Please read thoroughly before attempting fault diagnosis
F The boiler meets the basic requirements of the
appropriate standards and directives.
Conformity has been substantiated by the proper
documents which - together with the declaration of
conformity - are filed with the manufacturer.
Subject to technical modifications!
Constant development efforts may result in minor deviations
in illustrations, functional steps and technical data.
Updating the documentation
If you have suggestions for improvement or have found
discrepancies, please do not hesitate to contact us.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
2Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
These service instructions apply to:
Buderus wall-mounted condensing gas boilers
500 - 24/S, 500 - 24/C and 500 - 28/C.
Model:C
Type:GB/IE II
13(x)
, C
, C
33(x)
20 mbar, 37 mbar
2H3P
53(x)
, C
73(x)
Power rating: 230 VAC, 50 Hz, IP X4D
Fuse rating: 1.25 Ampere slow blow
The boiler unit consists of the following components:
– 500Gas condensing boiler
– 28Maximum output is 28 kW
– CCombination boiler (with integrated hot water
Only use the boiler in accordance with its designated use and
the service instructions. Installation, maintenance and repair
must be carried out by competent service engineers (e.g.
CORGI registered). Only use the boiler in conjunction with
the accessories and spare parts indicated in the installation,
maintenance and service instructions. Other accessories
and consumables may only be used if they are expressly
provided for the designated use and if system performance
and safety are not affected in any way.
The boiler is suitable for connection to fully pumped, sealed
water systems ONLY. Adequate arrangements for
completely draining the system by provision of draining
valves must be provided in the installation pipework.
Pipework from the boiler is routed downwards as standard,
but may be routed upwards behind the boiler using the wall
spacing frame.
Subject to technical modifications.
As a result of our policy of constant development, there may
be small differences between illustrations, functional steps
and technical data.
All Buderus gas fired boilers now include an installation,
Other manuals available for this boiler are:
– user manual;
– installation and maintenance instructions;
– wall spacing frame instructions.
commissioning and service record log book.
The details of the log book will be required in the event of any
warranty work being requested.
Please complete the appropriate sections on completion of
the installation and commissioning.
REMEMBER: Please hand the log book back to the user.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/20063
General1
1 General
box 3Regulations and directives
It is a requirement that all gas appliances are installed and
serviced by a CORGI registered installer in accordance with
the regulations. Failure to service appliances correctly could
lead to prosecution. It is in your own interest, and that of
safety, to ensure the law is complied with.
It is a requirement and in your own interest, and that of safety
that this boiler must be serviced by a CORGI registered
installer, in accordance with the relevant requirements of the
current Gas Safety (Installation and Use) Regulations,
The Building Regulations, current I.E.E. Wiring Regulations
and the relevant British Standard Codes of Practise.
Detailed recommendations are contained in the following
British Standard Codes of Practice:
BS. 5440:1Flues (for gas appliances of rated input not
exceeding 70 kW).
BS. 5440:2Ventilation (for gas appliances of rated
input not exceeding 70 kW).
BS. 5449Forced circulation hot water systems.
BS. 5546Installation of gas hot water supplies for
domestic purposes (2nd. family Gases).
BS. 6798Installation of gas fired hot water boilers of
rated input not exceeding 60 kW.
BS. 6891Low pressure installation pipes.
BS. 7593: 1992: Code of practice for treatment of water in
domestic hot water central heating
systems.
IGE/UP/1bTightness testing and purging domestic
sized gas installations.
Health and & Safety Document No. 635.
The Electricity at Work Regulations, 1989.
The manufacturer's notes must not be taken, in any way, as
overriding statutory obligations.
The design and construction of the Buderus wall-mounted
condensing gas boiler conforms to the basic specifications
listed in the European directive governing gas-fired appliances 90/396/EEC, and with respect to EN 625, EN 483 and
EN 677.
INOTE:
Observe the corresponding technical rules and the
building supervisory and statutory regulations when
installing and operating the system.
HWARNING!
Keep the burner-control unit housing CLOSED when
working on water-bearing components.
INOTE:
It is mandatory to clean and service the system once a
year. This includes an inspection of the entire system
to see if it is in full working order. Defects and faults
must be eliminated immediately.
INOTE:
When instructions aren’t followed, warranty expires.
INOTE:
Condensing boilers work more efficient if the
CH flow/return temperature is as low as possible.
Timber Framed Buildings
If the boiler is to be fitted in a timber framed building it should
be fitted in accordance with the Institute of Gas Engineering
document IGE/UP/7:1998 and BS 5440:1.
Bathroom Installations
This appliance is rated IP X4D.
The boiler may be installed in any room or internal space,
although particular attention is drawn to the requirements of
the current IEE (BS.7671) Wiring Regulations and, in Scot
land, the electrical provisions of the building regulations
applicable in Scotland, with respect to the installation of the
boiler in a room or internal space containing a bath or
shower.
If the appliance is to be installed or serviced in a room
containing a bath or shower then, providing water jets are not
going to be used for cleaning purposes (as in communal
baths/showers), the appliance can be installed or serviced in
Zone 3, as detailed in BS.7671.
Compartment Installations
A compartment used to enclose the boiler should be
designed and constructed especially for this purpose.
An existing cupboard or compartment may be used, provided
that it is modified for the purpose.
In both cases, details of essential features of cupboard/
compartment design, including airing cupboard installation,
are to conform to the following:
BS 6798 (No cupboard ventilation is required - see 'Air
Supply' for details).
It is not necessary to have a purpose-provided air vent in the
room or internal space in which the boiler is installed. Neither
is it necessary to ventilate a cupboard or compartment in
which the boiler is installed, due to the low surface tempera
tures of the boiler casing during operation; therefore the
requirements of BS 6798, Clause 12, and BS 5440:2 may be
disregarded.
The permanent clearances required are:
in front: 8 mm
below:21 mm
right side: 8 mm
left side: 8 mm
above:21 mm
The position selected for installation MUST allow adequate
space for servicing in front of the boiler. See table below:
in front:350 mm
below:180 mm
right side: 8 mm
left side: 8 mm
above:200 mm
In addition, sufficient space may be required to allow lifting
access to the wall mounting bracket.
