Bradley Terreon Multi-Fount Series, Terreon Quadra-Fount MF2949/IR Installation Instructions Manual

Bradley Multi-Fount™ Series
MF2949/IR
Terreon® Quadra-Fount
Wall-Hung Washfountain with Adaptive Infrared
(Standard* & Juvenile Height)
*ADA compliant when mounted at recommended heights
Installation Instructions
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . .2
Washfountain Component Parts . . . . . . . . . . . . . . . . .3
Installation Instructions . . . . . . . . . . . . . . . . . . . . .4-10
Cleaning Instructions . . . . . . . . . . . . . . . . . . . . . .11-12
Solenoid Valve Troubleshooting . . . . . . . . . . . . . . .13
215-1249 Rev. H; EN 03-045 © 2003 Bradley Corporation Page 1 of 13 9-15-2003
P.O. Box 309, Menomonee Falls, WI 53052-0309 TEL. 1-800-BRADLEY FAX 262-251-5817 http://www.bradleycorp.com
IMPORTANT
Read through this installation manual to ensure proper installation.
Make sure that water supply is completely off before installation is begun.
When drilling into tile, masonry, or other hard materials to install wall and floor anchors, be sure to wear safety goggles to prevent eye injuries.
Wall anchors used must have a minimum pull-out rating of 1,000 lbs.
The Quadra-Fount™ requires a water flowing pressure of at least 20 psi but no greater than 100 psi.
File these instructions with the owner or maintenance department.
Terreon® Quadra-Fount™ Wall-Hung Washfountain with Adaptive Infrared Control MF2949/IR Installation Instructions
Bradley Corporation • 215-1249 Rev. H; EN 03-045
2 9-15-2003
Terreon® Quadra-Fount™ Washfountain Warranty
Bradley Corporation warrants to commercial and institutional purchasers only each unit free from defects in material and workmanship under normal use and service upon the following terms and conditions.
1. This warranty is limited to replacing or repairing, at our option, transportation charges prepaid by the purchaser, any Bradley unit or part thereof which our inspection shall show to have been defective within the limitations of this warranty.
2. The period during which Terreon® Quadra-Fount™ components are warranted is as follows:
• Terreon® side panels, bowl, and top cover warranted for 2 years.
• All other Quadra-Fount™ components warranted for 1 year.
3. This warranty does not cover installation or any other labor charges and does not apply to any units which have been damaged by accident, abuse, improper installation or improper maintenance.
4. The replacement or repair of defective units as stated in this warranty shall constitute the sole remedy of the purchaser and the sole liability of Bradley Corporation under this warranty. Bradley Corporation shall not otherwise be liable under any indirect damages caused by defects in the repair or replacement thereof.
5. This warranty extends only to commercial and institutional purchaser and does not extend to any others, including consumer customers of commercial institutional purchasers.
6. This warranty is in lieu of all other warranties, expressed or implied, including any implied warranty of merchants ability or fitness for a particular purpose or otherwise.
Pre-Installation Information
Terreon® material
The Quadra-Fount™ features Terreon®, a durable solid surface material used on the bowl and pedestal. Terreon® resists stains, burns and impact, and is repairable with everyday cleaners or fine-grit abrasives.
Adaptive sensor and solenoid valve
Each nozzle is controlled by a separate solenoid valve, allowing each user to activate a flow of tempered water from one spray nozzle. Each valve uses less than half the maximum amount of hat water allowed by the ANSI/ASHRAE/IES 90A-1980 Standard.
Adaptive Infrared sensor: The Adaptive sensor modules are housed in the sprayhead. The sensor eyes are secured behind the sprayhead to protect it from water, soap, and dirt. The sensor is accessible by removing the top cover. All other electrical components are housed within the pedestal.
Solenoid valve: An electronically controlled solenoid valve serves as the metering mechanism. Few moving parts provide reliable metering performance and the solenoid is unaffected by chemicals and minerals often present in municipal water supplies.
Barrier-free and ADA compliant
The Terreon® Quadra-Fount™ with Adaptive Infrared is designed to comply with all ADA guidelines on reaches, clearances and operation when mounted at recommended height dimensions by the installer (see page 4 for rough-in and mounting dimensions).
Terreon® Quadra-Fount™ Wall-Hung Washfountain with Adaptive Infrared Control
Installation Instructions MF2949/IR
3
Bradley Corporation • 215-1249 Rev. H; EN 03-045
9-15-2003
Supplies required:
• (6) 3/8" diameter bolts with washers and (6) wall anchors appropriate for your installation.
• 1/2" NPT Hot and cold water supply lines
• Drain trap and waste connection
• Pipe sealant and plumber’s putty
• 110 VAC power source for 110/24 VAC plug-in transformer supplied
• OPTIONAL: Bradley recommends installing an electrical cut-off switch to the unit. This feature
prevents accidental water delivery during regular maintenance and service.
Parts Included with the Wall-Hung Quadra-Fount™
Separate all parts from packaging materials and ensure you have all the parts required for assembly. If any parts are missing, do not attempt to assemble the Quadra-Fount™ until you obtain all parts.
Figure 1
* Subtract 4" from this dimension for juvenile height model.
Terreon® Quadra-Fount™ Wall-Hung Washfountain with Adaptive Infrared Control MF2949/IR Installation Instructions
Bradley Corporation • 215-1249 Rev. H; EN 03-045
4 9-15-2003
Installation Instructions
Step 1: Install the 24 VAC transformer
WARNING: The Tri-Fount™ must be connected with a 24 VAC Class II plug-in
transformer. Connection with 110 VAC could result in personal injury and will result in damage to the electronics.
IMPORTANT: Consult local electrical codes for the mounting location of the 110/24
VAC Class II plug-in transformer. Compliance and conformity to local codes and ordinances is the responsibility of the installer.
Step 2: Rough-in piping and install pedestal frame assembly
NOTE: See Figure 1a or 1b for piping rough-in dimensions and wall anchor locations for the pedestal frame assembly.
IMPORTANT: Make sure that the water is completely shut off before beginning
installation.
1. Rough-in hot and cold supply lines through the wall.
2. Rough-in a drain waste connection through the wall.
IMPORTANT: Make sure the frame is level when using as a template for drilling
anchor holes.
IMPORTANT: Wall anchors need to withstand 1000 lb. pull force.
3. Drill four 1/2" diameter holes in the wall using the pedestal frame as a template.
4. Secure the pedestal frame to the wall anchors using four 3/8" dia. bolts and washers (supplied by installer).
110 V GFI ELECTRICAL OUTLET RECOMMENED LOCATION. REFER TO LOCAL CODES BEFORE ROUGH-IN.
22"
(559)
12"
(305)
Outline of Plumbing Opening
Outline of Wall Frame
1/2 NPT Hot Supply
Stub Out 1" (25)
4-1/4"
(108)
23-1/4"
(591)
110 V GFI ELECTRICAL OUTLET RECOMMENED LOCATION. REFER TO LOCAL CODES BEFORE ROUGH-IN.
1/2 NPT Cold Supply
12"
(305)
*
2-1/4"
(57)
4-1/4"
(108)
8-1/2"
(216)
Stub Out 1" (25)
26-1/2"
*
(673)
25-1/2"
*
(648)
1-1/2" (38) Drain
Stub Out 2" (51)
3/8" (10) Wall Anchors (6 total)
10"
(254)
9-1/4"
(235)
18-3/4"
(476)
Finished Floor
Finished Floor
Loading...
+ 9 hidden pages