after holiday start date).
6. Repeat steps 2-5 until all required holiday cycles have been entered.
7. Press the SETBACK SCHEDULE/EXIT button to exit the scheduling program.
Cambridge Engineering, Inc. 42 S-Series Technical Manual
TEMPERATURE CALIBRATION
To compensate for lead wire resistance, it may be neces­sary to make an adjustment to the displayed temperature to correct it to the temperature measured at the thermis­tor sensor. The calibration feature allows the displayed temperature to be offset either above or below the actual sensed temperature. Be sure to use an accurate tempera­ture meter for making this correction.
1. Press and hold the while pressing the UP or the DOWN button until the correct temperature is displayed. (A period [.] after the F will indicate the Calibration Mode).
2. Pressing the UP or the DOWN button will display the current calibration difference above or below (-) the measured temperature.
HEAT ON and HEAT OFF buttons
S-Series Technical Manual 43 Cambridge Engineering, Inc.
MAINTENANCE INSTRUCTIONS
mWARNING:
Turn the disconnect switch off when performing service or maintenance functions.
BLOWER BEARING LUBRICATION
Heaters with 3 HP or smaller motors have permanent­ly lubricated, double shielded and double sealed ball bearings which do not require additional lubrication. Heaters with 5 HP or larger motors require lubrication on intervals of 3 to 6 months. Use Duralube AW-2G, Goldplex (Lithplex HC 150 SMG), Shell Gadus S2V100 2 or Mobilith AW2 grease. Grease should be bearing quality and compatible to lithium bases thick­ener.
MOTOR BEARING LUBRICATION
Motors are pregreased normally with Exxon Polyrex EM. Equivalent greases which are compatible with the Exxon Mobil lithium complex greases and electric
motor polyurea greases per ASTM D6185.
NEMA 254
Frame or
larger
Annual Motor
Operation
Intermittent Operation -
>5000 hours
Continuous Operation -
Standard Service
Seasonal Service
(Motor is idle for 6 months or more)
Continuous Operation ­Severe Service
(High ambient, dirty or moist location, high vibra­tion)
Recommended
Lubrication Interval
NEMA 215T
Frame or
smaller
5 years 3 years
2 years 1 year
1 year
6 months
FILTERS
Filters may be provided in a V-bank filter section. Filters may be of the disposable or permanent type.
Service the filters as needed based on the "load­ing" experienced. Clean filters typically start out with a pressure drop across the filters between 0.15 and 0.25" WC. Cleaning or replacement is generally required below the pressure drop increased by a factor of 4 times the initial clean value.
Turn off the heater before servicing the filters. Remove the filters from the filter section by opening the filter access door. Handle the filters carefully to prevent debris from being dislodged from the filter into the heater.
Permanent Filters are 2" thick expanded aluminum washable filters in aluminum frames.
Permanent filters can be cleaned using a stream of water or soap and water. Back flush the filters until the water comes out clean. If soap is used, ensure that all soap is rinsed out of the filter. Visually inspect the filter to ensure that it is clean. Allow to dry before returning to service.
Disposable Filters are 2" thick cotton/polyester pan­els with galvanized expanded metal pleat support grids and beverage board frames.
Disposable filters are replaced when they become dirty. Replace the filter with the same size of filter which is removed from the filter section. Note the air­flow markings on the filter.
Model Quantity Size
S400/S800
S950/S1200/S1600
S1850/S2200/S3200
2 20" x 25" x 2"
4 20" x 25" x 2"
12 16" x 25" x 2"
Cambridge Engineering, Inc. 44 S-Series Technical Manual
BELT TENSIONING
Using a Browning Belt Tension Checker and a straight edge, verify proper belt tension according to the following table:
Model HP
S400/
S800
S400/
S800
Belt(s)
Qty Type
1 1 A 1/4" 2 - 3 1 - 2
2 1 A 1/4" 2½ - 4 1½ - 3
Center
Span
Deection
Force (lbs)
New
Belts
Used Belts
BURNER CLEANING
The Cambridge Engineering burner is for the most part self-cleaning. However, if the application is extremely dirty or dusty, it may become necessary to periodically clean the burner. Remove and clean the burner in accordance with the following recommend­ed procedures:
1. Turn the heater disconnect switch off. Close the manual gas supply shut-off valve.
2. Loosen the union in the gas train.
S950/
S1200
S800/ S950/
S1200
S1200/
S1600
S1850/
S2200
S1850/
S2200
S2200/
S3200
S2200/
S3200
2 1 BX 1/4" 3 - 4½ 2 - 3½
3 2 BX 1/4" 4½ - 6 4 -5½
5 2 BX 1/4" 3 - 5 2½ - 4
5 2 BX 7/16" 5 - 7 4½ - 6½
2 BX 7/16" 6 - 8 5½ - 7
10 2 BX 7/16" 6½ - 8½ 6 - 7½
15 2 BX 7/16" 7 - 9 6 - 8
Periodic belt adjustments may be required. Indications of loose belts include barking or squealing when the blower starts.
BLOWER CLEANING
The blower wheel should be examined for accumula­tion of dust on the blades. These surfaces must be kept clean. Dirt accumulation will result in significant air flow reduction and/or possible imbalance of the blower wheel.
CAUTION:
The igniter is made of silicon carbide material and should be handled with care to avoid breakage.
3. Disconnect the ignition cable from the burner and remove the flame rod and the igniter.
4. Examine the flame rod ceramic for cracks and replace if necessary. Clean the flame rod element with emery cloth to remove oxidation.
5. Remove the fasteners that secure the burner to the housing. The burner will then be free to slide out.
mCAUTION:
Be sure to take necessary safety precautions (such as wearing eye protection, etc.) before attempting the next step.
6. Clean the burner by back-flushing using high pressure air (40-80 PSI). Continue back-flushing until dust particles are completely expelled from the burner.
7. Reinstall the burner using the above steps in reverse order.
mCAUTION:
Prolonged imbalance can result in catastrophic failure of the blower wheel and other related components.
GAS TRAIN LEAK CHECK
Periodically check the gas control assembly, internal and external piping for leaks. Refer to the Gas Train Leak Check procedure (page 27). All relief vents on the gas controls should be checked for blockage (gas pressure regulators and pressure switches).
S-Series Technical Manual 45 Cambridge Engineering, Inc.
GAS VALVE CLEANING
All solenoid valves should be cleaned periodically. The time between cleanings will vary depending on the medium and the service conditions. In general, if the voltage to the coil is correct, sluggish valve operation, excessive noise, or leakage will indicate that cleaning is required. Refer to the Gas Valve Leak Check procedure (page 28).
mWARNING:
In the extreme case, the valve may fail to open or fully close.
IMPORTANT
It is not necessary to remove the valve from the gas train for cleaning.
IMPORTANT
If the valve has been disassembled for inspection and cleaning only and a Rebuild Kit is not being installed, lubricate the following with RemGrit TFL 50® Dry Lubricant:
• Diaphragm assembly on both sides
• Main disc at base of core/diaphragm sub-assembly
• Pilot disc at base of core assembly
mCAUTION:
Do not distort the hanger spring between the core assembly and the diaphragm assembly when lubricating the pilot disc.
mWARNING:
Before servicing the valve, turn off the electri­cal power, close the upstream manual gas valve, depressurize the valve, extinguish all open flames and avoid any type of sparking or ignition. Vent hazardous or combustible fumes to a safe area.
ASCO Gas Valves: Series 8214
Disassemble the valve (page 47) and clean all parts as follows:
IMPORTANT
If parts are worn or damaged, install a complete ASCO Rebuild Kit.
1. Remove the solenoid enclosure.
2. Remove the bonnet screws, valve bonnet, bonnet gasket, core/diaphragm subassembly and body gas­ket.
3. Lubricate the bonnet gasket and body gasket with a light coat of Dow Corning an equivalent high-grade silicone fluid.
4. Apply a light coat of RemGrit TFL 50 Lubricant to: the valve seat; the valve body surface where the diaphragm assembly contacts the valve body and body gasket; and the internal surface of the valve bonnet where the diaphragm assembly contacts the bonnet when the valve is in the ener­gized (open) position.
