California Faucets 1/2 Pressure Balance Valve Tirim User Manual

½” Pressure Balance Valve Trim
Installation Instructions
TO-PBL-XX
(ROUGH)
TO-PBL-XX_ii_110112.doc Pg 1
CALIFORNIA FAUCETS RECOMMENDS THAT ALL PLUMBING PRODUCTS BE INSTALLED BY
W
CW
A LICENSED PROFESSIONAL
TEMPERATURE SETTING
Remove MUDGUARD (1), SETSCREW (2), and
STEM-GUARD (3) from CARTRIDGE-STEM (4)
Place STEM (5) onto CARTRIDGE-STEM (4) and
secure in place with SCREW (6) as shown
WARNING: This valve is factory set to deliver water at the highest temperature possible. It is the installer’s responsibility set the desired and/or required maximum temperature setting to prevent risk on scalding or other severe injury prior to consumer use. The valve MUST installation. The installer is responsible to set this high temperature limit based on user preferences and all local plumbing code requirements. This valve does NOT monitor temperature. The valve will avoid anti-scald situations, due to pressure and flow fluctuations in supply lines, by regulating pressure during operation.
have the high temperature limit stop set during
Remove temperature limit STOP (8) from
CARTRIDGE (7)
Rotate STEM (5) counter-clockwise (CCW) to
start water flow. Temperature will become hotter as stem is rotated. Use temperature measuring device at outlet flow to determine maximum temperature
IMPORTANT: To prevent severe injury, maximum temperature setting should be no greater than 115ºF. The high temperature MUST meet all local plumbing code requirements.
to properly
Place temperature limit STOP (8) back onto
CARTRIDGE (7)
Lower temperature is achieved by rotating the
temperature limit STOP (8) clockwise (CW). This limits the rotation of the cartridge stem which in turn limits maximum temperature
Lowest Setting
Possible
CC
Reduced Setting
“Warm”
Reduced Setting
“Very Warm”
Factory Setting
“Hot”
110-115°F
TO-PBL-XX_ii_110112.doc Pg 2
Loading...
+ 2 hidden pages