Wall-mounted condensing gas combi boilers must only be
operated with Buderus purpose made gas systems, which
are certified for this type of boiler.
-
-
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
4Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
Observe the relevant standards, regulations and legislation
of the country or region of final use.
ACAUTION!
Use this boiler for its intended purpose only.
ADANGER!
Notes relating to the heating system water.
Thoroughly flush the system before it is filled with
water. Use only untreated water or water treatment
product such as Sentinel X100 to fill and top up the system. For more information about Sentinel call 0151 420
9563.
When using water treatment, only products suitable for
use with Buderus heat exchangers are permitted (e.g.
Sentinel X100). Your warranty is at risk if an incorrect
water treatment product is used in conjunction with this
appliance.
For more information, contact Buderus Technical Product Support Department.
It is most important that the correct concentration of the
water treatment product is maintained in accordance
with the manufacturer's instructions.
If the boiler is used in an existing system any unsuitable additives MUST be removed by thorough cleaning.
BS.7593:1992 details the steps necessary to clean a
domestic central heating system.
In hard water areas, treatment to prevent lime scale
may be necessary - however, the use of artificially softened water is NOT permitted.
Under no circumstances should the boiler be fired
before the system has been thoroughly flushed.
Do not use artificially softened water.
Only plastic pipework containing a polymeric barrier
should be used.
It is allowed to use copper for the first 600 mm.
INOTE:
Notes relating to domestic hot water
z The domestic hot water service must be in
accordance with BS 5546 and BS 6700.
z The boilers are suitable for connection to most types
of washing machine and dishwasher appliances.
z When connecting to suitable showers, ensure that:
a. The shower is capable of accepting mains
pressures and temperatures up to 65 °C.
b. The shower is ideally thermostatic or pressure
balancing.
z Where temporary hardness exceeds 150 mg/litre,
it is recommended that a proprietary scale reducing
device is fitted into the boiler cold supply with the
requirements of the local water company.
ACAUTION!
Provision must be made to accommodate the expansion of DHW contained within the appliance, where a
back flow prevention device is fitted
67989: §5.4.3.
BS.
General1
box 4Hazard definitions and abbreviations
Hazard definitions
ADANGER:
Indicates the presence of hazards that will cause
severe personal injury, death or substantial property
damage.
AWARNING:
Indicates the presence of hazards that can cause
severe personal injury, death or substantial property
damage.
ACAUTION:
Indicates presence of hazards that will or cause minor
personal injury or property damage.
INOTICE:
Indicates special instructions on installation, operation
or maintenance that are important but not related to
personal injury or property damage.
Abbreviations
AV= Air Vent
BCT= Buderus cylinder thermostat
BDV= Buderus diverter valve
CB= Connection Block
CH= Central Heating
CHF= Central Heating Flow
CHR= Central Heating Return
CT= Cylinder Thermostat
CWDO = Condensate water drainage outlet
DHW = Domestic Hot Water
DV= Diverter Valve
E=Earth
L=Live
LSV= Lock Shield Valve
MCW = Mains Cold Water
N= Neutal
JB= Junction Box / RTH Relay
PL= Permanent Live
Prog= Programmer
PRV= Pressure relief valve (safety valve)
RT= Room Thermostat
RV= ModuLink 250 RF Receiver
T=Timer
TRV= Thermostatic Radiator Valve
WC= Wiring Centre
ZV= Two Port Zone Valve
Safe handling of substances
No asbestos, mercury or CFCs are included in any part of the
boiler and its manufacture.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/20065
General1
box 5Technical specifications
Buderus
Hot water capacity (combination boilers)
Rated thermal load for CH
Rated thermal load for preparing DHW
Rated heating capacity for system temperature
(modulating from 30° to 100°)
Heating curve 75/60 °C
Chimney loss with burner shut down (standby heat loss) at nominal
thermal load
Hot water circuit
ΔT at residual head of 200 mbar
Maximum flow temperature
Permitted system pressure
Expansion vessel
Capacity of expansion vessel
Admission pressure of expansion vessel
Plate heat exchanger
DHW flow rate at 35 °C rise
Supply pressure of hot water
Adjustable DHW temperature
Pipe connections
Condensate outlet
CH flow/return (compression fitting)
MCW inlet / DHW outlet (compression fitting)
Gas on installation frame (compression fitting)
Pressure relief valve
Flue-gas connection
Type of flue-gas connection (model)
Ø Flue gas pipe / combustion-air inlet
Unit500-24/S500-24/C500-28/C
kW5.7 – 28.5
kW5.7 – 23.05.7 – 23.05.7 – 23.0
kW5.7 – 28.55.7 – 23.05.7 – 28.5
kW
kW
%
%
m3/h3.022.433.02
m3/h2.432.432.43
%104 / 104104 / 104104 / 104
%107107107
%96.396.396.3
%95.7 / 86.295.7 / 86.295.7 / 86.2
%94.6 / 85.294.6 / 85.294.6 / 85.2
%1.21.21.2
°C<20<20<20
°C808080
bar1.0 – 3.01.0 – 3.01.0 – 3.0
l7.57.57.5
bar1.01.01.0
l/min–9.411.7
bar–0.8 - 10.00.9 - 10.0
°C–40 - 6040 - 60
Ø mm21.521.521.5
Ø mm22.022.022.0
Ø mm15.015.015.0
Ø mm22.022.022.0
Ø mm15 mm (adapter supplied with boiler)
mm60/100 (accessory)
(with external
tank)
5.3 – 22.0
6.0 – 24.0
90.3
92.3
6.0 – 24.05.7 – 28.5
5.3 – 22.0
6.0 – 24.0
90.3
92.3
C
, C
33(x)
, C
53(x)
13(x)
, C
5.3 – 22.0
6.0 – 24.0
90.3
92.3
73(x)
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
6Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
box 5Technical specifications
Buderus
Flue-gas readings
Condensate water quantity, natural gas, 40/30 °C
Exhaust-fume mass-flow rate
Full load
Part-load
Exhaust-fume temperature, full load
Heating curve 75/60 °C
Heating curve 40/30 °C
Exhaust-fume temperature, partial load
Heating curve 75/60 °C
Heating curve 40/30 °C
CO2 full load, natural gas standard test gas G20
CO2 full load, natural gas standard test gas G31 propane
Standard emission factor NO
Standard emission factor CO
Flow pressure available for use
Electrical specifications
Mains connection voltage
Electrical protection rating
Electrical power consumption, standby
Electrical power consumption, partial load
Electrical power consumption, full load
Dimensions and weight of boiler
height × width × depth
Weight without casing
Weight with casing
Gas
Category of gas as per EN 437 for GB
Gas injector Ø natural gas H (G20)
Gas injector Ø propane P (G31)
Venturi article number
Natural gas H
Propane P
Other items
Pump
Pump over-run time:
Heating system default adjustments
External cylinder
Plate heat exchanger (ECO)
Plate heat exchanger (warm start)
After service mode
x
General1
Unit500-24/S500-24/C500-28/C
l/h1.6
g/s
g/s
°C
°C
°C
°C
%9,2
%10.3
ppm (mg/kWh)<30
ppm (mg/kWh)<22
Pa75
Vac230 (50 Hz)
W4
W88
W110
mm780 × 460 × 330 780 × 460 × 330780 × 460 × 330
kg
kg
mm4.454.454.45
mm3.453.453.45
30
33
II
20 mbar, 37 mbar (natural gas H and propane P)
2H3P
423.072A423.072A423.072A
Delivered ready for operation, adjusted to Wobbe index
14.1 kWh/m
Deemed suitable for use with propane after inspection
5 minutes
30 - 40 seconds
1 minute
3
(with reference to 15 °C, 1013 mbar),
applicable to Wobbe index range
Markings on gas classification plate:
Configured category: G
by a registered Corgi heating engineer.
