Bunn-O-Matic Corp. (“Bunn”) warrants the equipment manufactured by it to be commercially free from defects
in material and workmanship existing at the time of manufacture and appearing within one year from the date of
installation. In addition:
1.) Bunn warrants electronic circuit and/or control boards to be commercially free from defects in material and
workmanship for three years from the date of installation.
2.) Bunn warrants the compressor on refrigeration equipment to be commercially free from defects in material
and workmanship for two years from the date of installation.
3.) Bunn warrants that the grinding burrs on coffee grinding equipment will grind coffee to meet original factory
screen sieve analysis for three years from date of installation or for 30,000 pounds of coffee, whichever comes first.
This warranty does not apply to any equipment, component or part that was not manufactured by Bunn or that,
in Bunn’s judgement, has been affected by misuse, neglect, alteration, improper installation or operation, improper
maintenance or repair, damage or casualty.
THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR
ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of Bunn are
not authorized to make modifications to this warranty or to make additional warranties that are binding on Bunn.
Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not
be relied upon.
The Buyer shall give Bunn prompt notice of any claim to be made under this warranty by telephone at (217)
529-6601 or by writing to Post Office Box 3227, Springfield, Illinois, 62708-3227. If requested by Bunn, the Buyer
shall ship the defective equipment prepaid to an authorized Bunn service location. If Bunn determines, in its sole
discretion, that the equipment does not conform to the warranty, Bunn shall repair the equipment with no charge
for parts during the warranty period and no charge for labor by a Bunn Authorized Service Representative during
the warranty period. If Bunn determines that repair is not feasible, Bunn shall, at its sole option, replace the
equipment or refund the purchase price for the equipment.
THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE
OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AS
SPECIFIED HEREIN, TO REPAIR OR, AT BUNN’S SOLE OPTION, REPLACEMENT OR REFUND.
In no event shall Bunn be liable for any other damage or loss, including, but not limited to, lost profits, lost sales,
loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute
equipment, facilities or services, or any other special, incidental or consequential damages.
#00831.0000
USER NOTICES
Page 2
#00658.0000
29251 042301
USER NOTICES (Continued)
#00656.0000
#00882.0000
#02763.0000
#02765.0000
#02769.0000
Page 3
29251 101598
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specified in
Model 15 has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single
phase, 60 Hz.
Initial Set-Up.
WHITE
NEUTRAL
L1 BLACK
120V.A.C.
P2185
Model 20 requires 2wire, grounded service
rated 120 volts ac, 20
amp, single phase, 60 Hz.
Proceed as follows:
L2 RED
WHITE
NEUTRAL
L1 BLACK
120V A.C.
120V A.C.
208 or
240V.A.C.
P1841
Model 35 requires 3-
wire, grounded service
rated 120/208 or 120/240
volts ac, 20 amp, single
phase, 60 Hz. Proceed as
follows:
P2193
“A" & "B” models re-
quire 2-wire, grounded
service rated 200 volts ac
or 240 volts ac, 20 amp,
single phase, 50 Hz. Proceed as follows:
WHITE
NEUTRAL
L1 BLACK
100V.A.C.
P2185
"SDB” model requires
2-wire, grounded service
rated 100 volts ac, 20
amp, single phase, 50 Hz.
Proceed as follows:
1.An electrician must provide electrical service as specified.
2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3.Before electrically connecting the brewer, remove the front and rear panel and rotate the thermostat knob fully
counterclockwise to the "OFF" position. Keep this knob in the "OFF" position until performing the "Initial Set-Up"
4.Feed the power cord through the strain relief and connect it to the terminal block.
5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
(Models S and ST-15 have cord attached. Replace all panels.
6.If plumbing is to be hooked-up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked-up, the brewer is ready for "Initial Set-Up".
NOTE: Schematic wiring diagrams are included in this manual.
PLUMBING REQUIREMENTS
Models S & SA:
These models are completely portable and require no attached plumbing.
Models ST, STA, STF & STFA
These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a 1⁄2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install
a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water
inlet fitting is 1⁄4" flare.
