Bradley S19-2200, EFX60, EFX60P, EFX60RS Installation Instructions Manual

Installation
EFX 60/S19-2200
Robinet thermostatique mélangeur avec armoire en option
S19-2200
EFX60/P/RS
Válvula mezcladora termostática con armario opcional
Table of Contents
Supplies Required ..................................................... 2
Installation Instructions ............................................. 2
Dimensions ............................................................... 3
Optional Equipment Installation ................................ 5
Troubleshooting ......................................................... 6
Sommaire
Fournitures requises ................................................. 9
Instructions relatives à l’installation ........................... 9
Dimensions ............................................................. 10
Installation de l’équipement optionnel ..................... 12
Dépannage ............................................................. 13
Tabla de contenidos
Materiales necesarios ............................................. 16
Instrucciones de instalación .................................... 16
Dimensiones ........................................................... 17
Instalaciones de equipos opcionales ...................... 19
Solución de problemas ........................................... 20
Inlet Connections: 1" NPT Outlet Connection: 1-1/4" NPT Temperature Range: 65 – 95°F Maximum Pressure: 125 PSI Inlet Temperature Hot: 120 – 180° F Inlet Temperature Cold: 33 – 80° F Minimum Temperature Differential (from valve set point): 20° F
Raccords d’arrivée : 1 po NPT Raccord de sortie : 1-1/4 po NPT Plage de température : 65 – 95 °F Pression maximum : 125 lb/po Température d’arrivée, eau chaude : 120 – 180 °F Température d’arrivée, eau froide : 33 – 80 °F Différence de température minimum (à partir de valeur de consigne de robinet) : 20 °F
215-1289 Rev. L; EN 10-09-018 © 2011 Bradley Corporation Page 1 of 22 4-11-2011
Conexiones de entrada: NPT de 1 pulg. Conexión de salida: NPT de 1-1/4 pulg.
2
Rango de temperaturas: 65 – 95 °F Presión máxima: 125 PSI Temperatura de entrada, caliente: 120 – 180 °F Temperatura de entrada, fría: 33 – 80 °F Diferencial de temperatura mínima (desde el punto de ajuste de la válvula): 20 °F
P.O. Box 309, Menomonee Falls, WI 53052-0309 Phone: 1.800.BRADLEY Fax: 262.253.4161 bradleycorp.com
EFX 60/S19-2200 Installation
IMPORTANT!
Installation
fi nished with the installation, fi le this manual with the owner or maintenance department. Compliance and conformity to local codes and ordinances is the responsibility of the installer.
Read this entire installation manual to ensure proper installation. When
Separate parts from packaging and make sure all parts are accounted for
Packing List
before discarding packaging material. If any parts are missing, do not begin
THIS SIDE
P
U
installation until you obtain the missing parts.
Make sure that all water supply lines have been fl ushed and then completely turned off before beginning installation. Debris in supply lines can cause valves to malfunction.
Product warranties may be found under “Products” on our web site at bradleycorp.com.
Supplies recommended for installation
Lockable shut-off on the outlet if tempered water is supplied to one or more emergency fixtures
Lockable shut-off on the inlets/supplies
(6) 3/8" wall anchors and fasteners for surface-mounted cabinet
(4) 1/4" fasteners (and wall anchors, if necessary) for recess-mounted cabinet
Unions on all connections to facilitate removal of valve
Tools required for temperature adjustment
5/32" Allen wrench
Blade screwdriver
Install Optional Cabinet (If not installing cabinet, skip to Step 2)
1
Recessed Cabinet:
1. Rough-in wall opening 24-1/2" W x 28-1/2".
2. Insert the cabinet and secure to wall with four 1/4" fasteners properly anchored (supplied by installer.)
3. Install two anchors and screws through the valve bracket in back of the cabinet into a secure brace (supplied by installer) or into wall. This will support the valve.
4. Install the valve nipples and one-half of the union ball valve using pipe sealant or tefl on tape. Install the other half of the union ball valve onto inlet and outlet pipe.
5. Insert the valve into the bracket in the cabinet (right side goes in fi rst). Continue with the valve installation procedure.
6. Position the wall fl ange tight to the wall and caulk in place.
Surface-Mounted Cabinet:
1. Measure and mark the cabinet mounting hole locations at the dimensions shown on next page. Install six 3/8" wall anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into place with six 3/8" wall fasteners (supplied by installer).
