Calomax Quantum Installation, Operation And Maintenance Manual

Manuals and Documents
Brought to you by
Wechillit.com Ltd
WCI Group House
18 Pride Hill
Shrewsbury SY1 1DQ
Tel: 01743 289418
Web: www.wechillit.com
Quantum
Read these instructions thoroughly
before commencing installation or
undertaking maintenance workX
Issue N A zfiR MGSPUxMxpO
TjLP pWWN BSH MMUW F,XP pWWN BNO pNOU wwwXcalomaxXcoXuk
fiounterAtop fiatering Water Koiler
INSTALLATIONg OPERATION AND
MAINTENANCE MANUAL
CONTENTS
NX INST,LL,TION X X X X X X X X X N
SX fiOMMISSIONING X X X X X X X X X N
OX USjR INSTRUfiTIONS X X X X X X X X N
OXW Cleaning X X X X X X X X X S
OXB Service Indicator Light X X X X X X X S
GX F,ULT FINzING X X X X X X X X X M
UX WIRING SfiHjM,TIfi X X X X X X X X G
WX P,RTS IzjNTIFIfi,TION X X X X X X X P,Gj W
BX PL,NNING THj INST,LL,TION X X X X X X X B
BXW Water Requirements X X X X X X X B
BXB Electrical Requirements X X X X X X X B
BXN Installation Location X X X X X X X B
BXS Vent/Overflow Pipe Requirements X X X X X B
MX M,INTjN,Nfij X X X X X X X X X S
MXW Draining Down The Boiler X X X X X X X S
MXB Scale X X X X X X X X X X S
MXBXW Checking the Extent of Scale Formation X X X X X S
MXBXB De-Scaling X X X X X X X X X S
MXN Replacing the Element or Thermistor X X X X X O
MXS Replacing the Main Printed Circuit Board and Triac PCBX X X X O
MXO Replacing the Inlet Solenoid Valve X X X X X X O
MXM Replacing the Dispense Valve, Key Switch, Push Button, Fascia PCB . O
MXG Adjusting the Water Temperature Set Point . . . . X M
PAGE 1
NB15BLG
body lid
gasket
TAK thermistor
assembly kit
NBE3HK
element
(Wrapper not shown for clarity)
CASMR manual
reset thermostat
CASLPK kit
comprising 3 off
level sensors
QDVK valve
including
silicone sealing
grommet
FIH Water
Research Council
approved hose
QPCBT main pcb
includes triac pcb
CASSV
solenoid valve
NBPRG
pressure relief
grommet
QAPCBT
auxiliary
pcb
QEDV
drain
valve
QOCL
lid
QTK
front trim
panel
PBK
push
button
KSK
keyswitch
QNS
nozzle
sheath
ISSUE 3
F4 PLANNING THE INSTALLATION
All installation and maintenance work must be c
arried out by competent persons4
B
XW Water Requirements
The unit is designed to be connected to a cold water rising mains supply, using 15mm table “X” copper tube with a minimum pressure of 20 KPa
(0.2bar) and a maximum pressure of 1000 KPa and (10 bar).
So as to comply with the U.K. Water Bylaws a single check valve must be fitted to the cold water mains supplying the boiler. It is also recommended that an isolating valve be fitted to the mains water supply to the boiler to facilitate maintenance.
The formation of scale in hard water areas is a problem associated with all hot water appliances. Damage to the boiler caused by excessive scale deposits is not covered by the manufacturer’s warranty.
BXB jlectrical Requirements
The installation must comply with the current I.E.E Wiring regulations, if in doubt consult a qualified electrician. This appliance must be earthed. The boiler complies with the Electrical Equipment Safety Regulations (SI1994/3260) and has been independently tested to BS EN60335-2-63. The boiler operates a nominal 3 kW element at 240v. 50Hz supply. A circuit diagram is provided at the back of the manual
B
XN Installation Location
E
nsure the counter top is of suitable construction to support the working weight of the boiler. See Fig. 1 To comply with recommendations from the health and safety executive it is important that due
consideration be given to the safe operation of the controls of the boiler. The boiler should therefore be mounted in such a manner that the operator can stand directly facing the machine with the controls at the recommended height. See fig 2 Consideration should also be given to the servicing requirements of the machine.
