Cafe CSB912P2VS1, PSB9100SVSS Installation Instructions

INSTALLATION INSTRUCTIONS
Advantium
®
Built-In Microwave Oven
CSB912 PSB9100
P/No.: MFL59060949_00
31-2000355 Rev.4
Installation Instructions
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT
for local inspector’s use.
IMPORTANT
and ordinances.
Note to Installer Be sure to leave these
instructions with the Consumer.
Note to Consumer Keep these instructions
with your Owner’s Manual for future reference.
Skill LevelInstallation of this appliance
requires basic mechanical and electrical skills.
Completion Time — 1 Hour.
Proper installation is the responsibility
of the installer. Product failure due to improper installation is not covered under the warranty. See Owner’s Manual for warranty information.
IMPORTANT
intended purpose. Never use the oven for warming or heating a room. Prolonged use of the oven without proper ventilation can be hazardous.
CAUTION
breaker before beginning installation to avoid severe or fatal shock injury.
CAUTION
be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loads.
Save these instructions
Observe all governing codes
Use this oven only for its
For personal safety, remove house fuse or oven circuit
For personal safety, the mounting surface must
CONTENTS
Design Information
Models Available Product Dimensions and Clearances Tools and Parts Required
Installation Preparation
Electrical Requirements Grounding Instructions Preparing the Opening (Standard) Preparing the Opening (Flush Mount)
Installation Instructions
Step 1, Remove Packaging and Parts Step 2, Slide Oven Into Cutout Step 3, Install Bottom Trim Step 4, Install Mounting Screws Step 5, Finalize Installation
...............................................2
.................................3
....................................4
......................................4
....................5
.......................12
..............................12
......................12
.............................12
MODELS AVAILABLE
Café Pro Models:
CSB912P2NS1 – Stainless Steel CSB912P2VS1 – Stainless Steel
Café Min Models:
CSB912M2NS5 – Stainless Steel
Profile Models:
PSB9100SVSS – Stainless Steel
................3
...............9
............11
2 31-2000355 Rev. 4
Design Information
PRODUCT DIMENSIONS AND CLEARANCES
21-1/2Ǝ
2-1/4Ǝ
1Ǝ
1-1/4Ǝ
13 1/4Ǝ
TOOLS AND PARTS REQUIRED
(NOT SUPPLIED)
#2 Phillips screwdriver
Hand-held drill
High speed drill bit, 3/32Ǝ diameter
3/8Ǝ slot-head screwdriver
Level
Saw
3/8” slot-head screwdriver
Wood screws or other hardware for installing
runner or shelf to support oven (if required)
Safety glasses or goggles
26-3/4”
20-1/4”
ADVANCE PLANNING
7KHVHRYHQVPD\EHLQVWDOOHGGLUHFWO\LQWRDƎ
wide oven cabinet with standard installation.
Cutout height dimensions are different for
installations with an accessory storage drawer. Make sure to use the correct cutout when preparing the opening.
• Allow for clearance to adjacent corners, walls, drawers, etc.
The oven must be securely installed in a cabinet that is firmly attached to the house structure. Weight on the oven door could cause the oven to tip and result in injury. Never allow anyone to climb, sit, stand or hang on the oven door.
FLUSH MOUNT INSTALLATION
This installation method allows for the unit face to be inline with the cabinet face.
IMPORTANT: HIGH SKILL LEVEL IN CARPENTRY IS REQUIRED. Non-standard cabinetry may be required.
Flush installation of the oven will lead to the exposure of the cabinet face frame edges.
Side cleats may be visible and should be a finished surface.
31-2000355 Rev.4 3
Installation Preparation
ELECTRICAL REQUIREMENTS
Single Advantium Built-In Oven Installation:
This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency.
• Wire size must conform to the requirements of the National Electrical Code or the prevailing local code for this kilowatt rating.
• The power supply cord and plug should be brought to a separate 15 or 20 ampere branch circuit single grounded receptacle. The outlet box should be located within reach of the 48” power cord.
ELECTRICAL LOCATION
6”
9”
Locate outlet box in the shaded area
Install a recessed electrical outlet in the back wall of the opening within 6Ǝ of either side and at least 9Ǝ above the cutout floor.
GROUNDING INSTRUCTIONS
WARNING
Ensure Proper ground exists before use.
power cord having a grounding wire with a grounding plug. The plug must be plugged into an outlet that is properly installed and grounded.
Consult a qualified electrician or service technician if the GROUNDING INSTRUCTIONS are not completely understood, or if doubt exists as to whether the appliance is properly grounded.
If the outlet is a standard 2-prong wall outlet, it is your personal responsibility and obligation to have it replaced with a properly grounded 3-prong wall outlet.
Improper use of the grounding plug can result in a risk of electric shock.
This appliance must be grounded. In the event of an electrical short circuit, grounding reduces the risk of electric shock by providing an escape wire for the electric current.
