Bunn Coffee Maker TU3Q-EZ Installation Manual

BUNN
®
TU3Q-EZ
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
TELEPHONE: (217) 529-6601 FAX: (217) 529-6644
29460.0000C 8/00 © 1999 Bunn-O-Matic Corporation
CONTENTS
Introduction .............................................................. 2
Warranty ................................................................... 2
User Notices ............................................................. 3
Electrical Requirements ............................................ 4
Plumbing Requirements ........................................... 4
Initial Set-Up............................................................. 5
Operating Controls.................................................... 6
Cleaning.................................................................... 6
Tea Brewing .............................................................. 6
Adjustments and Optional Settings........................... 7
Troubleshooting ........................................................ 8
Service.................................................................... 14
Wiring Schematic ................................................... 22
INTRODUCTION
This equipment will brew a three-gallon batch of fresh tea into an awaiting dispenser. The tea will be dispensed at
approximately room temperature to conserve ice. The brewer is only for indoor use on a sturdy counter or shelf.
WARRANTY
Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from defects in material and workmanship existing at the time of manufacture and appearing within one year from the date of installation. In addition:
1.) Bunn warrants electronic circuit and/or control boards to be commercially free from defects in material and work-
manship for two years from the date of installation.
2.) Bunn warrants the compressor on refrigeration equipment to be commercially free from defects in material and
workmanship for two years from the date of installation.
3.) Bunn warrants that the grinding burrs on coffee grinding equipment will grind coffee to meet original factory screen
sieve analysis for three years from date of installation or for 30,000 pounds of coffee, whichever comes first.
This warranty does not apply to any equipment, component or part that was not manufactured by Bunn or that, in Bunns judgement, has been affected by misuse, neglect, alteration, improper installation or operation, improper mainte­nance or repair, damage or casualty.
THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of Bunn are not authorized to make
modifications to this warranty or to make additional warranties that are binding on Bunn. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.
The Buyer shall give Bunn prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Office Box 3227, Springfield, Illinois, 62708-3227. If requested by Bunn, the Buyer shall ship the defective equipment prepaid to an authorized Bunn service location. If Bunn determines, in its sole discretion, that the equipment does not conform to the warranty, Bunn shall repair the equipment with no charge for parts during the warranty period and no charge for labor by a Bunn Authorized Service Representative during the warranty period. If Bunn determines that repair is not feasible, Bunn shall, at its sole option, replace the equipment or refund the purchase price for the equip­ment.
THE BUYERS REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AS SPECIFIED HEREIN, TO REPAIR OR, AT BUNNS SOLE OPTION, REPLACEMENT OR REFUND.
In no event shall Bunn be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyers customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.
Page 2
29460 061599
USER NOTICES
Carefully read and follow all notices on the equipment and in this manual. They were written for your protec-
tion. All notices on the equipment should be kept in good condition. Replace any unreadable or damaged labels.
#00831.0000
#00656.0000
#03408.0000
#03409.0000
Page 3
29460 061599
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in
120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.
Proceed as follows:
Electrical Hook-Up
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage at the electrical source.
3. Connect the brewer to the power source.
4. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for
Initial Set-Up
.
Initial Set-Up.
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90 psi (620 kPa) from a 1⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 1⁄4" flare.
NOTE - Bunn-O-Matic recommends 1⁄4" copper tubing for installations of less than 25 feet and 3⁄8" for more than 25 feet from the 1⁄2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the
Building Officials and Code Administrators International, Inc. (BOCA)
and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).
Page 4
29460 061599
PLUMBING REQUIREMENTS (cont.)
P1804
1. Remove the shipping cap from the bulkhead fitting on the rear of the brewer.
2. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the water inlet fitting at the rear of the brewer.
3. Flush the water line and securely attach it to the flare fitting on the strainer/flow control.
4. Turn on the water supply.
INITIAL SET-UP
CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails.
2. Place an empty container of at least 4 gal. capacity under the funnel.
3. Connect the brewer to the power source.
4. Place the "ON/OFF" switch in the "ON" position and momentarily press the "START" switch.
5. Water will flow into the tank and dispenser for approximately three and one-half minutes. Empty the dis­penser when the first cycle stops and press the "START" switch again. Empty the dispenser when the second cycle stops and press the "START" switch once more. During the third cycle, the tank will fill to its capacity and the excess will flow from the brew funnel into the dispenser. Empty the dispenser when this third cycle stops.