Markings on gas classification plate:
Configured category: 3P
–
–
10.6
4.3
77
55
60
35
IP X4D
31
34
11.3 to 15.2 kWh/m
20 - 2E - 20 mbar
G 31_30-50 mbar.
UP 15-50
5 minutes
–
30 - 40 seconds
30 seconds
1 minute
3
.
30 - 40 seconds
30 seconds
31
34
5 minutes
–
1 minute
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/20067
General1
box 6Overview Buderus 500
1
2
3
11
12
13
14
15
16
17
18
10
19
4
5
6
7
8
9
20
21
22
23
24
25
26
27
28
29
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
8Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
General1
box 7Key to terms
Item 1:Ionisation electrode
Item 2:Glow ignitor
Item 3:Automatic air vent
Item 4:Safety sensor
Item 5:Clamp for heat exchanger cover
Item 6:Plate heat exchanger
Item 7:Condensate trap
Item 8:Flow NTC sensor
Item 9:DHW flow regulator
Item 10: Pressure gauge
Item 11: Concentric flue gas adaptor
Item 12 Fan
Item 13: Frame
Item 14: Gas/Air unit
Item 15: Sight glass
Item 16: Gas valve
Item 17: Heat exchanger
Item 18: Gas supply pipe
Item 19: Identification plate of boiler
Item 20: Air silencer tube
Item 21: Flue gas pipe
Item 22: Flue gas safety temperature limiter (STL)
Item 23: Pump 15-50
Item 24: Pressure relief valve discharge pipe
Item 25: Syphon
Item 26: Identification plate showing gas category
Item 27: Connection block
Item 28: DBA control panel
Item 29: RTH converter / junction box
box 8General points
AWARNING!
DANGER OF FATAL ACCIDENT
FROM EXPLOSIVE FUMES
If you smell gas
z There is a danger of explosion.
z No naked lights. No smoking. DO NOT use a naked
light to detect possible leaks.
z DO NOT operate any device that is likely to produce
sparks.
z DO NOT operate electrical switches of any kind
(including telephones, plug-in devices and
doorbells)
z Shut off the gas supply at the main valve.
z Open doors and windows.
z Warn other occupants of the building (but DO NOT
use the house intercom or doorbells).
z Contact the gas supplier from a telephone located
outside the building.
z If you detect an audible gas leak, evacuate the
building immediately, prevent other persons from
entering, and notify the police and fire service
immediately (from a telephone OUTSIDE the
building).
HWARNING!
DANGER OF FATAL ACCIDENT
due to electric shock
ACAUTION!
General information on maintenance work.
IUSER INSTRUCTIONS
Instructions for optimum usage, correct adjustment of
the boiler and other useful information.
ACAUTION!
Use eye protection, inhalation protection, hearing,
gloves, shoes etc. on the right time.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/20069
Servicing manual user guide2
2Servicing manual user guide
box 9
This document consists of various sections. These in turn
contain subsections/boxes in the form of text or tables.
Subsections/boxes inside text and tables are identified by a
small grey box. Each subsection/box is assigned its own
identification number.
These subsections/boxes are divided into operating steps.
If an operating step involves the taking of a yes/no decision,
the right-hand side of the table indicates which subsection / operating step you should proceed (cross reference).
Section
Cross reference to subsection
or operating step
Subsection/box
Diagnosis6
box 24
step 28 Check the actuation of the servomotor of the internal three-way valve, see box 186.
step 29 Does the servomotor of the internal three-way valve start up correctly?Yes:
step 30 Replace the servomotor of the internal three-way valve, see box 191.
step 31 Check the power supply cable of the internal three-way valve, see box 192.
step 32 Is the power supply cable of the internal three-way valve in good condition?Yes:
step 33 Replace the cable loom (or the affected part thereof).
step 34 Check the movement of the servomotor of the
see box 212.
step 35 Does the servomotor of the
step 36 Check to ensure that the the
see box 228.
step 37 Has the
step 38 Install the Buderus 24V AC external three-way valve correctly, see box 228.o box 43
step 39 Check to ensure that the
step 40 Does the Buderus 24V AC external three-way valve actuate correctly?Yes:
step 41 Replace the servomotor of the
step 42 Check the wiring of the Buderus 24V AC external three-way valve, see box 221.
step 43 Is the wiring of the
step 44 Replace the wiring of the Buderus 24V AC external three-way valve.
step 45 Check the drive mechanism of the
step 46 Is the drive mechanism of the Buderus 24V AC external three-way valve working correctly?Yes:
step 47 Replace the internal components of the
step 48 Check the wiring of the
On combi boiler supply: hot water available, but no heating operation.