NOTE - Bunn-O-Matic recommends 1⁄4" copper tubing for installations of less than 25 feet and 3⁄8" for more than
25 feet from the 1⁄2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the Building
Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation
Manual of the Food and Drug Administration (FDA).
Page 4
29251 011800
INITIAL SET-UP
CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
1.Insert an empty funnel into the funnel rails.
2.Place an empty dispenser under the funnel.
3.Remove the front or rear panel and turn the thermostat knob to the “OFF” position and connect the brewer
to the power source.
4.Fill the tank with water as directed:
4A. Models S & SA:
Pour three pitchers of tap water into the screened area on top of the brewer. Allow approximately two minutes
between pitchers for water to flow into the tank. While the third pitcher of water is entering the tank, the tank
will fill to capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
4B. Models ST, STA:
Connect the brewer to the power source, place the "ON/OFF" switch in the "ON" upper position, and
momentarily press and release the start switch. Water will begin flowing into the tank. When water stops
flowing into the tank, initiate a second and a third brew cycle. During the third brew cycle the tank will fill to
its capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
4C. Models STF & STFA
Brewers will fill automatically when lower ON/OFF switch is placed in the "ON" position and tank will fill to
capacity.
5.When the flow of water from the funnel stops, turn the thermostat knob to the “ON” position and wait
approximately twenty minutes for the water in the tank to heat to the proper temperature. Some water will
drip from the funnel during this time; this is due to expansion and should not occur thereafter.
6.Empty the dispenser and initiate another brew cycle as directed:
6A. Models S & SA:
Pour one pitcher of tap water into the screened area on top of the brewer.
6B. Models ST, STF, STA & STFA:
Place the "ON/OFF" switch in the "ON" upper position, and momentarily press and release the start switch.
7.Place the "ON/OFF" switch in the lower “OFF” position after water has stopped flowing from the funnel, and
let the water in the tank reheat to the proper temperature.
8.Empty the dispenser and proceed as directed:
8A. Models S & SA:
The brewer is now ready for use in accordance with the coffee brewing instructions on the next page.
8B. Models ST, STF, STA & STFA:
Place the "ON/OFF" switch in the "ON" upper position, and momentarily press and release the start switch.
Check the water volume in the dispenser after water has stopped flowing from the funnel. It should be 64
ounces.
9.If not, disconnect the brewer from the power source. On early models remove the access panel. Adjust the
timer as required (see service section). Replace the panel, connect the brewer to the power source, and allow
the water to reheat, start, and measure another brew cycle.
10. Repeat step 9 until 64 oz water volume is achieved.
11. The brewer is now ready for use in accordance with the coffee brewing instructions on the next page.
Page 5
29251 052500
OPERATING CONTROLS
Models S & SA:
These models function without operating controls.
Models ST, STF, STA & STFA:
ON/OFF SWITCH
Placing the "ON/OFF" switch in the "OFF" lower position stops brewing. Stopping a brew cycle after it has been
started will not stop the flow of water into the funnel until the tank syphons down to its proper level. Placing the
switch in the "ON" upper position supplies power to the brew station warmer and enables the brew circuit and on
Models STF and STFA refills the tank.
START SWITCH
Momentarily pressing and releasing the switch starts a brew cycle when the "ON/OFF" switch is in the "ON" upper
position.
NOTE – The "ON/OFF" switch must be in the "ON" upper position to initiate and complete a brew cycle.
COFFEE BREWING
1.Insert a BUNN® filter into the funnel.
2.Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.
3.Slide the funnel into the funnel rails.
4.Place an empty dispenser beneath the funnel.
5.Operate the brewer as directed:
5A. Models S & SA:
Pour one pitcher of tap water into the screened area on top of the brewer.
5B. Models ST, STF, STA & STFA:
Place the "ON/OFF" switch in the "ON" upper position. Momentarily press and release the start switch.
6.When brewing is completed, simply discard the grounds and filter.
