Bradley Express EXD Series, Express EXD-3/JUV, Express EXD-3/STD, Express EXD-3/WH97 Installation Instructions Manual

EXD-3/STD EXD-3/JUV
Express® Deck Lavatory System EXD Series
(Standard and Juvenile Height)
Table of Contents
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .2-3
Cleaning and Maintenance . . . . . . . . . . . . . . . .9
Assembly of Components . . . . . . . . . . . . . . . .10
P.O. Box 309, Menomonee Falls, WI 53052-0309 Phone: 1-800-BRADLEY Fax: (262) 251-5817 http://www.bradleycorp.com
Installation Instructions
For Service Only
215-1276 Rev. C; EN 03-817 © 2004 Bradley Corporation Page 1 of 11 6/8/04
IMPORTANT
Read this entire installation manual to ensure proper installation, then file these instructions with the owner or maintenance department.
Flush all the water supply lines before making connections. Debris in supply lines will cause the valves to malfunction.
Turn OFF electrical power to the outlet when installing the Express® Deck.
Wall anchors used must have a minimum pull-out rating of 1,000 lbs.
Product warranties may be found under "Product Information" on our web site at www.bradleycorp.com.
Express® Deck Lavatory System EXD Series EXD-3/STD, EXD-3/JUV Installation Instructions - For Service Only
2 6/8/04 Bradley Corporation • 215-1276 Rev. C; EN 03-817
EXD-3/STD & EXD-3/JUV Express® Deck Lavatory System Dimensions
Express® Deck Lavatory System EXD Series
Installation Instructions - For Service Only EXD-3/STD, EXD-3/JUV
3Bradley Corporation • 215-1276 Rev. C; EN 03-817 6/8/04
Dimensions
continued . . .
Standard Height
EXD-3/STD
Juvenile Height
EXD-3/JUV
Express® Deck Lavatory System EXD Series EXD-3/STD, EXD-3/JUV Installation Instructions - For Service Only
4 6/8/04 Bradley Corporation • 215-1276 Rev. C; EN 03-817
(MM)
32"
(813)
28-5/8"
(727)
23-1/2"
(597)
11-3/8"
(289)
19-5/8"
(498)
(8) 3/8" WALL ANCHORS WITH MINIMUM PULLOUT RATING OF 1,000 LBS.
38-1/2"
(978)
24-3/8"
(619)
2-3/4"
(70)
21-3/4"
(552)
14-3/16"
(360)
38-1/2"
(978)
24-3/8"
(619)
7-5/8"
(194)
1/2" NPT HOT AND COLD SUPPLIES OR TEMPERED SUPPLY - STUB OUT 2" (50) FROM WALL
Finished Floor
CENTERLINE
15-1/4"
(387)
1-1/2" NPT DRAIN ­STUB OUT 3-1/2" (89) FROM WALL
110 Volt GFCI ELECTRICAL OUTLET (optional)
Figure 1a
Standard Height - EXD-3/STD
Installation Instructions
Supplies required:
• (8) 3/8" wall anchors, bolts and washers to mount frame and bowl to wall (minimum pull-out rating of 1,000 lbs.)
• 1/2" NPT hot and cold supply piping
• 1-1/2" NPT drain piping
• 110 volt electrical outlet for optional 110/24 VAC plug-in transformer for infrared faucet option
Step 1: Rough in
IMPORTANT: Refer to Figure 1a below ( for Standard Height Express® Deck only)
or Figure 1b on page 5 (for Juvenile Height Express® Deck only) and Figure 2 on page 5 (for both Standard and Juvenile Height units).
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install (8) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer) at the locations shown in Figure 1a below or 1b on page 5.
4. INFRARED FAUCET OPTION ONLY: Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 1a below or 1b on page 5.
NOTE: The anchors will be used to mount the Express® Deck bowl and frame to the wall.