1. Gas Control set too low for desired watertemperature.
2. GasControl temperature issatisfied.
3. Insufficient gas supply or low gas
pressure.
4. Gas Control has wide differential or isoutof
calibration.
1. Insufficient combustion air supply.
2. Incorrect, clogged ventsystem/ ventterminal or location.
3. Inconsistent gas supply or gas pressure.
1. Gas Control set too low for desired watertemperature.
2. Cold inlet water temperature is very cold.
3. High demand periods.
4. Incorrectly sized water heater forapplication.
5. Gas Control isfunctioning.
6. Out of spec dip tube is diluting hot water
with cold water.
7. Integrated mixing device issettoo low for
desired water temperature.
outof calibration/not
1. Adjust temperature dial on gas control.
2. Check temperature dial settingongas control.
3. Check gassupply and line pressure.
4. Check gas control
for proper operation, replace ifne
cessary.
1. Verify adequate combustion air is availabletothe unit. Check and clear Jacketslotopenings of any dirt, dust, restrictions orother obstructions.
2. Check ventingfooperation
3. Check gassupply and line pressure.
1. Check dial ongas control.
2.Extremely cold water going intothe water
heater will decrease the amount of hot
water produced. It may benecessary totemper incoming water supply.
3. Adjust high demand u
4. ContactPlumbing professional.
5. Check gas control
for proper operation, replace ifnecessary.
6. Inspect dip tube and replace if necessary.
7. Reset device using the procedure
i
nthe instructions included with the device.
r proper sizingand proper
sage.
2. See Installation &
operation manual.
3. See Service Procedure
AG-III, Page 12
4. See Service Procedure
AG-III, Page 12
3. See Service Procedure
AG-III, Page 12
5. See Service Procedure
AG-III, Page 12
6. See Service Procedure
AG-V, Page23
Page 3
Page 4
Troubleshooting Chart
4
For Models Using Honeywell GasControl
Observe LED indicator on gas control. Error flash codes
are displayed with a three second pause before repeating.
Check and repair the system as noted in the troubleshooting
table below:
LED Indicator
LED StatusControl StatusProbable Cause
Not on and/or
not flashing
One flash and a three
second pause.
LED is on continuously
Twoflashesandathree
second pause.
Pilot flame may not be present.
Gas control is in the “PILOT” position and
the pilot flame is detected.
Gas control has recently been turned to the
“OFF” position. Wait until LED goes out
before attempting to relight.
Weak pilot flame detected. System will reset
when pilot flame is sufficient.
Pilot flame is not present.
Gas control is powered and waiting for the set
point knob to be turned to a water
temperature setting.
Gas control was turned to the “OFF” position.
1. Thermopile failure
2. Unstable pilot.
3. Pilot tube blocked or restricted.
Service
Procedure
1. Lite pilot per the instructions
locatedonthe lightinginstructions label orthe
lighting instructions locatedintheinstallationandoperation
manual.
2. See ServiceProcedure AG-I,
Page 7.
Normal operation. Adjust gas
control set point knobtodesiredtemperature level.
1. Wait for LED to go ou t.
2. Lite pilot pertheinstructions
locatedonthe lightinginstructions label orthe
lighting instructions locatedintheinstallationandoperation
manual.
1. See ServiceProcedure AG-I,
Page 7
2 & 3. See ServiceProcedure AG-II,Page 10.
Threeflashesandathreesecond pause.
Fourflashesandathreesecond pause.
Tank temperaturefault.
System will reset.
Excessivetank temperature.Thermowell sensor out of calibration.
Thermowell sensoroutof calibration.
Page 4
1. See ServiceProcedure AG-III,Page 16
1. See ServiceProcedure AG-III,Page 16
Page 5
Troubleshooting Chart (cont.)
5
For Models Using Honeywell GasControl
LED StatusControl StatusProbable Cause
Five flashes and a three
second pause.
Seven flashes and a
three second pause.
Eight flashes and a three
second pause.
Thermowell fault
Gas control fault detected.
Pilot flame remains on while gas control is in
the “OFF” position.
