Flush the water supply lines before beginning installation and after installation is complete. Test
the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all
times. Provisions shall be made to prevent unauthorized shutoff.
CAUTION
Emergency equipment must be supplied with tepid water (60°F to 100°F/15.6°C to 37.8°C). Any
prolonged exposure to near freezing water affects the body's ability to maintain body temperature,
increasing the risk of hypothermia.
NOTICE
Before installing this product, ensure that there are adequate clearances around the product and
activation of the product does not interfere with other products or obstructions.
Avoid cleaners containing organic solvents, alcohols and hydrocarbons. Rinse with water after
cleaning.
IMPORTANT
The installation and location of all safety drench showers, eye and eye/face washes must comply
with the requirements of ANSI/ISEA Z358.1.
Read this installation manual completely to ensure proper installation, then file it with the owner or
maintenance department. Compliance and conformity to drain requirements and other local codes
and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed
emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure.
Self-closing spring-loaded valves are not UL classified to ANSI/ISEA Z358.1.
Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable
flushing fluid supply is present and any sediment build-up in the supply line is cleared. Emergency
equipment should be inspected monthly to address any maintenance issues ensuring the
equipment is in good operating condition and that there are no signs of wear.
Workers who may come in contact with potentially hazardous materials should be trained regarding
the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or
call 800-BRADLEY (272.3539).
Product warranties and parts information may also be found under ”Products” on our web site at
bradleycorp.com.
• Piping to ½" NPT (BSPP) water supply inlet (30–90 psi [2.0-6.1 bar])
• Piping to 1¼” NPT drain outlet on unit (if included with unit)
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation.
Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it
is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the
contractor or purchased from Bradley Corporation.
Stay-Open Eyewash, Chrome-Plated Brass
Stay-Open Eyewash, 316 SS
Halo Eyewash
Halo Eye/Face Wash
Halo Eyewash, 304 SS Yoke
Halo Eye/Face Wash, 304 SS Yoke
304 SS Halo Eye/Face Wash, 304 SS Yoke
Halo Eyewash, 316 SS Yoke
Halo Eye/Face Wash, 316 SS Yoke
316 SS Halo Eye/Face Wash, 316 SS Yoke
Bowl and Dust Cover
¨A
¨B
¨D
¨E
¨F
¨G
¨H
¨J
¨0
Activation
¨A
¨B
¨C
¨D
¨E
Drench Hose and Backflow Prevention
¨A
¨B
¨C
¨D
¨0
Freeze and Scald Protection
¨N
¨P
¨R
¨0
Plastic Bowl, No Dust Cover
Plastic Bowl, Plastic Dust Cover
304 SS, No Dust Cover
304 SS, 304 SS Dust Cover
304 SS, Plastic Dust Cover
316 SS, No Dust Cover
316 SS, 316 SS Dust Cover
316 SS, Plastic Dust Cover
No Bowl or Dust Cover
300 SS Handle
316 SS Handle
300 SS Handle, 300 SS Foot Pedal
300 SS Handle with 316 SS Foot Pedal *
316 SS Handle with 316 SS Foot Pedal *
Drench Hose Kit with Vacuum Breaker
Drench Hose Kit with N9 Backflow Preventer
Drench Hose Kit with 9D Backflow Preventer
Drench Hose Kit without Backflow Preventer
No Drench Hose and No Backflow Prevention
Anti-Freeze Valve
Anti-Scald Valve
Anti-Freeze and Anti-Scald Valves
No Anti-Freeze Valve and No Anti-Scald Valve
NPT = National Pipe Thread
BSPP = British Standard Pipe Parallel Threads
All selections made through the configurator are
only UL certified to ANSI/ISEA Z358.1
How to Specify Model and Configurations
for Bradley Halo Products:
All dimensions assume standard thread engagement. Variations in manufacturing allow for +/- 1⁄8"
(3mm) per threaded joint. To find the tolerance of a dimension, add the number of thread joints
across the length of the dimension and multiply it by 1⁄8" (3mm).
Standard eyewash unit is shown. Other units are similar.
Connect components before securing the base to the floor. When connecting
components, use the rubber grip pad (provided) around pipes to prevent marring.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints, making
sure not to get any excess over the edge of the pipes.
BSPP = British Standard Pipe Parallel Thread (not available in the U.S.)
Halo unit with standard
drain option
½" NPT below supply
inlet, or ½" BSPP
Adapter when option
is specified
20½"
(521mm)
pipe length
Halo unit with 24"
drain option
½” NPT below
supply inlet, or ½"
BSPP Adapter
when option is
specified
1¼" NPT
drain outlet
or 1-1/4"
BSPP
Adapter
when option
is specified
12¾"
(324mm)
pipe length
1¼" NPT drain
outlet or 1-1/4"
BSPP Adapter
when option is
specified
For optional foot pedal
installation, the base
(3) Ø 3⁄8" (10mm) holes on
Ø 8" (203mm) bolt circle
must be positioned
so that the hole in the
base is perpendicular
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
341
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Prepack S08-390 (for units with brass ball valve)
Prepack S08-391 (for units with stainless steel ball valve)
Prepack S08-392 (for units with brass frost-proof ball valve)
Prepack S08-393 (for units with stainless steel frost-proof ball valve)
Prepack S08-394 (for units with 316 stainless steel ball valve and handle)
Prepack S08-395 (for units with 316 stainless steel frost-proof ball valve