Brayden Studio W001183314 Installation & Assembly

DESK
1
PLEASE READ
Thank you for purchasing this quality product. A list of PARTS and INSTRUCTIONS are included to assist you. Unpack and identify all parts included on the PARTS LIST and HARDWARE LIST. If parts are missing, Please do not return the item to the store. Contact our CUSTOMER SERVICE DEPARTMENT :
2
Before you begin, please follow assembly instructions carefully, then follow them step by step.
Reminder:
Please ensure that all surfaces and edges with colours/laminations are facing forward/outward.
SCREWDRIVER
HAMMER
SELF-PREPARED TOOLS: Tools below are NOT included in package.
1
1
2
PART LIST
TOP PANEL 1 PC
MINI FIX
4
SIDE PANEL (L)
6
7
8
QTY
1 PC
1 PC
3
1 PC
5
1 PC
1 PC
1 PC
2 PCS
HARDWARE
A
B
C
D
E
F
G
12 PCS
M3.5 X 16MM C.B SCREW
12 PCS
ALLEN KEY M4
1 PC
BOTTOM PANEL
DRAWER FRONT
DRAWER SIDE
H
I
J
K
M6 X 5OMM CSK CAP WOOD SCREW
10 PCS
A1
A2
A3
M8 X 30MM WOOD DOWEL
22 PCS
9
10
11
1 PC
DRAWER BOTTOM
1 PC
DRAWER BACK
14" DRAWER SLIDE
J1 ( L/R ) J2 ( L/R )
1 SET
M4 X 38MM C.B SCREW
8 PCS
SIDE PANEL (R)
2 PCS
LEG (R)
2 PCS
LEG (L)
12
13
BACK PANEL
CENTER PANEL (L)
1 PC
M4 X 45MM C.B SCREW
2 PCS
L
SPRING WASHER M6
FLAT WASHER M6
8 PCS
8 PCS
8 PCS
JCBC SCREW M6 X 40MM
M
WOOD HANDLE (SMALL)
1 PC
N
CENTER PANEL (R)
14
LEG BRACE 2 PCS
4 PCS
JCBC SCREW M6 X 70MM
4 PCS
JRN NUT
3
4
7
5
6
2
12
13
12
13
14
14
8
9
10
9
11
K
3
STEP 1 STEP 2
SCREWDRIVER
REQUIRED
Insert hardware A2 onto panel (1). (Repeat 10 times.)
A2
x10
ROTATE
1
STEP 3
SCREWDRIVER
REQUIRED
- Insert hardware A1 onto panel (3), (4), (5) and (6). (Repeat 8 times.)
- Insert hardware
A2 onto panel (3) and (4).
(Repeat 2 times.)
- Insert hardware
B onto panel (3), (4), (5) and (6).
(Repeat 16 times.)
* Ensure the arrows on hardware
A1 point towards mounting positions.
A2
x2
ROTATE
3
4
5
6
PRESS
A1
x8
x16
PRESS
B
- Insert hardware A1 onto panel (7). (Repeat 4 times.)
- Insert hardware
B onto panel (7).
(Repeat 2 times.)
* Ensure the arrows on hardware
A1 point towards mounting positions.
PRESS
A1
x1
x2
PRESS
B
x1
A1
PRESS
PRESS
A1
x2
7
4
Second hole from the edge.Second hole from the edge. Big hole at the center.
x1
ROTATE
x1 x1
ROTATE
ROTATE
D
D
D
J1(R)
5
J1(L)
6
- Fix hardware J1 (L) into panel (5) with hardware D. (Repeat 3 times for each hardware.)
- Fix hardware
J1 (R) into panel (6) with hardware D.
(Repeat 3 times for each hardware.)
x1x1x1
ROTATE
ROTATE
ROTATE
Second hole from the edge. Second hole from the edge.Big hole at the center.
D
D
D
STEP 4
SCREWDRIVER
REQUIRED
5
STEP 7 STEP 8
STEP 5 STEP 6
- Attach panel (7) to panel (3) and (4).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1. (Repeat 2 times.)
OR
HARDWARE G
SCREWDRIVER
REQUIRED
* In this step hardware A1, A2 and B are pre-inserted.
x2
PRESS
ROTATE
Section View
x2
A3
A1
A2
7
4
3
- Attach panel (3), (4), (5) and (6) to panel (1).
- Insert all hardware A2 into A1.
- Rotate all A1 until tight.
- Apply A3 onto all A1. (Repeat 10 times.)
OR
HARDWARE G
SCREWDRIVER
REQUIRED
* In this step hardware A1, A2 and B are pre-inserted.
x10
PRESS
ROTATE
Section View
x10
A3
A1
A2
1
7
4
3
6
5
Connect panel (2) to panel (3), (4), (5), (6) and (7) by using hardware C and G. (Repeat 10 times.)
* In this step hardware B are pre-inserted.
ROTATE
x10
C
G
7
3
4
1
6
5
2
Insert hardware B and I into two part (14).
(Repeat 2 times for each part.)
x4
PRESS
B
PRESS
x4
I
14
14
STEP 11 STEP 12
STEP 9 STEP 10
6
Attach panel (14) to panel (12) and (13) by using hardware G, H and I.
(Repeat 4 times.)
PRESS
x4
I
H
x4
G
ROTATE
* In this step hardware B and I are pre-inserted.
14
14
12
13
12
13
Assemble part 12 and 13 into panel (2) by using hardware G, L, M and N.
(Repeat 8 times.)
ROTATE
x8
G
L
M
N
12
12
12
13
13
2
1
3
SCREWDRIVER
REQUIRED
Assemble panel (9) to panel (8) and (10) by using hardware E. (Repeat 4 times.)
SCREWDRIVER
REQUIRED
ROTATE
E
x4
8
10
9
Insert the panel (11) along the slot. (Repeat 1 times.)
9
8
10
11
STEP 15 STEP 16
STEP 13 STEP 14
Put the drawer of in place along the drawer slides.
8
2
1
4
3
Assemble hardware J2 (L/R) to panel (9) by using hardware D.
(Repeat 3 times for each hardware.)
SCREWDRIVER
REQUIRED
Third hole from the edge.
D
D
D
ROTATE
x2
x2
Third hole from the edge.
Hole at the center.
x2
J2(L)
ROTATE
ROTATE
*Hardware J2 (L/R) shall be leaning against panel (8) when assembling.
J2(R)
8
9
10
9
11
Assemble panel (9) to panel (8) and (10) by using hardware E. (Repeat 4 times.)
x4
E
ROTATE
SCREWDRIVER
REQUIRED
8
11
9
10
9
Fix hardware K onto panel (8) by using hardware F. (Repeat 2 times.)
SCREWDRIVER
REQUIRED
8
9
9
10
11
ROTATE
x2
F
K
7
Loading...