On system boiler supply: no heating operation.
Hot water may be available, but no heating operation.
We reserve the right to make technical modificationsBuderus Ltd • http://www.buderus-domestic.co.uk
24Servicing manual Gas condensing bo iler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2005
Buderus 24V AC external three-way valve been fitted correctly?Yes:
see box 213 and box 229.
moving plug-and-socket connection and the control panel as per box 288.
box 25
step 1 Check to ensure that the power supply cable to the RTH converter/Junction box has been installed correctly,
see box 286.
step 2 Is the 230V connection to the RTH converter/Junction box fitted correctly?Yes:
step 3 Correctly attach the switch live to terminal 1 and Neutral to terminal 2 on the 230V connector, see box 286.
step 4 Disconnect black leads from terminals 1 & 2 on the back of the DBA and test for continuity between the two
leads. No continuity check S/L and N connections are made correctly and that there is 230v between the two.
Replace RTH converter/Junction box.Continuity reconnect the cables to terminals 1 & 2 and check the connections between the terminals and
the DBA.
Buderus 24V AC external three-way valve is actuated correctly,
Buderus 24V AC external three-way valve in correct condition?
Buderus 24V AC external three-way valve between the connection box or
Buderus 24V AC external three-way valve,
Buderus 24V AC external three-way valve operate correctly?Yes:
Buderus 24V AC external three-way valve has been fitted correctly,
Buderus 24V AC external three-way valve, see box 218.
Buderus 24V AC external three-way valve, see box 222.
Buderus 24V AC external three-way valve, see box 225.
o step 30
o step 31
No:
o box 43
o box 42
No: o step 33
o box 43
o step 36
o step 39
No:
o step 45
o step 38
No:
o step 41
o step 42
No:
o box 43
o step 47
Yes:
o step 44
No:
o box 43
o box 42
o step 47
No:
o box 43
o step 4
o step 3
No:
o box 43
Operating step number
Explanation of this subject starts in this box.
The following boxes can be relevant as well.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
10Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
3 Operation
box 10Operation
box 11
Operation
3
General points
1
The central boiler can be run from the DBA control panel
(item 1).
[80. Configure CH flow temperature, in °C. See also box 18. As soon as [80. is displayed, you can verify
the current CH flow temperature, or adjust it as required.
Adjust CH flow temperature ?
Lower: lower the CH flow temperature with the
Higher: increase the CH flow temperature with the
Has at least 10 seconds passed without a button being pressed and/or was mains supply interrupted ?
E-button once.
E-button once.
E-button once.
D-button.
C-button.
D- and C-buttons to activate and disable heating mode.
D-button.
C-button.
No:
Yes:
No:
Yes:
No:
Yes:
No:
→ step 11
→ step 12
→ step 15
→ step 16
→ step 19
→ step 20
→ step 22
→ step 21
step 22 Any adjustments that you have made will now be confirmed.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
→ step 1
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200613
Function4
4Function
box 15Boiler Functions
Start phase
step 1Turn the mains switch to “ON”.
step 2Turn the operating switch on the DBA control panel of the boiler to position “1“ (ON) – see also box 11.
step 3Is a 3-way valve fitted?Yes:
step 4Is the 3-way valve set to “hot water mode”?Yes:
step 5The Buderus 24V AC external 3-way valve is turned to “heating mode” in 7.5 seconds, while an internal 3-way
step 6
step 7
step 8
step 9Has the pre purge been completed correctly?Yes:
step 10 Deal with fault. The error code, which is now displayed, can be found in box 20. Deal with the fault.
step 11
step 12 Start of pump over-run time via the heating system.
step 13 Has the pump over-run time expired?Yes:
step 14 Is the boiler set to warm start for hot water and/or is an external storage-type water heater connected?Yes:
step 15 Is the plate heat exchanger triggered and/or is the temperature in the external storage-type water heater at least
step 16 Is there a current heat requirement from the (room) temperature controller?Yes:
step 17 Is the current CH flow temperature lower than 7 °C (frost protection)?Yes:
step 18 The pump stops.
step 19 Has the pump been out of use for more than 24 hours?Yes:
step 20 Is the plate heat exchanger triggered and/or is the temperature in the external storage-type water heater at least
step 21 Is there a current heat requirement from the (room) temperature controller?Yes:
valve is turned to “heating mode” in 2 seconds.
,00{ The display on the DBA control panel of the boiler is checked (maximum of one second).
[24] Current CH flow temperature, in °C. See also box 20.
C [0u] The boiler begins to warm up. Start of pre purge phase.
The fan runs for 15 seconds at about 60 % of maximum speed.
Checking phase
Operating phase
C [0h] Operating code. See also box 20. The boiler is ready for operation.
No current heat requirement.
The pump over-run time:
– via the heating system, factory-adjusted to 5 minutes;
– via the external reservoir, set to 30-40 seconds;
– via the plate heat exchanger (ECO), set to 30-40 seconds;
– via the plate heat exchanger (warm start), set to 30 seconds;
– after service mode, 1 minute.
5 °C below the temperature set at the DBA control panel?
5 °C below the temperature set at the DBA control panel?
No:
No:
No:
No:
No:
Yes:
No:
No:
No:
No:
Yes:
No:
No:
→ step 4
→ step 6
→ step 5
→ step 6
→ step 11
→ step 10
→ step 18
→ step 14
→ step 15
→ step 16
→ step 28
→ step 16
→ step 46
→ step 19
→ step 62
→ step 18
→ step 23
→ step 20
→ step 28
→ step 21
→ step 46
→ step 22
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
14Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
Function4
box 15Boiler Functions
step 22 Is the current CH flow temperature lower than 7 °C (frost protection)? Yes:→ step 62
No:
→ step 23
step 23 The pump is run for 10 seconds in order to prevent it from seizing up.