This appliance is equipped with a
Do not under any circumstacnes cut or remove the third (ground) prong from the power cord.
A short power-supply cord is provided to reduce risks resulting from becoming entangled or tripping over a longer cord.
Do not use an extension cord. If the power cord is too short, have a qualified electrician or service technician install an outlet near the appliance.
For best operation, plug this appliance into its own electrical outlet to prevent flickering of lights, blowing of fuse or tripping of circuit breaker.
4 31-2000355 Rev. 4
Standard Installation Preparation
PREPARE THE OPENING
The Advantium Built-In Oven can be installed in combination with other Built-In appliances. Always follow each product’s Installation Instructions to complete the installation.
Single Advantium Built-In Oven
Installation:
Order a 27” or 30” wide single oven cabinet or cut the opening in a wall to the dimensions shown.
27” or 30”
17-1/2”
36-3/4”
Min.
23-1/2”
25-1/4”
Construct solid bottom
- Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
PREPARE THE OPENING (CONT.)
Installation over a Warming Drawer:
Construct
27” or 30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location does not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.
solid bottom
- Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
2Ǝ Min.
(3Ǝ Recommended)
Per Warming Drawer Requirement
NOTE: Additional
Allow the following clearances around the cutout on the front surface of the cabinet:
í´IURPWKHWRS´IURPWKHVLGHHGJHV DQGí´IURPWKHERWWRP1RWHWKHVHUHIHU
to minimum clearances required for installation and do not reflect actual product dimensions.)
Oven overlaps will conceal cut edges on all
• sides of the opening.
When installed over a single oven or a
warming drawer, allow at least 2” between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120 and the other appliance overlaps.
The support must be level and rigidly mounted,
• flush with the bottom edge of the cutout.
31-2000355 Rev.4 5
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven:
Construct
27 or 30”
45-1/4”
Min.
23-1/2”
25-1/4”
17-1/2”
solid bottom
- Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
2” Min. (3” Recommended)
Per Oven Requirement
PREPARE THE OPENING (CONT.)
Installation over a Wall Oven and Warming Drawer:
Construct
27 or 30”
45-1/4”
Min.
23-1/2”
25-1/4”
17-1/2”
Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
2” Min. (3” recommended)
Per Oven Requirement
2” Min.
• If you are replacing an electric double oven with the combined installation of an Advantium Built-In Oven and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2” minimum shown.
Per warming drawer requirement
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.
CAUTION
mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loads.
For personal safety, the
6 31-2000355 Rev. 4
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation over another Advantium Built-In Oven:
27 or 30Ǝ
17-1/2Ǝ
17-1/2Ǝ
23-1/2Ǝ
25-1/4Ǝ
Construct solid bottom - Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
3 1/8Ǝ Min. (4 1/8Ǝ Recommended)
PREPARE THE OPENING (CONT.)
Installation under a Microwave Oven and over a Warming Drawer:
Construct
27 or 30Ǝ
Per Microwave
Oven Requirement
17-1/2Ǝ
Per Warming Drawer Requirement
23-1/2Ǝ
25-1/4Ǝ
solid bottom - Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
3.5Ǝ Min. (4.5Ǝ Recommended)
2Ǝ Min. (3Ǝ Recommended)
• If you are mounting a Built-In
another, use the dimensions separating the two openings may need to be larger than the 3-1/8Ǝ minimum shown.
Advantium Oven over
shown. The middle rail
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.
CAUTION
mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the oven and drawer, plus additional oven loads.
For personal safety, the
31-2000355 Rev.4 7
Standard Installation Preparation
PREPARE THE OPENING (CONT.)
Installation beside another Built-In Oven:
• If you are mounting an Advantium Built-In
another, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 4-1/2Ǝ minimum shown.
Oven
beside
25-1/4Ǝ
17-1/2Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
4-1/2Ǝ Min. (5-1/2Ǝ Recommended)
PREPARE THE OPENING (CONT.)
Installation under a 30Ǝ or 36Ǝ Cooktop or Countertop:
Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size. See the label on top of the oven for approved cooktop models. This oven requires a separate, properly grounded 15-Amp, 120-Volt, 60Hz power supply. The cooktop requires a separate power supply. Use a 30Ǝ or wider base cabinet.
Cooktop
Cooktop
1-1/2Ǝ Min.
25Ǝ
36Ǝ
Countertop
Height
Ǝ
Cooktop height including depth of electrical box on some models. Refer to cooktop installation instructions. No minimum clearance required between cooktop and oven.
23-1/2
4Ǝ High
Toekick
17-1/2
25-1/4Ǝ
Ǝ
8 31-2000355 Rev. 4
Flush Mount Installation Preparation
PREPARE THE INTERIOR
Cut and install side cleats:
Cut side wood cleats to height of cabinet opening and approx. 2-1/2” in depth. Install, on each side, Dim. E from the front face of the cabinet.