BXS Vent x Overflow Pipe Requirements
The vent and overflow pipe should be extended on site using 15mm Speed-fit plastic tube or 15mm Table “X” copper tube. The pipe must be laid with a continuous fallg discharging to a safe and visible position. The vent and overflow pipe should
not be connected directly to a soil pipe and should never be allowed to become blocked or restricted4 See fig -
Fig 1
Fig 2
DRY WEIGHT 12kg
WORKING WEIGHT 29Kg
ISSUE 3
PAGE 2
45
65
240
410
85
85
470
140
190
535
VENT / OVERFLOW FITTED WITH PUSH-ON SILICONE HOSE FOR EASE OF MAINTENANCE
SOLENOID WATER INLET CONNECTION
The height from the floor to the dispense valve should be 1200mm +/- 100mm
1200.47
64 COMMISSIONING
1. Turn water supply on
2. Turn electrical supply on
On initial switchAon only
After a few seconds delay for the electronics to charge up, the boiler will begin filling with water and the ‘Ready’ light will flash to indicate wait. If the key switch is in the ‘on’ position the push button will flash green to indicate wait, at this point the button is disabled. When water reaches the low level sensor (element covered) the element will be energised as well as the solenoid. When normal operating level is reached the solenoid will turn off and the element will remain on until full operating temperature is reached.
Figure 4 shows the approximate times for boiling water to be available from switch on.
Fig 4
Full capacity available after
From empty
45 mins
After overnight stand (full)
17 mins
With the key switch in the ‘ON’ position the push button will stop flashing and show solid colour when the boiler is up to full temperature and the button will be enabled, at this point the ‘ Ready’ light will stop flashing and show solid colour and the ‘Full’ light will also be illuminated.
On subsequent operation of the boiler
The boiler will fill and heat in cycles. It will allow only a limited amount of water to enter the unit at any one time and then switch off the solenoid and energise the element.
W4 USER INSTRUCTIONS
Boiling water is dispensed by operating the push button. The button will only be useable when the key switch is in the ‘ON’ position and illuminated solid green colour, indicating that water is up to temperature. Due caution should be applied as the water is at approximately 98˚ Centigrade at all times. The ‘Ready’ light will flash when the boiler is not up to temperature and show solid colour when at operating temperature. The ‘Full’ light will illuminate only when the boiler is at operating temperature and also full capacity is available for dispense. If all water is drawn from the unit the flow will reduce to a trickle. The unit will replenish the supply in cycles i.e. a small amount of water will enter the unit , which will subsequently be heated but all water available will be at approximately 98 ˚ Centigrade.
ISSUE 3 PAGE 3
B
oiler Vent / Overflow connection
99
88
99
Incorrect
Correct
Correct
Vent and Overflow
pipe
S
ilicone
connecting hose
Trapped water
prevents boiler
breathing
C
onnect pipes using silicone
tube provided
Pipe-work should be fitted with a continuous fall to a safe and visible point of discharge (e.g. a sink). It should not be
connected directly to a waste system because taste and smell problems will occur.
This installation allows the silicone hose to fit loose inside a fixed fitting. Air is allowed into the boiler at this point and will allow the boiler to breath in the event of the overflow becoming trapped.
Air gap
Pipe-work should be fitted with a continuous fall to a safe and visible point of discharge (e.g. a sink). It
should not be connected directly to a waste system because taste and smell problems will occur.
Vent and Overflow
Fig 3
-4 INSTALLATION
WX The boiler is supplied with a 3/4” BSP Water Research Council approved flexible water connection hose. This hose should be connected to the mains water supply using an isolating valve and then fitted to the machine solenoid valve inlet. BX The vent / overflow pipe should be extended on site using 15mm Table X copper tube or ‘Speedfit ‘ plastic pipe as described in Fig 3. The overflow pipe must be
fitted and arranged such that the outlet position is safeg visible and external to the boiler4 The overflow pipe must not be connected directly to a soil pipe and should never be allowed to become blocked or restrictedX
NX All Quantum machines are pre-wired with a 13A plug and lead for use with a 13 A socket.