®
200 Fluid lubricant or
®
Dry
5. Replace the body gasket and the core/diaphragm subassembly with the closing spring attached. Locate the bleed hole in the core/diaphragm sub-
assembly approximately 30˚ counterclockwise from
the valve inlet.
6. Replace the valve bonnet and the bonnet screws. Torque the screws in a crisscross manner to 100 ± 10 in-lbs. Replace the solenoid and make the elec­trical hookup.
mWARNING:
Before returning to service, check the valve for proper operation and perform Gas Valve Leak Check and Gas Train Leak Check procedures (page 27-28).
ORDERING INFORMATION FOR ASCO REBUILD KITS
Parts marked with an asterisk (*) in the exploded views are supplied in Rebuild Kits.
When ordering Rebuild Kits for ASCO valves, order the Rebuild Kit number stamped on the valve name­plate. If the number of the kit is not visible, order by indicating the number of kits required, and the Catalog Number and Serial Number of the valve(s) for which they are intended.
Cambridge Engineering, Inc. 46 S-Series Technical Manual
SOLENOID BASE SUBASSEMBLY
BONNET GASKET
VALVE BONNET
VALVE BODY
CORE/DIAPHRAGM SUBASSEMBLY
BONNET SCREW
BODY GASKET
Indicates parts supplied
in ASCO Rebuild Kit.
CAUTION
Do not damage
valve seat
Locate bleed hole in
core/diaphragm sub---
assembly approximately
30° from valve inlet
BLEED HOLE
Disassembled View of ASCO Valve
S-Series Technical Manual 47 Cambridge Engineering, Inc.
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
1. Unit in Reset
I. No Blower Operation
a) Outside temperature below LTC setpoint
in Vent Mode
b) Gas Valve not energized during call for
heat cycle
2. Heater Disconnect
a) Disconnect in OFF position a) Turn disconnect ON.
3. Mode Selector Switch on RCS
a) Switch in OFF position b) Defective Switch
4. Operating Thermostat
a) Thermostat satisfied b) Open in thermistor circuit c) Defective thermostat
5. Blower Service Switch
a) Switch in OFF position b) Defective switch
6. Control Transformer
a) No input voltage b) Blown control fuse c) Defective transformer
7. Class 2 Transformer
a) No output voltage b) Defective transformer
8. Multi-Functional PC Board
a) No input voltage on Terminal G (RCS) b) Improper wiring c) Defective board
9. Damper Motor
a) Damper fuse tripped due to damper motor
over-stroking b) Damper end switch not made c) Defective damper motor
10. Motor Protection
a) Overload relay tripped
b) Overload relay defective
11. Motor Starter
a) Coil open (Defective) b) Contacts welded closed (Defective)
12. Motor
a) No input voltage b) Improper voltage c) Defective motor
13. Blower
a) Defective or locked bearings b) Physical damage
14. Belts
a) Belt Slipping b) Belt broken or missing
a) Turn unit OFF momentarily and turn unit
ON.
b) See Problem III.
a) Place switch in proper mode. b) Replace switch.
a) Adjust thermostat, if applicable. b) Check wiring or replace thermistor. c) Replace thermostat.
a) Place switch in REMOTE position. b) Replace switch.
a) Check disconnect and supply fusing. b) Replace control fuse. c) Replace transformer.
a) Check supply voltage. b) Replace transformer.
a) Check voltage in RCS. b) Check wiring. c) Replace multi-functional PC board.
a) Adjust damper stroke (page 54).
b) Check end switch/cam interface. c) Replace damper motor.
a1) Check primary power source. a2) Reset overload relay and check motor
amps/overload setting.
b) Replace overload relay.
a) Replace starter. b) Replace starter.
a) Check primary power source. b) Consult factory. c) Replace motor.
a) Replace bearings. b) Replace or repair blower
a) Tighten belts. b) Replace belts.
Cambridge Engineering, Inc. 48 S-Series Technical Manual
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
II. BLOWER RUNS;
NO HEAT;
FLAME SAFETY RELAY DOESN’T LOCK OUT
III. BLOWER RUNS;
NO HEAT;
FLAME SAFETY RELAY LOCKS OUT
1. Mode Selector Switch
a) Switch in VENT position b) Defective Switch
2. Burner Service Switch
a) Switch in OFF position b) Defective switch
3. Multi-Functional PC Board
a) No input voltage on Terminal W (RCS) b) Inlet temperature above EAT setpoint c) Improper wiring d) Defective board
4. Airflow Switch
a) Blower running backwards b) Belts slipping c) Blocked intake or discharge d) Clogged airflow tubing or pickup ports e) Defective switch
5. Flame Safeguard Relay
a) No input voltage b) Defective FSR
1. Igniter
a) No current (open igniter) b) No voltage
2. High Limit
a) High limit tripped a) See Problem Number VI (page 51).
3. High or Low Gas Pressure Switches
a) Low gas pressure switch tripped
b) High gas pressure switch tripped
c) Defective gas pressure switch
4. Gas Valve
a) No input voltage
b) Gas valve does not open
c) Defective solenoid
5. Modulating Valve
a) Minimum fire set too low a) Adjust minimum fire on modulating valve.
6. Multi-Functional PC Board
a) Low fire start set too low
b) Thermistor open or not connected
a) Place switch in HEAT position. b) Replace switch.
a) Place switch in REMOTE position. b) Replace switch.
a) Check voltage in RCS. b) Adjust EAT setpoint. c) Check wiring. d) Replace multi-functional PC board.
a) Reverse motor direction. b) Tighten and/or replace belts. c) Find and remove obstruction. d) Clean or replace tubing or pickup ports. e) Replace switch.
a) Check wiring. b) Replace FSR.
During trial for ignition: a) Check igniter current. b) Check FSR output to igniter.
a) Check gas supply for low gas pressure or
no gas.
b1) Check manifold gas pressure for high
pressure reading and reset pressure regu­lator.
b2) Check gas supply pressure against name
plate.
b3) Verify the high pressure regulator is a
lock-up type.
c) Replace gas pressure switch.
a1) Check FSR output to R1 relay
during ignition trial. a2) Check gas valve circuit and wiring. b1) Compare supply voltage to nameplate
voltage. b2) Clean and/or replace gas valve parts. c) Replace solenoid or valve assembly.
a) Adjust modulating valve voltage between
10 and 13 Volts DC.
b) Properly install or replace thermistor.
S-Series Technical Manual 49 Cambridge Engineering, Inc.
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
III. BLOWER RUNS; NO HEAT; FLAME SAFETY RELAY LOCKS OUT (Continued)
IV. BLOWER RUNS;
BURNER FIRES;
FLAME SAFETY RELAY LOCKS OUT
V. BLOWER RUNS;
UNIT HEATS;
SHORT CYCLES
WITHOUT RESETTING
7. Regulator
a) Clogged vent orifice b) No supply pressure c) Improper manifold pressure d) Defective regulator
8. Burner
a) Defective burner a) Replace burner.
1. Low Flame Current
a) Dirt build-up on ceramic body
b) Minimum fire set too low c) Defective burner
2. Multi-Functional PC Board
a) Low fire start set too low a) Adjust modulating valve voltage between
3. No Flame Current
a) Ground connection open
b) Wire termination oxidized
4. Fluctuating Flame Current
a) Unit overfiring b) Minimum fire set too low c) Intermittent ground connection d) Loose terminal on Flame Rod
e) Defective burner
5. Flame Safeguard Relay
a) Defective FSR a) Replace FSR.
6. High Limit
a) High limit contact intermittent a) Replace high limit.
