CAMBRIDGE Pre-Packaged Olde English Paver Fireplace Kit Deluxe Surround Instruction Manual

Cambridge Pre-Packaged
Olde English Paver Outdoor Fireplace
Kit (Deluxe Surround)
Instruction Manual
Manual de Instrucciones Para La
Chimenea Cambridge Olde Ingles
Ladrillos (Anillo de Lujo) Pre-
Empaquetado Para Uso Afuera
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer Reference Guide: Guía de Referencia:
32
31 30 29 28
27 26
25 24
23 22
21 20
19 18 17
16 15
14 13
12 11
10 9
8
Finished
Grade
7 6
5 4 3 2 1
2 3/4” Above Top of Foundation
4” Concrete slab (4000 PSI) 6” Compacted 3/4” stone
1
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Shim Placement Detail:
2011
Place Blue, or Red shim here.Place Blue, or Red shim here.
2
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Cambridge Fireplace:
This unit is capable of burning natural gas, propane and wood. If either propane or natural gas is the preferred method of burning, seek a licensed professional plumber before construction. Also, if using propane or natural gas, a knockout is located on either side of the unit to facilitate gas piping. All pip­ing and knockouts must be completed before installing blocks around unit as the unit will become inac­cessible when construction is completed.
2011
Tools Required for Fireplace Kit Installation:
Safety Goggles Ear Protection Dust Mask Gloves Shovels (digging & flat) Metal Cutters for banding on cubes Mason Hammer (chipping, hammer) Road Stone Rake Tamper (Hand or Mechanical) Wheelbarrow Level (2’ and 6’ recommended) Speed Square Caulk Gun 10 oz or 28 oz (depends on what size adhesive is purchased) Rubber Mallet 14” Demo saw with diamond blade Tape Measure Marking Device (pencil, soap stone, etc) Chalk Line Hand Broom Concrete Tools (Trowel/Floats) 6 Foot ladder or scaffold according to your com­pany’s state, and OSHA safety policy Drill & 1/16” bit 5/16” nut driver 7 ¼” Circular saw with wood blade 4” Electric grinder 4” Diamond cup grinder 15’ Ratchet strap
Items Included in the Fireplace Kit:
1 - LennoxStainless Steel Fireplace with instruc­tion manual 1 - 4 Foot air-cooled chimney 1 - Black powder coated termination cap 1 - Galvanized flashing for top of completed fireplace 1 - Reinforced concrete lintels 48” x 4” x 6” 4 - Reinforced concrete lintels 32” x 4” x 6” 3 - Plastic shim pack sheet for leveling lintels or block as needed 1 - Cast Stone Surround Deluxe 3 - Cubes of Cambridge Olde English Pavers 1 - Installation manual for concrete pad and Olde English Pavers
Material Required: ¾” clean stone (approx. 1 ton) Concrete (approx. 17-80 lb bags) Cambridge concrete adhesive (approx. 6-29 oz. or 17-10.3 oz. tubes) (4 pcs) 2” x 4” x 8’ lumber 2 ½” wood screws ½” rebar (approx. 11’) Silicone for flashing
3
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Chimenea de Cambridge:
Esta unidad es capaz de quemar gas natural, propano, y la madera. Si bien el propano o el gas natural es el método preferido de la quema, buscar un profesional con licencia antes de construcción. Asimismo, si utiliza gas propano o gas natural, un golpe de gracia se encuentra a ambos lados de la unidad para facilitar la tubería de gas. Todas las tuberías y los golpes de gracia debe ser completado antes de instalar los bloques alrededor de la unidad como la unidad se convertirá en inaccesibles cuando se complete la construcción.
