P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 1-800-BRADLEY FAX (262) 251-5817
http://www.bradleycorp.com
Installation
215-155 Rev. V; EN 06-532D
© 2007 Bradley Corporation
Page 1 of 13 6/26/07
S19-210
Pedestal-Mount Eyewash w/Plastic Bowl
Douche oculaire sur pied (vasque en matière
plastique)
Lavaojos montado en pedestal con receptor de
plástico
S19-210B
Pedestal-Mount Eyewash w/Stainless Steel Bowl
Douche oculaire sur pied (vasque en acier inox)
Lavaojos montado en pedestal con receptor de
acero inoxidable
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . .2
Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . .3
Assembly of Components/Parts List
Plastic Bowl . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Stainless Steel Bowl . . . . . . . . . . . . . . . . . . . . . . .5
Table des matières
Avant l’installation . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Instructions d’installation . . . . . . . . . . . . . . . . . . . . . .7
Montage/liste des pièces
Vasque plastique . . . . . . . . . . . . . . . . . . . . . . . . . .8
Vasque acier inox . . . . . . . . . . . . . . . . . . . . . . . . .9
Contenido
Información previa a la instalación . . . . . . . . . . . . . .10
Instrucciones de instalación . . . . . . . . . . . . . . . . . . .11
Montaje de los componentes/Lista de piezas
Receptor de plástico . . . . . . . . . . . . . . . . . . . . . .12
Receptor de acero inoxidable . . . . . . . . . . . . . . .13

2
S19-210, S19-210B Installation
6/26/07 Bradley Corporation • 215-155 Rev. V; EN 06-532D
WARNING
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the
installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin
installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to
the eyewash should be “ON” at all times. Provisions shall be made to prevent
unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per
ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to
ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment
per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit
www.bradleycorp.com or call 1-800-BRADLEY.
Product warranties may also be found under ”Product Information” on our web
site at www.bradleycorp.com.
T
H
IS
S
ID
E
U
P
Packing List
!
!
!
!
P
.O
. B
o
x
3
0
9
, M
e
n
o
m
o
n
e
e
F
a
lls
, W
I 5
3
0
5
1
R
T
E
S
T
T
H
I
S
U
N
I
T
E
A
C
H
W
E
E
K
Test-operate valve(s) each week and sign below
.
R
eport any m
alfunctions imm
ediately.
Ven
til(e) w
öche
ntlich im
Testbe
trieb prüfen
, bestätig
t
durch U
ntersch
rift. Jeg
liche Störung sofort m
eld
en.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
D
I
E
S
E
S
G
E
R
Ä
T
1
S
T
W
Ö
C
H
E
N
T
L
I
C
H
Z
U
P
R
Ü
F
E
N
.
E
S
S
A
I
H
E
B
D
O
M
A
D
A
I
R
E
Test le fonctionnem
ent des va
lves chaque se
m
ain
e et
signe en bas. S
'il y à quelque chose q
u
i ne va pas fait
un rapport im
médiatem
ent.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051

Installation
Supplies Required:
• (3) 3/8" floor anchors and bolts
• Pipe sealant
• Piping to 1/2" IPS water supply inlet
• Piping to 1-1/4" IPS drain outlet
• Sign-mounting hardware
Step 1: Secure base to floor
1. To secure base to floor, install three suitable
anchors (supplied by installer) for 3/8" bolts in
the floor (Figure 1).
2. Bolt the base to the floor anchors using 3/8"
bolts (supplied by installer).
Step 2: Assemble eyewash
1. Assemble eyewash components as shown in
Figure 2a on page 4 (for unit with plastic bowl)
or Figure 2b on page 5 (for unit with stainless
steel bowl).
• Apply pipe sealant (supplied by installer) to
all male-threaded pipe joints.
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to
prevent marring. Place the grip pad on the
pipe, then put the wrench over the grip pad
and turn the pipe with the wrench.
Step 3: Connect water supply
1. Connect the water supply piping (supplied by
installer) to the 1/2" IPS inlet on the eyewash.
2. Connect the drain piping (supplied by installer)
to the 1-1/4" IPS drain outlet on the eyewash.
3. Mount the safety sign to the wall using signmounting hardware (supplied by installer).
4. Open the water supply lines and test for leaks
and adequate water flow.
Figure 1
3
Installation S19-210, S19-210B
Bradley Corporation • 215-155 Rev. V; EN 06-532D 6/26/07
S19-210
S19-210B
NOTE: All dimensions assume standard thread
engagement. Variations in manufacturing allow
for +/- 1/8" (3mm) per threaded joint. To find
the tolerance of a dimension, add the number
of thread joints in between a dimension and
multiply it by 1/8" (3mm).
7-3/8"
(187mm)
(914mm)
7-3/8"
(187mm)
36"
36"
(914mm)
15-1/2" (394mm)
Ø 10"
(254mm)
5-1/4"
(133mm)
(152mm)
15-1/2" (394mm)
Ø 10-3/4"
(273mm)
5-1/4"
(133mm)
41-1/2"
(1054mm)
6"
41-1/2"
(1054mm)
6"
(152mm)

Assembly of Components - S19-210 (Plastic Bowl)
4
S19-210, S19-210B Installation
6/26/07 Bradley Corporation • 215-155 Rev. V; EN 06-532D
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
4.7
4.8
4.5
Flow Control
This End
4.4
4.3
4.2
4.1
5
7
11
9
10
8
1/2" IPS
Supply Inlet
3
6
2
1
1-1/4" IPS
Drain Outlet
7.1
4
4.6
NOTE: Items 4.1–4.8 come preassembled as Item 4.
Figure 2a
1 131-059 1 Base
2 169-727 1 Pipe Tee 1-1/4” IPS
3 113-006LC 1 Pipe 1-1/4” IPS x 27-1/2"
4 S90-284 1 Plastic Bowl Assembly
4.1 111-039 1 Inlet Drain Fitting
4.2 124-028 1 Gasket
4.3 154-058 1 Plastic Bowl
4.4 173-025 1 Cup Strainer
4.5 S21-071 1 Supply Pipe Assembly
4.6 113-1185 1 Spacer, Drain
4.7 S05-091 1 Eyewash Yoke Assembly
4.8 107-371 2 Tethered Dust Cover
5 113-006LQ 1 1/2” NPT Pipe
6 169-025 1 Elbow, 1/2" Street
7 S27-282 1 1/2" Ball Valve w/Nut
7.1 110-215 1 Nut only
8 128-135 1 Eyewash Handle
9 142-002DA 1 Washer
10 114-051 1 Safety Sign
11 204-421 1 Emergency Tag
12 269-915 1 Grip Pad (not shown)
Item Part No. Qty Description
Prepack S45-122 includes Items 7, 7.1, 8, 9
Prepack S45-123 includes Items 7.1, 8, 9
Prepack S45-1785 includes Items 4.2, 4.4, 4.5, 4.6