Fig. 5
OXW fileaning
When required the unit should be wiped down with a damp cleaning cloth The unit is not protected against the ingress of water and therefore should not be washed down in any manner that would allow water to enter the electrical chamber of the unit e.g. the use of a spray water jet.
OXB Service light
Certain types of operational fault will cause the ‘Service’ light to flash. If this occurs refer to the section ‘Fault Finding’ on page 6.
MXB Scale
The Quantum boiler incorporates an integral scale inhibitor. In general, independent users throughout the country have benefited from either a vastly reduced scale build up, and / or much easier maintenance due to the softer nature of the scale, which tends not to adhere rigidly to the internals of the machine. Please note that this is not a scale eliminator and its effect will differ according to water quality.
MXBXW fihecking the extent of scale formation
WX Remove the body lid by releasing the four fixing
screws. To remove the lid it must be pushed forwards to the front of the boiler before lifting to allow the condenser mechanism to clear the body top flange4 See Fig4 W
It is very important that the lid assembly is fitted the correct way round for the condenser to work effectively4 See label on top of lid
IMPORT,NTX It is recommended that a new
body lid gasket be fitted on re3assembly to ensure a steam tight seal4 Damage to the unit caused by incorrectly sealed gaskets that should have been replaced during maintenance is not
covered by the manufacturers warranty4
ISSUE3 PAGE 4
B4 MAINTENANCE
Competent persons must carry out all maintenance work4 When the body lid has been removedg it is recommended that a new body lid gasket is fitted on assembly to ensure a steam tight seal4 Damage to the unit caused by incorrectly sealed gaskets that should have been replaced during maintenance is not covered by the manufacturers warranty4
MXW zraining down the boiler
For ease of maintenance the Quantum water boiler is fitted with a drain valve at the rear of the unit The machine should be manoeuvred over a sink or large vessel that will adequately take the volume of water from the machine. To guard against a dripping drain valve, a blank­ing cap is fitted at the outlet of the valve and must be removed prior to draining the unit and replaced after the valve has been turned off.
To ensure regular trouble free operation, periodically check for scale inside the boiling chamber and around the dispense valve, see section 6.5 on page
5. The production of scale is a natural phenomenon and some de-scaling may be required within the first 12 months. This is not covered under the products warranty as it is not a fault.
The solenoid is fitted with a removable filter at the inlet point4 This filter should be cleaned as required4
Check the extent of scale formation on the element.
MXBXB zeAScaling
Scale deposits should be removed from all internal surfaces, particularly the heating element, thermistor pocket and level sensor probes. Gentle tapping or scraping is usually sufficient to remove scale build up. If the deposits are soft use a nylon pad and flush out with water. Abrasive cleaning materials containing scouring powder and detergents must not be used, such materials can cause taste problems. Chemical de-scalants must only be used in accordance with the manufacturers instructions.
IMPORT,NTX All chemical agents must be
thoroughly flushed out to avoid taste problemsg health risksg and possible malfunction of the boiler4
Before re3commissioning the unitg all scale and moisture must be removed from the level sensor insulating gaskets to avoid false signalling through the scale to the boiler body4 Failure to remove this scale and dry the probes could cause the sensor to indicate to the Printed Circuit Board hPCBv that water is covering the element whether or not water is present4 In this situation the PCB could energise the element g causing failure4 If in doubt g protect the element by hand filling the boiler with water to cover the element before switching on the electrical supply4
ISSUE 3 PAGE 5
MXN Replacing the jlement or Thermistor
The element or thermistor can be replaced by removing the back-nuts and washers and withdrawing
from inside the boiling chamber.