Cut and install bottom cleat:
Cut bottom wood cleat to a height of 1-1/8”, a depth of the cabinet minus Dim. E and a width of 25-1/4” to fit between side cleats. Install onto the cabinet floor between the side cleats, push it all the way back against cabinet wall and make sure its front face aligns with the front faces of the side cleats (Dim. E gap from the front cabinet face).
A
A
PREPARE THE OPENING
The Advantium Built-In Oven can be installed in combination with other Built-In appliances. Always follow each product’s Installation Instructions to complete the installation.
Single Advantium Built-In Oven
Installation:
Cut the opening in a cabinet to the dimensions shown.
*See table below for desired reveals on sides.
**20 1/2”
23-1/2” min.
F *
Oven or warming drawer
Construct solid bottom
- Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
2” Min. (3” recommended)
Per appliance specs.
C
B
Side and top cleats depth 2-1/2” min.
A
Bottom cleat height 1-1/8”
B
Bottom cleat depth Cabinet depth minus
C
Bottom cleat width 25-1/4”
D
All four cleats inset depth 1 1/4”
E
D
E
Dim. E”
D
C
TOP
VIEW
A A
Front Face of Cabinet
36-3/4”
Min.
• The support must be level and rigidly mounted, flush with the bottom edge of the cutout.
Approved Flush Installation
Single Advantium 27” 27-1/4” Over Warming Drawer 27” 27­Over Oven Over Oven and Warming Drawer Over Built-in Oven Double Advantium (side by side) Under Cooktop or Countertop See page 10
Dimension F
1/8” Reveal 1/4” Reveal
1
/4” 27” 27-1/4” 27” 27-1/4” 27” 27-1/4
See page 10
** Top and bottom reveals are set to 1/8”.
EE
31-2000355 Rev.4 9
Flush Mount Installation Preparation
PREPARE THE OPENING
The Advantium Built-In Oven can be installed beside another Advantium Built-In Oven in a side-by-side combination.
Double Advantium Built-In Oven
Installation:
Cut the opening in a cabinet to the dimensions shown.
• Center divider acts as cleat for side of each respective unit. Only one additional side cleat needed per oven cutout.
• The support must be level and rigidly mounted,
flush with the bottom edge of the cutout.
*See table for desired reveals on sides and between unit.
Dimension 1/8” Reveal 1/4” Reveal
G 53-7/8” 54-1/4” H 1-5/8” 1-3/4”
I 26-1/8” 26-1/4”
23-1/2” min.
G*
H*
I*
I*
20-1/2”
1 1/4”
36-3/4”
Construct solid bottom - Min. 3/8” plywood supported on all four sides. Must be able to support weight of oven and contents.
PREPARE THE OPENING
Installation under a 30Ǝ or 36Ǝ Cooktop or Countertop:
Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size. See the label on top of the oven for approved cooktop models. This oven requires a separate from the cooktop, properly grounded 15-Amp, 120-Volt, 60Hz power supply. Use a 30Ǝ or wider base cabinet.
23-1/2
4Ǝ High
Toekick
1-1/2Ǝ Min.
Cooktop
Cooktop
20-1/2”
J*
Ǝ
25Ǝ
36Ǝ
Countertop
Height
Cooktop height including depth of electrical box on some models. Refer to cooktop installation instructions. No minimum clearance required between cooktop and oven.
*See table for desired reveals on sides.
Dimension 1/8” Reveal 1/4” Reveal
J 27” 27-1/4”
*1/8” reveals on sides and top
10 31-2000355 Rev. 4
Installation Instructions
1
REMOVE THE PACKAGING AND PARTS
• Remove all packing material and tape.
• Locate parts package containing mounting screws.
• Remove the oven from the carton. Do not lift unit by handle or conduit. Two people are required to lift this oven.
• Open the door and remove any packaging in oven.
5 Color-Matched Screws
(4 required, 1 extra)
6 Brass Screws for the
Bottom Trim
(3 required, 3 extra)
Owner’s Manual
Owner’s Manual
Glass Tray
Installation
Instructions
Cooking Guide
Cooking Guide
Turntable Ring
Flat-Head Screws (4 extra)
Bottom Trim
IMPORTANT: If installing the Advantium Built-In
Oven with an accessory storage drawer, read the storage drawer assembly instructions to assemble the products together before proceeding to Step 2.
Metal Trays (2)
Rack
31-2000355 Rev.4 11
Installation Instructions
SLIDE OVEN INTO CUTOUT
2
INSTALL M O UN T I NG S CR E W S
4
CAUTION
Grasp the bottom at the front and rear. DO NOT USE THE HANDLE TO LIFT THE OVEN. DAMAGE WILL OCCUR!
• Lift and hold the oven at the front of the opening. Hold the oven at a 45º angle and plug in the power cord.
Carefully, slide the oven into the cabinet part way.
• Leave the oven a few in ches f orw ard of the cabinet frame.
• Check to be sure the power cord is not trapped under the oven or along the sides of the oven.
Two people are required to lift the oven into the opening.