CLEANING
1.The use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all
surfaces on Bunn-O-Matic equipment.
2.Check and clean the sprayhead. The sprayhead holes must always remain open.
3.With the sprayhead removed, insert the deliming spring (provided) all the way into the sprayhead tube. When
inserted properly, no more than two inches of spring should be visible. Saw back and forth five or six times.
NOTE – In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer and
takes less than a minute.
Page 6
29251 101598
TROUBLESHOOTING
A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems
encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic
Technical Service Department.
•Inspection, testing, and repair of electrical equipment should be performed only by qualified service personnel.
•All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of
terminals or the application of external voltages may result in board failure.
•Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If an
intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a
terminal or crimp.
•Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are
energized for more than ten minutes without a supply of water.
•The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will help
to avoid twists and kinks in the tubing.
•Make certain that all plumbing connections are sealed and electrical connections tight and isolated.
•This brewer is heated at all times. Keep away from combustibles.
WARNING – • Exercise extreme caution when servicing electrical equipment.
• Unplug the brewer when servicing, except when electrical tests are specified.
• Follow recommended service procedures
• Replace all protective shields or safety notices
PROBLEM
Brew cycle will not start (ST, STF,
STA & STFA)
PROBABLE CAUSE
1. No water
2. No power or incorrect voltage to
the brewer
REMEDY
Water lines and valves to the brewer
must be open.
(A1) Check the terminal block for
120 volts across the black and
white terminals on two wire 120
volt brewers.
(A2) Check the terminal block for
120 volts across the red and white
terminals and the black and white
terminal on three wire 120/240
volt brewers.
(A3) Check the terminal block for
200 volts on Model STFB brewers
or 240 volts on "A Series" brewers
across the red and black terminals.
(A4) Check the terminal block for
100 volts on Model SDB brewers
across the white and black terminals.
Page 7
(B) Check circuit breakers or fuses.
29251 101598
TROUBLESHOOTING (cont.)
PROBLEM
Brew cycle will not start (cont.)
(ST, STF, STA & STFA)
PROBABLE CAUSE
3. ON/OFF switch
4. Start switch
5. Timer
6. Solenoid valve
7. Strainer/flow control (.222
GPM)
REMEDY
Refer to
Service
- ON/OFF Switch
for testing. See page 17
Refer to
Service
- Start Switch for
testing procedures. See page 19
Refer to
Service
- Timer for testing
procedures. See page 22 or 24
Refer to
Service
- Solenoid Valve
for testing procedures. See page
18
(A) Direction of flow arrow must
be pointing towards brewer.
(B) Remove the strainer/flow control and check for obstructions.
Clear or replace.
Water is not hot
Inconsistent beverage level in dispenser
1. Limit thermostat
CAUTION - Do not eliminate or
bypass limit thermostat. Use only
BOM replacement part #29329.
1000.
2. Control thermostat
3. Tank heater
1. Strainer /flow control (.222
GPM) (ST, STF, STA & STFA)
Refer to
Service
- Limit Thermostat for testing procedures. See
page 16
Refer to
Service
- Control Thermostat for testing procedures. See
page 14
Refer to
Service
- Tank Heater for
testing procedures. See page 20
(A) Direction of flow arrow must
be pointing towards the brewer.
(B) Remove the strainer/flow control and check for obstruction.
Clear or replace.
2. Liquid level board or level probe
Page 8
Refer to
Service
- Liquid Level
Board for testing procedures. See
page 26
29251 052500
TROUBLESHOOTING (cont.)
PROBLEM
Inconsistent beverage level in dispenser (cont.)
Consistently low beverage level in
the dispenser (ST, STF, STA &
STFA)
PROBABLE CAUSE
3. Syphon system
4. Lime build-up
CAUTION - Tank and tank components should be delimed regularly
depending on local water conditions. Excessive mineral build-up
on stainless steel surfaces can initiate corrosive reactions resulting
in serious leaks.
5. Water pressure (ST, STF, STA
& STFA)
1. Timer
REMEDY
The brewer must be level or slightly
lower in front to syphon properly.
