Bray S85 User Manual

A Subsidiary of BRAY INTERNATIONAL, Inc.
INSTALLATION – MAINTENANCE MANUAL SERIES 85 FULL PORT, 2 PIECE BALL VALVE
Installation and Maintenance Manual
®
Series 85 Ball Valves
Date: August 2011 / Page 1 of 2
USE
Maximum results and long life of the valve can be maintained under normal conditions and in accordance with Flow-Tek’s pressure/temperature and corrosion data. During shipment, storage, and in operation, the valve should be fully open or fully closed (“open” is preferred for shipping and storage). Do not use in intermediate positions without knowledge of flow and pressure drop.
MANUAL OPERATION
The opening and closing of the valve is done by turning the handle a quarter turn (90 degree turn)
A. VALVE OPEN POSITION
The handle is in line with the valve or pipeline.
B. VALVE IN CLOSED POSITION
The handle is across the pipeline.
Valves with actuators should be checked for actuator
- valve alignment. Angular or linear misalignment will result in high operational torque, and damage to valve stem and seals.
STEM SEAL ADJUSTMENT
If slight leakage is noted at stem, straighten lock washer tab, tighten stem nut to flatten Bellville Washers, back stem nut off 1/4 turn, secure lock washer tab.
GENERAL INFORMATION FOR ON-SITE INSTALLATION
1. The valve may be fitted in any position on the pipeline.
2. Before installing the valves, the pipes must be flushed clean of dirt, burrs, and welding residues, or the seats and ball surface will be damaged.
3. The pipe must be free of tension.
INSTALLATION
1. Use conventional sealant, such as hemp core, Teflon, etc.
2. Apply wrench only on the hexagon valve end being tightened. Tightening by using the valve body or handle can seriously damage the valve.
DISASSEMBLY FOR STEM AND SEAL REMOVAL
CAUTION: Ball valves can trap pressurized media when closed. Flush line with valve 1/2 open to remove hazardous media.
Stem seal leakage may be corrected without disassembly by tightening the packing sleeve nut (the nut underneath the handle) until such leakage stops. If the leakage continues or valve operating torque becomes excessive, the seals are worn and replacement will be necessary.
DISASSEMBLY AND CLEANING PROCEDURE
1. If the valve has been used to control hazardous media, it must be decontaminated before disassembly. It is recommended that the following steps be taken for safe remval and assembly.
2. As shipped from the factory, valves contain Silicone based lubricant. This is for break-in and may be removed by disassembly and solvent washing, if it is objectionable for a particular application.
FLOW-TEK, Inc. Tel: 832.912.2300 8323 N. Eldridge Pkwy #100 Fax: 832.912.2301 Houston, Texas 77041 www.flow-tek.com
A. Remove valve from line for servicing.
B. Loosen handle nut and remove handle. Remove
packing sleeve nut.
C. Remove the threaded end cap for disassembly,
leaving the ball for last.
D. EXTREME CARE should be taken upon ball
removal as not to scratch seating surface or the stem, which will result in leakage after reassembly.
E. Remove all seats, seals, stem packing and thrust
washer.
© 2011 Flow-Tek, Inc.
A Subsidiary of BRAY INTERNATIONAL, Inc.
4
3
4
6
2
1
14
11B
15
18
19
26
26
25
29
28
23
24
11A
12
10
5
Installation and Maintenance Manual
®
Series 85 Ball Valves
Date: August 2011 / Page 2 of 2
ASSEMBLY
1. Install the thrust washer on stem O.D.
2. Install stem packing in valve body.
3. Insert stem into body, taking care not to pinch or nick stem packing.
4. Install seat in the rear of the body cavity with the spherical curvature facing the mating ball.
5. Insert ball in body, care should be taken not to scratch the ball during installation.
6. Insert seat in threaded end cap so that spherical curvature is facing the ball. Tighten end cap tightly.
7. Tighten packing sleeve nut.
8. Place handle on assembly and tighten stem nut.
9. Safe and proper bench testing is required before re-installing to service. Ensure that valve operates smoothly.
WARNING: DO NOT REMOVE ANY VALVE PARTS WHILE LINE IS UNDER PRESSURE! UNDER NO CIRCUMSTANCES! LINE MUST BE DEPRESSURIZED BEFORE DEISASSEMBLY. VALVE SHOULD BE CYCLED TO ASSURE THERE IS NOT PRESSURE IN VALVE CAVITY.
Item Name
1 Body 2 End Cap 3 Ball 4 Seat* 5 Stem 6 Body Seal* 7 Anti-Static Device 8 Thrust Bearing*
9 Thrust Washer* 10 Stem Packing* 11 Packing Gland 12 Belleville Washer 13 Tab Lock Washer 14 Stop Set Sleeve 15 Stop Bolt 16 Handle 17 Nut 18 Handle Sleeve 19 Locking Device
*Parts included in the repair kits
FLOW-TEK, Inc. Tel: 832.912.2300 8323 N. Eldridge Pkwy #100 Fax: 832.912.2301 Houston, Texas 77041 www.flow-tek.com
This brochure is general in nature and manufacturer reserves the right to change dimensions, materials or to make design improvements
© 2011 Flow-Tek, Inc.