1. Air Flow Switch
a) Blower running backwards b) Belts slipping c) Blocked intake or discharge d) Air delivery below unit specs
e) Clogged airflow tubing or pick-up ports
f) Defective switch
2. Flame Safeguard Relay
a) Defective FSR a) Replace FSR.
3. Operating Thermostat
a) Differential temperature setting too tight b) Open or short in thermistor circuit
4. Damper Motor End Switch
a) End switch making intermittent contact a) Replace end switch assembly.
a) Clean or replace orifice. b) Check all gas cocks and piping. c) Adjust regulator. d) Replace regulator.
a) Clean dirt deposit from ceramic body and
install protective boot. b) Adjust minimum fire on modulating valve. c) Replace burner.
10 and 13 Volts DC.
a1) Reference transformer to ground. a2) Secure ground between control enclosure
and burner. a3) Tighten loose ground screws. b) Clean terminal and reinsert.
a) Check manifold pressure. b) Adjust minimum fire on modulating valve. c) Tighten all ground points. d) Remove jam nuts from Flame Rod.
Reassemble with terminal located between jam nuts on Flame Rod.
e) Replace burner.
a) Reverse motor direction. b) Tighten and/or replace belts. c) Find and remove obstruction. d) Increase fan RPM for air delivery require-
ments.
e) Clean or replace airflow tubing or pick-up
ports.
f) Replace switch.
a) Increase differential temperature setting. b) Check wiring or replace thermistor.
Cambridge Engineering, Inc. 50 S-Series Technical Manual
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
VI. HIGH LIMIT TRIPPED
VII. BLOWER RUNS;
UNIT HEATS;
WILL NOT CYCLE OFF
VIII. MODULATING
VALVE DOES NOT MODULATE;
CONTINUOUS HIGH FIRE
1. High Limit
a) High limit will not reset a) Replace high limit.
2. Unit Overfiring
a) Manifold pressure too high a) Adjust appliance regulator to obtain tem-
3. Discharge Damper
a) Damper blades partially closed b) Defective damper motor
4. Low Airflow
a) Blower running backwards b) Belts slipping c) Blocked intake or discharge
5. Temperature Control System
a) Temperature control system does not
modulate
1. Operating Thermostat
a) Short in thermistor circuit
b) Thermostat located improperly
c) Thermostat differential setting too wide d) Defective thermostat
2. Burner Service Switch
a) Switch in LOCAL position a) Place switch in REMOTE position.
3. Auxiliary Control
a) Auxiliary contacts closed a) Check auxiliary circuit wiring and
4. Misunderstood Control System Operation
a) Control system doesn’t function as
expected
1. Amplifier (A1014 or A1044 or AD1014)
a) Wire not connected to amplifier terminal
3 or 4. Also terminal 5 on A1044 amplifier
b) Jumper not installed between terminals 2
and 3 of A1014 or AD1014
c) Defective amplifier
2. Discharge Temperature Sensor
(TS114J or TS144)
a) Discharge Air Temperature Sampling
Tube clogged
b) Open in sensor circuit
c) Sensor cross-wired to amplifier d) Temperature Control System out of cali-
bration
perature rise specified on nameplate.
a) Adjust damper stroke length. b) Replace damper motor.
a) Reverse motor direction. b) Tighten or replace belts. c) Find and remove obstruction.
a) See problem VIII (page) 51.
a) Check thermistor wiring and/or replace
thermistor. b1) Thermostat in cold draft-relocate. b2) Thermostat not satisfied-turn down. c) Reduce differential setting. d) Replace thermostat.
contacts.
a) Review control system operational charac-
teristics.
a) Reinstall wire.
b) Reinstall jumper.
c) Replace amplifier.
a) Clean Discharge Air Temperature
Sampling Tube (page 69).
b) Replace the sensor if the resistance mea-
sured at terminals 1 and 2 on TS114J sen-
sor exceeds 15,000 Ω 1 and 3 or 2 and 3
on TS144 exceeds 6,000 Ω.
c) Correct wiring terminations. d) Perform appropriate calibration procedure
(pages 29-31).
S-Series Technical Manual 51 Cambridge Engineering, Inc.
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
VIII. MODULATING
VALVE DOES NOT MODULATE;
CONTINUOUS HIGH FIRE
(Continued)
IX. MODULATING VALVE
DOES NOT MODULATE;
CONTINUOUS LOW FIRE
3. Space Temperature Selector (Series 44 only)
a) Open in sensor circuit
b) Induced voltage in field wiring c) Space sensor located improperly
4. Space thermostat (Series 14 only)
a) Thermostat out of calibration b) Thermostat located improperly c) Thermostat differential setting too wide d) Thermostat defective
5. Remote Heat Adjust (TD114 or CEI 4175-0-960)
a) Short in Remote Heat Adjust circuit
b) Induced voltage in field wiring
6. Modulating Valve (M511, M611 or
MR212)
a) Foreign material holding valve open
b) Modulating valve misassembled
1. Class 2 Transformer
a) No voltage output to amplifier a1) Check for short in modulating valve coil.
2. Modulating Valve
a) Valve coil is open or shorted
b) Plunger jammed c) Ruptured main or balancing diaphragm
3. Amplifier
a) No output voltage to valve a) With the wire removed from terminal 3
4. Discharge Temperature Sensor
(TS114J or TS144)
a) Short in sensor circuit
b) Temperature control system out of calibration
a) Replace the sensor if the resistance mea-
sured is more than: 7,000 Ω for the T244; 5,500 Ω for the TS244; or 2,250 Ω for the
TD244. b) Utilize shielded, twisted pair wiring. c) Sensor in cold draft - relocate.
a) Recalibrate thermostat or replace. b) Thermostat in cold draft - relocate. c) Reduce differential setting. d) Replace thermostat.
a) Replace Remote Heat Adjust if resistance
measure between terminals 1 and 3 of
Remote Heat Adjust is less than 6,000 Ω.
b) Utilize shielded, twisted pair wiring.
a) Disassemble valve and remove foreign
material. b) Disassemble valve and assemble correctly.
a2) Replace transformer.
a) Replace valve coil if its resistance is less
than 40 Ω or greater than 85 Ω.
b) Clean or replace plunger. c) Check diaphragm condition and replace if
defective.
of amplifier, replace amplifier if the valve voltage does not exceed 18 Volts DC.
a) Replace the sensor if the resistance measured
at: terminals 1 and 2 on TS114J is less than
8,000 Ω; terminals 1 and 3 or 2 and 3 on
TS144 is less than 2,900 Ω.
b) Perform temperature control system
calibration.
Cambridge Engineering, Inc. 52 S-Series Technical Manual
TROUBLESHOOTING INSTRUCTIONS
TROUBLESHOOTING GUIDE
Problem Possible Cause Corrective Action
IX. MODULATING
VALVE DOES NOT MODULATE;
CONTINUOUS LOW FIRE
(Continued)
X. ERRATIC OR
PULSATING FLAME
5. Space Temperature Selector (T244 or TS244/TD244)
a) Short in sensor circuit a) Replace the sensor if the resistance mea-
6. Remote Heat Adjust (TD114 or CEI 4175-0-960)
a) Open in the Remote Heat Adjust control
circuit
7. Multi-Functional PC Board
a) Terminal X has power b) Defective board
1. High Pressure Regulator
a) Vent undersized
b) Defective regulator
2. Amplifier
a) Hunting
b) Temperature control system out of cali-
bration
c) Defective amplifier
3. Space Temperature Selector (T244 or TS244/TD244)
a) Induced voltage in field wiring a) Utilize shielded, twisted pair wiring.
4. Remote Heat Adjust (TD114 or CEI 4175-0-960)
a) Induced voltage in field wiring a) Utilize shielded, twisted pair wiring.
sure is less than 5,000 Ω for the T244 or 3,500 Ω for the S244 and 1,950 Ω for the
TD244.
a) Replace the control if the resistance
measured at terminals 1 and 3 exceeds
12,000 Ω.
a) Determine power source. b) Replace board.
a) Enlarge vent piping size or reduce vent
piping length.
b) Replace regulator.
a) Adjust sensitivity control dial counter-
clockwise.
b) Perform appropriate calibration procedure
(pages 29-31).
c) Replace amplifier.
