INSTALLATION - MAINTENANCE MANUAL
RF15 and RF30 Series
150 and 300 Lb. Flanged One piece Ball Valves
Installation and Maintenance Manual
®
Series RF15-RF30 Ball Valves
Date: August 2011 / Page 1 of 5
DESIGN
The design features of this valve include a one
piece construction body which results in simplified
maintenance and trouble free operation. These valves
feature a “free floating” ball. The ball is not fixed, but
is free to move with the line pressure. As a result of this
feature, these valves are capable of tight shut-off with
flow in either direction or dead-ended, regardless of
the position of the valve in the line.
The downstream seat, opposite the pressurized side of
a closed valve, must carry the load exerted by the line
pressure on the ball, while the upstream seat is subject
to little load or wear. For this reason, it is sometimes
possible to increase useful seat life by turning the valve
end-for-end in the pipeline.
1. USE
The valve should be maintained as part of a preventative
maintenance program and in accordance with
Flow-Tek’s recommended pressure, temperature and
corrosion limits to insure a long service life. During
shipment, storage, and in operation, the valve should
be fully open or fully closed (“open” is preferred for
shipping and storage). Do not use in throttling service
without investigating flow and pressure conditions.
A. VALVE OPEN POSITlON
The handle is parallel with the pipeline.
B. VALVE IN CLOSED POSITION
The handle is perpendicular to the pipeline.
Valves with actuators should be checked for actuator
-valve alignment. Misalignment will result in high
operational torque and damage to stem and seals.
3. STEM SEAL ADJUSTMENT
1. For 1”- 2”, if slight leakage is noted at stem,
straighten lock washer tab, tighten stem nut to
flatten Bellville Washers, back stem nut off 1/4
turn, secure lock washer tab.
2. For sizes larger than 2”, simply tighten gland
bolts evenly until leak stops. Do not over tighten.
4. GENERAL INFORMATION FOR ON-SITE
INSTALLATION
The valve may be fitted in any position on the pipeline.
Before installing the valves, the pipes must be flushed
clean of dirt, burrs, and welding residues, or the seats
and ball surface will be damaged.
WARNING: Before installing this equipment, confirm
that it is suitable for the intended service.
The identifications tags describe the maximum allowable
service conditions for this product.
Be sure that the installation is protected by appropriate
pressure control and safety devices to insure that
acceptable limits are not exceeded.
2. OPERATION:
Operation of the valve is done by turning the handle a
1/4 turn (90 degree turn). Clockwise to close, counter
clockwise to open.
FLOW-TEK, Inc. Tel: 832.912.2300
8323 N. Eldridge Pkwy #100 Fax: 832.912.2301
Houston, Texas 77041 www.flow-tek.com
5. DISASSEMBLY AND CLEANING PROCEDURE
CAUTION: Line must be depressurized before
disassembly. Valve should be cycled to assure there is
no pressure is trapped in valve cavity. Ball valves can
trap pressurized media when closed. Flush line with
valve 1/2 open to remove hazardous media. Valve
should be cycled to assure there is no pressure in the
valve body cavity.
Warning: DONOT remove packing gland or any other
valve parts while line is under pressure!
1. If the valve has been used to control hazardous
media, it must be decontaminated before
disassembly. It is recommended that the following
© 2011 Flow-Tek, Inc.
A Subsidiary of BRAY INTERNATIONAL, Inc.
Installation and Maintenance Manual
®
Series RF15-RF30 Ball Valves
Date: August 2011 / Page 2 of 5
steps are taken for safe removal and reassembly.
2. As shipped from the factory, valves contain a
Silicone based lubricant. This is for break-in
and may be removed, if it is objectionable for
a particular application, by disassembling and
solvent washing.
Stem seal leakage may be corrected without disassembly
by tightening the packing gland nut until such leakage
stops. If the leakage continues or valve operating torque
becomes excessive, the seals are worn and replacement
will be necessary.
If the valve has been used to control hazardous media,
it must be decontaminated before disassembly.
It is recommended that the following steps be taken
for safe removal and assembly.
As shipped from the factory, Valves contain Silicone
based lubricant. This is for break-in and may be removed
by disassembly and solvent washing.
6. DISASSEMBLY
E. If stem seals are to be replaced, remove handle
retainer nut, stop plate and packing gland. Push
stem into valve cavity and remove from retainer end.
F. Remove seats from insert and body cavity, remove
stem seals.
7. VISUAL INSPECTION:
Clean and inspect metal parts. It is not necessary to
replace the hall and stem unless the seating surfaces have
been damaged by abrasion or corrosion. Replacement
of all soft parts whenever the valve is disassembled
for reconditioning is strongly recommended. This is
the surest protection against subsequent leakage after
valve assembly. The replacement parts can he ordered
in kit form.
NOTE: The valve may be assembled and operated
dry where no lubricants are allowed in the system;
however, a light lubrication of mating parts will aid in
assembly and reduce initial operating torque. Lubricant
used must be compatible with the intended line fluid.
8. ASSEMBLY:
Stem seal leakage may be corrected without
disassembly. Tighten the packing gland nuts until
leakage stops. If leakage continues or valves operating
torque becomes excessive, the seals are worn and
replacement will be necessary.
Warning: DO NOT remove packing gland or any
other valve parts while line is under pressure! Under
no circumstance! Line must be depressurized before
disassembly.
A. Remove valve from line and clamp in vise
with handle and removable body insert in an
accessible position.
B. Put ball in the OPEN position. Insert spanner
wrench into slot in the retainer and rotate the
counter-clockwise.
C. Remove body seal from body. Use caution to
prevent damage to metal parts; discard seal.
D. Turn handle to CLOSED position so that the stem
tang and ball slot are in line with the port opening.
Lift or roll ball out of insert end.
1. Install one seat in the body cavity with the
spherical curvature facing the ball.
2. Install thrust washer on stem and slide the stem
up through the body. Install packing and packing
gland with packing gland bolt.
3. Install stop plate, handle and handle nut.
4. Turn the handle to the CLOSED position. Line up
the ball slot with the stem tang and slide the ball
into position.
Open the valve to hold the ball in place.
5. Install the remaining seat in the insert with the
spherical curvature facing the ball. Install body
gasket.
6. Carefully center the insert and press down until the
threads are engaged. Start the threads clockwise
by hand tightening with the tool used for removal.
The end cap should be tightened until the end cap
is flush with the flange face. The insert bottoms out
in a metal to metal fit.