IMPORTANT 9 A
new body lid gasket may be required4
MXS Replacing the Main fiircuit board LPfiK1 and Triac PfiKX
The main PCB and the triac PCB should bereplaced as a matched pair to be sure of correcting circuit board faults4
WX Disconnect the wiring connections to the main PCB BX Remove the PCB by pulling it forward off the supports NX Disconnect the wiring to the triac PCB and remove by releasing the fixing screw and pulling it forward off the supports. SX Apply a thin layer of heat transfer compound (supplied) to the mounting platform of the replacement triac PCB and fit to the mounting supports. Ensure it is positively located and secure it with the single
fixing screw4
OX Reconnect the triac wiring , see wiring diagram at the rear of the manual MX Position the main PCB on the four supports and wire in accordance with wiring diagram
MXO Replacing the Inlet Solenoid Valve
IMPORTANT9 In areas where scale can be a problemg check that the fault is not due to a blocked filter ( this is removable at the inlet to the solenoid) before replacing the unit4 Scale build up in the filter can cause intermittent problems4
WX Remove the silicone hose that joins the sole­noid to the water inlet. Warningg the pipe will
retain a volume of water that will be released when the connection is broken4
F4 Pull the solenoid from the mounting brack- et IMPORTANT9 the correct operation of the boiler relies on a regulated flow of water from the solenoid valve and there3 fore a genuine replacement part supplied by Calomax must be fitted4
-4 Fit the replacement part onto the exist-
ing mounting bracket (if a mounting bracket was supplied with the replacement valve this should be removed ) and re-connect the live and neutral connections
MXM Replacing the zispense ValveF Key Switch F Push KuttonF Fascia PfiK
To replace any of the above parts, the following instructions should be followed:-
1. Remove the outer casing lid
2. Loosen the two screws in the cover plate located above the fascia and slide the plate out.
3. Remove the four screws from the back panel and remove , being careful not to damage the thermal cut-out in the process
4. Remove each of the two screws holding the copper heat sink, solenoid bracket and main PCB bracket in position and allow them to hang loose.
5. Remove the earth wire adjacent to the main PCB from the right hand side of the outer casing.
6. Unplug the wiring harness from the fascia PCB and move the harness away from the top of the outer casing.
7. Remove 2 screws from either side of the base of the boiler.
8. The outer casing can now be removed by leaning it forward, clear of the dispense valve, and lifting it up / forward from the base.
Note 9 when re3assembling the boiler ensure the wiring harness is plugged back into the fascia PCB and the harness does not become trapped between the body and outer casing4
zispense Valve
1. Disconnect the wires from the coil
2. Remove the two setscrews
3. Pull the valve forward leaving the rubber insert behind.
ISSUE 3 PAGE 6
GX F,ULT FINzING
To protect the unit in the event of continuous over boilingg the unit is fitted with a thermal cut3out device4 This device will cut power to the entire machine and can be re3set manually4 Before re3setting the deviceg the cause of the trip hde3scale required etc4v should be investigated4
The ‘Service’ light on the front of the machine and Light Emitting Diodes (LED’s) fitted to the main PCB, can be used to diagnose operating problems with the machine. When the green ‘service’ light is showing solid colour, the machine has been starved of water and has disabled the solenoid to protect against burn out. In this state the boiler must be disconnected from the power supply and then switched back on to re-enable the solenoid after the water supply has been re-established
Certain types of operational fault will cause the ‘service’ light to flash in a sequence of pulses A two pulse generally indicates that the low level probe requires de-scale A three pulse indicates a loss of signal from the normal water level probe , causing the unit to overfill. A four pulse indicates the unit has overfilled due to debris trapped in the solenoid valve. This is usually solved by drawing all the water from the machine, causing the valve to operate and flush out the obstruction. Check for debris in the valves inlet filter. A five pulse indicates the boiler has overfilled due to scale on both the low and normal water level probes.
The unit can be used normally while the service light is flashing
LED’s fitted to the main PCB indicate the operation of the solenoid and element. The red LED indicates the element should be energised and the yellow LED indicates the solenoid should be energised. The solenoid, dispense valve and element are permanently live fed, and each are switched via the neutral connection.