• Slide the oven the remaining way into the opening so that the side flanges and control panel are against the cabinet frame. Make sure that the oven is centered in the opening.
• Open the door, place a turntable tray in the oven and make sure that the tray in the unit is level.
• Drill pilot holes through the side flanges.
• Drive the color-matched screws into the side flanges. It is recommended that the screws be hand tightened..
3
INSTALL BOTTOM TRIM
• Align bottom trim tabs to slots in the bottom of the oven.
• Secure the bottom trim to the bottom of the oven using 3 brass screws provided.
FINALIZE INSTALLATION
5
• Turn power on at the source. The interior light should come on when the door is opened.
• Refer to the Owner’s Manual for operating instructions.
12 31-2000355 Rev. 4
Notes
31-2000355 Rev.4 13
NOTE: While performing installations described in this book, safety glasses or goggles should be worn.
NOTE: Product improvement is a continuing endeavor at GE Appliances. Therefore, materials, appearance and
Printed in China
specifications are subject to change without notice.
14 31-2000355 Rev. 4
INSTRUCCIONES DE INSTALACIÓN
Horno Microondas Empotrable Advantium®
CSB912 PSB9100
P/No.: MFL59060949_00
31-2000355 Rev.4
Instrucciones de Instalación
ANTES DE COMENZAR
Lea estas instrucciones en su totalidad y atentamente.
IMPORTANTE
para uso del inspector local.
IMPORTANTE
y ordenanzas gubernamentales.
Nota para el Instalador — Asegúrese de que
el Comprador conserve estas instrucciones.
Nota para el Consumidor — Guarde estas
instrucciones con su Manual del Propietario para referencia futura.
Nivel de habilidad — La instalación de este
electrodoméstico requiere un nivel básico de habilidades mecánicas y eléctricas.
Tiempo de Compleción — 1 Hora.
Es responsabilidad del instalador realizar una instalación adecuada. Si se producen fallas en el producto debido a una instalación inadecuada, la garantía no cubrirá las mismas. Para obtener información sobre la garantía, consulte el Manual del Propietario.
NOTA: Sólo se aprueba la instalación de este horno
de acuerdo con los modelos específicos que aparecen etiquetados en esta unidad.
IMPORTANTE
sólo para su propósito original. Nunca use el electrodoméstico para calentar o calefaccionar una habitación. El uso prolongado del horno sin una ventilación adecuada puede ser riesgoso.
PRECAUCIÓN
abierto antes de comenzar la instalación, a fin de evitar lesiones graves o una descarga mortal.
PRECAUCIÓN
poder soportar la carga del gabinete, además del peso agregado del horno y el cajón, sumado esto a las cargas adicionales del horno.
Conserve estas instrucciones
Cumpla con todos los códigos
Use este electrodoméstico
Para su seguridad personal, retire el fusible del hogar o el disyuntor
Para su seguridad personal, la superficie de instalación deberá
CONTENIDOS
Información de Diseños
Modelos Disponibles .................................................2
Dimensiones y Espacios de Despeje del Producto ..3
Herramientas Necesarias ..........................................3
Planificación Anticipada ............................................3
Preparación de la Instalación
Requisitos Eléctricos .................................................4
Instrucciones de conexión a tierra ............................4
Preparación de la Abertura (Estándar) .....................5
Preparación de la Abertura (Montaje al Ras) ...........9
Instrucciones de Instalación
Paso 1 ....................................................................11
Paso 2 .....................................................................12
Paso 3 ....................................................................12
Paso 4 .....................................................................13
Paso 5 .....................................................................13
MODELOS DISPONIBLES
Café Pro Modelos:
CSB912P2NS1 – Acero Inoxidable CSB912P2VS1 – Acero Inoxidable
Café Min Modelos:
CSB912M2NS5 – Acero Inoxidable
Profile Modelos:
PSB9100SVSS – Acero Inoxidable
2 31-2000355 Rev. 4
Información de Diseños
DIMENSIONES Y ESPACIOS DE DESPEJE DEL PRODUCTO
NOTA: La apariencia variará según el modelo
26-3/4Ǝ
2-1/4Ǝ
1Ǝ
21-1/2Ǝ
1-1/4Ǝ
13 1/4Ǝ
20 1/4Ǝ
HERRAMIENTAS Y PIEZAS REQUERIDAS (NO SUMINISTRADAS)
Destornillador Phillips nº 2
Perforadora manual
7DODGURGHDOWDYHORFLGDGGLiPHWURGHƎ
'HVWRUQLOODGRUFRQSXQWD3KLOOLSVGHƎ
Nivel
Sierra
&RQWUDFKDSDGRSDUDSLVRGHXQPtQGHƎVLVH
requiere)
Tornillos de madera y otras herramientas para instalar el riel o el estante para sostener el horno (si se requiere)
Anteojos o gafas de seguridad
INSTALACIÓN DEL MONTAJE AL RAS (Monogram únicamente)
Este método de instalación permite que la cara de la unidad quede alineada con la cara del gabinete.
