
THIS
SIDE
UP
Packing List
•
•
•
•
ASSE 1016 & UPC Certified
For use with shower heads rated
at 5.7 L/min (1.5 gpm) or higher.
Installation
S59-1005
Bradley Equa-Flo™ HD
Pressure-Balancing Shower Valve
Table of Contents
Supplies Required ............................... 2
Installation Instructions ........................... 2
Adjusting the Equa-Flo™ HD Valve.................. 3
IMPORTANT!
Read this entire installation manual to ensure proper installation. When finished
with the installation, file this manual with the owner or maintenance department.
Compliance and conformity to local codes and ordinances is the responsibility
of the installer.
Hot limit screw is set in the maximum temperature position. Failure to adjust
properly may result in serious scalding. This valve may not protect from scalding
if there is a failure of other temperature-controlling devices elsewhere in the
plumbing system. Excessive heat may cause damage to internal parts.
Separate parts from packaging and make sure all parts are accounted for before
discarding packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Make sure that all water supply lines have been flushed and then completely
turned off before beginning installation. Debris in supply lines can cause valves
to malfunction.
Product warranties may be found under “Products” on our web site at
www.bradleycorp.com.
215-1492 Rev. E EN 12-03-009
© 2012 Bradley
Page 1 of 3 8/7/2012
P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817
bradleycorp.com

S59-1005 Installation
Supplies Required:
• Teflon Tape
• Allen key wrenches
• Screwdriver
• 1/2" NPT Brass pipe plug
• Adjustable wrench
1
Rough-in
• Rough-in 1/2" NPT hot and cold water supply piping (supplied by installer) as shown below.
• For finished wall, make a 4-1/2" hole in the wall where the shower handle is desired.
• For unfinished wall, use the rough-in shield as a guide. Keep rough-in shield over valve when finishing
wall. The face of the rough-in shield should fit flush with the finished wall. The rough-in shield can either
be secured to the valve using the escutcheon screws or press-fit into place.
Shower Only Installation Tub/Shower Installation
7"
3-1/4" MAX.
2-1/2" MIN.
12"
40"
72"
5"
HOT
6-1/2"
WITH STOPS
2-1/2" WITHOUT STOPS
COLD
1/2"
NPT
1-1/2"
1/2" NPT
PIPE PLUG
(SUPPLIED
BY OTHERS)
7"
3-1/4" MAX.
2-1/2" MIN.
3-7/8" MAX. DEPTH
3-1/8" MIN. DEPTH
24"
48"
72"
1/2"
NPT
1-1/2"
FLOOR
"Back-to-Back" Installation
Contact your Bradley Representative
and ask for S45-2264 Back-to-Back
Rotor Kit to swap out the rotor on the
reversed side.
2 8/7/2012 Bradley • 215-1492 Rev. E; EN 12-03-009
FLOOR
3-7/8" MAX. DEPTH
3-1/8" MIN. DEPTH
HOT
STANDARD INSTALL
32"
SUPPLIES REVERSED
COLD