Step 2.Using a multimeter capable of measuring millivolts, connect
one alligator clip to the end ball or contact portion of the
thermocouple, and the other alligator clip to copper portion of
the thermocouple.
Figure1
Step 3.Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for
three minutes. A reading of 20 to 30 millivolts indicates good thermocouple output.
NOTE:
It will be necessary to hold the gas control
knob down in the “PILOT” position
continuously throughout this test.
THERMOCOUPLE REPLACEMENT
Step 1.Turn off gas supply to water heater. Rotate knob of gas control to “OFF” position.
For White Rodgers gas
control, depress knob
slightly and rotate
clockwise to the “OFF”
position.
Step 2.Remove outer jacket door.
Figure 2
Figure3
ForRobertshaw gas
control, rotate knob
clockwise to the “OFF”
position.
Step 3.Slide open inner combustion chamber door.
Step 4.Disconnect thermocouple from gas control. Locate other end of
thermocouple inside of combustion chamber and remove from pilot bracket. Pull firmly pulling away
from the pilot assembly.
Step 5.Install new thermocouple into pilot bracket making certain the thermocouple is fully engaged into the pilot
bracket. Connect other end of thermocouple to gas control (finger tight + ¼ turn).
Step 6. Route carefully through the relief opening in the combustion chamber skirt.
Step 7.To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Step 8.Slide inner door closed when finished.
Thermocoupleposition
Page6
Figure 4
Page 7
SERVICE PROCEDURE AG-I
7
ThermocoupleTesting andReplacement
For Models Using Honeywell GasControl
OPEN CIRCUIT THERMOPILE TESTING
Step 1. Disconnect red and white thermopile wires from the wire harness leading to the gas control.
Step 2. Using a multimeter capable of reading millivolts, check across thermopile leads.
Step 3. Following the instructions located on the lighting instruction label or the lighting instructions located in the
installation and operation manual, proceed to light the pilot and allow the gas control to operate for three
minutes.
NOTE:
It may be necessary to hold the gas
control knob down in the “PILOT” position
continuously throughout this test.
Inan OPEN CIRCUIT test:
Any reading over 400 millivolts
indicates good thermopile output.
For readings under 400 millivolts
replacement of thermopile is
recommended.
Figure 5
CLOSED CIRCUIT THERMOPILE TESTING
Step 1. Closed circuit testing is the preferred method for testing the thermopile. Following the instructions
located on the lighting instruction label or the lighting instructions located in the installation and operation
manual, proceed to light the pilot and allow the control to operate for three minutes.
Step 2. Using a multimeter capable of measuring millivolts, measure across thermopile connections at the
gas control (see Figure 6).
InaCLOSEDCIRCUIT test:
Any reading over 300 millivolts
indicates good thermopile output.
For readings under 300 millivolts
replacement of thermopile is
recommended.
It may be necessary to hold the gas
control knob down in the “PILOT” position
continuously throughout this test.
NOTE:
GasControl
Knob
Thermopile
Connections at gas
control
Figure6
Page7
Page 8
SERVICE PROCEDURE AG-I
8
ThermopileTesting andReplacement
For Models Using Honeywell GasControl
THERMOPILE REPLACEMENT
Step 1. Turn off the gas supply to the water heater by rotating the gas control knob to the “OFF” position
(see Figure 7).
Step 2. Remove outer jacket door.
Step 3. Remove or slide open the inner combustion chamber door.
Step 4. Disconnect red and white thermopile wires from the wire harness leading
to the gas control.
Step 5. Disconnect the thermopile from the pilot bracket using a 7/16” open-end wrench.
Step 6. Install the new thermopile into the pilot bracket and tighten the threads using care not to damage the
thermopile lead wires. Route new wires through the appropriate opening in the combustion chamber.
Step 7. Reconnect the lead wires being careful to match the colors (red to red and white to white).
Step 8. Reinstall, or slide closed, inner combustion chamber door.
Step 9. Replace the outer door.