IMPORTANTE: SE REQUIERE UN NIVEL DE HABILIDAD ALTO EN CARPINTERÍA. Se podrán adquirir gabinetes no estándares.
La instalación al ras del horno hará que se expongan los extremos del marco de la cara del gabinete.
Los ristreles laterales podrán quedar visibles y deberán poseer una superficie acabada.
PLANIFICACIÓN ANTICIPADA
Estos hornos pueden ser instalados directamente en
un gabinete para horno de 30” de ancho, utilizando la instalación estándar.
Las dimensiones de altura de la abertura son diferentes para las instalaciones con un cajón de almacenamiento de accesorios. Asegúrese de usar el recorte correcto al preparar la abertura.
• Deje espacio en relación a las esquinas adyacentes,
paredes, cajones, etc.
• Las alacenas instaladas al lado de hornos de pared
deben tener una especificación de adhesión de potencia de temperatura de por lo menos 194°F.
El horno debe ser instalado de forma segura en un gabinete que esté adherido de manera firme a la estructura de la casa. Cualquier peso sobre la puerta del horno podrá hacer que éste se incline y se produzcan lesiones. Nunca permita que nadie se trepe, siente, pare ni cuelgue de la puerta del horno.
31-2000355 Rev.4 3
Preparación de la Instalación
REQUISITOS ELÉCTRICOS
Instalación Simple del Advantium horno
6”
empotrado
Este producto requiere un circuito de 120 voltios, 60 Hz, 15 amperes y consume 1.8 kilowatts. Este producto se debe conectar a un circuito con un suministro correcto de voltaje y frecuencia.
• El tamaño del cable deberá ser conforme a los requisitos del Código Eléctrico Nacional o del código local obligatorio con relación a la cantidad de kilowatts.
• El cable y el enchufe de suministro de corriente se deberán conectar al tomacorriente simple con conexión a tierra de un disyuntor de entre 15 y 20 amperes. La caja del tomacorriente deberá ser ubicada dentro del alcance del cable de corriente de 48”.
Ubique la caja del tomacorriente en el área sombreada.
9”
Instale un tomacorriente eléctrico empotrado en la pared trasera de la abertura, dentro de las 6” de cualquiera de los lados y a por los menos 9” sobre el piso del recorte.
INSTRUCCIONES DE CONEXIÓN A TIERRA
ADVERTENCIA
descargas eléctricas.
Asegúrese de contar con una conexión a tierra adecuada antes de usar.
Este electrodoméstico está equipado con un cable de corriente que posee un cable de conexión a tierra con un enchufe a tierra. El enchufe se deberá conectar en un tomacorriente instalado y conectado a tierra de forma adecuada.
Consulte a un electricista calificado o al personal del servicio técnico en caso de que las INSTRUCCIONES DE CONEXIÓN A TIERRA no se entiendan completamente o si tiene dudas sobre si el electrodoméstico está conectado a tierra de forma apropiada.
En caso de contar con un tomacorriente de pared estándar de 2 cables, es su responsabilidad y obligación reemplazarlo por un tomacorriente de pared de 3 cables correctamente conectado a tierra.
El uso inadecuado del enchufe de conexión a tierra puede provocar riesgos de
Este electrodoméstico deberá estar conectado a tierra. En caso de que se produzca un cortocircuito, la conexión a tierra reduce el riesgo de descarga eléctrica, brindando un cable de salida de la corriente eléctrica.
Bajo ninguna circunstancia corte o elimine el tercer cable (tierra) del cable de corriente.
Se brinda un cable de corriente corto para reducir riesgos que puedan resultar de enredos o tropiezos con un cable más largo.
No use un prolongador. Si el cable de corriente es demasiado corto, solicítele a un electricista o a personal del servicio técnico calificado la instalación de un tomacorriente cerca del electrodoméstico.
Para un mejor funcionamiento, conecte este electrodoméstico en su tomacorriente eléctrico a fin de evitar parpadeos de las luces, explosión del fusible o desactivación del disyuntor.
4 31-2000355 Rev. 4
Preparación de la Instalación Estándar
PREPARACIÓN DE LA ABERTURA
El Advantium puede ser instalado junto con otros electrodomésticos. Siempre siga las instrucciones de instalación de cada producto, a fin de completar la
instalación.
Instalación Simple del Advantium
Ordene un gabinete de horno simple de 30” de ancho o recorte la abertura en una pared siguiendo las dimensiones
mostradas.
27 o 30”
17-1/2”
36-3/4”
Min.
23-1/2”
25-1/4”
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
PREPARACIÓN DE LA ABERTURA
Instalación sobre un Cajón para Calentar:
27 o 30”
17-1/2”
Mín. de
36 ¾”
NOTA: Se podrán requerir despejes adicionales entre los recortes. Asegúrese de que los soportes del horno sobre la ubicación del Cajón para Calentar no obstruyan la profundidad y altura internas requeridas. Para más detalles, consulte las instrucciones de instalación del Cajón para Calentar.
