Blickman LSQ 600 Installation, Operation, Maintenance Manual

Page 1
"600
SERIES"
COFFEE URN
INSTALLATION, OPERATION, MAINTENANCE MANUAL
Blickman Supply Company
280 Midland Avenue M-1 Saddle Brook NJ 07663
INSTALLATION
SETTING UP THE URN — Place the urn carefully in position on urn stand or counter. Faucets should be located over a drip trough or similar
receptacle. Then connect water supply, electric, gas or steam in accordance with the following suggestions:
WARNING: GAS URN — Do not install gas urn near a combustible wall or counter top without proper insulation. WATER CONNECTIONS — Connect urn water inlet connection with matching size water supply pipe. Valve inlet is 1/2" i.p.s. pipe. Somewhere in
the water supply line before the urn, there should be a union and shut-off valve for easy connection or later change. If local plumbing code requires a check valve and vacuum breaker before urn inlet, be sure plumber has this part installed. A reducing valve should be provided if water pressure is over 45 P.S.I.
ELECTRIC CONNECTIONS — Be sure that your current characteristics (voltage, etc.) agree with data specified on metal plate attached to urn. An experienced electrician should make the installation and he should check that the proper size power cable leads to your urn and that the circuit is fused adequately. (Do not supply power to a dry urn.)
GAS CONNECTIONS — Connect 1/2" gas supply. Burner is rated at 22,000 BTU on twin LSQ urn and 15,000 BTU on single LSQ urn. (Do not apply heat to a dry urn).
STEAM CONNECTIONS — On steam heated urns, it is also recommended that a valve be placed in the steam line before the steam line is connected to the urn. Steam pressure at urn location (not at your steam boiler) should match the pressure for which the urn was built, as indicated on tag attached to the urn. Excessive pressure can be reduced by installing a reducing valve. Too low a pressure may result in insufficient heating and improper functioning of the thermostat. Steam lines must be blown out before installation to eliminate any accumulation of chips, dirt or white lead that may clog system.
ADJUSTMENT OF THERMOSTATS — Normally the thermostats should not have to be adjusted after installation. However, if any adjustment is required, see pages 5-7.
Rev. 1 (Id) 2/79 1 LSQ
Page 2
FOREWORD CONTENTS
urns available in the world today. It has been thoroughly tested
However, even the best of equipment will not function correctly
time of installation and kept for future reference. Proper care in
book are available at
$1.00
each.)
our Blickman dealer or service agency at once. In any
Your Blickman LS Q "600" Series is one of the finest coffee and inspected at the factory under actual operating conditions
and was in perfect condition when shipped from the factory.
unless it is operated and maintained with proper care.
The purpose of this manual is to help you keep your urn in perfect operating condition. It should be studied care fully at
operation and maintenance will protect your investment and assure a uniformly delicious brew. (Additional copies of this
If any problems arise which are not covered in this manual, contact y correspondence with the factory, always include the urn serial number. It is stamped into the upper right-hand section of the urn body and is also found on the electrical data plate on the
control box.
INSTALLATION. ................................................................ 1
OPERATION .................................................................. 3- 4
CLEANING ........................................................................ 4
ADJUSTING THERMOSTATS ....................................... 5- 7
FILTER SYSTEMS. ........................................................... 8
TROUBLE SHOOTING. ............................................... 9- 14
WARRANTY
2 LS Q
Page 3
OPERATING INSTRUCTIONS
WARNING
STEAM
Units healed by steam have a steam inlet a
nd outlet. Always leave outlet valve open. A
CAUTIONS
for COMBINETTE and TWIN NON-PRESSURE URNS
DO NOT TURN ON ANY HEATING UNIT UNTIL WATER IS PUT INTO URN IN ACCORDANCE WITH THESE INSTRUCTIONS
OPERATION OF HEATING UNITS
trap is recommended. Control heal by opening or closing inlet valve according to the amount of heat required
GAS Burner height must be set so that the burner flame just reaches bottom of coffee urn. The flame should not spread. Flame along bottom of the urn should not be wavy, otherwise the burner will operate inefficiently.
ELECTRIC . . . Electrically heated units normally furnished with thermostat pre-set at Factory — No. 10 position is 210 and decreases according to position you leave thermostat set at.
a. If steam is used for heating, pressure
should be approximately 20-25 Ibs. Do not use a different pressure unless your urn was ordered for it
b. Never allow water level in boiler gauge
to go lower than 3 inches from bottom of gauge
c Be sure that water is fully boiling
before brewing coffee
d. To protect coffee flavor, wash out urn
with hot water after every batch is made and clean liner, gauges and faucets often
e. If hard water condition exists, place
recommended type of water conditioner in cold water inlet line leading to urn
f. Do not install gas heated coffee urn on
wood counter —— must be metal.
3 LSQ
Page 4
1.
Start daily with a well cleaned coffee urn.
1.
After all brewed coffee has been drawn from the urn pour over
two gallons of fresh hot water and thoroughly brush it out with
don't guess. The quantity of ground coffee depends on the
2.
Drain the water off
, again pour over
2
gallons of fresh hot
minutes for fresh coffee to ripen. Coffee is now ready
2.
Fill liner with several gallons of water and add at least 1
-
1/2
time heat should be on full.
3.
Scrub insid
e of liner and inside of cover with long handled
brush.
brush to clean fitting at bottom of liner and pipe connecting to
times with fresh
2. Keep water in jacket at a height of 2" from the top of the water gauge glass. Fill by opening water inlet valve. IMPORTANT: Do not fill above this mark.