S-Series Technical Manual 53 Cambridge Engineering, Inc.
TROUBLESHOOTING INSTRUCTIONS
DAMPER MOTOR REPLACEMENT & ADJUSTMENT
1. Before reinstalling the damper motor into the heater assembly, remove the black plastic weather cover from the damper motor by removing the screw that secures the cover to the damper assembly using either a flat tip screw driver or a ¼" nut driver. It may be necessary to twist the cover slightly to dis­engage it from its mounting to the end of the motor after the screw is removed.
2. Verify the damper motor is in the CLOSED posi­tion (Drive tube is retracted with a minimum of 1/4" gap between the drive tube and the body of the damper assembly).
3. Verify the inner cam has fully engaged the lower limit switch plunger and the lower limit switch (next to the body of the damper motor) shows con­tinuity between the common (C) terminal and the normally open (NO) terminal.
5. Verify the heater disconnect switch is turned OFF and the service switches are in the OFF position.
6. Connect the wires to the terminals as shown in Figure 2 and reinstall the cover.
Figure 1
mCAUTION:
If the lower limit switch does not indicate con­tinuity, the damper motor must be driven to the fully CLOSED position BEFORE connecting the damper linkage tube to drive tube of damper motor assembly.
IMPORTANT
If the drive tube bottoms out against the damper motor housing, damage to the PC board or trip­ping of the onboard fuse may result. If the fuse trips, place the blower service switch in the OFF position for 15 seconds to allow fuse to reset. Proceed with steps 4 through 10 PRIOR to connecting the damper motor to the linkage tube.
4. Verify the cam location on the upper cam is set just short of the four o’clock position with respect to the switch plunger being the twelve o’clock refer­ence position. If it is beyond the four o’clock posi­tion, use a deep well 1/2" hex socket or nut driver and manually rotate the cam counterclockwise a few clicks, as required, to obtain the correct starting position. (Refer to Figure 1.)
Figure 2
7. Remove the push-in plug (located in the weather cover) to have access to the upper cam adjusting nut.
8. Connect the motor pivot to the damper motor sup­port bracket using the 3/8" diameter clevis pin.
IMPORTANT
Do not connect the damper linkage tube at this time.
9. Remove the wire from the “G” terminal of the ter­minal block. (This is to avoid a “Call-for-Fan” signal from the remote control station during the next two steps).
Cambridge Engineering, Inc. 54 S-Series Technical Manual
10. Suspend the damper motor assembly from the damper motor support bracket. Turn the discon­nect switch on and turn the blower service switch to the “LOCAL” position for approximately 5 seconds.
IMPORTANT
Do not restrain the drive tube from turning freely.
11. Turn the blower service switch to the “REMOTE” position until the damper motor drive tube stops turning. (Drive tube is now fully retracted).
IMPORTANT
Damper blades should be snug to avoid fluttering in the high velocity air stream.
12. Turn the disconnect switch off. Manually trip the motor starter overload using the manual trip lever located on the overload between the overload and the motor starter.
13. Slide the damper linkage tube into the drive tube and align the hole in the drive tube with the hole in the damper linkage tube by manually rotat­ing the drive tube in 1/2 turn increments until the 5/16" diameter clevis pin can pass through both parts. Lubrication of the damper linkage tube may be required. Maintain the damper blades in the tightly-held, fully closed position during this adjustment.
14. Turn the disconnect switch on and turn the blower service switch to the “LOCAL” position. The damper will open to the point the upper cam engages the upper limit switch.
15. Remove the plastic plug from the damper view­port (located on the exterior side of the heater housing toward the discharge end). It may be helpful to place a flashlight inside the heater hous­ing to observe the damper linkage tube travel to ultimately rest against the hex shaft.
Figure 3
mCAUTION:
Do not over-drive the damper motor as damage to the PC board or tripping of the onboard fuse may result. If the fuse trips, place the blower service switch in the “OFF” position for 15 seconds to allow fuse to reset.
17. Turn the blower service switch to the “REMOTE” position and, after the damper motor closes, turn the disconnect switch off.
18. Reinstall the plastic plug from the damper view­port and the weather cover push-in plug.
19. Reconnect the wire removed in step 9 to terminal “G”.
20. Reset the motor starter overload.
21. Verify that both service switches are in the “REMOTE” position, close the electrical enclo­sure door and turn the disconnect switch on.
16. Using a deep-well, 1/2" hex socket or nut driver, turn the upper cam hex nut clockwise in one click increments until the damper linkage tube rests against the hex shaft. (Refer to Figure 3. )
S-Series Technical Manual 55 Cambridge Engineering, Inc.
REFERENCE
ELECTRICAL CONTROL ENCLOSURE ISOMETRIC DRAWING
Cambridge Engineering, Inc. 56 S-Series Technical Manual
REFERENCE
ELECTRICAL WIRING DIAGRAMS
400,000 BTU & BELOW
EDL Controls
Symbol Description
AF Air Flow Switch AMP Amplifier Solid State AX1 Auxiliary Contact AX Auxiliary Contact CR1 Control Relay D & D1 Damper Motor & End Switch DISC Service Disconnect Non - Fused DTS Discharge Temperature Sensor EAT Entering Air Thermostat FR Flame Rod FSR Flame Safeguard Relay
Symbol Description
FU1 Fuse 24 Volt Control FU2 Fuse 120 Volt Control HL High Limit IG Igniter L1 Light - Alarm L2 Light - Fan L3 Light - Heat LTC Low Temperature Cutout M Motor MS Motor Starter MV Modulating Valve
Symbol Description
OL Overload Relay PCB Printed Circuit Board
RTS Remote Temperature Sensor R1 Relay - Gas Valve SOV Shut-Off Valve - Gas SW1 Service Switch - Fan SW2 Service Switch - Heat SW3 Switch - Fan/Off/Heat T1 Multi-Tap Transformer (24 & 120 Volt) T2 Class 2 Transformer (24 Volt) TS Temperature Sensor - LTC/EAT
S-Series Technical Manual 57 Cambridge Engineering, Inc.
400,000 BTU & ABOVE
EDL Controls
Symbol Description
AF Air Flow Switch AMP Amplifier Solid State AX1 Auxiliary Contact AX Auxiliary Contact CR1 Control Relay D & D1 Damper Motor & End Switch DISC Service Disconnect Non - Fused DTS Discharge Temperature Sensor EAT Entering Air Thermostat FR Flame Rod FSR Flame Safeguard Relay
Symbol Description
FU1 Fuse 24 Volt Control FU2 Fuse 120 Volt Control HL High Limit IG Igniter L1 Light - Alarm L2 Light - Fan L3 Light - Heat LTC Low Temperature Cutout M Motor MV Modulating Valve MS Motor Starter
Symbol Description
OL Overload Relay RTS Remote Temperature Sensor R1 Relay - Gas Valve SOV Shut-Off Valve - Gas SSV Safety Shut-Off Valve - Gas SW1 Service Switch - Fan SW2 Service Switch - Heat SW3 Switch - Fan/Off/Heat SW4 Switch - SOV Leak Test T1 Multi-Tap Transformer (24 & 120 Volt) T2 Class 2 Transformer (24 Volt)
Cambridge Engineering, Inc. 58 S-Series Technical Manual
400,000 BTU & ABOVE
EDSM Controls
Symbol Description
AF Air Flow Switch AMP Amplifier Solid State AX1 Auxiliary Contact AX Auxiliary Contact CR1 Control Relay D & D1 Damper Motor & End Switch DISC Service Disconnect Non - Fused DTS Discharge Temperature Sensor EAT Entering Air Thermostat FR Flame Rod FSR Flame Safeguard Relay FU1 Fuse 24 Volt Control
Symbol Description
FU2 Fuse 120 Volt Control HL High Limit IG Igniter L1 Light - Alarm L2 Light - Fan L3 Light - Heat LFS Low Fire Start LTC Low Temperature Cutout M Motor MS Motor Starter MV Modulating Valve OL Overload Relay
Symbol Description
R1 Relay - Gas Valve RC Calibration Resistor RTS Remote Temperature Sensor SOV Shut-Off Valve - Gas SSV Safety Shut-Off Valve - Gas STS Space Temperature Selector SW1 Service Switch - Fan SW2 Service Switch - Heat SW3 Switch - Fan/Off/Heat SW4 Switch - SOV Leak Test T1 Multi-Tap Transformer (24 & 120 Volt) T2 Class 2 Transformer (24 Volt)
S-Series Technical Manual 59 Cambridge Engineering, Inc.