Step 10. To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
GasControl Knob
(Shown in OFF
position)
Figure7
Page8
Page 9
R
9
PILOT ASSEMBLY INSPECTION,
CLEANING AND REPLACEMENT
SERVICE PROCEDURE AG-II
Pilot Assembly Inspection, Cleaning
and Replacement For Models Using White
Rodgers orRobertshawGasControl
ForWhiteRodgers gas
control, depress knob
slightly and rotate
clockwise to the “OFF”
position.
Figure8
Step 1.Turn off gas supply to water heater. Rotate knob
of gas control to “OFF” position.
Step 2.Remove outer jacket door.
Step 3.Slide open inner combustion chamber door.
Step 4.Disconnect thermocouple, pilot tube,
and feedline from gas control.
NOTE: Feedline nut for natural gas control
uses right hand threads, LP control uses left hand thread.
Step 5.Remove burner assembly from combustion chamber.
Step 6.Remove pilot assembly from feedline.
Step 7.Inspect pilot for the following:
a) Primary air openings for blockage. Must be free from any
debris (dirt, lint, etc).
b) Kinks or cracks in the pilot tube. If found,
the pilot must be replaced.
Step 8.Inspect pilot orifice:
a) Remove ½" nut from bottom of pilot assembly.
b) Remove pilot tube and pilot orifice.
ForRobertshaw gas
control, rotate knob
clockwise to the “OFF”
position.
Figure10
PilotOrifice
Figure11
Figure9
Feedline Nut
PrimaryAir
Opening
c) inspect pilot orifice for blockage, must be cleaned or replaced.
Step 9.Install pilot assembly to feedline, secure with screw from step 6.
Step 10.Re-Install burner assembly into combustion chamber, connect feedline, pilot tube and thermocouple
to gas control.
Step 11.Slide inner combustion chamber door closed and re-attach outer jacket door.
Step 12.To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Page9
Page 10
R
10
PILOT ASSEMBLY INSPECTION,
CLEANING AND REPLACEMENT
SERVICE PROCEDURE AG-II
Pilot Assembly Inspection, Cleaning
and Replacement For Models Using
Honeywell Gas Control
Step 1. Turn off the gas supply to the water
Heater. Rotate gas control knob to the
Primary Air
Opening
“OFF” position.
Step 2. Remove outer jacket door.
Step 3. Remove burner assembly per
Service Procedure AG-IV page 20.
Step 4. Remove the pilot assembly from the burner assembly.
Step 5. Inspect the pilot assembly for the following:
PilotOrifice
a)Primary air opening for any blockage .
Must be free from any debris (dirt, lint, dust, etc.).
b) Kinks or cracks in the pilot tube. If found, the pilot
must be replaced.
Step 6. Inspect pilot orifice:
a) Remove 7/16” nut from the bottom of the pilot assembly.
b) Remove pilot tube and pilot orifice.
c) Inspect pilot orifice for blockage, must be free from any debris (dirt, lint, dust, etc.).
d) Reassemble pilot orifice and pilot tube to pilot assembly.
Step 7. Install pilot assembly to burner assembly using the screw from Step 4.
Figure12
Figure13
Step 8. Reinstall burner assembly per Service Procedure AG-IV page 22: Steps 10 through 12.
Step 9. To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Step 10. Check all gas connections for gas leaks using a soapy water solution.
Page10
Page 11
SERVICE PROCEDURE AG-II
11
Pilot Assembly Inspection, Cleaning
and Replacement For Models Using
R
Honeywell Gas Control
IGNITER/ELECTRODE TESTING AND
REPLACEMENT
With the pilot not in operation (no pilot flame) the igniter and electrode circuit function can be observed by
opening the combustion chamber door and viewing whether there is a sparking action.
Step 1. Make sure the gas control is in the “OFF” position.
Step 2. Remove outer jacket door.
Step 3. Slide open or remove the inner
RepeatedlyDepress
Igniter
combustion chamber door.
Step 4. Depress the igniter button repeatedly while viewing
the spark through the open door of the combustion
chamber. If there is no spark proceed to Step 5.
If there is a spark, the igniter is OK.