No:
Yes:
No:
No:
No:
No:
No:
No:
No:
No:
→ step 18
→ step 25
→ step 28
→ step 26
→ step 46
→ step 27
→ step 62
→ step 24
→ step 32
→ step 72
→ step 39
→ step 34
→ step 35
→ step 32
→ step 29
→ step 38
→ step 46
→ step 19
step 24 Have 10 seconds elapsed?Yes:
step 25 Is the plate heat exchanger triggered and/or is the temperature in the external storage-type water heater at least
5 °C below the temperature set at the DBA control panel?
step 26 Is there a current heat requirement from the (room) temperature controller?Yes:
step 27 Is the current CH flow temperature lower than 7 °C (frost protection)? Yes:
step 28 The symbol “
step 29
step 30
step 31 Does the ionisation current exceed 1.4 µA (microamperes) within 5 seconds?Yes:
step 32
step 33 Is the temperature in the plate heat exchanger higher than the temperature entered via the DBA control panel? Yes:
step 34 Is the CH flow temperature 46 °C higher than the preset DHW temperature and/or higher than 93 °C?Yes:
step 35
step 36 The symbol ”
step 37 The fan stops after 30 seconds.
step 38 Is the CH flow temperature lower than the preset DHW temperature plus 35°C?Yes:
step 39 The gas valve is closed and the burner is shut down.
step 40 The symbol
step 41 Start of pump over-run time via the cylinder.
step 42 The fan stops.
step 43
step 44 The 3-way valve turns to the heating mode setting for two seconds.
step 45 Is there a current heat requirement from the (room) temperature controller?Yes:
step 46 The symbol
step 47
step 48
C [0c] The fan runs at 49 % of capacity.
The 3-way valve turns to the hot water setting for two seconds.
The glow ignitor is activated for two seconds.
C [0l] Ignition phase: The gas valve is opened. The glow ignitor is activated for one second, followed by
alternating half-second periods of inactivity and activity until five seconds have elapsed.
C [=h] The boiler is in hot water mode. If there has been a power cut: The startup load on the boiler is 49%
for the first 13 seconds for the purposes of flow monitoring. It is then increased or decreased accordingly. The
symbol ”
C [0y] The gas valve is closed and the burner is shut down.
Start of pre purge phase (10 seconds).
C [0h] The pump stops.
The symbol “
C [0c] The fan runs at 49 % of capacity. The pump is started up.
The glow ignitor is activated for seven seconds.
C [0l] Ignition phase: The gas valve is opened.
H" or “I" for hot water mode on the DBA control panel display lights up.
G “ lights up.
G “ goes out.
G goes out.
H" or “I" goes out.
K lights up.
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200615
Function4
box 15Boiler Functions
step 49 Does the ionisation current exceed 1.4 µA (microamperes)) within 5 seconds?Yes:→ step 50
No:
→ step 72
step 50
step 51 Is there a heating requirement from the (room) temperature controller?Yes:
step 52 Is the heat system flow temperature 6 °C higher than the target setting?
step 53
step 54 The symbol
step 55 The fan stops.
step 56 Is the CH flow temperature
step 57 The symbol “
step 58
step 59 The symbol ”
step 60 Start of pump over-run time via the heating system. The pump over-run time via the heating system is 5 minutes.
step 61 The fan stops.
step 62 The symbol “
step 63
step 64
step 65 Does the ionisation current exceed 1.4 µA (microamperes) within 5 seconds?Yes:
step 66
step 67 Is the current CH flow temperature higher than 15 °C?Yes:
step 68 The symbol “
step 69
step 70 Start of pump over-run time via the heating system. The pump over-run time via the heating system is 5 minutes.
step 71 The fan stops.
[-h] The boiler is in heating mode. The symbol G lights up.
The startup load on the boiler is 49% for the first 13 seconds for the purposes of flow monitoring.
It is then increased or decreased.
(The target setting is entered at the DBA control panel if room-temperature adjustment is required)
C [0y] The gas valve is closed and the burner is shut down.
G goes out.
≥ 6 °C lower than the target setting?Yes:→ step 47
K “ goes out.
C [0h] The gas valve is closed and the burner is shut down.
G “ goes out.
Start of the post purge phase of fan (10 seconds).
K “ lights up.
C [0c] The fan starts up. The pump is started up.
The glow ignitor is activated for seven seconds.
C [0l] Ignition phase: The gas valve is opened.
C [-h] The symbol ” G “ lights up. The boiler is in heating mode.
K goes out.
C [0h] The gas valve is closed. The burner is shut down. The symbol G goes out.
Start of the post purge phase of fan (10 seconds).
No:
Yes:
No:
No:
No:
No:
→ step 52
→ step 57
→ step 53
→ step 50
→ step 53
→ step 13
→ step 66
→ box 36
→ step 68
→ step 67
→ step 13
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
16Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
5Symptoms
box 16Display icons
Symptoms5
Display
indication
F
G
H
I
J
K
L
Key to display indication
Service mode
Ionisation signal (flame monitoring)
Hot water mode “ECO” setting or hot water requirement
Hot water mode “warm start” setting or hot water requirement
Standby, hot water mode to “warm start”
Heating mode or heating requirement
Summer operation, no heating mode, hot water only
box 17Display readings
Display
readings
[24]
Key to display reading
Current CH flow temperature
box 18Control-panel settings
Button
Display
Setting
Key to display setting
Unit
°C
Range
[30]
Unit
–
Range
Factory
default
setting
[80]
1x A<24]
C[lo]
1x
A C[hi]
1x
A
E[pr#
E[60)
Service mode
Service mode, partial load%25
Service mode, full load%100
End service mode (or wait for 30 minutes)
Hot water mode
Only applies to combi boilers
DHW temperature
1)
H = Hot water supply to ECO
I = Hot water mode to warm start
°C
40 – 60
K = Heating mode ON
E[pr'
Heating mode
L = Heating mode OFF
E[80.
[//]
1)
= flashing
When it appears on the display at a system boiler, please connect a link between terminal 3 and 4 on the back side of the
CH flow temperature
DBA control panel (hot water cylinder sensor) or make sure that the hot water cylinder sensor is fitted securely.
box 19Displaycodes
Normaly you see the current CH flow temperature. By pushing the "C"-button you will see the current operation code.
Blocking:
The boiler stops heating and will wait until the blocking is solved.
Locking:
Displaycode is blinking and also a blinking wrench "F" appears. The boiler stops heating and the pump is still running. The only
way to stop the locking is by pushing the reset "
B" button.