(CONT.)
23-1/2”
25-1/4”
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 2” (3” Recomendado)
De acuerdo con los requisitos sobre el Cajón para Calentar
Deje los siguientes espacios libres alrededor de la
• abertura sobre la superficie frontal del gabinete: 1 7/8” desde la parte superior, 2 3/8” desde los extremos laterales, y 1 1/8” desde la parte inferior. (Nota: los mismos se refieren a los espacios libres mínimos requeridos para la instalación y no reflejan las dimensiones reales del producto).
• Las superposiciones del horno ocultarán los extremos cortantes sobre todos los costados de la abertura. Cuando se instale sobre un horno simple o sobre un cajón para calentar, deje por lo menos 2” entre las dos aberturas. Esta separación brindará espacio entre la superposición inferior del Advantium y las superposiciones de los demás electrodomésticos.
• El soporte debe estar nivelado y montado de forma rígida, al ras con el extremo inferior de la abertura.
31-2000355 Rev.4 5
Preparación para la Instalación Estándar
PREPARACIÓN DE LA ABERTURA
Instalación sobre un horno de pared:
27 o 30”
17-1/2”
Mín. de
45 ¼”
* Si reemplazará un horno eléctrico doble por la
instalación combinada de un Advantium y un horno simple, use las dimensiones mostradas. Es posible que el riel intermedio que separa las dos aberturas deba ser más largo que el de un mínimo de 2” mostrado.
(CONT.)
23-1/2”
25-1/4”
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 2” (3” Recomendado)
De Acuerdo con los Requisitos del Horno
PREPARACIÓN DE LA ABERTURA
Instalación sobre un horno de pared y un cajón calentador:
27 o 30”
17-1/2”
45-1/4”
NOTA: Se podrán requerir despejes adicionales entre los recortes. Asegúrese de que los soportes del horno sobre la ubicación del Cajón para Calentar no obstruyan la profundidad y altura internas requeridas. Para más detalles, consulte las instrucciones de instalación del Cajón para Calentar.
(CONT.)
23-1/2”
25-1/4”
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 2” (3” Recomendado)
De Acuerdo con los Requisitos del Horno
Mín. de 2” (3” Recomendado)
De acuerdo con los requisitos sobre el Cajón para Calentar
PRECAUCIÓN
Para su seguridad personal, la
superficie de instalación deberá poder soportar la carga del gabinete, además del peso agregado del horno y el cajón, sumado esto a las cargas adicionales del horno.
6 31-2000355 Rev. 4
Preparación para la Instalación Estándar
PREPARACIÓN DE LA ABERTURA (cont.)
Instalación sobre otro horno incorporado Advantium:
27 o 30”
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
17-1/2Ǝ
• Si montará un horno de Velocidad de Cocción Incorporado sobre otro, use las dimensiones mostradas. Es posible que el riel intermedio que separa las dos aberturas deba ser más largo que el de un mínimo de 3-1/8” mostrado.
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 3 1/8” (4 1/8” Recomendado)
PREPARACIÓN DE LA ABERTURA (cont.)
Instalación debajo de un horno de microondas y sobre un cajón calentador:
Construya un
27 o 30”
23-1/2Ǝ
25-1/4Ǝ
De Acuerdo con
los Requisitos del
Horno Microondas
17-1/2Ǝ
De acuerdo con los requisitos sobre el Cajón para Calentar
NOTA: Se podrán requerir despejes adicionales entre los recortes. Asegúrese de que los soportes del horno sobre la ubicación del Cajón para Calentar no obstruyan la profundidad y altura internas requeridas. Para más detalles, consulte las instrucciones de instalación del Cajón para
Calentar.
fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 3.5” (4.5” Recomendado)
Mín. de 2” (3” Recomendado)
PRECAUCIÓN
soportar la carga del gabinete, además del peso agregado del horno y el cajón, sumado esto a las cargas adicionales del horno.
31-2000355 Rev.4 7
Para su seguridad personal, la
superficie de instalación deberá poder
Preparación para la Instalación Estándar
PREPARACIÓN DE LA ABERTURA (cont.)
Instalación al lado de otro horno incorporado:
• Si montará un horno de Velocidad de Cocción Incorporado junto a otro, use las dimensiones mostradas. Es posible que el riel intermedio que separa las dos aberturas deba ser más largo que el de un mínimo de 4 ½” mostrado.
17-1/2Ǝ
PREPARACIÓN DE LA ABERTURA (cont.)
