CALORIQUE Snow & Ice CM1020, CM1020 Installation Manual

Installation Manual
Snow & Ice Melting
Loading Dock
Skid Plates
CCMM11002200
- 04-08-13
Before Installing
Failure to follow installation instructions, or misapplication, may result in electrical shock, fire and/or personal injury hazard.
Installation must conform to all requirements of the National Electrical Code (NEC) 426.23(B) (Fixed Outdoor Electric Deicing and Snow-Melting Equipment) and any local codes or ordinances. In countries other than the USA, follow the dictates of the local electrical and building code.
The electrical source must conform to the heating units’ require­ments (voltage and circuit amperage capacity) and overcurrent protection device must incorporate a GFCI.
Connection of heating unit(s) should be performed by a licensed electrician.
Do not cut, bend or otherwise alter the CalorIQue Heated Skid Plate. Any alterations to the units may present a shock or fire hazard.
Suitable overcurrent protection shall be provided by means of circuit breaker or fuse. Overcurrent protection shall be of a type indicated as being acceptable for branch circuit protection.
WARNING: Ensure that adequate drainage is provided for water runoff.
Tools & Materials
CalorIQue Heated Skid Plate. See Free Estimate Worksheet (CM1012) for ordering details.
Typical heated skid plate. Your model may vary.
Standard Electrical Hand Tools.
Overcurrent Protection. User / installer supplied. The circuit
breaker used with this sistem must have an overcurrent rating of 30 amps and an integral GFCI rated for 30mA equipment protection.
Electrical Conduit. Rigid or flexible conduit meeting the requirements of N.E.C. 426.23(B) of local code (e.g. carflex).
Electrical Wire. Suitable wire for use within exterior conduit. Three conductors must be available. Conductors may range from #14-22 AWG, size based upon total ampacity connected.
Drill with Bits. Bit must be rated for drilling into the material onto which the skid plate(s) is being installed.
NOTE: If using an anchoring method other than the supplied expan­sion shields and stainless steel screws, follow the manufacturer’s instructions for best results. In all preparation and installation steps indicating use of the expansion shields and supplied 1/4” stainless steel screws, replace with the anchor manufacturer’s instructions.
Construction Adhesive. This adhesive must be water and heat resistant.
Non-Skid Surface
Loading...
+ 2 hidden pages