Step 5. Remove the lead wire from the igniter at the connector
provided for this. Hold the igniter lead from the gas valve
close to an unpainted metal surface (such as the burner feedline)
and depress the igniter button (see Figure 15). If there is a spark the igniter is OK.
If no spark is present the igniter is not functioning and the gas control
must be replaced per Service Procedure AG-III page 18.
Figure14
Lookfor spark in
the gap
Figure15
Page11
Page 12
SERVICE PROCEDURE AG-III
12
GasControl Testing andReplacement
For Modelsusing WhiteRodgersor
RobertshawGasControl
GasControl Testing and Replacement
The gas control is a non repairable device. If trouble shooting has determined a problem with the gas control, it must be
replaced.
If the burner and/or pilot do not function, service checks for gas pressure, thermocouple output, magnet assembly and
ECO are to be performed. If these check OK, the gas control may be faulty.
LINE PRESSURE
The gas control is designed for a maximum line pressure of 14.0" w.c. and a minimum line pressure of 1.0"w.c. over the
water heater rated manifold pressure. Line pressure must be checked with burner on and burner off to assure proper
readings.
MANIFOLDPRESSURE TESTING (thisprocedureassumesa maximum line pressure of 14.0" w.c.)
Step 1.Set gas control to “OFF” position.
Step 2.Remove pressure tap plug and install
pressure tap.
Step 3.Connect manometer to pressure tap.
Step 4.Follow lighting instructions and proceed to light
main burner and observe manometer reading.
Pressure Tap
Shown
Installed
Figure16
Step 5.Proper operating range for natural gas is 4.0 ±0.3" W.C.
Proper operating range for L.P. gas is 10.0 ±0.5" W.C.
Step 6.If pressure is OK, set gas control to “OFF”
Figure17
remove manometer and pressure tap and replace pressure tap plug. Check for gas leaks before placing water
heater back in operation. If pressure is out of the specification noted in step 5, proceed to step 7 or 8 for proper
service procedure.
Step 7.For White Rodgers control, the manifold pressure is not adjustable. If manifold pressure is outside the range
in step 5, the control must be replaced.
Step 8.For Robertshaw control, the manifold pressure is adjustable, proceed to step 9 for adjustment procedure
Step 9.While burner is in operation, remove regulator access cap to expose the regulator adjusting screw. With small
screw driver, rotate adjusting screw clockwise to increase pressure and counter clockwise to decrease pressure.
Figure18Figure19
Step 10.Replace regulator access cap, set gas control to “OFF”. Remove manometer and
pressure tap and replace pressure tap plug. Check for gas leaks before placing water heater back in operation.
Page12
Page 13
THERMOCOUPLE TESTING
13
See SERVICE PROCEDURE AG-II
MAGNET ASSEMBLY TESTING (White Rodgers Control)
SERVICE PROCEDURE AG-III
Gas Control Testing andReplacement
For Modelsusing WhiteRodgersor
RobertshawGas Control
Step 1.Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for
three minutes. If the pilot will not stay lit, hold the pilot button (located on the combination
thermostat/gas valve) down during this test
Step 2.Using a multimeter capable of measuring millivolts, connect one lead
using an alligator clip to the copper sheath of the thermocouple, use the second lead of the multi meter to
probe the top terminal located at the back of the gas control.
Alligatorclip tocoppersheath
Probetopterminal onback of
gascontrol
of thermocouple
Figure 20
Step 6.With a meter reading of 13 millivolts or greater, rotate knob of gas control to the
“OFF” position.
Step 7.The magnet should remain closed for a drop of at least 6 millivolts. You will here a “snap” or “click” sound
when the magnet opens, if you hear this sound prior to a drop of 6 millivolts, the magnet is out of
specification and the gas control should be replaced.
MAGNET ASSEMBLY TESTING (Robertshaw Control)
Step 1.Disconnect thermocouple from gas control.
Step 2.Connect a thermocouple adaptor
Figure 21
(BWC P/N 239-44642-00, Robertshaw P/N 75036) at the
thermocouple location in the gas control.
Step 3.Reconnect thermocouple to adaptor. Make certain all connections
are tight (finger tight plus ¼” turn).