°C
30 – 80
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200617
Symptoms5
box 20Display codes
Display indication
z
Display
code
Key to display code
[//]
[//)
StandbyHot water mode to “warm start”.box 21
C[0h]
StandbyApplies to boilers with hot water supply,
C[0h]
C[0h]
C:-h.
C:=h)
C[0a]
C[0a]
C[0c]
C[0e]
C[0h]
C[0l]
C[0u]
C[0y]
C[0y]
?1c]
C[2f]
1) This error code may deactivate again automatically after a specific time (without reset). Heating and hot water are now available once more.
2) In the event of this malfunction, the pump is started up and remains in continuous operation in order to minimise the possibility of the heating system
freezing up.
StandbyApplies to boilers with hot water supply,
Operating phase:
The boiler is in heating mode.
Operating phase:
The boiler is in hot water mode. The symbol “ G ” lights up.
Operating phase:
Pump over-run time via the external cylinder/hot water
heater. The symbol “ G “ is off.
Operating phase:
The switch optimisation program is activated. This
program is activated if there is, more frequently than once
every 10 minutes, a heating water requirement from an
RC or ON/OFF control signal. This means that the boiler
cannot be restarted until at least 10 minutes have elapsed
since initial startup of the burner.
Pre-operative phase:
The boiler prepares for burner startup whenever a heating
requirement or hot water requirement arises.
Ready for operation:
The boiler is in ready mode. There is a current heat
requirement, but too much energy has been supplied.
Standby for operation:
The boiler is in ready mode.
There is no current heat requirement.
Ignition phase:
The gas valve is activated.
Startup phase:
The boiler starts up after activation of the mains power
supply or completion of a system reset. This code is
displayed for a maximum of 4 minutes.
Operating phase:
The flow sensor has detected that the current CH flow
temperature is higher than the temperature entered at the
control unit, or that it is higher than the CH flow temperature calculated according to heating requirements, or that
it is higher than the CH flow temperature calculated for the
purposes of hot water supply.
Fault:
The flow sensor or safety sensor has detected that the
current CH flow temperature is higher than 95°C.
Fault:
The flue-gas STL (fume-monitoring device) has detected
a temperature higher than 105°C.
The flue-gas STL is opened.
Fault:
The flow sensor and safety sensor have, after burner
startup, not detected any temperature increase in the
heating water, or they have determined that the
temperature difference between The flow sensor and
safety sensor is too high.
Reset
required?
No
1)
Yes
2)
No
1)
Other symptoms
No indication on DBA control panel display.box 21
No (or insufficient) hot water, radiators, convectors,
etc. may be heated without current heat requirement.
hot water available, no heating operation.
Applies to boilers without hot water supply,
no heating operation.
hot water available, no heating operation.
The heating circuit is warmed up without a heat
requirement.
Pump over-run time:
Heating system factory default setting = 5 minutes;
for details of hot water and service mode see box 5.
The target room-temperature may not be reached.box 25
Heat request, but no respons of the boilerbox 285
Recycling phase:
The fan runs for 15 seconds at about 60% of
maximum speed.
"Extraction of residual fumes in boiler"
The target room-temperature may not be reached.box 26
The target room-temperature may not be reached.box 27
No heating operation and no hot water.box 28
Diagnosis
box 22
box 23
box 24
box 22
box 27
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
18Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
box 20Display codes
Symptoms5
Display indication
Display
z
code
C[2p]
C[3a]
?3l]
?3l]
?3y]
?4a]
?4e]
?4l]
?4p]
C[6a]
?6a]
:6c]
?6c]
C[6l]
?7c]
!88|
?9a]
?9f]
?9h]
Key to display code
Fault:
The flow sensor has detected a temperature increase, in
the heating system water, of over 5 °C/sec.
Fault:
The tacho signal from the fan has failed during the
operating phase.
Fault:
The tacho signal from the fan is not present during the preoperative or operating phase.
Fault:
No current of air after a certain time.
Fault:
The fan runs too slowly or too fast.
Fault:
The flow sensor and safety sensor have detected a
CH flow temperature of over 105 °C.
Fault:
The sensor test has failed.
Fault:
The contacts of the flow sensor and safety sensor are
shorted to each other, or there is a short-circuit to earth
(ground), or the flow or safety sensor has detected a
CH flow temperature of above 130 °C.
Fault:
The contacts of the flow sensor or safety sensor are
broken.
Fault:
During the ignition phase, the system has detected an
insufficient ionisation current.
Fault:
After four startup attempts, the system has detected an
insufficient ionisation current.
Fault:
The system has detected an ionisation current before
burner startup.
Fault:
An ionisation current has been measured as soon as the
burner shuts down.
Fault:
The flame goes out during the operating phase.
Fault:
The power supply was shut off during a crucial breakdown.
Operating phase:
Display test during startup phase:
The code is displayed for a maximum of 1 second.
Fault:
The DBA control panel is defective.
Fault:
The contacts of the gas valve have been broken.
Fault:
The DBA control panel is defective.
Reset
required?
Yes2)No heating operation and no hot water.box 29
Yes2)No heating operation and no hot water.box 30
Yes2)No heating operation and no hot water.box 31
Yes
Yes2)No heating operation and no hot water.box 33
Yes
Yes2)No heating operation and no hot water.box 35
Yes
Yes
Yes2)No heating operation and no hot water.box 38
Yes2)No heating operation and no hot water.box 39
Yes2)No heating operation and no hot water.box 41
Yes2)No heating operation and no hot water.box 40
Yes2)No heating operation and no hot water.box 41
Other symptoms
No
1)
No
1)
No heating operation and no hot water.box 32
2)
No heating operation and no hot water.box 34
2)
No
1)
No heating operation and no hot water.box 36
2)
No heating operation and no hot water.box 37
2)
No
1)
Diagnosis
box 27
box 29
box 36
?9l]
?9l]
1) This error code may deactivate again automatically after a specific time (without reset). Heating and hot water are now available once more.
2) In the event of this malfunction, the pump is started up and remains in continuous operation in order to minimise the possibility of the heating system
freezing up.
Fault:
The contacts of the gas valve have been broken.
Fault:
The DBA control panel is defective.
