Bloomfield HT-427 Installation Instructions Manual

ELECTRICAL
INSTALLATION INSTRUCTIONS
DROP-IN BAIN MARIE STYLE HEATED TANK
MODEL HT-427
MODEL VOLTS WATTS
HT-427 HT-427 240
UNITS ARE SHIPPED THREE PHASE AND ARE FIELD CONVERTIBLE TO SINGLE PHASE
208 5000
6600
AMPS PER LINE 3 PHASE
L1 L2 L3
11.9
13.8 27.5
20.6
23.8
CUTOUT DETAILS PRODUCT DIMENSIONS
29 1/2
749
56 1/2
(1435)
12 7/8
(327)
3 1/8
(79)
5
(127)
4 1/8 (105)
11.9
13.8
3 7/8
(98)
AMPS
SINGLE
PHASE
23.8 12 AWB Cu 90°C
53 3/4 (1365)
57 1/2
(1461)
(356)
FIELD WIRING GAUGE
6 1/4 (159)
CONTROL PANEL WITH FLEXIBLE CONDUIT
26 7/8
(683)
9 3/4 (248)
1 PHASE3 PHASE
8 AWB Cu
30 5/8
(778)
TEMP.
RATING
90°C8 AWB Cu10 AWB Cu
1 INCH NPT DRAIN WITH BALL VALVE
INCHES
(MM)
INSTALLATION INSTRUCTIONS
INSTALLER MUST MEET CONDITIONS OF ACCEPTABILITY OUTLINED BELOW UPON INSTALLATION:
1. Required installation clearances: Wooden and Metal Installation: DO NOT install closer than 4 1/8 inches to front wall, 1 inch to back and side walls, and 10 3/4 inches to surface below the unit.
2. Unit shall be accessible for servicing from the bottom.
3. If storage is to be used underneath the unit, it is recommended that a baffle be placed 12 inches below the unit to avoid contact with elevated temperatures.
TO FABRICATE:
1. Lay out "cutout" dimensions on countertop and front apron.
2. Lay out and fabricate control panel holes in counter apron using the control box as a template.
3. Cut out holes.
TO INSTALL:
IMPORTANT - DO NOT disconnect lead wires from the Master Control Panel when making installation.
1. Tilt and pass Control Panel and electrical box through the countertop cutout, then through the apron cutout. Lower modular section into countertop cutout and position. RECOMMENDATION: Before final seating of modular section to countertop, apply a bead of silicone adhesive/sealant to the underside of gasket supplied on the mounting flange.
2. From underneath, insert screwdriver into slots in Wellslock frame and twist ears outward (clockwise) as required to secure flange tightly to countertop.
3. Mount Control Box to apron cutout as shown in drawing.
4. Mount Control Panel onto electrical box using the screws supplied.
WELLS/BLOOMFIELD * VERDI, NV
CLEARANCES
MINIMUM CLEARANCE REQUIRED
FROM UNIT TO THE NEAREST SURFACE
BACK SIDE BOTTOM FRONT
1 1
WARMER FLANGE
GASKET
COUNTERTOP
(25)
MASTER CONTROL PANEL
WELLSLOK
SCREWDRIVER
(25) (273)
TO PLUMB:
1. A drain with valve is supplied on all units. Location of the valve handle is at the discretion of the fabricator (see drawing).
2. Connect 1" drain connection to a suitable drain line.
TO WIRE:
1. Final connection is accomplished by bringing proper power supply leads (see 'WIRING REQUIREMENTS' label) through conduit knockout to terminal block supplied within the Master Control Panel. Check nameplates for voltage and phase.
NOTES:
BAIN MARIE STYLE HEATED TANKS ARE DESIGNED FOR WET OPERATION ONLY.
THIS EQUIPMENT IS TO BE INSTALLED TO COMPLY WITH APPLICABLE FEDERAL, STATE AND LOCAL PLUMBING AND ELECTRICAL CODES.
10 3/4
302964-3 REV (-)
4 1/8
(105)
Loading...