
Installation
SS-2N/BIR3/STD
SS-2N/BIR3/WH
Express® Lavatory
System SS-Series
SS-3N/BIR3/STD/LSD-3
SS-3N/BIR3/WH/LSD-3
Express Lavatory Systems are ADA and TAS compliant
U.S. Pat. Nos. 5,611,093; D447-224
Other Patents Pending
Table of Contents
Pre-Installation Information ...............................2
Components ..........................................3
Supplies Required......................................4
Dimensions - Front and Top Views .......................4-5
Rough-Ins ............................................6
Mount the Frame.......................................7
Install the Bowl ........................................7
Connect the Supply - Hot and Cold Supply ..................8
Connect the Supply - Single Tempered Supply ...............8
Install the Drains .......................................9
Connect Electrical and Sprayhead Supplies..................9
Adjust the Temperature.................................10
Cleaning and Maintenance ..............................11
Troubleshooting – BIR3 Components .....................12
Solenoid Valve........................................13
Stop Valve Troubleshooting ..............................13
Thermostatic Mixing Valve Troubleshooting .................14
Fill Soap Dispenser....................................15
Clean Soap Dispenser .................................15
215-1500 Rev. J; ECN 17-08-026
© 2018 Bradley
Page 1 of 15 5/14/2018
Menomonee Falls, WI 53052 USA
P.O. Box 309
800 BRADLEY (800 272 3539)
+1 262 251 6000
bradleycorp.com

SS-2N/BIR3/STD, SS-2N/BIR3/WH Installation
WARNING
Make sure that all water supply lines have been flushed and then completely turned off before beginning
installation. Debris in supply lines can cause valves to malfunction.
Turn OFF electrical power to the electrical outlets, then unplug all electrical units prior to installation. Electrical
power MUST remain off until installation is complete. After installation is complete, turn on the water supply
first, then turn on the electrical power.
Installer's hardware must be appropriate for wall construction. Wall anchors must have a minimum pull-out
rating of 1,000 pounds.
NOTICE
Overtightening fasteners can damage the Terreon material. Use caution when tightening bowl and sprayhead
fasteners.
IMPORTANT
Read this entire installation manual to ensure proper installation. When finished with the installation, file this
manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances
is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging
material. If any parts are missing, do not begin installation until you obtain the missing parts.
Product warranties may be found under “Products” on our website at www.bradleycorp.com.
2 5/14/2018 Bradley • 215-1500 Rev. J; ECN 17-08-026

Installation SS-2N/BIR3/STD, SS-2N/BIR3/WH
Components
Panel Fasteners (160-450)
Washers (142-002CA)
(6) Places
Bolt 5/16-18
(160-371)
Screw 10-24
(160-386)
Sprayhead Cover
(SS-2N-COVR-ONLY)
Contact your local Bradley
Representative for part number.
Sprayhead Body
(SS-2N-SPYD-ASSY)
Contact your local Bradley
Representative for part number.
Bowl
(SS-2N-BOWL)
Contact your local Bradley
Representative for part number.
Washer (142-002BJ)
LockWasher (142-002BK)
Nut, 5/16-18 (161-036)
Access Panel
Coal (186-1455B)
Drain Assembly
P-Trap (Polypropylene)
(269-1697)
Optional P-Trap
(Chrome-Plated Brass)
(S29-094)
Scuff Base Panel
Coal (185-034B)
#8-32 Screw
Drain Plug (P16-072)
(160-319)
Scuff Panel Fasteners (160-450)
Washers (142-002CA) (4) Places
Strainer (P16-075)
1/8" Rubber Washer (125-001DP)
Tailpiece (129-056)
Main Frame (S17-325)
Scuff Frame (S17-326)
Used with Standard Height
Frames Only
Bowl Mounting
Hardware
1/4"-20x1/2"
Pan Head
Screw (qty 4)
(160-389)
1/4"-20
Washer
(qty 4)
(142-002DB)
Bradley • 215-1500 Rev. J; ECN 17-08-026 5/14/2018 3

SS-2N/BIR3/STD, SS-2N/BIR3/WH Installation
Supplies Required
• (6) 3/8" wall anchors, bolts and 1" min. O.D. washers to mount main frame and bowl to wall (minimum pull-out rating
of 1,000 lbs.)
• STD. HEIGHT ONLY: (2) 3/8" wall anchors, bolts and 1" min. O.D. washers to mount scuff base to wall
• 1/2" nominal copper tubing for hot and cold supplies and 1-1/2" NPT drain piping
Dimensions - Front and Top Views
50"
(1270)
Top View
8-5/8" (219)
8" (203) Radius
(mm)
Front View
Standard Frame
Front View
Wall-Hung Frame
15"
(381)
38-1/4"
(972)
21-1/4" (540)
30" (762)
36" (914)
38-1/4"
(972)
15"
(381)
10" (254)
Radius
7" (178)
7"
(178mm)
30" (762)
36" (914)
4 5/14/2018 Bradley • 215-1500 Rev. J; ECN 17-08-026

Installation SS-2N/BIR3/STD, SS-2N/BIR3/WH
Dimensions - Side Views
Standard
Height
38-1/2"
(978)
(864)
34"
30"
(762)
13-1/4"
(311)
Wall Hung Mounted
at Juvenile Height
Ages: 6 through 12
21-1/8" (537)
11-1/2"
(292)
8-5/8"
(219)
35-1/2"
(902)
31"
(787)
27"
(686)
3" (76)
Scuff Base on
Standard Height
Only
Wall Hung Mounted
at Standard Height
21-1/8" (537)
11-1/2"
(292)
8-5/8"
(219)
38-1/2"
(978)
(864)
34"
30"
(762)
13-1/4"
21-1/8" (537)
11-1/2"
(292)
8-5/8"
(219)
(311)
Wall Hung Mounted
at TAS Height
Grades: 6 through 8 or 9
36-1/2"
(927)
32"
(813)
28"
(711)
11-1/4"
(286)
21-1/8" (537)
11-1/2"
(292)
8-5/8"
(219)
TAS
10-1/4"
(260)
Wall Hung Mounted
at TAS Height
Grades: Pre-K through 5 or 6
34-1/2"
(876)
30"
(762)
26"
(660)
9-1/4"
(235)
21-1/8" (537)
11-1/2"
(292)
8-5/8"
(219)
TAS
Bradley • 215-1500 Rev. J; ECN 17-08-026 5/14/2018 5