Inspect the tank assembly for excessive lime deposits. Delime as
required.
The water pressure to the brewer
must be at least 20 psi (138 kPa).
(A) Early models-Timer dial must
indicate at least two minutes and
fifteen seconds.
Spitting or excessive steaming
2. Strainer/flow control (.222
GPM)
1. Lime build-up
CAUTION - Tank and tank components should be delimed regularly
depending on local water conditions. Excessive mineral build-up
on stainless steel surfaces can initiate corrosive reactions resulting
in serious leaks.
2. Control thermostat
(B) Refer to
Service
- Digital Timer
for testing procedures. See page
24
(A) Direction of flow arrow must
be pointing towards brewer.
(B) Remove the strainer/flow control and check for obstructions.
Clear or replace.
Inspect tank assembly for excessive lime deposits. Delime as required.
Refer to
Service
- Control Thermostat for testing procedures. See
page 14
Page 9
29251 052500
TROUBLESHOOTING (cont.)
PROBLEM
Dripping from sprayhead
Water flows into tank continuously
(ON/OFF Switch "ON")
PROBABLE CAUSE
1. Syphon system
2. Lime build-up
CAUTION - Tank and tank components should be delimed regularly
depending on local water conditions. Excessive mineral build-up
on stainless steel surfaces can initiate corrosive reactions resulting
in serious leaks.
3. Solenoid valve (ST, STF, STA &
STFA)
1. Timer (ST, STF, STA & STFA)
REMEDY
The brewer must be level or slightly
lower in front to syphon properly.
Inspect the tank assembly for excessive lime deposits. Delime as
required.
Remove the solenoid valve and
clear any obstructions. Rebuild or
replace the valve if necessary.
See page 18
Refer to
Service -
Timer for testing
procedures. See page 22 or 24
Water flows into tank continuously
(ON/OFF Switch "OFF")
Beverage overflows dispenser
2. Start switch
3. Liquid level board
4. Relay
1. Solenoid valve (ST, STF, STA &
STFA)
1. Dispenser
2. Timer (ST, STF, STA & STFA)
Refer to
Service
- Start Switch for
testing procedures. See page 19
Refer to
Service
- LiquidLevel
Board for testing procedures. See
page 26
Refer to
Service
- Relay for testing
procedures. See page 28
Remove the Solenoid Valve and
clean any obstruction. Rebuild or
replace the valve if necessary. See
page 18
The dispenser must be completely
empty before starting a brew cycle.
Refer to
Service -
Timer for testing
procedures. See page 22 or 24
Page 10
29251 052500
TROUBLESHOOTING (cont.)
PROBLEM
Beverage overflows dispenser
(cont.)
Weak beverage
PROBABLE CAUSE
3. Solenoid valve (ST, STF, STA &
STFA)
1. Filter type
2. Coffee grind
3. Sprayhead
4. Funnel loading
REMEDY
Remove the Solenoid Valve and
clean any obstruction. Rebuild or
replace the valve if necessary. See
page 18
The BUNN® paper filter must be
used for proper extraction.
A fine or drip grind must be used
for proper extraction.
A six-hole stainless steel sprayhead must be used for proper
extraction.
The BUNN® paper filter must be
centered in the funnel and the bed
of ground leveled by gentle shaking.
Dry coffee grounds remain in the
funnel
Brewer is making unusal noises
(ST, STF, STA & STFA)
5. Water temperature
1. Funnel loading
1. Solenoid valve
2. Plumbing lines
Place an empty funnel on an empty
dispenser beneath the sprayhead.
Initiate a brew cycle and check the
water temperature immediately
below the sprayhead with a thermometer. The reading should not
be less than 195°F. Adjust the
control thermostat to increase the
water temperature. Replace if necessary.
The BUNN® paper filter must be
centered in the funnel and the bed
of grounds leveled by gently shaking.
The nut on the solenoid must be
tight or it will vibrate during operation.
Plumbing lines should not resting
on the counter top.