2011
Herramientas Necesarias Para la Instalación Del Kit de Chimenea:
Gafas de seguridad Protección auditiva Máscara de polvo Guantes Palas (excavación y plano) Cortadores de Metal de bandas en los cubos Matrillo de Mason (astillado, martillo) Camino del rastrillo de Piedra Sabotaje (manual o mecánica) Carretilla Nivel (2’ y 6’ recomendado) Velocidad de la Plaza Pistola para calafatear 10 oz o 28 oz (depende de qué tamaño es comprar pegamento) Martillo de goma 14” Demo sierra con disco de diamante Cinta métrica Dispositivo de marcado (lápiz, piedra jabón, etc) Línea de tiza Escoba de mano Herramientas concretas (paleta / flotadores) 6 pies escalera o andamio de acuerdo al estado de su empresa, y la política de seguridad de OSHA Taladro y 1 / 16” bits 5 / 16”tuerca conductor 7 ¼”Sierra circular con hoja de madera 4” amoladora eléctrica 4” amoladora de la taza del diamante 15’ correa de trinquete
Artículos Incluidos en el Kit de Chimenea:
1-Lennox de acero inoxidable de chimenea con manual de instrucciones 1-4 pies chimenea enfriado por aire 1-Polvo Negro tapa de terminación de cubierta 1-Galvanizado intermitente para la tapa de la chime­nea completa 1-Dinteles de hormigón armado de 48” x 4” x 6” 4-Dinteles de hormigón armado de 32” x 4” x 6” 3-Hoja de calza plástico para nivelar dinteles o blo­quear cuando sea necesario 1-Anillo de la piedra del molde de lujo 3-Cubos de Olde Inglés ladrillos 1-Manual de instalación para la plataforma de con­creto y Olde Inglés ladrillos
Material Necesario:
¾” piedra limpia (aprox. 1 tonelada) Hormigón (aprox. 17bolsas de 80 libras) Cambridge concretas adhesivo (aprox. 6-29 oz o 17-
10.3 oz. tubos) (4 piezas) de 2” x 4” x 8’de madera 2 ½”tornillos para madera ½” barra de refuerzo (aprox. 11’) Silicona para el flasheo
4
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Fireplace Concrete Pad Construction:
Call 811 for information on underground utility marking. Select desired location and excavate 52” L x 65 3/4” W x 12 3/4” D area for concrete pad. Fill excavated area with approximately 6” of ¾” clean gravel, compacting every 3”. Frame remaining 4” with 2” x 4” lumber to create a level pad. (Be sure 2” x 4” wood frame is perfectly level, front to back and side to side) See attached drawing for details of steel reinforcement rod placement. Fill 2” x 4” wood frame with a 4,000 PSI strong concrete mix. *Allow pad to cure for minimum of 48 hours. *Note: (Wood Box Additions) If you are going to add fire wood box extensions, either a single unit or a set it will be necessary to construct an additional concrete pad for each unit added.
2011
Chimenea Construcción Base de Concreto:
Llame al 811 para obtener información sobre la utilidad de metro marcado. Seleccione la ubicación de­seada y excavar 52” de largo x 65 3/4” W x 12 3/4” D área de plataforma de concreto. Llene la zona ex­cavada con aproximadamente 6 "de ¾" limpia grava, compactando cada 3”. Marco restantes 4"con 2” x 4” de madera para crear una plataforma de nivel. (Asegúrese de 2” x 4” marco de madera está perfecta­mente horizontal, de adelante hacia atrás y de lado a lado) Véanse los detalles del dibujo para la coloca­ción de varillas de acero de refuerzo. Llene 2” x 4” marco de madera con una mezcla de concreto 4000 PSI fuerte.
*Deje que la almohadilla para curar por un mínimo de 48 horas.
* Nota: (El texto añadido Caja para la lena) Si usted va a agregar el fuego extensiones caja para la lena, ya sea una sola unidad o conjunto será necesario construir más plataformas de concreto para cada uni­dad adicional.
