Express® Deck Lavatory System EXD Series
EXD-3/STD, EXD-3/JUV Installation Instructions - For Service Only
4 6/8/04 Bradley Corporation • 215-1276 Rev. C; EN 03-817
(MM)
32"
(813)
28-5/8"
(727)
23-1/2"
(597)
11-3/8"
(289)
19-5/8"
(498)
(8) 3/8" WALL
ANCHORS WITH
MINIMUM PULLOUT
RATING OF 1,000
LBS.
38-1/2"
(978)
24-3/8"
(619)
2-3/4"
(70)
21-3/4"
(552)
14-3/16"
(360)
38-1/2"
(978)
24-3/8"
(619)
7-5/8"
(194)
1/2" NPT HOT AND
COLD SUPPLIES
OR TEMPERED
SUPPLY - STUB
OUT 2" (50) FROM
WALL
Finished
Floor
CENTERLINE
15-1/4"
(387)
1-1/2" NPT DRAIN STUB OUT 3-1/2"
(89) FROM WALL
110 Volt GFCI
ELECTRICAL
OUTLET
(optional)
Figure 1a
Standard Height - EXD-3/STD
Installation Instructions
Supplies required:
• (8) 3/8" wall anchors, bolts and washers to mount frame and bowl to wall (minimum pull-out
rating of 1,000 lbs.)
• 1/2" NPT hot and cold supply piping
• 1-1/2" NPT drain piping
• 110 volt electrical outlet for optional 110/24 VAC plug-in transformer for infrared faucet option
Step 1: Rough in
IMPORTANT: Refer to Figure 1a below ( for Standard Height Express® Deck only)
or Figure 1b on page 5 (for Juvenile Height Express® Deck only) and
Figure 2 on page 5 (for both Standard and Juvenile Height units).
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install (8) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer)
at the locations shown in Figure 1a below or 1b on page 5.
4. INFRARED FAUCET OPTION ONLY: Install the 110 volt GFCI electrical outlet per local code
at the location shown in Figure 1a below or 1b on page 5.
NOTE: The anchors will be used to mount the Express® Deck bowl and frame to the wall.