Page 11
29251 052500
TROUBLESHOOTING (cont.)
PROBLEM
Brewer is making unusal noises
(ST, STF, STA & STFA)(cont.)
Automatic refill will not operate
PROBABLE CAUSE
3. Water supply
4. Tank heater
1. No water
2. Strainer/flow control
REMEDY
(A) The brewer must be connected
to a cold water line.
(B) Water pressure to the brewer
must not exceed 90 psi (620 kPa).
Install a regulator if necessary to
lower the working pressure to approximately 50 psi (345 kPa).
Remove and clean lime off the
tank heater. See page 20
Check plumbing
A. Direction of arrow must be
pointing towards brewer.
B. Remove the strainer/flow control and check for obstructions.
Clean or replace.
Beverage not staying hot in dispenser
3. Solenoid valve
4. Liquid level control board or
level probe
5. Relay
1. ON/OFF switch
2. Warmer elements
Refer to
Service
- Solenoid Valve
for testing procedures. See page
18
Refer to
Service
- Liquid level control board or level probe for testing procedures. See page 26
Refer to
Service
- Relay for test-
ing procedures. See page 28
Refer to
Service
- ON/OFF switch
for testing procedures. See page
17
Refer to
Service
- Warmer elements for testing procedures. See
page 29
Page 12
29251 052500
SERVICE
This section provides procedures for testing and
replacing various major components used in this
brewer should service become necessary. Refer to
Troubleshooting
cause of any problem.
WARNING - Inspection, testing, and repair of electrical
equipment should be performed only by qualified
service personnel. The brewer should be unplugged
when servicing, except when electrical tests are required and the test procedure specifically states to
plug-in the brewer.
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power
source before the removal of any panel or the replacement of any component.
All components are accessible by the removal of
the top cover or top warmer housing and front and rear
inspection panels.
for assistance in determining the
The top cover for Models with no top warmer and
the top warmer housing is attached with four #8-32
screws. Unplug upper wiring harness and set housing
aside.
The front and rear inspection panels are attached
with four #8-32 screws each.
Contents
Control Thermostat............................................. 14
3.Check the voltage across the blue wire on the
control thermostat and the white insert on two
pole 100 or 120 volt terminal block or three pole
120/240 volt terminal blocks and the red insert
on two wire 200 volt or 240 volt terminal block
with a voltmeter. Connect the brewer to the
power source. The indication must be:
a) 120 volts ac for two wire 120 volt models and
three wire 120/240 volt models.
b) 200 to 240 volts ac for two wire 200 or 240 volt
models.
c) 100 volts ac for two wire 100 volt models.
4.Disconnect the brewer from the power source.
If voltage is present as described, proceed to #5. If
voltage is not present as described, refer to the
Diagrams
and check the brewer wiring harness.
Wiring
FIG. 2 CONTROL THERMOSTAT
Location:
Models S & SA: The control thermostat is mounted
on a bracket inside the rear inspection cover on
the left side.
Models ST, STA, STF & STFA: The control thermostat is located inside the front inspection
cover on the component mounting bracket.
P1585
Page 14
5.Locate the black wire on the control thermostat.
6.Gently remove the capillary bulb and grommet
from the tank.
7.Check the voltage across the black wire of the
control thermostat and the white insert on the
two pole 100 or 120 volt or three pole 120/240
volt terminal block and the red insert on the two
pole 200 volt or 240 volt terminal block with a
voltmeter when the control thermostat is turned
"ON" (Fully clockwise). Connect the brewer to the
power source. The indication must be:
a) 120 volts ac for two wire 120 volt models and
three wire 120/240 volt models.
b) 200 to 240 volts ac for two wire 200 volt or 240
volt models.
c) 100 volts ac for two wire 100 volt models.
8.Disconnect the brewer from the power source.
If voltage is present as described, reinstall the capillary
tube into the tank to the line 4.5" above the bulb, the
control thermostat is operating properly.
If voltage is not present as described, replace the
thermostat.
29251 052500
Loading...
+ 30 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.