6. Wait approximately twenty minutes for the water in the tank to heat to the proper temperature.
7. Place the "ON/OFF" switch in the "ON" position then momentarily press and release the "START" switch.
8. Allow the cycle to finish and measure the amount of water in the container. It should be 396 ounces ± 2. Refer
to
Adjustments & Optional Settings
The brewer is now ready for use in accordance with the
to adjust the water volume, if needed..
Tea Brewing
instructions.
Page 5
29460 082300
OPERATING CONTROLS
A. ON/OFF Switch
ON - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three gallons
of tea.
OFF - Placing the switch in the right position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank syphons down to its proper level. The switch should
always be placed in this position after a brew cycle and whenever the brewer is unattended.
B. Start Switch Starts a brew cycle when the ON/OFF switch is in the "ON" position.
C. Ready Indicator This indicator glows when preselected brew water temperature has been achieved. It is also used for diagnostic testing of brewer.
CLEANING
CAUTION - CLEAN AND SANITIZE YOUR ICED TEA BREWER DAILY
1. Remove and thoroughly clean the entire brew funnel. The funnel tip and screen must be free from any tea particles or residue. Reassemble the funnel.
2. Place the ON/OFF switch in the "OFF" position. Remove and thoroughly rinse the sprayhead. The holes must be open and clear of any mineral deposits. Wipe the sprayhead panel clean with a damp cloth.
3. Insert the deliming spring into the sprayhead fitting until no more than two inches is visible and move it in and out 5 or 6 times. Reattach the sprayhead.
4. Wash the entire outside surface of the brewer with a clean damp cloth.
CAUTION - DO NOT KEEP BREWED ICED TEA OVERNIGHT. THE SERVER MUST BE CLEANED DAILY.
TEA BREWING
1. Begin each brew cycle with a clean empty brew funnel and server. (Be sure the server lid doesnt interfere with the flow of dilution water.)
2. Insert a BUNN® filter into the funnel.
3. Pour the packet of loose fresh tea leaves into the filter. Approximately four ounces is recommended.
4. Level the bed of tea leaves by gently shaking.
5. Slide the funnel into the funnel rails until it stops.
6. Place the ON/OFF switch in the "ON" position.
7. Momentarily press the start switch.
CAUTION - The funnel contains hot liquids. Remove funnel slowly.
8. Carefully remove the brew funnel and discard the used filter when tea no longer drips from the funnel tip.
9. Place the ON/OFF switch in the "OFF" position to prevent a false start.
10. Fresh tea is available at the faucet.
Page 6
29460 061599
TU3Q-EZ ADJUSTMENTS & OPTIONAL SETTINGS
P1864
P1901
Adjusting Total Volume
BREW VOLUME SET-UP: Use the following steps when
setting up the brewer for the first time.
1. Place an empty funnel in the funnel rails and an empty vessel of at least 4 gallons beneath the funnel.
Page 7
2. Place the "ON/OFF" switch in the "ON", up­per position.
3. Press and hold the brew start switch until you hear the brew solenoid click on-and­off three times (approximately 5 seconds). Release the switch immediately. Failure to release the switch within 2 seconds of the third click causes the volume setting to be aborted and the previous volume setting will remain in memory
4. Allow the cycle to continue until the desired amount of water is dispensed and then turn "OFF" the brewer.
The brewer is now set to dispense this amount of water for each subsequent brew cycle.
To increase the amount of water for each
cycle place an empty funnel in the funnel rails and an empty vessel of at least 4 gallons be­neath the funnel. Place the "ON/OFF" switch in the "ON", upper position. Press and hold the "START" switch until you hear the solenoid click on-and-off three times (approximately 5 seconds), then release the "START" switch immediately. Failure to release the switch within 2 seconds of the third click causes the volume setting to be aborted and the previ­ous volume setting will remain in memory. Momentarily press and release the "START" switch once for each 3.2 ounces (approximate) of water to be added to the prior setting and allow the cycle to finish.
To decrease the amount of water for each
cycle place an empty funnel in the funnel rails and an empty decanter or graduated vessel beneath the funnel. Place the "ON/OFF" switch in the "ON", upper position. Momentarily press and release the "START" switch once for each
3.2 ounces (approximate) of water to be re-
moved from the existing setting. Press and hold the "START" switch until you hear the solenoid click on-and-off three times (approxi­mately 5 seconds), then release the "START" switch immediately (failure to release the switch within 2 seconds of the third click causes the volume setting to be aborted and the previous volume setting will remain in memory) and allow the cycle to finish.
29460 061599
Loading...
+ 15 hidden pages