400,000 BTU & ABOVE
EDSM/TP Controls
Temperature Setback System
Temperature Averaging System
Symbol Description
AF Air Flow Switch AMP Amplifier Solid State AX1 Auxiliary Contact AX Auxiliary Contact CR1 Control Relay D & D1 Damper Motor & End Switch DISC Service Disconnect Non - Fused DTS Discharge Temperature Sensor EAT Entering Air Thermostat FR Flame Rod FSR Flame Safeguard Relay FU1 Fuse 24 Volt Control FU2 Fuse 120 Volt Control
Symbol Description
HL High Limit IG Igniter L1 Light - Alarm L2 Light - Fan L3 Light - Heat LFS Low Fire Start LTC Low Temperature Cutout M Motor MS Motor Starter MV Modulating Valve OL Overload Relay OTS Override Timer Switch RC Calibration Resistor
Symbol Description
RTSS Remote Temperature Sensor R1 Relay - Gas Valve SOV Shut-Off Valve - Gas SSV Safety Shut-Off Valve - Gas STS Space Temperature Selector SW1 Service Switch - Fan SW2 Service Switch - Heat SW3 Switch - Fan/Off/Heat SW4 Switch - SOV Leak Test T1 Multi-Tap Transformer (24 & 120 Volt) T2 Class 2 Transformer (24 Volt) TPS Tamperproof Sensor TSS Programmable Thermostat/Timer
Cambridge Engineering, Inc. 60 S-Series Technical Manual
400,000 BTU & ABOVE
EDR Controls
Symbol Description
AF Air Flow Switch AMP Amplifier Solid State AX1 Auxiliary Contact AX Auxiliary Contact CR1 Control Relay D & D1 Damper Motor & End Switch DISC Service Disconnect Non - Fused DTS Discharge Temperature Sensor EAT Entering Air Thermostat FR Flame Rod FSR Flame Safeguard Relay FU1 Fuse 24 Volt Control
Symbol Description
FU2 Fuse 120 Volt Control HL High Limit IG Igniter L1 Light - Alarm L2 Light - Fan L3 Light - Heat LFS Low Fire Start LTC Low Temperature Cutout M Motor MS Motor Starter MV Modulating Valve OL Overload Relay
Symbol Description
RHA Remote Heat Adjust RTS Remote Temperature Sensor R1 Relay - Gas Valve SOV Shut-Off Valve - Gas SSV Safety Shut-Off Valve - Gas SW1 Service Switch - Fan SW2 Service Switch - Heat SW3 Switch - Fan/Off/Heat SW4 Switch - SOV Leak Test T1 Multi-Tap Transformer (24 & 120 Volt) T2 Class 2 Transformer (24 Volt) TS Temperature Sensor - LTC/EAT
S-Series Technical Manual 61 Cambridge Engineering, Inc.
REFERENCE
ELECTRICAL CONNECTION DIAGRAM
Cambridge Engineering, Inc. 62 S-Series Technical Manual
REFERENCE
MANIFOLD PRESSURE REGULATOR)
GAS TRAIN DRAWINGS
MANIFOLD PRESSURE READING
Under 400 MBH CSA Certified FM Compliant XL GAPS Compliant
1
2
3
MANOMETER TAP FOR
MODULATING VALVE
MANIFOLD PRESSURE
ADJUSTMENT SCREW
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
TO BURNER
HAND SHUT-OFF VALVE
TO BURNER
HAND SHUT-OFF VALVE
LOW FIRE
ADJUSTMENT SCREW
ELECTRIC SHUT-OFF VALVE (REDUNDANT VALVE WITH
Over 400 MBH Low Pressure CSA Certified
1
XL GAPS Compliant
Over 400 MBH High Pressure CSA Certified
1
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MODULATING VALVE
ELECTRIC SHUT-OFF VALVE (SSV)
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
3
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MODULATING REGULATING VALVE
ELECTRIC SHUT-OFF VALVE (SSV)
HAND SHUT-OFF VALVE
TO BURNER
HAND SHUT-OFF VALVE
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
LOW FIRE ADJUSTMENT SCREW
MANOMETER TAP FOR
VALVE LEAK TEST
ELECTRIC SHUT-OFF VALVE (SOV)
MANIFOLD PRESSURE ADJUSTMENT SCREW
MANIFOLD PRESSURE REGULATOR
LOW FIRE & MANIFOLD PRESSURE ADJUSTMENT SCREWS (UNDER COVER)
MANOMETER TAP FOR VALVE LEAK TEST
ELECTRIC SHUT-OFF VALVE
(SOV)
1
Certified by CSA International to comply with ANSI Standard Z83.4/CSA3.7
2
Complies with Factory Mutual insurance requirements
3
Complies with XL Insurance Global Asset Protection Services requirements
S-Series Technical Manual 63 Cambridge Engineering, Inc.
REFERENCE
MANIFOLD PRESSURE REGULATOR
GAS TRAIN DRAWINGS
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MODULATING VALVE
ELECTRIC SHUT-OFF VALVE (SSV)
TO BURNER
HAND SHUT-OFF VALVE
MANUAL RESET SWITCH
HIGH GAS PRESSURE SWITCH
LOW FIRE
ADJUSTMENT SCREW
MANOMETER TAP FOR VALVE LEAK TEST
ELECTRIC SHUT-OFF VALVE
w/ VISUAL INDICATOR
MANIFOLD PRESSURE ADJUSTMENT SCREW
Over 400 MBH With Discharge Damper
and without Filter Section Low Pressure CSA Certified FM Compliant
1
2
MANIFOLD PRESSURE READING
MANOMETER TAP FOR
ELECTRIC SHUT-OFF VALVE (SOV)
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
TO BURNER
HAND SHUT-OFF VALVE
HIGH GAS PRESSURE SWITCH
MANUAL RESET SWITCH
ELECTRIC SHUT-OFF VALVE
MANOMETER TAP FOR
VALVE LEAK TEST
w/ VISUAL INDICATOR
LOW FIRE & MANIFOLD PRESSURE ADJUSTMENT SCREWS (UNDER COVER)
MODULATING REGULATING VALVE
Over 400 MBH With Discharge Damper
and without Filter Section High Pressure CSA Certified FM Compliant
1
Certified by CSA International to comply with ANSI Standard Z83.4/CSA3.7
2
Complies with Factory Mutual insurance requirements
Cambridge Engineering, Inc. 64 S-Series Technical Manual
ELECTRIC SHUT-OFF VALVE (SSV)
ELECTRIC SHUT-OFF VALVE (SOV)
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
1
2
HAND SHUT-OFF VALVE
TO BURNER
HIGH GAS PRESSURE SWITCH
REFERENCE
GAS TRAIN DRAWINGS
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
Over 400 MBH Without Discharge Damper
or with Filter Section Low Pressure CSA Certified FM Compliant
1
2
HAND SHUT-OFF VALVE
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MANOMETER TAP FOR
MANIFOLD PRESSURE
ADJUSTMENT SCREW
MANIFOLD PRESSURE REGULATOR
VALVE LEAK TEST
MODULATING VALVE
HAND SHUT-OFF VALVE
MANUAL RESET SWITCH
HIGH GAS PRESSURE SWITCH
LOW FIRE
ADJUSTMENT SCREW
ELECTRIC SHUT-OFF VALVE W/ VISUAL INDICATOR (SSV)
ELECTRIC SHUT-OFF VALVE W/ VISUAL INDICATOR (SOV)
EXTERNAL GAS TRAIN ENCLOSURE (ROOF SUPPORT BY OTHERS)
Over 400 MBH Without Discharge Damper
or with Filter Section High Pressure CSA Certified FM Compliant
1
2
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MANIFOLD PRESSURE & LOW FIRE
ADJUSTMENT SCREWS (UNDER COVER)
MODULATING REGULATING VALVE
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
MANOMETER TAP FOR
VALVE LEAK TEST
TO BURNER
HAND SHUT-OFF VALVE
MANUAL RESET SWITCH
ELECTRIC SHUT-OFF VALVE W/ VISUAL INDICATOR (SSV)
ELECTRIC SHUT-OFF VALVE W/ VISUAL INDICATOR (SOV)
EXTERNAL GAS TRAIN ENCLOSURE (ROOF SUPPORT BY OTHERS)
1
Certified by CSA International to comply with ANSI Standard Z83.4/CSA3.7
2
Complies with Factory Mutual insurance requirements
S-Series Technical Manual 65 Cambridge Engineering, Inc.