Step 4.Using a multimeter capable of measuring millivolts, connect one
alligator clip to the set screw of the adaptor and the other alligator
clip to copper portion of the thermocouple.
Figure 22
Step 5.Following the lighting instruction label on the heater, proceed to light the pilot and allow to operate for
three minuets.
Step 6.With a meter reading of 13 millivolts or greater, rotate knob of gas control to the
“OFF” position.
Step 7.The magnet should remain closed for a drop of at least 6 millivolts. You will here a “snap” or “click” sound
when the magnet opens, if you hear this sound prior to a drop of 6 millivolts, the magnet is out of
specification and the gas control should be replaced.
Page13
Page 14
SERVICE PROCEDURE AG-III
14
GasControl Testing andReplacement
For Modelsusing WhiteRodgersor
RobertshawGasControl
ECO (EnergyCut Off) TESTING
Step 1.Disconnect thermocouple from gas control.
Step 2.Using a multimeter capable of measuring Ohms (or continuity),
attach one lead (alligator clip) to the pilot tube. Insert the other lead
(probe) fully into the magnet opening, Be sure the probe makes
contact only at the top center of the magnet opening. Do not allow
the probe to make contact with the threaded sides of the opening.
Figure 23
Step 3.If continuity is indicated, the ECO is OK. If continuity is not indicated, the ECO has opened and the
gas control must be replaced.
GASCONTROL REPLACEMENT
Step 1. Rotate knob of the gas control
to the “OFF” position.
Step 2. Turn off gas supply to water heater.
Step 3. Disconnect gas supply line from
gas control.
Step 4. Turn off water supply and drain water heater completely.
Step 5. Remove outer jacket burner access door.
Step 6. Slide open inner combustion chamber door.
For White Rodgers gas
control, depress knob
slightly and rotate
clockwise to the “OFF”
position.
Figure 24
ForRobertshaw gas
control, rotate knob
clockwise to the “OFF”
position.
Figure 25
Figure 26
Page14
Page 15
Step 7. Removal of gas control.
15
a) Disconnect main burner feedline, pilot tube and thermocouple
from gas control & remove burner from combustion chamber.
NOTE: Feed line nut for natural gas control uses right hand threads,
LP control uses left hand thread.
b) Remove gas control from heater,
rotating counter clockwise using a control body wrench or a
length of ½" NPT pipe threaded into inlet of control.
SERVICE PROCEDURE AG-III
GasControl Testing andReplacement
For Modelsusing WhiteRodgersor
Robertshaw Gas Control
Wrench Boss
To remove or install control, insert only
½" NPT threaded pipe into inlet and
use to loosenortightencontrol.
Step 8. Installation of gas control.
a) Install new gas control using a control body wrench or a length of ½" NPT
pipe threaded into inlet of control. DO NOT OVER TIGHTEN. Use caution not to damage cast
aluminum body of gas control. Be certain not to damage the bundled wire
leads.
NOTE: gas control must be installed in proper upright position to
assure the feedline will align properly at the inner door flange.
DO NOT OVER TIGHTEN. If control is turned past proper alignment, do not
reverse direction to align.
b) Reattach main burner feedline, pilot tube and thermocouple to gas control.
NOTE: Feedline nut for natural gas control uses right hand threads,
LP control uses left hand thread.
c) Connect gas supply piping to inlet of control. Use back up wrench on wrench boss of control, never
use back up wrench on body of control.
Step 9.Reconnect gas supply to gas control.
Step 10.Resume water supply to water heater. Be sure tank is full of water.
Step 11.Slide inner combustion chamber door closed
Figure 27
Step 12.Re-attach outer jacket door.
Step 13.To resume operation follow the instructions located on the lighting instruction label or the lighting instructions
located in the installation and operation manual.
Page15
Page 16
SERVICE PROCEDURE AG-III
16
Honeywell Thermowell Testing and
Replacemet
HONEYWELL THERMOWELL TESTING
Step 1. If gas control has gone into lockout due to excessive tank temperature (four flashes and a three second
pause) reset the gas control to the “OFF” position. Then follow the instructions located on the lighting
instruction label or the lighting instructions located in the installation and operation manual.