Yes2)No heating operation and no hot water.box 40
Yes2)No heating operation and no hot water.box 41
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200619
Symptoms5
box 20Display codes
Display indication
z
Display
code
?9p]
?9y]
?ef]
?e1]
to
Key to display code
Fault:
The DBA control panel is defective.
Fault:
Short circuit in the gas valve.
Fault:
The contacts of the KIM (EEPROM on the DBA control
panel circuit board) may be loose or short-circuited.
Fault:
The DBA control panel is defective.
Reset
required?
Yes2)No heating operation and no hot water.box 41
Yesbox 41
Yes2)No heating operation and no hot water.box 41
Other symptoms
No
No heating operation and no hot water.box 41
1)
?e4]
?ea]
?ec]
Fault:
C[re]
1) This error code may deactivate again automatically after a specific time (without reset). Heating and hot water are now available once more.
2) In the event of this malfunction, the pump is started up and remains in continuous operation in order to minimise the possibility of the heating system
freezing up.
Reset is carried out.
This code appears after the reset button
5 seconds.
B is pressed for
Applies only to a system-blocking error (flashing
display code)
Diagnosis
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
20Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
6Diagnosis
box 21
Diagnosis6
[\/\/\|
step 1Check to ensure that the power supply cable to the mains switch box has been installed correctly.
step 2Is the power supply cable to the mains switch box correctly installed?Yes:→ step 4
step 3Install the power supply cable correctly, see box 54.→ box 42
step 4Check to ensure that the operating switch on the boiler DBA control panel is set to position “1” as per box 55.
step 5Is the operating switch on the boiler DBA control panel set to “I” (ON)?Yes:→ step 7
step 6Turn the operating switch on the DBA control panel of the boiler to position “1” (ON), see box 55.→ box 42
step 7Check to the ensure that there is a 230V AC power supply at the mains switch.
step 8Is there a 230V AC supply at the mains switch?Yes:→ step 10
step 9Deal with any problem in the electrical system.→ box 42
step 10Measure the resistance of the 230V AC power supply cable.
step 11Is the resistance of the 230V AC power supply cable within the specified limits?Yes:→ step 22
step 12Replace the cable loom (or the affected part thereof).→ box 42
step 13Use a multimeter to check the fuse on the inside of the DBA control panel, see box 62 to 65.
step 14Is the fuse working correctly?Yes:→ box 41
step 15Replace fuse, see box 62.
step 16Is there any indication on the DBA control panel display?Yes:→ box 42
step 17Turn the operating switch on the DBA control panel of the boiler to position “0” (OFF), see box 43.
step 18Disconnect the following boiler components from the electrical power supply:
step 19Check the fuse again for correct functioning. Use a multimeter to check the fuse on the inside of the DBA
step 20Is the fuse working correctly?Yes:
step 21Replace fuse again, see box 62.
step 22Turn the operating switch on the DBA control panel of the boiler to position “1” (ON), see box 55.
step 23Is there any indication on the DBA control panel display?Yes:
step 24Use a multimeter to check the power supply cables of the pump (box 95), the fan (box 69) and the glow ignitor
step 25Are the cables in order?Yes:→ step 27
step 26Replace the cable harness (or the affected part thereof).
step 27Turn the operating switch on the DBA control panel of the boiler to position “0” (OFF), see box 43.
step 28Connect the power supply plug of the pump in reverse.
step 29Turn the operating switch on the DBA control panel of the boiler to position “1” (ON), see box 55.
No indication on DBA control panel display.
– pump, see box 92
– fan, see box 71, item 1.
control panel, see box 62.
(box 137) for signs of short circuiting.
Replace fuse again, see box 62.
No:→ step 3
No:→ step 6
No:→ step 9
No:→ step 21
No:→ step 15
No:→ step 17
→ step 22
No:
→ step 21
→ step 27
No:→ step 24
No:→ step 26
→ box 42
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200621
Diagnosis6
box 21
step 30Is there any indication on the DBA control panel display?Yes:→ step 33
No:→ step 31
step 31Replace the pump, see box 101.
step 32Replace fuse again, see box 62.→ step 33
step 33Turn the operating switch on the DBA control panel of the boilerto position “0” (OFF), see box 43.
step 34Connect the power supply plug of the fan in reverse.
step 35Turn the operating switch on the DBA control panel of the boiler to position “1” (ON), see box 55.
step 36Is there any indication on the DBA control panel display?Yes:→ box 42
step 37Replace fan, see box 76.→ step 38
step 38Replace fuse again, see box 62.
box 22
No (or insufficient) hot water, radiators, convectors, etc. may be heated without current heat requirement.
step 1Set the operating switch on the boiler DBA control panel to position “0“ (OFF), see box 43, and set the other
DBA control panel operating switch to position “1“ (ON), see box 55.
step 2Open a hot water tap.
step 3Check that the hot water pipe directly beneath the (external) storage-type water heater warms up.
step 4 Does the pipe warm up (to approx. 60 °C)?Yes:
step 5The cause of this fault does not lie with the boiler, but with the mains water supply. Check to see if the
MCW inlet and DHW outlet have been incorrectly connected to the (external) storage-type water heater.
step 6Are the pipes connected correctly?Yes:
step 7Connect the pipeworks correctly.
step 8Close the shut-off valve in the MCW inlet and open a hot water tap at random to see if water is still flowing.
step 9Is this the case?Yes:
step 10The cause is a defective (thermostat-controlled) mixer tap, a thermostat-controlled mixer valve or a short
circuit between the hot- and cold water circuits.
step 11Check to see if any other external part of the drinking-water system is a possible cause.
step 12Are such items detected?Yes:
step 13Place the affected components out of service.
step 14Check
to ensure that the pre-adjusted setting corresponds to the hot water
to ensure that the DHW temperature is adjusted to a high enough setting, see box 61.
to see if the hot water supply has been shut off by the control system (ModuLink 250 RF).
step 15Are the adjustment settings in order?Yes:
step 16Adjust the settings.
step 17Check to see if the “hot water mode” indicator (H) or (I) lights up on the display, see box 11.
step 18Does the “hot water mode” indicator (H) or (I) light up?Yes:
step 19Check the turbine flow-meter, see box 104, or DWH temperature sensor of any external storage-type water
heater that might be fitted.
