B&W Trailer Hitches 1400R User Manual

B&W Trailer Hitches
1216 Hawaii Road / PO Box 186 Humboldt, KS 66748
620.473.3664
800.248.6564 Fax: 620.473.3766
NOTE: We recommend reading instructions before beginning the installation. WARNING: The tow vehicle’s towing capacities should under NO circumstances be exceeded.
TurnoverballTM Gooseneck Hitch Installation Instructions
Call or E-mail for installation support
Model 1400R
Chevrolet & GMC (1973 - 1987)
1/2 - 3/4 - 1 Ton Trucks
hitches@turnoverball.com www.turnoverball.com
Mounting Kit Box (GNRK1400)
ITEM DESCRIPTION QTY
1 Center Assembly 1
2 2-5/16” Ball 1
Mounting Kit Bolt Bag
1/2" X 1-1/2" Carriage Bolt 4
1/2” Finish Nut 4
1/2” Lock Washer 4
1/2" Flat Washer 4
Safety Chain Kit Bolt Bag
3 1/2" U-Bolt 2
4 Conical Springs 4
5 1/2" Lock Nut 4
5/16" X 3/4" Carriage Bolt 1
5/16" X 3/4" Cap Screw 1
5/16" Flange Nut 1
NOTICE: This product was designed to t vehicles in their original, “as manufactured” condition. Compatibility with vehicles having replacement parts, or other modications is not guaranteed. Inspect vehicle for modications before installation of this product.
BEFORE INSTALLING
OVERHEAD LIFTING DEVICE
An overhead-lifting device, such as chain falls, engine hoist, or cable come-a-long, can be used to lift the center section of the hitch in place. Lower a loop of rope or chain
through the 4” hole in the truck bed oor and attach it to the latch pin in the round hitch
until the round hitch receiver tube that protrudes from the center section ts in the 4” hole in the truck bed oor. Maintaining upward pressure may facilitate fastening the crossmember to the center section, especially if the truck bed oor has been distorted downward from heavy use. If you use an overhead-lifting device, it should be discon-
nected before squaring the center section across the frame, installing the sideplates and torquing fasteners.
WARNING
Most trucks have FUEL LINES and/or BRAKE LINES and/or ELECTRICAL WIRES located along the frame rails where B&W Turn­overball™ hitches install. Carefully examine the location of fuel lines, brake lines and electrical wires BEFORE INSTALLATION. Be certain you will not damage fuel lines, brake lines or electrical wires when positioning hitch components, drilling holes, tightening fasteners, and lifting and lowering the truck bed. The fuel tank vent, located on top of the gas tank, can be easily damaged during the installation of the hitch components. Care must be taken when positioning the front crossmember and
center section components.
Warning
On Short bed trucks, BEFORE INSTALLING THIS HITCH, check for adequate turning clearance between the front of all of your
trailers and the truck cab.
Warning
DO NOT invert the ball in the socket when carrying heavy loads on 2 wheel drive trucks. The ball may hit the top of the dif- ferential. Remove the ball from the socket before loading. A plug for the socket is available from B & W.
INSTALLATION INSTRUCTIONS
STEP ONE
Mark a 4” round hole on the topside of the truck bed oor. Center the hole between the wheel wells and 49 ½” to the center of the hole from the back edge of the truck bed. Drill a small hole inside the marked area and cut out the circle using a saber saw with a metal cutting blade or a 4” hole saw.
STEP TWO
Loosen, but do not remove, the passenger’s side bed bolts. Remove all remaining bed bolts. (Loosen or remove running board or other equipment fasteners that would prevent lifting the truck bed off the frame.) Raise the driver’s side of the truck bed approximately 4” by jacking against the truck bed oor in front of the wheel well. (Be cautious of fuel ller hoses and electrical wiring.)
STEP THREE
With the latch pin mechanism on the driver’s side, position the hitch receiver assembly across the top of the frame rails. Slowly lower the truck bed, aligning the hitch receiver tube that protrudes from the hitch receiver assembly to t through the round 4” hole in the truck bed oor. Replace the bed bolts. Square the hitch receiver assembly across the frame. Check truck bed
alignment with the cab, and tighten the bed bolts.
STEP FOUR
Fastening the hitch receiver assembly to the truck frame requires drilling four 9/16” holes through the truck bed oor, hitch receiver assembly and truck frame rails. To locate the holes, mark a line, squared across the truck bed oor, through the center of the round hitch receiver tube. Mark the location on the line 15 ¾”from the center of the round hitch receiver tube on each side. (If these locations are in a raised corrugation in the truck bed oor, insert a metal shim of the correct thickness between the hitch receiver assembly and the truck bed oor in the raised corrugation.) Mark a hole location 3” above the line and 3” below the line at these locations. Verify that these locations are near the center of the frame rails, and carefully examine fuel lines, brake lines, and electrical wiring to assure adequate clearance. Mark, DOUBLE CHECK and center punch
these hole locations. To maintain proper alignment use the following procedure, one hole at a time: First, drill a ¼” pilot hole,
then drill a 9/16” hole through the pilot hole, and drop the bolt in the hole. When all holes have been drilled, use a at washer,
lock washer and tighten a nut on each bolt. Seat the square bolt shank of the bolts with several sharp hammer blows to the
bolt heads. Finally, torque the fasteners to 90 ft. lbs.
STEP FIVE
To install the safety chain brackets it is necessary to drill four ½” holes through the truck bed oor and the hitch receiver assembly. Mark a location on the line, squared across the truck bed oor, centered through the round hitch receiver tube 6
¼” from the center of the round hitch receiver tube on each side. These locations should be in a low section of the corrugated
bed oor. Mark a hole location 1” above the line and 1” below the line at these locations. Center punch these hole locations and drill ¼” pilot holes through the truck bed oor and hitch receiver assembly. Complete by drilling ½” holes through the pilot holes. Drop a safety chain bracket (U-bolt) through each pair of holes from the topside of the truck bed oor. Place a
spring and lock nut on each of the four legs. Tighten the lock nuts until ¼” of threads extends through the lock nut.
STEP SIX
Retract the latch pin by pulling the handle all the way out and sliding it to the left. Place the 2-5/16” ball in the hitch receiver. Engage the latch pin by moving the handle to the right and in. Be certain the latch pin passes through the hole and the 2-5/16” ball and fully engages through the hitch receiver. Repeat this process with the 2-5/16” ball in all eight positions. Grease the
square base of the 2-5/16” ball.
Copyright 2014 B&W Custom Truck Beds, Inc. ALL RIGHTS RESERVED
1400R - 05 01 2014
Loading...