Step 2. Observe the water heater operation. If the gas control continues to lockout due to excessive tank
temperature proceed to Step 3, thermowell testing, to determine the cause.
Step 3. To perform thermowell testing turn the gas control to the “OFF” position and disconnect the
thermowell harness from the gas control.
Disconnect
thermowell wire
harness
CAUTION
DO NOT Use standard multimeter probes to
test. Doing so will damage connector. Use
special pin type electronic probes or small
diameter wire pins inserted into connector
Figure 28
Figure 29
Figure30
Step 4. Using a multimeter set to measure Ohms determine the resistance of the thermowell sensor (See
caution on this page).
Step 5. Hold one probe in the center pin and measure the outside positions pins (see figure 29 & 30).
Step 6. Refer to Table 1 on page 17 to determine the correct resistance value for the water heater tank
temperature.
Step 7. If the resistance values are correct the gas control needs to be replaced. If they are incorrect the
thermowell needs to be replaced.
Page16
Page 17
SERVICE PROCEDURE AG-III
17
Honeywell Thermowell Testing and
Replacement
DETERMINE WATER HEATER TANK TEMPERATURE
NOTE:
Itisimportantto understand once the resistance
forthe thermowell isdetermined,water flow
through the water heater should not occur. Prior
to performing the steps below turn off cold water
supply to the water heater. This will prevent cold
water flow into the tank affecting theresistance
value of the thermowell.
Stored water may be HOT when
performing the following steps in this
procedure. Take necessary precaution to
prevent personal injury
DONOT use standard multimeter
WARNING
CAUTION
probes to test. Doing so will damage
connector. Use special pin type
Step 1. Turn the gas control to the “OFF” position and
disconnect the thermowell harness from the gas control.
electronic probes or small diameter
wire pins inserted into connector
Step 2. Using a multimeter set to measure Ohms determine the resistance of the thermowell sensor (See
caution on this page).
Step 3. Hold one probe in the center pin and measure the outside positions pins (see figure 29 & 30, page 16).
Step 4. Draw approximately 1 quart of water from the drain valve and immediately measure the water
temperature using an accurate thermometer. It may be necessary to open a hot water faucet to allow
the heater to drain.
Step 5. Refer to Table 1 below to determine the correct resistance value for the water heater tank temperature.
Example: If the temperature of the water is 84°F, then the resistance through the sensor would be 8449 (see
shaded area). NOTE: Sensor resistance increases as the temperature falls.
Step 1. Turn the gas control knob to the “OFF” position.
Gas Control
Thermowell
Step 2. Turn off water supply and drain water heater completely.
Step 3. Turn off and disconnect gas supply to control
Step 4. Disconnect wire harness and burner
assembly from the gas control.
Figure31
Step 5. Remove gas control and thermowell by rotating flats of the thermowell counter clockwise.
HONEYWELL GAS CONTROL REMOVAL FROM THERMOWELL
NOTE; Following the instructions below allows the removal of the gas control from the thermowell without
removing the thermowell from the tank.
Step 1. Turn the gas control knob to the “OFF” position.
Step 2. Turn off and disconnect gas supply piping to the gas control.
Step 3. Disconnect wire harnesses and burner assembly from the gas control.
Step 4. Using the gas control service tool (part number 239-45991-00) available from your Bradford White
parts supplier, insert tool into the back of the gas control (see Figure 32 & 33).
Viewfromback of
Insert tool into
back of gas
control
gascontrol forclarity
Figure32Figure33
Step 5. Pivot service tool towards water heater as far as possible (see Figure 34). Lift up straight on gas
control. The gas control should move about 1/8”. Hold gas control in position and remove tool.
Lift straight up on the gas control to remove completely from the thermowell.
Figure34
Page18
Page 19
SERVICE PROCEDURE AG-III
19
Honeywell Gas Control and Thermowell
Replacement
HONEYWELL GAS CONTROL ASSEMBLY TO THERMALWELL
Step 1. Install threaded end of thermowell into water heater. When tight, be sure thermowell flange is
positioned so that thermowell relief opening is in the 6 o’clock position for proper control alignment
(see Figure 35).