[60) box 14 supply.
→ step 32
No:→ step 37
→ box 42
→ step 5
No:→ step 39
→ step 8
No:
→ step 7
→ box 42
→ step 10
No:
→ step 11
→ box 42
→ step 13
No:
→ box 42
→ box 42
→ step 17
No:
→ step 16
→ box 42
→ step 25
No:→ step 19
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
22Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
Diagnosis6
box 22
step 20Is the turbine flow-meter working correctly (along with DHW temperature sensor of any external storage-type
water that might be fitted)?
step 21Replace the turbine flow-meter, or DHW temperature sensor of any external storage-type water heater that
might be fitted.
step 22Check the cable of the turbine flow-meter, see box 112, or cable of the DHW temperature sensor of any
external storage-type water heater that might be fitted.
step 23Is the cable correctly connected and free of damage?Yes:
step 24Replace the cable loom (or the affected part thereof).
step 25Check to ensure that the boiler starts up to supply hot water, see box 15.
step 26Does the boiler start up?Yes:
step 27Interpret current display codes box 20 and deal with fault.
step 28Check to ensure that the tap flow rate is correctly adjusted, see box 180.
step 29Is the tap flow rate correctly adjusted?Yes:
step 30Correctly adjust the tap flow rate, see box 180.
step 31Is an internal 3-way valve fitted? Yes:
step 32Check the movement of the servomotor of the Buderus 24V AC external 3-way valve, see box 211.
step 33Does the servomotor of the Buderus 24V AC external 3-way valve move correctly?Yes:
step 34Check the movement of the servomotor of the internal 3-way valve, see box 181..
step 35Does the servomotor of the internal 3-way valve move correctly?Yes:
step 36Check to ensure that the the Buderus 24V AC external 3-way valve has been fitted correctly,
see box 227.
step 37Has the Buderus 24V AC external 3-way valve been fitted correctly?Yes:
step 38Fit the Buderus 24V AC external 3-way valve in the correct way, see box 227.
step 39Check the drive mechanism of the internal 3-way valve, see box 195.
step 40Is the drive mechanism of the internal 3-way valve working correctly?Yes:
step 41Replace the drive mechanism of the internal 3-way valve, see box 198.
step 42Check the circulation for debris, see box 97.
step 43Is there any debris in the pump?Yes:
step 44Clean the pump, see box 97.→ box 42
step 45The following components must be checked for soiling and/or damage:
- combustion-air inlet pipework
- heat exchanger
- flue-gas pipework.
step 46Are the above-mentioned components clean and free of damage?Yes:
step 47Clean and/or replace the corresponding components.
Yes:→ step 22
No:
→ step 21
→ box 42
→ box 41
No:
→ step 24
→ box 42
→ step 28
No:
→ step 27
→ box 42
→ step 31
No:
→ step 30
→ step 34
No:
→ step 32
→ step 36
No:
→ step 63
→ step 39
No:
→ step 57
→ step 69
→ step 38
No:
→ box 42
→ step 42
No:
→ step 41
→ box 42
→ step 44
No:
→ step 45
→ step 48
No:→ step 47
→ box 42
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/200623
Diagnosis6
box 22
step 48Check the standing and working gas pressures, see box 230.
step 49Are the standing and working pressures correct?Yes:
step 50If the standing and working gas input pressures are not detected, consult your gas utility company.→ box 42
step 51Check the gas/air ratio, see box 233.
step 52Is the gas/air ratio correct?Yes:
step 53Adjust the gas/air ratio, see box 233.
step 54Check the plate heat exchanger or the external hot water cylinder for furring.
step 55Is the plate heat exchanger or hot water cylinderfurred up?Yes:
step 56Decalcify the plate heat exchanger and/or hot water cylinder, see from box 269.
step 573-way valve: Check the startup of the servomotor of the internal 3-way valve, see box 181 and box 185.
step 58Does the servomotor of the internal 3-way valve start up correctly?Yes:
step 59Replace the servomotor of the internal 3-way valve, see box 190.
step 60Check the wiring of the internal 3-way valve, see box 191.
step 61Is the cable correctly connected and free of damage?Yes:
step 62Replace the cable loom (or the affected part thereof).→ box 42
step 63Check to ensure that the Buderus 24V AC external 3-way valve has actuated correctly,
see box 212 and box 228 parts 1 and 2.
step 64Does the Buderus 24V AC external 3-way valve actuate correctly?Yes:
step 65Replace the servomotor of the Buderus 24V AC external 3-way valve, see box 217.
step 66Check the wiring of the Buderus 24V AC external 3-way valve, see box 220.
step 67Is the wiring of the Buderus 24V AC external 3-way valve in correct condition?Yes:
step 68Replace the wiring of the Buderus 24V AC external 3-way valve.
step 69Check the drive mechanism of the Buderus 24V AC external 3-way valve, see box 221.
step 70Is the drive mechanism of the Buderus 24V AC external 3-way valve working correctly?Yes:
step 71Replace the drive mechanism of the Buderus 24V AC external 3-way valve, see box 221.
step 72Check the wiring of the Buderus 24V AC external 3-way valve between the connection box or moving plug-
and-socket connection and the motor of the Buderus 24V AC external 3-way valve, see box 287.
step 73Is the wiring in order?Yes:
step 74Replace the cable loom (or the affected part thereof).
box 23
On combi boilers: hot water available, but no heating operation.
On system boilers: no heating operation.
Hot water may be available, but no heating operation.
step 1Check to ensure that the power supply cable to the mains switch box has been installed correctly, see box 54.
→ step 51
No:
→ step 50
→ step 54
No:→ step 53
→ box 42
→ step 56
No:
→ box 41
→ box 42
→ step 59
No:
→ step 60
→ box 42
→ box 41
No:
→ step 62
→ step 65
No:
→ step 66
→ box 42
→ step 71
No:
→ step 68
→ box 42
→ step 42
No:→ step 71
→ box 41
No:
→ step 74
→ box 42
We reserve the right to make technical modificationsBuderus Ltd. • http://www.buderus-domestic.co.uk
24Servicing manual Gas condensing boiler Buderus 500-24/S, 500-24/C and 500-28/C • Issued 02/2006
Loading...
+ 56 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.