REFERENCE
GAS TRAIN DRAWINGS
TO BURNER
HAND SHUT-OFF VALVE
MANIFOLD PRESSURE READING
Over 400 MBH Low Pressure CSA Certified
1
XL GAPS Compliant
MANOMETER TAP FOR
3
MODULATING VALVE
ELECTRIC SHUT-OFF VALVE (SSV)
ELECTRIC SHUT-OFF VALVE (SOV)
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
MANUAL RESET SWITCH
HIGH GAS PRESSURE SWITCH
LOW FIRE
ADJUSTMENT SCREW
TO BURNER
HAND SHUT-OFF VALVE
MANOMETER TAP FOR VALVE LEAK TEST
MANIFOLD PRESSURE ADJUSTMENT SCREW
MANIFOLD PRESSURE REGULATOR
MANOMETER TAP FOR
MANIFOLD PRESSURE READING
MANUAL RESET SWITCH
HIGH GAS PRESSURE SWITCH
ELECTRIC SHUT-OFF VALVE (SSV)
ELECTRIC SHUT-OFF VALVE (SOV)
Over 400 MBH High Pressure CSA Certified XL GAPS Compliant
1
Certified by CSA International to comply with ANSI Standard Z83.4/CSA3.7
2
Complies with Factory Mutual insurance requirements
3
Complies with XL Insurance Global Asset Protection Services requirements
1
3
MANOMETER TAP FOR UNIT
SUPPLY PRESSURE READING
HAND SHUT-OFF VALVE
MANOMETER TAP FOR
VALVE LEAK TEST
LOW FIRE & MANIFOLD PRESSURE ADJUSTMENT SCREWS (UNDER COVER)
MODULATING REGULATING VALVE
Cambridge Engineering, Inc. 66 S-Series Technical Manual
INDIVIDUAL COMPONENT DESCRIPTIONS
REMOTE CONTROL STATIONS
REMOTE CONTROL STATION - SECURITY (RCS-S)
The RCS-S is a lockable NEMA 1 enclo­sure (9"W x 14"H x 5"D) equipped with a three position key-lock selector switch (Summer Ventilation - Off - Heating); an Operating Electronic Thermostat (OET); and indicating lights for blower operation
(green), burner operation (red), and reset (amber).
The operator can control the heater from this panel provided the heater mounted disconnect is in the “ON” position and the service switches are in the “REMOTE” position. The OET utilizes an encapsulat­ed thermistor to sense space temperature. The adjust­able differential is set by the selection of the ON and OFF temperatures. See instructions for the OET. (page
33).
TEMPERATURE SETBACK SYSTEM (TSS)
The TSS is a lockable NEMA 1 enclosure (9"W x 14"H x 5"D) equipped with a three position selector switch (Summer Ventilation - Off - Heating); a combination seven day programmable timer and ther-
mostat; an override timer; and indicating lights for blower operation (green), burner operation (red), and reset (amber).
The operator can control the heater from this panel provided the heater mounted disconnect is in the “ON” position and the service switches are in the “REMOTE” position. The TSS utilizes an encapsulated thermistor to sense space temperature. The adjustable differential is set by the selection of the ON and OFF temperatures. This control can accommodate separate­ly programmed schedules for both the ventilation and heating modes. See the operating and programming instructions for the TSS Controller (page 35).
REMOTE CONTROL STATION COMPONENTS
CLOGGED FILTER LIGHT (CF)
The clogged filter light is an alarm light mounted in the remote control station to indicate a clogged fil­ter condition. Includes an adjustable pressure switch mounted in the electrical control enclosure to monitor the pressure drop across the filters.
EXHAUST FAN INTERLOCK (EFI)
An exhaust fan interlock is used to interlock the make­up air heater as a slave to an exhaust fan. Terminals are provided in the remote control station for wiring of dry contacts (by others).
MANUAL MAKE-UP AIR SWITCH (MMS)
A manual make-up air toggle switch is used to manu­ally turn the heater on and off. It is either mounted on the exterior of the door of the remote control station or mounted inside for tamperproof applications.
NON-ADJUSTABLE THERMOSTAT (TTP)
The non-adjustable thermostat is a fixed temperature, solid state, epoxy sealed thermostat with a specified temperature setpoint, either: 41°F, 50°F, 55°F, 60°F, or 65°F. It is wired between terminals Z1 and Z2.
TEMPERATURE AVERAGING SYSTEM (TAS-2)
The TAS-2 option is used in conjunc­tion with the RCS-S or TSS to average the space temperature between two dis­tant points within a facility. It consists of four thermistors which are wired in a series/parallel combination in order to
simulate a single thermistor response.
S-Series Technical Manual 67 Cambridge Engineering, Inc.
REMOTE TEMPERATURE SENSOR (RTS)
The thermistor is wired to the remote temperature sensor terminal block. If remote location of the sensor is desired, the connecting cable must be wired between the thermistor and this point.
The thermistor enclosure (SH-1) is packed in the remote control station for shipment. It can be mounted on the exterior sides or bottom of the remote control station or a remote location within 500 feet using 18 gauge stranded, twisted-pair, shielded cable.
on the dial face by the increment selected (10 to 40˚F)
when a jumper or switch contact is provided across ter­minals 20 and 22.
Heaters which are specified with a temperature rise
above 130˚F are supplied with dual adjusting knobs on
the dial face of the RHA. This control permits manual adjustment of the discharge temperature from 55 to
105˚ or 120 to 160˚F. A jumper or switch contact is
required across terminals 20 and 22 to activate the higher temperature selection.
GAS CONTROL SYSTEMS
ELECTRONIC DISCHARGE-LOCAL (EDL)
The EDL temperature control system utilizes Maxitrol’s Series 14 modula­tion controls. The discharge tempera­ture sensor, which is mounted in the discharge, transmits a resistance sig­nal back to the amplifier that corre­sponds to the discharge temperature.
The amplifier creates a voltage out­put to drive the modulating valve to maintain the pre­selected temperature that is set on the dial located on the amplifier. This control permits adjustment of the discharge temperature (110 to 160°F) from inside the heater control enclosure.
ELECTRONIC DISCHARGE-REMOTE (EDR)
The EDR temperature control sys­tem utilizes Maxitrol’s Series 14 modulation controls. The discharge temperature sensor, which is mount­ed in the discharge, transmits a resistance signal back to the amplifi-
er that corresponds to the discharge temperature. The amplifier creates a voltage output to drive the modulating valve to maintain the preselected temperature that is set on the Remote Heat Adjust (RHA).
