Blodgett 6E-SC User Manual

Project
Item No.
Quantity
Model 6E-SC (6 pan electric convection steamer on a cabinet base)
CONSTRUCTION
Stainless steel constructionStainless steel doors with strong continuous hinge and are field
reversible for left or right swing
is pushed or slammed shut
Hidden magnetic door switch cuts power to blower and steam flow to that
cavity, when the door is opened
Pan support racks shall be polished stainless steel and removable for
easy cleaning
Wide drip sink with condensate drain is positioned under cavity doors21-5/8” wide cabinet base shall have stainless steel frame with all stain-
less steel top deck, hinged front access panel and removable side and rear panels.
Front and rear legs shall have adjustable bullet feet9KW electric heating elements are replaceable from the front.
OPERATION
Steamer cavity controls are mounted on the front panel for easy accessSteamer cavity controls include an ON-OFF power touch pad; 60-minute
electro-mechanical timer, with continuous steam setting; and READY light which indicates when cavity is ready for steaming.
Auto-Delime button initiates deliming cycle. DELIME indicator light warns
operator of need to delime generator.
Separate ON-OFF/60 minute timer control with constant steam setting,
for each steamer cavity.
Unit will shut off if water level is low or unit builds too much pressureWhen power switch is turned off, unit automatically blows down the
steam generator, to reduce sediment build-up.
Twin electric-heated, cabinet-mounted steam generators to provide
atmospheric steam to the chambers at a temperature of approximately 212° F. Each steam generator has an electric water sensor.
Each steamer cavity shall have a powerful side mounted blower, which
increases steam velocity and provides efficient steam distribution throughout cavity and between loaded pans.
Steam generators deliver 3KW input per 2-1/2” steam pan.8-10 minutes heat-up time to READY under normal conditions. Cavities
are kept warm and ready for instant steam between loads. No cavity warm up required, after READY light comes on.
CAPACITY
BLODGETT
44 Lakeside Avenue, Burlington, VT 054012 • Phone: (802) 658-6600 • Fax: (802) 864-0183
OPTIONS AND ACCESSORIES
(AT ADDITIONAL CHARGE)
Flange mounting feet
6E-SC
Electric Convection Steamer on
Cabinet Base
6E-SC CONVECTION STEAMER
Pan Size Per Cavity Total
12” x 20” x 1” 6 12
12” x 20” x 2.5” 3 6
12” x 20” x 4” 2 4
STANDARD FEATURES
One year parts and labor warranty*
* For all international markets, contact your local distributor.
BLODGETT
44 Lakeside Avenue, Burlington, VT 054012 • Phone: (802) 658-6600 • Fax: (802) 864-0183
6E-SC CONVECTION STEAMER
Printed in U.S.A. NOTE: FOR COMMERCIAL USE ONLY
NOTE: The company reserves the right to make substitutions of components without prior notice.
APPROVAL/STAMP
P/N S00134 Rev A (4/11)
WATER SUPPLY:
Water quality is a major factor affecting the performance of your steamer. If you are unsure of water quality, consult a local water treatment specialist and have the water analyzed. Your water supply must be within these general guidelines:
Total dissolved solids: Less than 30 PPM Total alkalinity: Less than 20 PPM Silica: Less than 13 PPM Chlorine: Less than 1.5 PPM pH Factor: 7.0 - 9.0
Water which fails to meet these standards should be treated by installation of a water conditioner. Failure or malfunction of this steamer due to poor water quali­ty is not covered under warranty.
WATER & DRAIN CONNECTIONS:
Drain 1 1/2” NPT free venting drain Cold Water Two 3/4” NPT cold water supply lines. Additional cold water
connections are provided or spray condenser.
Appliance is to be installed with backflow protection in accordance with Federal, State or Local codes.
SHORT FORM SPECIFICATIONS
Provide Blodgett model 6E-SC (6 pan) pressureless steamer with twin, independent electric heated steam generators mounted in 21-5/8” wide cabinet base. All stainless steel construc­tion with two steam cavities, each powered by its own independent atmospheric steam generator with powerful blower to circulate steam within cavity and separate operating controls, including: 60-minute electro-mechanical timer with constant steam setting, ready light and Delime cycle button to initiate deliming. Simple deliming through ports on top. Doors are field­reversible, with easy-open latch and hidden magnetic door switch, and wide condensate sink with drain is provided under cavity doors. Twin atmospheric steam generators require no pressure gauges or switches, and have 9KW input each. Unit shall come up to steam in 8-10 minutes or less from a cold start, and provide warm cavity instant steam capability. Provide options and accessories as indicated.
VAC Phase Amps Max kW
208V
1 87 18
3 50 18
240V
1 75 18
3 43 18
480V 3 22 18
POWER SUPPLY
SHIPPING INFORMATION:
Approx. Weight:
6E-SC 430 lbs. (195 kg)
Treated water supply connection
Un-treated water supply connection (optional)
DETAIL VIEW
of water connection
(if second connection ordered)
(REAR VIEW)
TOP VIEW
1
2
3.75 (95)
Condensate drain vent
6
(152)
3
49
(1245)
FRONT VIEW
21.63 (549)
26.56 (686)
59.13
(1502)
2 (51)
4
1.5 (38) min
2.63 (67) max
SIDE VIEW
2
3
1
Adjustable bullet feet
Electrical box
5.75
(146)
23.63 (600)
14 (356)
35.19 (894)
Condensate drain vent
4
6 (152)
NOTES:
1. Drain connection 1-1/2” tube (drain free venting)
2. Cold water supply at 30 to 60 PSIG with a flow rate of 1/5-3/0 GPM and with a 3/4” NH connection.
3. Electrical connection 1” conduit. See table for requirements.
4. Minimum clearance required
5. Dimensions are in inches (mm).
Loading...