Thermowellflange slots
6 o’clock position
Route wire through
relief opening
Figure 35
Step 2. Route lead wires through the relief opening (see Figure 35).
Step 3. Align slots located on the thermowell flange with tabs located on the back of the gas control
(see Figure 36).
Gascontrol tabs
Figure36
Step 4. Carefully push the gas control back onto the thermowell flange.
Step 5. Install burner assembly and reconnect pilot tubing and main burner feed line to gas control.
Step 6. Reconnect wire harness and igniter wire to the gas control.
Step 7. Resume water supply to water heater and check for leaks. Be sure tank is full of water.
Step 8. Reconnect the gas supply to gas control. Check for gas leaks using a soapy water solution.
Ste p 9. To resume operation follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Page19
Page 20
SERVICE PROCEDURE AG-IV
20
Burner Operation Inspection, Adjustment
Cleaning and Replacement
R
MAIN BURNER: Inspection, Adjustment, Cleaning and Replacement
At periodic intervals (not more then 6 months) a visual inspection should be made of the main burner for proper operation
and to insure no debris accumulating.
Main burner should light smoothly from pilot and burn with a blue flame with a minimum of yellow tips.
Steel burner models have a self adjusting air mixture and do not have an adjustable air shutter. Cast iron burner can have
the gas and air mixture properly proportioned by adjusting the air shutter on the mixer face of the main burner (see step 2
below).
Main burner must be free from any debris accumulation that may effect burner operation (see burner cleaning procedure
on page 21).
CAST IRON BURNER ADJUSTMENT
WARNING
Innerdoorandburnercomponentsmaybe HOT whenperforming thisoperation. Take
necessaryprecautiontopreventpersonal injury.
Step 1.With main burner in operation slide the inner combustion chamber door open.
Step 2.To adjust for proper burning, loosen the air shutter nut, rotate the shutter to close the opening in the burner,
then slowly rotate the shutter until the yellow tips are minimized and the flame becomes blue. Tighten the air
shutter nut. Too much air will cause the flame to lift off the burner ports and create noisy burner operation.
Too little air (yellow tips) will result in soot formation.
AirShutter
Nut
Figure37
Page 20
Page 21
SERVICE PROCEDURE AG-IV
21
Burner Operation Inspection, Adjustment
Cleaning and Replacement
MAIN BURNER: Inspection, Adjustment, Cleaning and Replacement (cont.)
Step 3.Fully inspect combustion chamber for debris or carbon build up.
Step 4.Be certain that thermocouple or thermopile, and pilot tube are routed correctly through the relief opening in
the combustion chamber.
Position thermocouple or
thermopile, and pilot tube.
Step 5.Burner should operate as adjusted in step 2 on page 20, if not, repeat procedure
compensating air shutter position for proper burner operation with inner door closed.
Figure38
Step 6.It may be necessary to clean main burner or main burner orifice to achieve proper burner operation. If
cleaning is required proceed to burner cleaning procedure below.
BURNER CLEANING (Steel &Cast Iron)
Step 1.Slide open or remove inner combustion chamber door.
Step 2.Disconnect main burner feed line, pilot tube, and thermocouple or thermopile from gas control
and remove burner assembly from combustion chamber.
NOTE: Feedline nut for natural gas control uses right hand threads,
LP control uses left hand threads.
Step 3.Thoroughly inspect burner surface area and burner ports and remove any debris build up.
BurnerSurfaceArea
Figure39
BurnerPortArea
Figure 40
Figure 41
Step 4.On cast iron burners, inspect
for any debris build up inside
burner venturi. If found,
disconnect main burner feedline
from burner and remove debris
build up.
Figure 43
Page 21
Figure 42
Burner Venturi
Opening
Feedline
Page 22
BURNER CLEANING (Cont.)
22
Step 5.Steel Burner:
Disconnect (unscrew) burner from main burner orifice.
Cast Iron Burner:
Disconnect (unscrew) main burner feedline from burner.