3. Install the valve nipples and one-half of the union ball valve using pipe sealant or tefl on tape. Then install the other half of the union ball valve onto the inlet and outlet piping.
4. Insert the valve into the bracket in the cabinet (right side of the valve goes in fi rst). Continue with the valve installation procedure.
2 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Installation EFX 60/S19-2200
Optional Recessed Cabinet
26-3/4"
(679) Door
30"
(762)
10-3/16"
7-5/8"
(194)
(259)
Nipple
22-3/4" (578)
Union Ball
8-3/4"
(222)
Bottom View
Door
Valve
26"
(660)
Wall
Flange
1-1/4" NPT
Outlet
0.28" Dia. Holes (4) each side,
(8) Total
Side ViewFront View
(51)
2"
6-1/2"
(165)
2" (51)
2-1/2"
(64)
2-1/2"
(64)
2-1/4" (57)
(127)
1" NPT
Inlets
5"
18"
(457)
28"
(711)
(mm)
Optional Surface-Mounted Cabinet
26-3/4"
(679) Door
10-3/16"
(259)
7-5/8"
(194)
Nipple
22-3/4" (578)
8-3/4"
(222)
Door
Union Ball
Valve
24"
(610)
1-1/4" NPT Outlet
1" NPT
Inlets
6-1/2"
(165)
Wall Opening: 24-1/2" W x 28-1/2" H
2-1/4" (57)
2-1/2"
(64)
28"
(711)
2-1/2"
(64)
Mounting Hole Locations
5-1/8"
(130)
9-3/4"
(248)
0.47 Dia. Holes (6) Places
24"
(610)
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 3
24"
(610)
2"
(51)
9-3/16"
(233)
2"
(51)
20"
(508)
EFX 60/S19-2200 Installation
Connect Supply Lines and Install Thermometer
2
Slotted Cover
Screw
Tempered Water
(to Fixture)
When the check valves are in the open (opera ting) position, the cover screw for the stop/check stem will be fl ush with the valve cap.
Install Thermometer using pipe sealant or tefl on tape.
Check for leaks by pressurizing unit SLOWLY.
Adjust Temperature with Water Running
3
Check the temperature when approximately 10 GPM water fl ow is reached (equivalent to two face washes)
Thermometer
Check
Stop Nut
HOT
5/32" Allen Wrench
COLD
Stop/Check Cover Screw
Water Recirculation
Plug
Slotted Cover
Screw
This device must be checked for fi nal temperature and adjusted as necessary. The standard preset factory temperature setting is 85°F (29°C). [the range of the valve is 65°F – 95°F (18°C – 35°C)]. Consult proper medical and/or safety authorities for the optimum temperature recommended for your particular application.
Test Unit
4
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off, check to make sure the cold water continues to fl ow. If the cold water is fl owing properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off, check to make sure that the hot water fl ow has shut down. If hot water is shut down, reopen cold water supply. Test unit weekly for proper function and desired set temperature.
DO NOT SKIP THIS STEP!!!
4 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Temperature Set
Screw
H
C
Installation EFX 60/S19-2200
Optional Water Recirculation Setup
5
Recirculating the water in the system provides constant regulation of the water temperature. Flush the supply lines thoroughly after completing installation. Close off all fi xtures and label them as not available for use durin g the recirculating process.
Check Valve
(Typ)
Tempered Water Flow
Alternate
Recirculation
(less than 5 GPM)
Cold
Water
COLD
Heat Trap 28" Drop
Temperature Switch
Recirculated
Tempered
Water
Recirculating Pump
Water
Heater
Storage
Tank
HOT
Return Flow
Balancing Valve (Typ)
1. Turn off the recirculating pump and turn on the water supply at emergency fi xture (a water fl ow rate of 10-15 GPM is required).
2. Let the water run through the system until a consistent temperature is obtained. If you do not obtain the required temperature, refer to step #3 on previous page for temperature readjustment.
3. As soon as the water reaches the proper temperature, turn on the recirculating pump (make certain the proper system temperature has been achieved before proceeding).
4. Check the water temperature at the return pump. If the temperature exceeds the appropriate level by 2°F, adjust the temperature high-limit switch (this will turn off the pump). Wait until the return water temperature is 5°F below the appropriate level and adjust the low-limit switch (this will turn the pump back on).
5. Open the balancing valve completely.
6. Turn off all fi xtures and make sure there is no water running through the system (the cold inlet pipe should feel warm to the touch).
