Warnings and Cautions 2
Typical Installation 2
New Construction Installation 3
Retrofit Installation 7
Operation 12
Cleaning and Maintenance 12
Troubleshooting 13
Service Parts 13
Warranty 14
Page 2
ZB110HL1 Installation Guide
WARNING
TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR
INJURY TO PERSONS, OBSERVE THE FOLLOWING:
1. Use this unit only in the manner intended by the manufacturer.
If you have questions, contact the manufacturer at the address
or telephone number listed in the warranty.
2. Before servicing or cleaning unit, switch power off at service
panel and lock the service disconnecting means to prevent
power from being switched on accidentally. When the service
disconnecting means cannot be locked, securely fasten a
prominent warning device, such as a tag, to the service panel.
3. Installation work and electrical wiring must be done by a
qualified person(s) in accordance with all applicable codes
and standards, including fire-rated construction codes and
standards.
4. Sufficient air is needed for proper combustion and exhausting
of gases through the flue (chimney) of fuel burning equipment
to prevent backdrafting. Follow the heating equipment
manufacturer’s guideline and safety standards such as those
published by the National Fire Protection Association (NFPA),
and the American Society for Heating, Refrigeration and
Air Conditioning Engineers (ASHRAE), and the local code
authorities.
5. When cutting or drilling into wall or ceiling, do not damage
electrical wiring and other hidden utilities.
6. Ducted fans must always be vented to the outdoors.
Use only ON/OFF switch, mechanical timer or relay-switched
7.
control.
8. Acceptable for use over a tub or shower when connected to
a GFCI (Ground Fault Circuit Interrupter) - protected branch
circuit.
9. This unit must be grounded.
CAUTION
1. For general ventilating use only. Do not use to exhaust
hazardous or explosive materials and vapors.
2. This product is designed for installation in flat ceilings. Sensor
will not function reliably if product is not installed in flat ceiling.
DO NOT MOUNT THIS PRODUCT IN A WALL.
3. To avoid motor bearing damage and noisy and/or unbalanced
impellers, keep drywall spray, construction dust, etc. off power
unit.
4. Please read specification label on product for further
information and requirements.
NOT FOR USE IN A COOKING AREA
Do not install above or inside this area
45°45°
Cooking
Equipment
Floor
Typical Installation
• Installation is the same for:
Joists I-Joists Trusses
• Fits in 2" x 8" ceiling construction.
• Infinitely adjust the fan position
between joists from 14" to 24"
on center.
The ducting from this fan to the outside of the building has a strong effect on the air flow, noise and energy use of the fan. Use the shortest, straighest duct routing possible for best performance, and avoid
installing the fan with smaller ducts than recommended. Insulation around the ducts can reduce energy loss and inhibit mold growth. Fans installed with existing ducts may not achieve their rated airflow.
6-inch round rigid metal duct is recommended for best performance.
HOUSING
POWER
CABLE*
Seal gaps
around
Housing.
*Purchase
separately.
INSULATION*
(Place around and
over Fan Housing.)
FAN
ROUND
DUCT*
Seal duct
joints with
tape.
OR
ROUND
ELBOWS*
ROOF CAP*
(with built-in
damper)
Keep duct
runs short.
WALL CAP*
(with built-in
damper)
Page 3
New Construction Installation
ZB110HL1 Installation Guide
Tools needed
• Power screwdriver with a Phillips bit
• Phillips screwdriver
• Flathead screwdriver
• Pliers
• Wire insulation stripper
• Wire cutter
Remove Packaging
1
Parts Bag holds
Knockout Plate
and six (6)
screws
Materials needed
• 6" round metal ducting recommended for best performance.
Use of other ducting is acceptable but may impact performance.
• Roof cap or wall cap (built-in damper recommended)
• Tape to seal duct connections
• Electrical wiring and supplies per local code requirements
Punch out Mask from
packaging. See Step 6.
Remove
Instruction
Sheet
Install
2
Mounting
Frame
2
1
4
3
Page 4
New Construction Installation
Snap-in and
3
Secure Housing
2
snap!
ZB110HL1 Installation Guide
1
4
Attach Duct Connector and Ducting
4
Top and bottom flanges
go outside Housing
Insert tab into slot
inside Housing
1
6" Ducting
3
Screws from Parts Bag
Tape
Position Housing
between joists and
crimp channel on both
sides of Mounting Frame
to lock Housing in place.
Do not crimp Housing.
Screw from
2
Parts Bag
3
Page 5
New Construction Installation
Connect Wires and Install Knockout Plate
5
• Run 120VAC electrical wiring to the installation location.
• Use proper UL-approved connectors to secure wiring to the Knockout Plate provided in Parts Bag.
