Rough for Floor Mount Tub Filler
(for use with 1103-XX, 1203-XX, 1303-XX & 1403-XX)
Installation Instructions
9516
CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED
BY A LICENSED PROFESSIONAL
IMPORTANT: Read all instructions prior to installation and provide copy of instructions to consumer.
Operating Specifications:
Recommended Supply Pressure: 20 to 70 psi
Maximum Flow Rate: 15 gpm
* Operating pressures between hot and cold supplies should vary no more than 30 psi.
† If water pressure exceeds 70 psi, install a Pressure-Reducing Valve (RPV).
PREPARING SUPPLY NIPPLES
• Remove MUDGUARDS❶
• Using 3/8” hex KEY❷(not supplied), remove ½”
PLUGS❸ from NIPPLES❺
Important: It is the responsibility of the INSTALLER to refer to
the various installation methods shown in steps or to
determine proper rigid copper PIPES❿ lengths.
3
5
*†
• Solder or use female adapter to attach rigid copper
PIPES❿ to bottom inlet of NIPPLES❺
Use Rigid
Copper Pipe
WATER TIGHT SEAL
• Apply Teflon
PLUGS❸
• Using 3/8” hex KEY❷ (not supplied), secure ½”
PLUGS❸ (MAXheight3/8”)into NIPPLES❺
Important: Tighten PLUGS❸,3/8” MAX height into NIPPLES❺
so that PLUG❸ does not interfere with MUDGUARD❶
Only supplied PLUGS❸ may be used to ensure proper fit and
installation height of MUDGUARDS❶
• Place MUDGUARDS❶ onto NIPPLES❺
®
TAPE❹ (not supplied) onto
3/8” MAX
9516_ii_140613 Pg 1
INSTALLING IN WOOD FLOOR
• Determine location of tub & faucet prior to
proceeding
Important: It is the responsibility of the INSTALLER to ensure
that the floor rough is properly secured to all sub-floor construction.
All local building and plumbing codes and/or ordinances, shall be
followed to confirm proper secure installation.
• After determining tub location preparing the floor is
necessary to properly support the rough PLATE❻
by using 2 x 4 wood cross SUPPORT❼ which are
attached floor JOIST❽
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
TUB
location
• Place MUDGUARDS❶ onto NIPPLES❺
• Use a LEVEL❾ to properly level the PLATE❻ and
SUPPORTS❼ in all directions; vertical height of
PLATE❻ is determined by using the MIN/MAX
finished floor marks on MUDGUARD❶
• Verify that copper PIPES❿ attached to bottom of
NIPPLES❺ clear SUPPORT❼; adjust in necessary
• Using SCREWS⓫ secure the PLATE❻ to both
SUPPORTS❼andattach to floor JOIST❽
• Connect water supply to preassembled copper
PIPES❿ and check for leaks
FINISHED FLOORING (on wood)
Important: It is the responsibility of the INSTALLER to have
some knowledge of finished floor thickness before proceeding.
• Apply top floor SUBSTRATE⓬ around
MUDGUARDS❶, the two through holes shall be
Ø1-5/16” to 1-1/2” diameter and 7” center to
center
COLD
suppl
HOT
suppl
Use Rigid
Copper Pipe
Ø1-5/16 to 1-1/2”
”
• Apply top floor COVERING⓭ (e.g. tile, stone,
etc…) to floor SUBSTRATE⓬
• Finished floor COVERING⓭ must fall between the
MIN/MAX marks on MUDGAURD❶ for proper
installation of Floor Mounted Tub Filler Faucet
Ø1-5/16 to 1-1/2”
”
9516_ii_140613 Pg 2