Bradley S19-130BF, S19-130ABF Installation Manual

Page 1
Installation
S19-130BF S19-130ABF
Drench Shower - Vertical Supply
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . 2
Installation Instructions. . . . . . . . . . . . . . . . . . . . . . . . . 3
S19-130BF Components and Parts List . . . . . . . . . . . . 4
S19-130ABF Components and Parts List. . . . . . . . . . . 5
215-1263 Rev. C; ECN 07-522 © 2007 Bradley Corporation Page 1 of 5 8/27/07
P.O. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE 1-800-BRADLEY FAX (262) 251-5817 http://www.bradleycorp.com
Page 2
S19-130BF, S19-130ABF Installation
WARNING
Installation
R
1
5 0 3 I 5
W ,
s ll a F
e e n o
R P
m o
U
n
Z
e
H
M ,
IC
9
L
0
K
T
3
E
N E
x
E
eek an
o
H
W
C
B
H
.
Ö
h w
C
O
c
E
.
W
A
P
R I
T
E
s immed
S
A T I
D 1
Testbe
N
A
T
e(s) ea
U
Ä M R
S
O
I
alv
h im
E D
H
eglic
T
B
G
alfunction
tlic
E
S
T
E
S
H I
S
E
y m
hen
T
A
E
hrift. J
I
perate v
S
D
öc
S E
nnem
'il y
ntersc
Test-o
eport an
m
R
as. S
fonctio
Ventil(e) w
t im
durch U
e en b
Test le
rappor sign un
Date
Datum
Date
114-051
. N E F Ü
belo
d sign
. y
el
prüfen,
iat
b
g s trie törun
es he S
alv
e c es v ent d
ent. à quelqu édiatem
Signed Unterschrift
Signe
. w
ätigt est elden.
b
aine et
t m
as fait
or
a p
of
e v chaque sem se qui n ho
Date
Date
Date
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
THIS SIDE UP
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
Signed Signed Signed
The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per
http://www.bradleycorp.com
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www. bradleycorp.com or call 1-800-BRADLEY.
Product warranties may also be found under ”Product Information” on our web site at www.bradleycorp.com.
2
8/27/07 Bradley Corporation • 215-1263 Rev. C; ECN 07-522
Page 3
Installation S19-130BF, S19-130ABF
Installation
Supplies Required:
• Teflon tape and pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate 30 gallons per minute discharge for drench shower waste
• Sign-mounting hardware
Step 1: Assemble drench shower
IMPORTANT: Some teflon sealants may cause stress cracks in the plastic showerhead leading to failure. Use teflon tape for sealing the showerhead.
1. Assemble the components as shown on page 4 (for units with plastic showerhead) or page 5 (for units with stainless steel showerhead).
• Apply pipe sealant or tape (by
installer) to all male-threaded pipe joints.
• Use a strap wrench around pipes
when tightening to prevent marring.
• Bottom edge of showerhead should
be 7'-0" (2134 mm) from the floor.
2. To assemble the pull rod, thread jam nut on to threaded end, then thread pull rod into coupling as shown. Tighten jam nut.
9"
(229mm)
7'-0"
(2134mm)
Suggested
Height to
Floor
7-1/4"
(184mm)
S19-130BF
Ø 10"
(254mm)
S19-130ABF
Ø 10-3/4"
(273mm)
1" IPS Supply
45"
(1142mm)
9"
(229mm)
Step 2: Connect water supply
IMPORTANT: Do not rely on Bradley’s Drench Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet on unit (piping supplied by installer). Provide adequate supports (supplied by installer) for supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using sign-mounting hardware supplied by installer.
3. Open water supply lines. Test for leaks and adequate water flow.
Bradley Corporation • 215-1263 Rev. C; ECN 07-522 8/27/07
3
Page 4
S19-130BF, S19-130ABF Installation
Assembly of Components - S19-130BF (Plastic Showerhead)
1" NPT
Supply Inlet
1
1.1
NOTE: Use teflon tape
only.
4.1
1.2
1.4
1.3
1.5
3
1.11
5
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
6
2
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
R
4.2
4.3
4
Parts List
Item Part No. Qty Description
1 S30-060 1 Stay-Open Ball Valve 1" NPT
1.1 S27-278 1 Ball Valve 1" with Jam Nut
1.11 110-214 1 Jam Nut only
1.2 140-720 1 Stop Bracket
1.3 124-048 1 Friction Washer
1.4 128-132 1 Handle
1.5 142-002DC 1 Lockwasher
2 S90-365D 1 Pull Rod - 45" Long
ALIGN
HANDLE
PIECES
AS SHOWN
NOTE: Items 1.1–1.5 come preassembled as Item 1. Items 4.1–4.3 come preassembled as Item 4.
Item Part No. Qty Description
2.1 161-026 1 Hex Nut 1/4"-20 Stn. Steel
3 113-006LN 1 Pipe Nipple
4 S24-070 1 Plastic Showerhead Assembly
4.1 154-057 1 Plastic Showerhead Shell
4.2 155-005 1 Diffuser
4.3 160-245 3 Screw
5 114-050 1 Safety Sign
6 204-421 1 Emergency Inspection Tag
4
8/27/07 Bradley Corporation • 215-1263 Rev. C; ECN 07-522
Page 5
Installation S19-130BF, S19-130ABF
Assembly of Components - S19-130ABF (Stn. Steel Showerhead)
1" NPT
Supply Inlet
1
1.1
1.2
1.4
1.3
1.5
3
1.11
2
5
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-050
6
4.5
4.4
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN. ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below. Report any malfunctions immediately. Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden. Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
Date
Signed
Date Signed
Datum
Unterschrift
Date
Signed
Date
Signe
Date
Signed
R
4
4.1
4.2
4.3
Parts List
Item Part No. Qty Description
1 S30-060 1 Stay-Open Ball Valve 1" NPT
1.1 S27-278 1 Ball Valve 1" with Jam Nut
1.11 110-214 1 Jam Nut only
1.2 140-720 1 Stop Bracket
1.3 124-048 1 Friction Washer
1.4 128-132 1 Handle
1.5 142-002DC 1 Lockwasher
2 S90-365D 1 Pull Rod - 45" Long
2.1 161-026 1 Hex Nut 1/4"-20 Stn. Steel
ALIGN
HANDLE
PIECES
AS SHOWN
NOTE: Items 1.1–1.5 come preassembled as Item 1. Items 4.1–4.5 come preassembled as Item 4.
Item Part No. Qty Description
3 113-006LN 1 Pipe Nipple
4 S24-084 1 Stn. Steel Showerhead Assembly
4.1 187-053 1 Stn. Steel Showerhead Shell
4.2 155-008 1 Diffuser
4.3 160-138 2 Screw
4.4 125-001DP 1 Washer
4.5 153-312 1 Adapter, Celcon
5 114-050 1 Safety Sign
6 204-421 1 Emergency Inspection Tag
Bradley Corporation • 215-1263 Rev. C; ECN 07-522 8/27/07
5
Loading...