Water boils at different temperatures depending on barometric pressure4 The temperature should not be tuned higher than the pre3set :) degreesg or over boiling may occurg causing the unit to trip the over heat cut3out device4
Fascia PfiK
1. Disconnect the 6 wires from the fascia PCB
2. Remove the retaining screws and gently pull away from the lens housing
3. Fit new PCB and re-wire. Refer to the wiring diagram at the rear of the manual
fileaning the zispense Nozzle
1. Slide the retaining clip out from the flow restrictor housing.
2. Remove the breather hose.
3. Quarter turn the flow restrictor / nozzle housing and pull free, clean and re-assemble
Key Switch
1. Disconnect the 2 wires from the fascia PCB
2. Remove the single retaining screw from the centre of the switch
3. Slide the retaining collar away from the switch and withdraw the switch from the boiler.
4. Fit the new switch ensuring it is the correct way up so as to correspond with the lock / un­lock symbols on the front of the boiler.
Note 9 Take care not to over tighten the retaining screw when assembling
Push Kutton Switch
1. Disconnect the 4 wires from the fascia PCB
2. Using the tool provided, unscrew the retaining collar anti-clockwise and withdraw the push button switch.
3. Fit the new switch and re-wire. Refer to the wiring diagram at the rear of the manual.
MXG ,djusting the Water Temperature Set Point
The temperature potentiometer (Pot) is pre-set at Calomax and will only require adjustment in exceptional circumstances, the adjustment Pot is located at the bottom left corner of the main PCB. It controls the operating temperature of the boiler. 1/2 turn clockwise on the device will raise the temperature of the water by approximately 1 degree centigrade.
ISSUE 3 PAGE 7
Wiring Schematic for Calomax Quantum Water Boiler using v10 board
RED
YE
L
LOW
B
LACK
B
LUE
P
INK
B
ROWN
ORANGE
W
HITE
+12Vd
c (BROWN)
B
LACK
RED
0.75mm YELLOW
0.2mm YELLOW
BLACK
BLACK
RED
N
E
L
B
L
U
E
B
L
U
E
L
N
E
B
L
A
C
K
Y
E
L
L
O
W
/
G
R
E
E
N
BLA
CK
BLACK
Y
ELLOW / GR
EEN
R
E
D
0
Vdc
(ORANGE)
RED
R
E
D
ORANGE
YELLOW
R
ED
BLUE
C
O
N
N
E
C
T
O
R
P
L
U
G
COLD WATER INLET SOLENOID VAL
VE
ELEMENT
TRIAC P
C
B
QP
CBA
HIGH
N
O
RMAL
LOW
LEVEL SENSOR
S
HOT WATER OUTLET DISPENSE VAL
V
E
H
EAT
E
R
L
ED
S
OL
E
NOID
L
ED
THERMISTOR
PUSH B
UTTON
O
N FRONT
PANEL
KEYSWITCH ON FRO
NT
P
ANEL
T
HERMAL
C
UTOUT
EARTH O
N BODY
E
ARTH
O
N
B
ASE
P
I
N
K
P
I
N
K
ORANGE
BROW
N
OPT1
U1
OP1
EARTH ON CASING
Wiring Schematic for Calomax Quantum Water Boiler using v11 board
RED
YELLOW
B
LACK
BLUE
PINK
BROWN
O
RANGE
WHITE
+12Vdc (BROWN)
BLACK
RED
0.75mm YELLOW
0.2mm YELLOW
BLACK
BLACK
RED
N
E
L
BLUE
BLUE
L
N
E
BLACK
YELLOW / GREEN
BLACK
BLACK
YELLOW / GREEN
RED
0Vdc (ORANGE)
RED
RED
ORANGE
YELLOW
RED
BLUE
CONNECTOR PLUG
COLD WATER INLET SOLENOID VALVE
ELEMENT
TRIAC PCB
QPCBA
HIGH
NORMAL
LOW
LEVEL SENSORS
HOT WATER OUTLET DISPENSE VALVE
HEATER LED
SOLENOID LED
THERMISTOR
PUSH BUTTON ON FRONT PANEL
KEYSWITCH ON FRONT PANEL
THERMAL CUTOUT
EARTH ON BODY
EARTH ON BASE
PINK
PINK
ORANGE
BROWN
OPT1
U1
OP1
EARTH ON CASING
Loading...