Bretford MSB-F2, MSB-F3 Assembly Instructions Manual

FLOOR INFEED
LIQUID™ WORKSP ACE
Assembly Instructions
MODEL:
MSB-F2 MSP-F3
Use this instruction sheet in conjunction with the appropriate instruction sheet from either the Substation or Support.
CAUTION:
T urn off all power prior to connecting or disconnecting the liquid electrical components.
Substation
Steps to connect Floor Infeed to Junction Box
Substation
parts removed
for clarity
Substation skin open position
Infeed
Floor
monument
Note 2. :
Infeed
Junction Box
open end
Fig. 1
Note 1. :
Substation Channel instruction sheet step 1 thru step 3 must be completed before wiring can be done.
The open end of the Infeed is to be installed by a certified electrician. Will require cover plate to have 1 1/8” knock out and an appleton 7289v connector to complete connection.
STEP 1
Plug the other end of the Infeed into the Junction Box. Close the Substation Skins.