Heaters which are specified with a temperature rise of
less than 130˚F are supplied with a single adjusting
knob on the dial face of the RHA. This control permits manual adjustment of the discharge air temperature
from 55 to 130˚F. The override temperature selector
dial, which is visible from the top of the RHA control, increases the discharge temperature above the setting
ELECTRONIC DISCHARGE-SPACE MODULATION (EDSM)
The EDSM temperature control system utilizes Maxitrol’s Series 44 modulation controls. The Space Temperature Selector (STS) is set to the desired space temperature and it transmits a resistance output to the amplifier (AMP) to control
the discharge temperature. The discharge temperature sensor (DTS), which is mounted in the discharge, transmits a resistance signal back to the amplifier that corresponds to the discharge temper­ature. The amplifier creates a voltage output to drive the modulating valve (MV) to maintain the selected space temperature by controlling the heater output between the MIN and MAX setting on the amplifier. The MIN dial setting determines the minimum dis-
charge temperature the heater will deliver (40 to 80˚F).
The MAX dial setting determines the maximum dis­charge temperature the heater will deliver (80 to
160˚F). When the space temperature drifts from the STS setpoint by more than 3˚F, the modulating valve is
driven to the MIN or MAX discharge temperature, as applicable.
ELECTRONIC DISCHARGE-SPACE MODULATION/TAMPER PROOF (EDSM/TP)
The EDSM/TP temperature control system functions identical to the EDSM control sys­tem. The difference is the STS is replaced with two devices. The adjustable temperature selector is typically mounted inside the remote control station and the non-adjustable space sensor (RTSS) is mounted in the space.
Cambridge Engineering, Inc. 68 S-Series Technical Manual
ELECTRONIC DISCHARGE-SPACE MODULATION/HAZARDOUS AREA
The Hazardous Area temperature control system func­tions identical the EDSM/TP, except the space sensor (TS244A) is replaced by a space sensor with epoxy coated circuitry (ES225A). The standard remote control station is not suitable for hazardous areas and would need to be mounted outside of the hazardous area.
DISCHARGE TEMPERATURE SENSOR (DTS)
The DTS is mounted in the discharge of the heater. It senses the average dis­charge temperature and transmits a resistance signal back to the amplifier that corresponds to the discharge tem­perature.
GAS CONTROL COMPONENTS
AMPLIFIER (AMP)
The amplifier creates a voltage output to drive the modulating valve to main­tain the selected discharge tempera­ture. On EDL control systems, the dis­charge temperature is set at the ampli­fier. On EDR control systems, the dis-
charge temperature is set on the RHA. On EDSM control systems, the range of the discharge temperature is set at the amplifier, however, the STS controls when more or less heat is required.
COMBINATION VALVE
The combination valve serves as a manifold pressure regulator and redundant gas shut-off valve. This control is typically used for gas capacities below 400,000 Btu/hr. The
valve operates on 24 Volts AC power. The combination valve is rated for a maximum gas supply pressure of 14" WC.
DISCHARGE AIR TEMPERATURE SAMPLING BOX
The discharge air temperature sam­pling box is located on the side of the discharge, and is accessible from the electrical control enclosure side of the unit. The sampling box houses the high limit (HL) and the discharge temperature sensor (DTS). This box should not be tampered with unless performing the Calibration Procedures (pages 29-31).
FLAME ROD (FR)
The flame rod senses the presence of flame and signals the flame safeguard relay. The presence of flame is detected by the flame rectification of the AC signal that
is supplied to the flame rod thus creating the DC response. The resulting current flow produced can be measured with a DC microammeter. The reading should be steady and between 2.0 and 6.0 microamps (mA).
FLAME SAFEGUARD RELAY (FSR)
The flame safeguard relay supplies 24 Volts AC to the igniter for 4 seconds before the gas valve is energized. If the burner does not light (flame is not
established within 7 seconds), this con­trol will lock out gas flow until the control is reset. If flame signal is lost during burner operation, the control will allow one retry for ignition.
HIGH/LOW GAS PRESSURE SWITCH (HGP, LGP)
This gas pressure switch is a manual reset safety device to lock out the burner operation should large gas pres­sure fluctuations occur. The high gas pressure switch should be set 3" WC above manifold gas pressure. The low
pressure switch should be set at 2" WC. The adjustment screw is located under the top plate. The low gas pressure switch will have to be reset whenever gas supply has been interrupted.
S-Series Technical Manual 69 Cambridge Engineering, Inc.
HIGH PRESSURE REGULATOR (HPR)
The HPR option is required when the gas supply pressure exceeds the nameplate rating for the heater. Unless otherwise specified, the HPR assembly is also furnished with a high
gas pressure manual shut-off valve and a tap for measuring the upstream gas pressure. The HPR must be a positive lock-up type regulator which must be vented to outdoors. It is sized according to the gas supply pressure and the capacity requirements of the heater.
INTERMITTENT/CONTINUOUS CONTROL
The Intermittent/Continuous Control allows the burner input to be modulated to be operated continuously at modulating discharge temperature for make-up air (see EDSM on page 68) or operated intermittently based on a thermostat at maximum discharge temperature (see EDL on page 68) for space heating.
Requires EDSM controls and a signal to switch between modes (Exhaust Fan Interlock, Temperature Setback System, Manual Make-Up Air Switch, etc.)
IGNITER (IG)
The hot surface igniter is the igni­tion source for lighting the gas in the burner. It is made of silicon car­bide which is very fragile. Care should be used in handling. It oper­ates on 24 Volts and the current
ranges from 1.3 to 1.7 amps. It will reach temperatures in excess of 2400˚F during the ignition trial. It is fur­nished with a vinyl sleeve for shock mounting and sealing in the mounting tube.
LEAK TEST FACILITY (SW4)
The leak test facility is provided on all heaters over 400,000 Btu/hr. It consists of a momentary switch for the shut-off valve (SOV) in the gas train and a gauge port between the (SOV) and (SSV) shut-off valve. By holding the gas valve momentary switch closed, the (SOV) gas valve is energized which allows gas pressure to build on the seat of the SSV safety shut-off gas valve.
The gauge port between valves is used to determine if the SOV shut-off gas valve seat is properly sealed.
MANIFOLD PRESSURE REGULATOR
The manifold pressure regulator con-
trols the burner manifold pressure. When the MR212 valve is used, this modulating valve also serves as the manifold pressure regulator. The maximum gas supply pressure rating
is normally determined by the exposed pressure rating of the regulating device. RV61 and RV81 regulators are rated at 1 psig; and the MR212 is rated at 5 psig. (For units rated at 400,000 Btu/hr or below, see the combination valve below.)
MODULATING VALVE (MV)
The MV responds to a 4 to 24 Volt DC signal from the amplifier to modulate the flow of gas to the burner. On the M511 or M611 valve, the low fire adjusting screw is
located on the far side of the valve under the dust cover. On the MR212 valve, the low fire adjusting screw is located under the large dust cover. The MR212 modulating valve also serves as the mani­fold pressure regulator.
REMOTE HEAT ADJUSTMENT (RHA)
As discussed under the component
description for the EDR control sys-
tem, the RHA may have a single or
dual adjusting knob(s) on the dial
face. The single adjusting knob con-
trol permits manual adjustment of
the discharge air temperature from
55 to 130˚F. The override tempera­ture selector dial which is visible from the top of the RHA control, increases the discharge temperature above the setting on the dial face by the increment selected when a jumper or switch contact is provided across terminals 20 and 22.
Heaters which are specified with a temperature rise
above 130˚F are supplied with dual adjusting knobs on
the dial face of the RHA. This control permits manual adjustment of the discharge temperature from 55 to
105˚F or 120 to 160˚F. A jumper or switch contact
is required across terminals 20 and 22 to activate the higher temperature selection.