25-1/4Ǝ
23-1/2Ǝ
25-1/4Ǝ
17-1/2Ǝ
Mín. de 4 ½” (5 ½” Recomendado)
Instalación debajo de una Superficie de Cocción o Mesada de 30” o 36”:
Las superficies de cocción a gas o eléctricas podrán ser instaladas sobre este horno. Para conocer el tamaño de la abertura, consulte las instrucciones de instalación de la superficie de cocción. Consulte la etiqueta en la parte superior del horno para conocer los modelos con superficie de cocción aprobados. Este horno requiere un suministro de corriente aparte, adecuadamente conectado a tierra de 15 amperes, 120 voltios y 60 Hz. La superficie de cocción requiere un sumistro de corriente aparte. Use un gabinete de 30” o con una base más ancha.
Mín de 1 ½”
25Ǝ
36Ǝ Altura
de la Mesada
Ǝ
Altura de la superficie de cocción, incluyendo la profundidad de la caja eléctrica en algunos modelos. Consulte las instrucciones de Instalación de la superficie de cocción. No se requiere ningún espacio de despeje mínimo entre la superficie de cocción y el horno.
23-1/2
Ǝ
Superficie
de cocción
Superficie
de cocción
17-1/2
25-1/4Ǝ
Zócalo
de 4” de
Altura
8 31-2000355 Rev. 4
Preparación de la Instalación para el Montaje al Ras
(Monogram Únicamente)
PREPARE EL INTERIOR
Corte e instale los ristreles laterales:
• Corte los ristreles de madera laterales a la altura de la abertura del gabinete y a aproximadamente 2 1/2” de profundidad. Instale, a cada lado, la Dim. E desde la cara frontal del gabinete.
Corte e instale el ristrel inferior:
• Corte el ristrel de madera inferior hasta una altura de 1 1/8”, una profundidad del gabinete menos la Dim. E y un ancho de 25 ¼” para que encaje entre los ristreles laterales. Realice la instalación sobre el piso del gabinete entre los ristreles laterales, empuje totalmente hacia atrás contra la pared del gabinete y asegúrese de que su cara frontal se alinee con las caras frontales de los ristreles laterales (brecha de la Dim. E desde la cara del gabinete frontal).
A
A
PREPARACIÓN DE LA ABERTURA
El Advantium puede ser instalado junto con otros electrodomésticos. Siempre siga las instrucciones de instalación de cada producto, a fin de completar la instalación.
Instalación Simple de Advantium 120
Corte la abertura en un gabinete siguiendo las dimensiones mostradas.
*Consulte la siguiente tabla para conocer las fugas deseadas a los costados.
**20-1/2”
0tQGHƎ
F *
Horno o cajón para calentar
Construya un fondo sólido, sostenido por un contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Mín. de 2” (3” recomendado)
Especificaciones por electrodoméstico
C
B
A rofundidad de los ristre-
les lateral y superior
B Altura del ristrel inferior 1-1/8” C Profundidad del ristrel
inferior
D Ancho del ristrel inferior 25-1/4” E Profundidad de inserción
de los cuatro ristreles
0tQGHƎ
Profundidad del gabinete menos la Dim. E
1 1/4”
D
C
VISTA
SUPERIOR
D
E
Mín. de
36 ¾”
• El soporte debe estar nivelado y montado de forma rígida, al ras con el extremo inferior de la abertura.
Instalación al Ras Aprobada
Advantium Simple Sobre el Cajón para Calentar Sobre el Horno Sobre el Horno y el Cajón para
Calentar Sobre el Horno con Velocidad de
Cocción Incorporada Advantium Doble (lado a lado)
'HEDMRGHOD6XSHU¿FLHGH&RFFLyQR
de la Mesada
Dimensión F
Fuga de 1/8” Fuga de 1/4”
27” 27-1/4” 27” 27-1/4” 27” 27-1/4” 27” 27-1/4
27” 27-1/4
Lea la página 10 Lea la página 10
A A
Cara Frontal del Gabinete
** Las fugas superior e inferior están configuradas en
1/8”.
EE
31-2000355 Rev.4 9
Preparación de la Instalación para el Montaje al Ras
(Monogram Únicamente)
PREPARACIÓN DE LA ABERTURA
El Advantium puede ser instalado junto a otro Advantium combinando uno al lado del otro.
Instalación del Advantium Doble:
Corte la abertura en un gabinete siguiendo las dimensiones mostradas.
• El divisor central actúa como un ristrel para el lado de cada unidad respectiva. Sólo un ristrel lateral adicional es necesario de acuerdo con la abertura del horno.
• El soporte debe estar nivelado y montado de forma rígida, al ras con el extremo inferior de la abertura.
G* H*
I*
20-1/2”
Mín. de 23-1/2”
I*
1-3/8”
*Consulte la tabla para conocer las fugas nece­sarias a los costados y entre la unidad.
Dimensión Fuga de 1/8” Fuga de 1/4”
G 53-7/8” 54-1/4”
H 1-5/8” 1-3/4”
I 26-1/8” 26-1/4”
Mín. de
36-3/4”
Construya un fondo sólido, sostenido por contrachapado de un mínimo de 3/8” sobre los cuatro lados. Deberá poder sostener el peso del horno y sus contenidos.