5
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Fireplace Concrete Pad Detail-Cross Section Drawing
Concreta del cojín de la Chimenea Detail-Dibujo Seccionado Transversalmente
2011
TopView-Footing Detail / Vision Superior-Detaile De Pie
52”
65 3/4”
6
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Stones Included In The Kit:
48” Lintel (1 Piece)
32” Lintel (4 Pieces)
2011
Headstone (1 Piece) Cut Large to remove 2 3/4”x8 1/4” (1 Piece)
Large (125 Pieces) Small Cast Stone Legs (4 Pieces) Large Cast Stone Legs (4 Pieces)
7
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
4”x4”
4 1/2”x4 1/4” Small Cut (1 Piece) Cut Small to remove 1”x2” (1 Piece) 4”x4” Cut Stone (1 Piece)
You will need to cut the medium stones to measure 8 1/4” x5 1/2” (7 times) for this kit.
8 1/4”x5 1/2” Medium (7 Pieces) Cut Medium to remove 2 1/4”x4” (1 Piece) Small (221 Pieces)
You will need to cut the large stones to measure 8 1/4” x8 1/4” (4 times) for this kit.
8 1/4”x8 1/4” Large Cut (4 Pieces) Medium (82 Pieces) 6 3/4”x6 3/4” Medium Cut(1 Pieces)
8
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
Mantel Left Corner (1 Piece) Mantel Center (1 Piece) Mantel Right Corner (1 Piece)
2011
Front Left Corner Cap (2 Pieces) Front Center Cap (2 Pieces) Front Right Corner Cap (2 Pieces)
Hearth Left Corner (1 Piece) Hearth Center (1 Piece) Hearth Right Corner (1 Piece)
You will need to cut the large stones to measure 5 1/2” x13 3/4” (6 times) for this kit.
Large to remove 3”x4” (1 Piece) Large to remove 3”x3” (1 Piece) 5 1/2”x13 3/4” Large (6 Pieces)
9
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 1:
Piece Count = (10) Small, (15) Medium, (12) Large
Mark a line 4” in on all sides on the concrete pad to mark the outside perimeter of the fireplace.
Apply concrete adhesive and install per photo.
Capa 1:
Numero de Piezas = (10) Pequeño, (15) Mediano, (12)Grande
Marque una línea 4” de todo los lados del cojín de concreto a marca el perímetro exterior de la chi­menea.
Aplique el pegamento concreto e instálelo por la foto.
10
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 1-A:
Firebox Placement: Install firebox unit 8 ¼” from the front of layer 1 and 9” in on the left and right side. Attach 4ft air-cooled chimney per manufactures instructions enclosed in the fire­box.
Capa 1-A:
Colocacion de la caja de fuegos: Instale unidad de la caja de fuegos 8 ¼” del frente de la capa 1 y 9” adentro en lado izquierdo y derecho. Ate la chimenea refrigerada de 4 pies por fabrica la instruccion.
11
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 1-B:
Remove firebox top support with a Phillips screwdriver. Take the 8 screws out removing the firebox top face support. This will not be needed for the install. See photo for details.
Capa 1-B:
Quite la ayuda de tapa del lugar de la caja de fue­gos con un destornillador de Philips. Tome los 8 tornillos hacia fuera que quitan la caja de fuegos ayuda de cara superior. Esto no será necesario para la instalaci n. Vea la foto para los detalles.
12
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 2:
Piece Count = (2) Small, (3) Medium, (10) Large
Apply concrete adhesive and install per photo.
Capa 2:
Numero de Piezas = (2) Pequeño, (3) Mediano, (10) Grande
Aplique el pegamento concreto e instálelo por la foto.
13
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 3:
Piece Count = (2) Small, (3) Medium, (10) Large
Apply concrete adhesive and install per photo.
Capa 3:
Numero de Piezas = (2) Pequeño, (3) Mediano, (10) Grande
Aplique el pegamento concreto e instálelo por la foto.
14
Cambridge Pre-Packaged
Olde English Paver Fireplace Kit Deluxe Surround
2011
Layer 3-A: Hearth Layer
Center the large cast Hearth piece to the front of the firebox. Make sure it is centered with 11inches on both sides and flush with the front of the firebox as shown.
Capa 3-A: Capa del Hogar
Centro de la gran elenco pieza Hogar al frente de la caja de fuego. Asegúrese de que esté centrado con 11inches a ambos lados como se muestra
15