Cambridge Engineering, Inc. 70 S-Series Technical Manual
SPACE TEMPERATURE SELECTOR (STS)
The STS is part of the EDSM control system. The STS senses the space tem­perature and provides a resistance sig­nal back to the amplifier that corre­sponds to the temperature variation
from setpoint. A 3˚F drift from the set
temperature will cause the heater to modulate to the extreme end of the preset range on the amplifier.
HEATER COMPONENTS
EXHAUST FAN CONTACT (EFC)
The exhaust fan contact is an auxiliary dry contact that is mechanically interlocked to the heater’s motor starter and is provided with terminals located in the electrical enclosure. The EFC is typically wired into an exhaust fan control circuit to activate the exhaust fan as a slave to the heater.
FUSE BLOCK (FU1, FU2)
The fuse block provides line fusing for branch circuit protection. It is wired in conjunction with the non-fused discon­nect switch.
AIRFLOW SWITCH (AF)
The airflow switch senses the pressure
drop across the burner. It is factory set
and not adjustable. It is designed to
prevent burner operation if the airflow
drops significantly below the minimum
design airflow of the heater.
DAMPER MOTOR (D, D1)
The damper motor operates on 24 Volts AC and switches power to the motor starter when the damper blades are fully open by the closure of the damper end switch. The damper end
switch is an adjustable internal auxil­iary switch which has been factory set to operate when the damper is fully open. The damper motor will power closed when the heater cycles off. The damper motor will not close unless the blower service switch is in the “REMOTE” position. For detailed instructions refer to Damper Motor Replacement & Adjustment (page 54).
HIGH TEMPERATURE LIMIT (HL)
The high limit opens when discharge
temperature exceeds 180˚F. This limit
must be manually reset.
MOTOR STARTER (MS, OL, AUX)
The motor starter assembly consists of a motor starter, overload relay and auxiliary contact. The overload relay protects the motor from excessive cur­rent or single phasing. If the overload relay trips, it must be reset manually. The auxiliary contacts are used in the
gas valve safety circuit as an indica­tion the blower is operating, and as an optional exhaust fan contact for interlocking other equipment with the operation of the heater.
MULTI-FUNCTIONAL PC BOARD
DISCONNECT SWITCH (DISC)
The disconnect switch is provided on all heaters and includes the disconnect rod and lockable operating knob. The disconnect
switch must be in the “OFF” position to gain access to the control enclosure. Once the control enclosure is open, experienced service technicians may activate the electrical circuit by twisting the disconnect rod clockwise to assist in troubleshooting. The discon­nect rod must be turned back to the “OFF” position before attempting to secure the enclosure door.
2) The LTC (Low Temperature Cutout) circuit func­tions to shut down the blower in approximately 3
minutes if either of the following occurs: (a) The inlet temperature drops below the LTC setpoint (40, 45, 50,
or 55˚F) in the ventilation mode; or (b) the gas valve
fails to remain energized during a heating cycle.
3) The EAT (Entering Air Thermostat) circuit func­tions automatically to turn off the burner when the out-
The multi-functional PC board provides five (5) separate functions as follows:
1) Blower Relay (CR1) which is energized on “call for blower” from the remote con­trol station.
1
/2
S-Series Technical Manual 71 Cambridge Engineering, Inc.
door temperature reaches the EAT setpoint (45, 50, 55,
57.5, 60, 62, 64, 66, 68 or 70˚F).
4) The PT (Purge Timer) circuit function is preset at the factory to provide four air changes within the heater cabinet prior to an ignition attempt (normally set at 4 or 8 seconds). If inlet ducting is attached to the heater, the delay time can be increased to 8, 16, or 32 seconds, as applicable.
5) The patented LFS (Low Fire Start) circuit function is provided to limit the initial heater firing for the first 15 seconds of a heating cycle. The voltage to the modulat­ing valve is adjusted between 9 and 13 Volts DC by an adjustable potentiometer on the PC board.
SERVICE SWITCH (SW1, SW2, SW3)
The service switches are mounted in the electrical control enclosure. In the “LOCAL” or “OFF” position, the service technician has local control of the heater. These switches must be placed in the “REMOTE” position for normal control
from the remote control station.
TRANSFORMER (T1, T2)
Heaters supplied with an output of greater than 400,000 Btu/hr are fur­nished with a dual voltage transform­er unless the supply voltage is 115 volts. The transformer furnished
depends on the supply voltage (208, 230, 460 or 575 volts). This transformer provides the secondary control voltage of 24 and 115 Volts. Heaters rated below 400,000 Btu/hr or supplied for 115 Volts are furnished with the 24 Volt secondary transformer only. Secondary fusing is provided in all Class I transformer circuits to protect the downstream components from short circuit. Fuse sizing is as follows: FNM-6.25 for 150 VA 24 Volt; FNM-1.6 for 150 VA 115 Volt; and FNM-2.25 for 200 VA 115 Volt. Consult the heater wir­ing diagram to identify the proper fusing. Do not increase the fuse rating over that which is specified.
Cambridge Engineering, Inc. 72 S-Series Technical Manual
ANSI/ASHRAE/IESNA STANDARD 90.1
Overview
Energy efficient, Genuine Cambridge® direct gas-fired heating equipment can comply with the requirements of ANSI/ASHRAE/IESNA Standard
90.1-2010. Compliance is shown on the Cambridge heater nameplate.
Purpose of ASHRAE Standard 90.1
ASHRAE Standard 90.1 provides minimum require­ments for the energy efficient design and construc­tion of new commercial buildings in the United States. The standard covers the entire building, setting minimum equipment efficiency levels for components that may be used, rather than setting standards for component manufacturing. The provi­sions of this standard do not apply to single family houses, low rise residential buildings and buildings (or portions of buildings) that use energy primarily for industrial, manufacturing or commercial pro­cesses.
• Damper (Section 6.4.3.4.3)
A damper is required on each heater. The Cambridge Motorized Discharge Damper (MDD) will meet the standard.
• Labeling (Section 6.4.1.5.1)
The heater must be labeled to indicate that it complies with the requirements of the standard. The nameplate of Cambridge heaters includes the required labeling.
• Efficiency (Section 6.4.1.3)
Direct gas-fired heating equipment has no minimum efficiency requirement. However Cambridge certifies that its equipment has a 100% combustion efficiency (Ec) and a 92% thermal efficiency (Et).
Compliance Requirements:
The following are required for Cambridge heaters to comply with Standard 90.1:
• Controls (Section 6.4.3)
Total airflow of all heaters less than 10,000 cfm
- The Cambridge TSS Controller will meet the standard. A properly configured building DDC system with the necessary programming for zone control, automatic shutdown and setback can also meet the standard.
Total airflow of all heaters exceeds 10,000 cfm
- The Cambridge TSS Controller with optimum start control will meet the standard. A properly configured building DDC system with the neces­sary programming for zone control, automatic shutdown, setback and optimum start can also meet the standard.
Units intended to operate continuously - No spe­cial controls are required to meet the standard.
S-Series Technical Manual 73 Cambridge Engineering, Inc.
MAINTENANCE LOG
MODEL NO. SERIAL NO.
Date
Activity
Technician
Cambridge Engineering, Inc. 74 S-Series Technical Manual
SCAN THIS CODE TO ACCESS OUR "HOW-TO" SERVICE VIDEOS ONLINE.
https://www.cambridge-eng.com/parts-service/how-to-service-videos
Cambridge Engineering, Inc. reserves the right to change specifications, modify the design and/or
substitute equivalent materials without notice as the result of code requirements, product enhancements,
ongoing research/development and vendor changes beyond our control.
760 Long Road Crossing Dr., Chesterfield, MO 63005
Phone: (636) 532-2233 (800) 899-1989, Fax: (636) 530-6133
www.cambridge-eng.com
Loading...