Instalación debajo de una Superficie de Cocción o Mesada de 30” o 36”:
Las superficies de cocción a gas o eléctricas podrán ser instaladas sobre este horno. Para conocer el tamaño de la abertura, consulte las instrucciones de instalación de la superficie de cocción. Consulte la etiqueta en la parte superior del horno para conocer los modelos con superficie de cocción aprobados. Este horno require un suministro de corriente aparte, adecuadamente conectado a tierra de 15 amperes, 120 voltios y 60 Hz. Use un gabinete de 30” o con una base más ancha.
Mín de 1-1/2Ǝ
Superficie
de cocción
Superficie
de cocción
25Ǝ
Altura de
la Mesada
de 36”
20-1/2”
J*
Altura de la superficie de cocción, incluyendo la profundidad
23-1/2
Zócalo
de 4” de
Altura
Ǝ
NOTA: Sólo se aprueba la instalación de este horno de acuerdo con los modelos específicos que aparecen etiquetados en esta unidad.
de la caja eléctrica en algunos modelos. Consulte las instrucciones de Instalación de la superficie de cocción. No se requiere ningún espacio de despeje mínimo entre la superficie de cocción y el horno.
*Consulte la siguiente tabla para conocer las fugas deseadas a los costados.
Dimensión Fuga de
1/8”
J 27” 27-1/4”
Fuga de
1/4”
10 31-2000355 Rev. 4
Instrucciones de Instalación
1
RETIRE EL EMBALAJE Y LAS PIEZAS
• Retire todo el material de embalaje y la cinta.
• Ubique el paquete de piezas que contiene los tornillos de montaje.
• Retire el horno del cartón. No levante la unidad de la manija ni del conducto. Es necesario que el horno sea levantado por dos personas.
• Abra la puerta y retire cualquier embalaje que haya dentro del horno.
Owner’s Manual
5 Tornillos del Mismo
Color
(4 requeridos, 1
adicional)
Tornillos de cabeza plana
(4 adicionales)
6 Tornillos de Latón para la
Moldura Inferior
(3 requeridos, 3 adicionales)
Manual del Propietario
Bandeja de Vidrio
Bandejas de Metal (2)
(No se incluye con modelos
CWB7030 y PWB7030)
Instrucciones
de Instalación
Cooking Guide
Guía de Cocción
Anillo del Plato Giratorio
Ajuste inferior
IMPORTANTE: Si instalará el Horno Advantium
con un cajón de almacenamiento de accesorios, lea las instrucciones de ensamble del cajón de almacenamiento para ensamblar los productos juntos, antes de proceder al paso 2.
Estante
31-2000355 Rev.4 11
Instrucciones de Instalación
2
DESLICE EL HORNO POR LA ABERTURA
PRECAUCIÓN
la abertura. Se deberá tomar la parte inferior sobre la parte frontal y trasera. NO USE LA MANIJA PARA LEVANTAR EL HORNO. SE PRODUCIRÁN DAÑOS.
Se requiere contar con dos personas para colocar el horno en
3
INSTALE LA MOLDURA INFERIOR
• Alinee las lengüetas del borde inferior con las ranuras en la parte inferior del horno.
• Asegure la moldura inferior a la parte inferior del horno utilizando 3 tornillos de latón proporcionados
Levante y sostenga el horno desde el frente de la abertura. Sostenga el horno en un ángulo y enchufe el cable de corriente.
Con cuidado, deslice el horno sólo hasta una parte dentro del gabinete. Deje el horno a unas pocas pulgadas delante de la estructura del gabinete.
• Asegúrese de que el cable de corriente no quede atrapado debajo del horno ni a lo largo de los costados del horno.
12 31-2000355 Rev. 4
Instrucciones de Instalación
4
INSTALACIÓN DE LOS TORNILLOS DE MONTAJE
Deslice el horno por el resto del recorrido hasta la
abertura, de modo que las pestañas laterales y el panel de control queden contra la estructura del gabinete. Asegúrese de que el horno quede centrado en la abertura.
Abra la puerta, coloque una bandeja giratoria en el
horno y asegúrese de que la misma quede nivelada en la unidad.
Haga agujeros piloto a través de las pestañas
laterales.
Coloque los tornillos del mismo color en las pestañas
laterales. Se recomienda que los tornillos sean ajustados de forma manual.
5
FINALIZACIÓN DE LA INSTALACIÓN
Presione el encendido. La luz interna se deberá
encender cuando la puerta se abra.
Para acceder a instrucciones de uso, consulte el Manual del Propietario.
31-2000355 Rev.4 13
NOTA: Al realizar las instalaciones descriptas en este libro, se deberán usar anteojos o gafas de seguridad.
NOTA: GE Appliances se esfuerza de forma constante para mejorar sus productos. Por lo tanto, los materiales, el aspecto
Impreso en China
y las especificaciones están sujetos a cambios sin aviso previo.
14 31-2000355 Rev. 4
Loading...