Bryant NAHA003WK.01 User Manual

Twinning Kit NAHA003WK.01
For Use With Furnace Models Using
Honeywell ST9120 and ST 9160 Electronic Fan Controls
Please read these instructions completely before attempting installation.
!
Electrical shock hazard/Fire and/or explosion haz­ard.
Turn off gas supply at field installed manual gas valve before starting installation.
Failure to follow this warning can result in property damage, personal injury and/or death.
!
Installation or repairs made by unqualified persons can result in hazards to you and others. Installation MUST conform with local building codes or, in the absence of local codes, with the National Fuel Gas Code NFPA 54/ANSI A223.1,1990 or latest edition. In Canada, National Standard CAN/CGA B149--1.
The information contained in this manual is in­tended for use by a qualified service technician fa­miliar with proper safety procedures and equipped with the proper tools and test instruments.
Failure to carefully read and follow all instructions in this manual can result in furnace malfunction, property damage, personal injury and/or death.
This twinning kit is intended to permit two identical gas furnaces to be installed connected to the same duct work. Air conditioning can be added by using one air conditioning evaporator coil sized for the total air flow c apabilities of the two furnaces.
Single and Two Stage Heating
Single or two stage heating is obtainable using twinning kit NAHA003WK01. Follow the instructions located in the Twinning Kit Installation section for proper hookup of desired thermostat staging.
Furnace Installation
Refer to the Installation Instructions packed with the furnaces for information about clearances, start--up and maintenance, gas piping and vent installation.
CAUTION
Furnaces installed MUST be identical. They may be installed on a raised platform or wood floor which MUST be level. When side return is required, separate return air drops MUST be made to both furnaces. Do not use rear of furnace for the return air duct connection.
CAUTION
Make sure blower motors are wired to operate on the same speed tap.
CAUTION
Two furnaces must be plumbed with a single supply gas shut off valve.
NOTE: When twinning kit has been installed, locate the adhesive
backed wiring diagram included in the kit and apply next to the existing wiring diagrams in the furnaces.
TWINNING KIT INSTALLATION
The twinning kit c ontains (2) 36” wires of two different colors to interconnect the electronic fan controls of the two furnaces. For
proper operation, and to avoid damage to the controls, be sure to match Z1 to Z1 and Z2 to Z2 or C to C and H to H on each fan control (see Figure 1 and Figure 2). The wires are
color coded to assist with this connection. Each wire is factory terminated with a special crimped edge connector which will push into mating connection positions on the edge of the circuit board on each fan control. The length of these wires can be extended by cutting and splicing sufficient additional wire to each lead.
An isolation relay is provided to protect the system’s thermostat from possible overloading due to the combined valve and control load of the two appliances.
PrintedinU.S.A.
441 06 1003 02 (10/2001)
Installation Procedures
1. Remove line power from both appliances before starting installation of the twinning kit.
2. Locate the Z1 and Z2 or C to C and H to H connections along one edge of each c ontrol (see Figure 1 and Figure 2). The designations are printed on top of the circuit board, and a black bar shows the correct orientation of the metal body which will be pushed in to make connection.
3. Remove furnace casing hole plugs and route the twinning leads throughbushings provided asrequired, and lengthen if necessary by splicing. Be sure to observe the polarity required so as to match Z1 to Z1 and Z2 to Z2 or C to C and HtoH(seeFigure 3).
4. Push the terminal into the s lot on the circuit board edge. Be sure to align the body with the black bar to line up the solder finger below the circuit board (see Figure 1). The terminal will “bite into” the solder and make the necessary connection. Repeat for each end of both wires.
5. Locate and mount the isolation relay in the circulating blower compartment on the same panel as the electronic fan control in furnace #1 (see Figure 1 and Figure 2).
6. Refer to single stage or two s tage thermostat wiring as noted below.
Single Stage Thermostat Operation Reference Figure 6 and Figure 7
1. Interconnect the thermostat wiring in parallel from the thermostat to theterminal blocks on each fan control, for the “G” and “Y” connections only. Interconnect the wiring from the “C” connections at the terminal blocks on each fan control. Note: The “Y” connection is not required if air conditioning is not available.
2. Connect wire from “W” connection at the thermostat to the “W” connection of the electronic fan control of furnace #1.
“G” and “Y” connections only. Interconnect the wiring from the “C” connections at the terminal blocks on each fan control. Note: The “Y” connection is not required if air conditioning is not available.
