Requirements
GA124 -17 70 MBtu/hr
GA124 -23 94 MBtu/hr
GA124 -30 123 MBtu/hr
WARNING!
This conversion kit must only be installed by qualified heating contractor as specified by the manufacturer’s instructions and the applicable rules and regulations of the local authorities. If these instructions are not followed exactly, a fire, explosion or release of carbon monoxide may occur with serious property damage or loss of life and serious injury. The heating contractor is liable for correct conversion of the heating system with this conversion kit.
CAUTION!
Before converting the heating system to a different type of gas the gas line must first be shut off and then the power to the heating system must be disconnected.
Conversion instructions from natural gas to propane
R o o m a i r - i n d e p e n d e n t special gas-fired boi le r Logano GA124
Note: Please keep these instructions for future reference.
Please read carefully before use
Contents
1Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1 Correct use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2 Notes structure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Please observe these notes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2 Scope of delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3 Conversion to propane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4 Start-up instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.1 Making boiler ready for operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4.2 Carrying out final commissioning tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2
We reserve the right to make any changes due to technical modifications.
Conversion instructions Logano GA124 special gas-fired boiler • Issue 2012/10
Safety 1
1 Safety
Observe these instructions for your safety.
1.1 Correct use
The conversion kit is used for conversion of the GA124 special gas-fired boiler from natural gas to propane.
1.2 Notes structure
Additional symbols for identification of dangers and user instructions.
RISK TO LIFE
Identifies possible dangers emanating
WARNING!
WARNING!
from a product, which might lead to serious injury or death if appropriate care is not taken.
RISK TO LIFE
from electric shock.
USER NOTE
Tip for the optimum utilization and setting of the control(s) plus other useful information.
1.3 Please observe these notes
RISK TO LIFE
from explosion of flammable gases.
WARNING!
WARNING!
Never work on gas lines unless you are
licensed for this type of work..
RISK TO LIFE
from electric shock.
Disconnect the power supply to the
heating system before conducting any work on it, e.g. switch off the heating emergency switch outside the boiler room.
It is not sufficient just to switch off the
control.
2 Scope of delivery
1. Honeywell gas solenoid valve conversion kit
# 393 691, comprising:
black safety screw
pressure adjustment screw
red spring
yellow label for gas fitting
2. BBR 12 ignition gas pilot orifice
3. main gas orifices and seals
4. unit label (to be filled out and attached to the unit)
5. Technical documents
We reserve the right to make any changes due to technical modifications.
Conversion instructions Logano GA124 special gas-fired boiler • Issue 2012/10
3
Conversion to propane3
3 Conversion to propane
Read the instructions before conversion for your safety.
RISK TO LIFE
due to not observing the attached
WARNING!
The following instructions must be followed for conversion of the boiler to propane:
1. If the boiler was in operation, close the gas shut-off
valve. Otherwise continue with step 3.
2. Disconnect system from the power supply and set the thermostat to the lowest setting.
conversion instructions.
If you wish to convert the boiler for
operation with propane, the conversion from natural gas to propane must be carried out first as specified by the attached conversion instructions.
3. Remove safety screws from the left and right side panels, then lift the front panel of the boiler and pull it forward.
Fig. 1 Removing front panel of boiler
4
We reserve the right to make any changes due to technical modifications.
Conversion instructions Logano GA124 special gas-fired boiler • Issue 2012/10
Conversion to propane 3
1
4
1
2
3
10
11
5
8
7
6
9
6 720 804 894-01.1T
4. Turn gas valve ON/OFF button clockwise to OFF position. Do not use force.
RISK TO LIFE
from explosion of flammable gases.
WARNING!
Replacing main gas orifices
5. Disconnect pilot gas line from gas valve.
Wait five (5) minutes until all gas
residues have dissipated. Check whether there is any smell of gas, including at floor level. If there is a gas odor: STOP! Follow instructions in section "B" of the safety instructions on page 9 If there is no sign of a gas odor, continue with the next step.
Fig. 2 Gas valve
1 ON/OFF button (at ON position)
6. Disconnect ignition cable from ignition module.
Fig. 3 Front view
1 Flame roll-out switch (boiler size 17) 2 Gas connection pipe 3 Gas valve 4 Ignition cable 5 Ignition module 6 Wire holder for gas supply line 7 Aquasmart 8 Pilot gas line 9 Air supply hose 10 Gas supply pipe 11 Fuse
We reserve the right to make any changes due to technical modifications.
Conversion instructions Logano GA124 special gas-fired boiler • Issue 2012/10
5
Loading...
+ 11 hidden pages