Bloomfield HT-227 Installation Instructions Manual

ELECTRICAL
HT-227
FIELD WIRINGPHASEAMPSWATTSVOLTSMODEL GAUGE
2500208
240HT-227
3300
11.9 SINGLE13.8
12 AWG Cu 90°C
TEMP.
RATING
90°C12 AWG CuSINGLE
INCHES
(MM)
CUTOUT DETAILS PRODUCT DIMENSIONS
30 5/8
6 1/4 (159)
26 7/8
(683)
(778)
28 1/2
(724)
3 1/8
(79)
(127)
4 1/8 (105)
29 1/2
(749)
25 3/4
(654)
29 1/2
(749)
INSTALLATION INSTRUCTIONS
DROP-IN BAIN MARIE
STYLE HEATED TANK
MODEL HT-227
9 3/4 (248)
4 7/8 (124)
5 7/8 (149)
INSTALLATION INSTRUCTIONS
INSTALLER MUST MEET CONDITIONS OF ACCEPTABILITY OUTLINED BELOW UPON INSTALLATION:
1. Required installation clearances: Wooden and Metal Installation: DO NOT install closer than 4 1/8 inches to front wall, 1 inch to back and side walls, and 10 3/4 inches to surface below the unit.
2. Unit shall be accessible for servicing from the bottom.
3. If storage is to be used underneath the unit, it is recommended that a baffle be placed 12 inches below the unit to avoid contact with elevated temperatures.
TO FABRICATE:
1. Lay out "cutout" dimensions on countertop and front apron.
2. Lay out and fabricate control panel holes in counter apron using the control box as a template.
3. Cut out holes
TO INSTALL:
IMPORTANT - DO NOT disconnect lead wires from the Master Control Panel when making installation.
1. Tilt and pass Control Panel and electrical box through the countertop cutout, then through the apron cutout. Lower modular section into countertop cutout and position. RECOMMENDATION: Before final seating of modular section to countertop, apply a bead of silicone adhesive/sealant to the underside of gasket supplied on the mounting flange.
2. From underneath, insert screwdriver into slots in Wellslock frame and twist ears outward (clockwise) as required to secure flange tightly to countertop.
3. Mount Control Box to apron cutout as shown in drawing.
4. Mount Control Panel onto electrical box using the screws supplied.
WELLS/BLOOMFIELD * VERDI, NV
WARMER FLANGE
TO PLUMB:
1. A drain with valve is supplied on all units. Location of the valve handle is at the discretion of the fabricator (see drawing).
2. Connect 1" drain connection to a suitable drain line.
TO WIRE:
1. Final connection is accomplished by bringing proper power supply leads (see 'WIRING REQUIREMENTS' label) through conduit knockout to wire leads supplied within the Master Control Panel. Check nameplates for voltage and phase.
NOTES: BAIN MARIE STYLE HEATED TANKS ARE DESIGNED FOR WET
OPERATION ONLY. THIS EQUIPMENT IS TO BE INSTALLED TO COMPLY WITH
APPLICABLE FEDERAL, STATE OR LOCAL PLUMBING AND ELECTRICAL CODES.
CONTROL PANEL WITH FLEXIBLE CONDUIT
GASKET
COUNTERTOP
FROM UNIT TO THE NEAREST SURFACE
BACK SIDE BOTTOM FRONT
1 1
(25)
WELLSLOK
SCREWDRIVER
1 INCH NPT DRAIN WITH BALL VALVE
CLEARANCES
MINIMUM CLEARANCE REQUIRED
10 3/4
(25) (273)
MASTER CONTROL PANEL
302964-1 REV (-)
4 1/8 (105)
Loading...