2. Connect wire from “W1” of the thermostat to the “W” connection of the electronic fan control of furnace #1.
3. Connect wire from “W2” of the thermostat to one side of the 24Vac coil of the isolation relay (terminal #3). (Wire terminals for connection to the isolation relay are provided in the kit)
4. Connect wire from “R” connection at the thermostat to the “R” connection of the electronic fan control of furnace #1.
5. Connect wire from the “C” connection of the electronic fan control of furnace #1 to the other side ofthe 24Vac coil of the isolation relay (terminal #1).
6. Connect one wire to each of the normally open terminals of the isolation relay (terminal #2 and #4) and connect to the “R” and “W” connections at the electronic fan control of furnace #2.
7. Set the heat delay off timings on each control to the same setting.
8. Set thermostat anticipator setting at 0.75 for the 1st stage and 0.15 for the 2nd stage.
9. Recheck wiring connections, splices, and insulation. Re--apply line power to both appliances.
Twinning Kit Operation
1. Turn the heat/cool switching at the thermostat to “OFF”, or set so neither a call for heating nor cooling is being made.
2. Turn the fan switch to “ON” from“AUTO”, orjumper from “R” to “G” at “furnace 1”. Within severalseconds, the circulation blowers of each furnace will start at the same speed connected to their respective “heat” speed taps.
3. Connect wire from “R” connection at the thermostat to the “R” connection of the electronic fan control of furnace #1.
4. Connect wire from the “W” connection of the electronic fan control of furnace #1 to one side of the 24Vac coil of the isolation relay (terminal #3). (Wire terminals for connection to the isolation relay are provided in the kit)
5. Connect wire from the “C” connection of the electronic fan control of furnace #1 to the other side ofthe 24Vac coil of the isolation relay (terminal #1).
6. Connect one wire to each of the normally open terminals of the isolation relay (terminals #2 and #4) and connect to the “R” and “W” connections at the electronic fan control of furnace #2.
7. Set the heat delay off timings on each control to the same setting.
8. Set thermostat anticipator setting at 0.90.
9. Recheck wiring connections, splices, and insulation. Re--apply line power to both appliances.
Two Stage Thermostat Operation Reference Figure 6 and Figure 7
1. Interconnect the thermostat wiring in parallel from the thermostat to theterminal blocks on each fan control, for the
3. Turn the fan switch to “OFF” from “AUTO” or remove the jumper from “R” to “G”. Both circulation blowers will stop after several seconds.
4. Disconnect one wire from the high limit connection on “furnace 1”. Within several seconds, the circulation blowers of each furnace will start at the same speed connected to their respective “heat” s peed taps.
5. Re--connect the wire removed from the high limit connection on “furnace 1”. After the completion of the heating “blower off” delay, both blowers will stop.
6. Repeat steps (4) and (5) with the limit connection in “furnace 2” versus :furnace 1². The same operation should result.
7. Operate the system through a normal call for heat, burner on operation, and burner off operation. Each furnace should fire and cycle both blowers, including blower on and off delays, as in a normal single system.
8. Operate the system through a normal call for cooling. The compressor operation should function normally, with each furnace circulation blower operating at the speeds connected to their respective “cool” speed taps after cooling “blower on” delay. When the call for cooling ends, the circulation blowers will stop upon the completion of the “cooling off” delay.
2
441 06 1003 02 (10/2001)
Figure 1 Connection of Twinning Leads and Locating Isolation Relay On Furnace #1 Control Panel
CONTROL PANEL (Located In Blower Compartment).
Z1
Twinning Leads
T
W
N
Transformer
I
ST9120C40
4
2
1
IS O LATION RE L AY
(SPST)
DRILL TWO 1/8” Dia.
3
CONTROL PANEL (Located In Blower Compartment).
ELECTRONIC
FAN CONTROL
ST9120
Transformer
ST9160B
H
DATA
ELECTRONIC
FAN CONTROL
TWIN
ST9160
C
Twinning Leads
4
2
1
IS O LATION RE L AY
(SPST)
DRILL TWO 1/8” Dia.
3
25--23 --77
3
Figure 2
CONTROLS FOR ST 9210 & ST9160
ELECTRONIC FAN CONTROL
(ST9120)
Z1
T
W
I
N
Twinning Leads
Connect Z1 To Z1
AndZ2ToZ2.
ELECTRONIC FAN CONTROL
(ST9120)
ELECTRONIC FAN CONTROL
(ST9160)
ST9160B
DATA
H
TWIN
C
Twining Leads
Connect H To H And C To C.
ELECTRONIC FAN CONTROL
(ST9160)
ST9160B
DATA
25--23--78
4
441 06 1003 02 (10/2001)
Loading...
+ 7 hidden pages