9190, 9190-3, 9190-IP-2, 9190-IP-3,
Installation Instructions
StyleDrain
9190-ABS & 9190-PVC
StyleDrain® Tile™
(patent pending)
®
CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED
BY A LICENSED PROFESSIONAL
IMPORTANT: Read all instructions prior to installation and provide copy of instructions to consumer. This installation
instructions sheet is a guide for installing StyleDrain
waterproofing material MUST be followed to achieve proper installation and meet all code requirements
Mortar
ood Sub-floo
ood Sub-Floor Concrete Sub-Floor
Mortar Morta
Floo
Joist
®
Tile™, all local building and plumbing codes as well as manufactures
Collar Up Collar Down
Tile
aterproo
Membrane
Mortar
Concrete
Earth/Ground
9190_ii_121022.doc Pg 1
All figures show 2” cast iron no-hub connection
INSTALLING DRAIN BODY
• Connect BODY (1) to pre-installed DRAINPIPE (3)
via one of the following connections which are not
included:
o 2” Cast Iron No-Hub use 2” no-hub SLEEVE (2)
o 3” Cast Iron No-Hub use 3” no-hub sleeve
o 2” or 3” Cast Iron IPS use 2” or 3” pipe nipple
o 2”/3” ABS use ABS solvent cement
o 2”/3” PVC use PVC solvent cement
NOTE: It may be necessary to trim excess DRAINPIPE (3) to obtain
proper final installation height
• For wood sub-floor installations the following cut hole
sizes shall be made to properly support the installed
drain BODY (1):
o Ø 6-1/4” for ALL cast iron bodies
o Ø 7-5/8” for ALL ABS and PVC bodies
• Perform leak test in accordance with local building &
plumbing codes before proceeding
• For proper support on drain BODY (1) use one of
the following methods based on installation type:
o Wood sub-floor: provide framing support of drain
BODY (1) and strapping of DRAINPIPE (3)
Ø6-1/4” (Cast Iron)
Ø7-5/8” (ABS/PVC)
o Concrete sub-floor: backfill with dirt and concrete
around drain BODY (1)
INSTALLING WATERPROOFING
NOTE: All waterproofing materials shall be installed per manufactures
instructions and local building & plumbing codes. The following is a guide
as to how waterproofing relates to the StyleDrain
• Loosen or remove BOLTS (4) and remove COLLAR
(5) from drain BODY (1)
• Use MORTAR (6) or similar to achieve proper
drainage (generally ¼” per linear foot) then apply
WATERPROOFING (7) on top of MORTAR (6)
• Reattach COLLAR (5) in either down or up position
based on desired height requirements and/or local
building & plumbing codes, tighten BOLTS (4) to
secure COLLAR (5) into place
NOTE: When COLLAR (5) is installed in up position an additional 7/8”
in height is achieved
IMPORTANT: It is necessary that WEEP HOLES (5a) are open and
free of WATERPROOFING (7)
IMPORTANT: Perform water leak testing of WATERPROOFING (7)
per manufactures and local building & plumbing codes requirements
®
Tile
™
9190_ii_121022.doc Pg 2