7. Let the system run for 30 minutes or longer without water. If, after thirty minutes, the water temperature increases, you may readjust the temperature by slowly closing the balancing valve until the appropriate temperature is reached.
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 5
EFX 60/S19-2200 Installation
Troubleshooting Thermostatic Mixing Valve
Stop/Check Valve
Before attempting to troubleshoot the valve or disassemble the components, check for the following:
• Stop/check valves are fully open (the slotted stem must be flush with the stop/check cap) and that all inlet and outlet shut-off valves are open
• Hot and cold inlet pipes are connected properly, and that there are no cross-connectio ns or leaking stop/check valves
• Water heater output is at least 15° F above the set temperature.
Be sure to close the appropriate shut-off valves prior to disassembly of the valve and reopen the valves after inspection and repair is complete.
Stop/Check
Strainer
Valve Seat
Problem Cause Solution
External leaks in the system
No hot water fl ow (cold water fl ow only)
Limited water fl ow The inlet shut-off valve may be partially closed
Temperature fl uctuation or improper Temperature
Either the NPT joints or the o-rings have been damaged.
The thermostat has failed and, subsequently, the safety shut-off has engaged.
or there has been a signifi cant decrease in water pressure.
Dirt and debris have collected on the check screen or seat, limiting the movement of the stop and checks.
The stop and check sections of the valve do not move freely.
Thermostat is slowly failing. Check Thermostat as described above, or replace. Inlet supply line to the mixing valve is being
shared by other pieces of equipment that are used only periodically, such as laundry appliances or washdown stations. It may reduce the inlet pressure to the mixing valve to less than 10 PSI. The supply line size may not be large enough to supply both the valve and the other appliances.
Recirculation is not balanced. Review recirculation set up on page 5.
Piston does not move freely and must be cleaned. See next page for piston disassembly and cleaning directions.
Replace the NPT joints and/or o-rings where necessary. For replacement of o-rings, contact your Bradley representative and ask for O-Ring Seal Kit (S65-177).
Inspect Thermostat:
1. Remove the top cap and pull out the push rod and thermostat.
2. Insert a 7/16" dia. rod into the thermostat bellows.
3. Mark the length of the thermostat bellows (at room temperature, with 10 lb. of force, the bellows length should be approx. 2-5/8").
4. If the thermostat bellows length is not in the proper range, the thermostat must be replaced (it cannot be repaired). Contact your Bradley representative and ask for Thermostat Kit (S65-178).
Clean Stop and check Valves:
Remove the stop and checks, clean the screen and seat and reassemble the valve. Do not remove the seat. The components may be scraped with a screwdriver to remove debris. A pair of tweezers works well for pulling debris out from the seat. If the stop and checks need to be replaced, contact your Bradley representative and ask for Check/Stop Kit (S65-179).
Clean Stop and Check Valves as described above.
Enlarge the supply line size, reconfi gure the supply line or regulate the supply usage.
6 4-19-2011 Bradley Corporation • 215-1289 Rev. L; EN 10-09-018
Installation EFX 60/S19-2200
Troubleshooting: Piston Disassembly and Cleaning
To prevent injuries, use proper protective equipment for eyes and skin when using a propane torch.
Remove the valve’s top cap and pull out the push rod and then the thermostat. You may use a
A
needle-nose pliers to remove the thermostat from the valve body if desired.
Insert a 7/16" dia. rod into the valve and into the piston overheat chamber. Mark the length of the
B
rod inside the valve. Push the rod until the piston stops and mark the new length.
Top Cap
with Pushrod
Thermostat
If the rod travels less than1/2", the piston is not moving freely within the liner and they must be cleaned:
1. Remove the control section assembly, top cap and thermostat.
2. Unthread the liner from the cap (it is glued
C
D
together; the o-rings must be removed and heat should be applied to melt the glue and loosen the liner).
3. Clean the piston and liner with any cleaner suitable for brass and stainless steel (400-grit sandpaper may be used to polish and hone the piston and liner).
Push the mechanism up and down several times to make sure the piston moves smoothly and consistently. If it is not consistent, repeat Procedure C until it moves freely, or replace. Contact your Bradley representative and ask for Piston/Liner Kit (part number S65-180).
7/16"
Rod
The second mark
should be 1/2"
higher on the rod
than the fi rst mark.
Piston Overheat
Chamber
Bradley Corporation • 215-1289 Rev. L; EN 10-09-018 4-19-2011 7
Loading...
+ 15 hidden pages