Step 6.Remove main burner orifice from feedline.
Inspect and clean if necessary.
SERVICE PROCEDURE AG-IV
Burner Operation Inspection, Adjustment
Cleaning and Replacement
Figure 44
Step 7.Inspect pilot assembly per service procedure AG-II.
Figure 45
Step 8.Reassemble burner assembly.
Step 9.Inspect combustion chamber area of water heater and clean if needed prior to reinstallation of burner
assembly.
Step 10.Reinstall burner assembly into combustion chamber, reconnect feedline, thermocouple or thermopile, pilot
tube and igniter wire (for applicable models) to the gas control.
Step 11.Slide close or attach inner combustion chamber door and reattach outer jacket door.
Step 12. To resume operation, follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Page 22
Page 23
SERVICE PROCEDURE AG-V
23
Diptube andAnode
InspectionandReplacement
R
DIPTUBE INSPECTION AND REPLACEMENT
WARNING
Water heatercomponentsand stored watermaybe HOT when performing the following
Step 1.Turn the gas control knob to the “OFF” position.
For White Rodgers Control,
depress knob slightly and
rotate clockwise to the “OFF”
position.
Figure 46
ForHoneywell gas
control, rotate knob
counter clockwise to the
“OFF” position.
For RobertshawControl,
rotate knob clockwise to the
“OFF” position.
Figure 47
Figure 48
Step 2.Turn off cold water supply to water heater. Connect hose to drain spigot of water heater and route to a
suitable drain. Open a nearby hot water faucet to vent water heater for draining. Open drain spigot of
water heater and allow to drain.
Step 3.Disconnect plumbing system from inlet nipple/diptube.
Step 4.With an appropriate wrench, remove inlet nipple/diptube from the water heater. Use caution not to damage
the nipple threads.
Step 5.Visually inspect inlet nipple/diptube. Inlet nipple/diptube should be free of cracks and any blockage.
The small curved openings should be open and free of any blockage.
Anti-siphon hole located approximately 6" from the bottom of nipple, should be free of any blockage.
Any damage such as cracks, restriction due to deformation or unintentional holes are not field repairable
and the inlet nipple/dip tube must be replaced.
Step 6.Upon completion of inspection or subsequent replacement, reinstall inlet nipple/diptube into water heater.
Reconnect plumbing system to inlet nipple/diptube, resume cold water supply and check for leaks.
Step 7. To resume operation follow the instructions located on the lighting instruction label or the lighting instructions
located in the installation and operation manual.
Page 23
Page 24
SERVICE PROCEDURE AG-V
24
Diptube andAnode
InspectionandReplacement
ANODE INSPECTION AND REPLACEMENT
WARNING
Water heatercomponents and stored water may be HOT when performing the following
For White Rodgers Control,
depress knob slightly and
rotate clockwise to the “OFF”
position.
Figure 49
ForHoneywell gas
control, rotate knob
counter clockwise to the
“OFF” position.
For RobertshawControl,
rotate knob clockwise to the
“OFF” position.
Figure50
Figure51
Step 2.Turn off cold water supply to water heater. Connect hose to drain spigot of water heater and route to a
suitable drain. Open a nearby hot water faucet to vent heater for draining. Open drain spigot of water
heater and allow to drain.
Step 3.Disconnect plumbing system from outlet nipple/anode.
Step 4.With an appropriate wrench, remove outlet nipple/anode from the water heater. Use caution not to damage
the nipple threads.
Step 5.Visually Inspect outlet nipple/anode. Outlet nipple/anode may show signs of depletion, this is normal.
If depletion is ½ of the original anode diameter (approximately ¾” diameter), replacement is recommended.
If any of the steel core of the anode is exposed, replacement is recommended.
Step 6.Upon completion of inspection or subsequent replacement, reinstall outlet nipple/anode into water heater.
Reconnect plumbing system to outlet nipple/anode, resume water supply and check for leaks.
Step 7. To resume operation, follow the instructions located on the lighting instruction label or the lighting
instructions located in the installation and operation manual.
Page 24
Page 25
Page 26
Page 27
Page 28
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.