• Connect wires as shown in wiring diagram.
ZB110HL1 Installation Guide
Fan
LINE
MANUAL
SENSOR/
CONTROL
MASTER
BLK
LINE
WHT
IN
GRD
LIGHT
SWITCH
IN
ON
Attach cable clamps to Knockout
1
Plate. Knockout Plate mounts to
outside of Housing and may be
oriented as desired.
Light
2
Connect wires
LIGHT WITH ON/OFF SWITCH
14/2
FAN
MANUAL
ON
FAN
MASTER &
SENSOR/
BLK
WHT
GRD
CONTROL
14/3
LIGHT WITH DIMMER SWITCH
DIMMER
SWITCH
SWITCH BOX
BLKBLU
WHT
ORG
RED
BLK
WHT
GRD
14/2
14/4
BRN
BLK
WHT
RED
BLU
BLK
WHT
GRD
RED
BLK
LIGHT
SENSOR
CONTROL
BLK
FAN
UNITSWITCH BOX
BLU
ORG
BRN
RED
BLK
3
WHT
WHT
LIGHT
SENSOR
CONTROL
BLK
FAN
UNIT
4
Screw from
Parts Bag
WHT
WHT
• See OPERATION
section on page 12 for
details.
• MASTER switch
turns fan system on
and shuts it off for
fan cleaning and
maintenance purposes.
• SENSOR/CONTROL
switch turns humidity
control automatic
operation on/off.
• MANUAL-ON switch
directly increases fan
operation to certified
airflow rate.
• MASTER switch must
be on for humidity
control or MANUAL-ON
switch to change fan
operation to certified
airflow rate.
• MANUAL-ON switch
is not required to
manually increase fan
operation to certified
airflow rate (see page
10).
• MASTER and
SENSOR/CONTROL
switches can be
combined (see page
10).
• MASTER switch along
with or separate from
SENSOR/CONTROL
switch may be located
where they are not
easily accessed for
everyday usage, they
may need to be labeled
and located where
they can’t be turned
on without being seen
from fan to comply
with local and national
codes.
Page 6
New Construction Installation
Insert Mask and
6
Finish Ceiling
• Install ceiling material.
• Cut out around Housing.
CAUTION
IN ORDER TO PREVENT
MOTOR/CONTROL DAMAGE:
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plugs into control assembly.
Install Grille
7
ZB110HL1 Installation Guide
Mask protects unit
during construction.
Remove before
installing Grille.
Plug in
Sensor
1
2
Plug in
Light
3
4
Page 7
Retrofit Installation
ZB110HL1 Installation Guide
Tools needed
• Power screwdriver with a Phillips bit
• Phillips screwdriver
• Flathead screwdriver
• Pliers
• Wire insulation stripper
• Wire cutter
• Ruler
• Pencil
• Drywall saw
• Claw hammer or pry bar
• Utility knife
Materials needed
• Tape to seal duct connections
• Existing rigid duct will require the
addition of a short length of flexible duct
• Electrical wiring and supplies per
local code requirements
Remove Packaging
1
Remove
Instruction
Sheet
Parts Bag holds
Knockout Plate
and six (6)
screws
Punch out Mask from
packaging. See Step 12.
Switch Off Power
2
WARNING
Before removing existing fan, switch power off at service panel and lock the service disconnecting
means to prevent power from being switched on accidentally. When the service disconnecting means
cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.
Enlarge Ceiling Opening and Remove Existing Fan
3
12" (30.5 cm)
11" (27.9 cm)
parallel with joists
Existing ductwork and
1
Examine Wiring
4
Examine the existing wiring to make sure it is not damaged. If any damage is found,
DO NOT CONTINUE INSTALLATION of this product. Contact a qualified person(s) for repair.
wiring left in place
2
Page 8
Retrofit Installation
Remove Blower Assembly
5
2
ZB110HL1 Installation Guide
1
Set aside
Blower
Assembly
Both sides
Remove Wiring Panel
6
Set aside
screw
1
3
Set aside
Wiring Panel
2
3
Insert
7
Mounting
Frame
4
3
1
Remove screws from
Mounting Frame
and set aside
5
2
Bend up
four tabs
Page 9
Retrofit Installation
Secure
8
Mounting
Frame
Snap-in Housing
9
ZB110HL1 Installation Guide
Screws set
aside
in Step 7
2
10
Pull existing
ductwork
into Housing
1
Pull existing wiring into
Housing as it is inserted
into Mounting Frame
snap!
Attach Ducting and Duct Connector
1
2
4
Screw from
Parts Bag
3
Insert tab into
slot inside
Housing
6" Ducting
Tape
Loading...
+ 19 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.