3. Turn thermostat to No. 10 position. (If your urn is electrically heated).
BETWEEN BREWS - A quick rinse between brews is desirable.
1. Rinse liner.
2. Drain the water off. The urn is ready for the next brew.
OPERATION
4. While urn is heating to brewing temperature: A. Rinse liner with clean water.
B. Fill filter* with proper amount of fresh coffee. Be exact . . .
desired strength — from 2 to 3 gallons per pound. Increased amounts are required for iced coffee or demi­tasse.
5. Five minutes after brewing is completed, remove filter and discard old coffee grounds. NOTE: Never leave coffee grounds in the liner after this time.
6. After removing grounds, take a gallon measurer and pour brewed coffee over to blend the coffee.
to serve.
NOTE: Never serve coffee that has been held over 1-1/2 hours. Don't make fresh coffee on top of old. Always wash out urn before each operation. Don't leave coffee in urns overnight. Wash out thoroughly before closing. Leave a gallon or so of fresh water in liner.
CLEANING
DAILY - Daily cleaning after the last batch of coffee is used
should be regular routine.
long handled brush.
water, brush it out and drain again. Wipe down liner with clean towel.
3. If urn is not going to be used again immediately, put a gallon or so of fresh water in the liner. Do not drain this water off until just before making next coffee brew.
TWICE A WEEK - Coffee urns must have a special scouring twice a week. To scour the urn thoroughly:
1. Be sure water jacket is 3/4 full of water and turn on heat. 7. Allow 10
ozs. of coffee urn cleaning compound. Allow this solution to remain in the liner approximately 30 minutes, during which
4. Use long thin brush to clean coffee gauge glass. Use same
* For complete details on use and care of the Blickman Filtering Systems, see page 8.
4 LSQ
coffee faucet.
5. Drain urn cleaning solution off and rinse 3 or 4 hot water, repeating steps 3 and 4 again. Drain rinse water.
6. Occasionally take faucet valves apart and clean thoroughly.
7. Leave a gallon or so of fresh water in urn until just before brewing next batch of coffee.
Page 5
HOW TO ADJUST THERMOSTAT
(For electrically heated urns)
THERMOSTAT CALIBRATION
Your thermostat should be calibrated if it cycles off before the urn reaches the brewing range on the dial thermometer (200° - 205°F) or if the urn reaches a boiling point.
To Calibrate Thermostat:
1. Turn control to off position and remove black knob.
2. With a small screwdriver, turn screw "A" clockwise to decrease and counter-clockwise to increase the temperature.
3. Adjusting the calibration screw 1/4 turn will increase or decrease the temperature approximately 10°F.
4. Replace knob and turn thermostat back to the No. 10 position and check to see if it is calibrated properly. When the thermostat is in the No. 10 position — dial thermometer should stay in the brewing range.
5 LSQ
Page 6
Instructions for Maintenance and Adjustment of Steam Thermostat
Steam thermostats are designed for use with steam pressure specified on order for each urn. If cleaned regularly, the thermostat will operate properly and give
IMPORTANT: Before installation, blow out pipe lines and check strainer on inlet side of thermostat lo make sure it is clean. Clean valve disc a lew days after initial installation (see instructions in first column). Also, clean valve disc promptly whenever thermostatic action appears defective.
CLEAN VALVE DISC AND SEAT EVERY 60 DAYS
After several hours use on a new in stallation and every 60 days thereafter, Valve disc, gland pin and seat should be cleaned to insure proper operation. Proceed as follows:
TO CHECK & CLEAN STRAINER
If there is a noticeable increase in time required to heat urn, this may be due to clogging of the strainer on the inlet side of­the thermostat by scale and other foreign matter. The strainer should be cleaned to restore normal flow of steam as follows:
(Note: Not all thermostats have strainer.)
many years of reliable service. Cleaning is important to satisfactory operation. Therefore, follow these instructions carefully.
TO ADJUST THERMOSTAT
Temperature adjustment of this thermostat has been carefully checked at the factory and will rarely require re-setting and adjustment. Adjustment may be made if necessary as follows:
6LSQ
Page 7
THERMO-MAGNETIC AUTOMATIC PILOT
A tubular thermocouple of a small rod welded within a tube of heat resistant metal (A) bathed by the pilot flame generates an electric current.
Carried through heavy tubular copper conductor (B), the current energizes a heavy electro-magnet (2) capable of holding the valve mechanism (5) in the operating position as long as the pilot flame remains lighted. Within a minute after pilot flame failure (perhaps caused by a draft, clogging or "no gas") the electro-magnet releases with a positive snap action shutting off the main burner and pilot gas supply. THERMOSTAT WITH AUTO SAFETY PILOT IS AN OPTIONAL FEATURE
PROCEDURE FOR LIGHTING OR RELIGHTING:
1. Turn GAS COCK HANDLE to "off" position and DIAL ASSEMBLY to lowest temperature position.
2. Wait sufficient length of time to allow gas which may have accumulated in burner compartment to escape.
3. Turn GAS COCK HANDLE to "Pilot" position.
4. Fully depress SET BUTTON, and light pilot burner. (Adjust, if necessary, as noted under "Pilot Burner Adjustment".)
5. Allow pilot to burn approximately 1/2 minute before releasing SET BUTTON. If pilot does not remain ignited, repeat operation allowing longer period before releasing SET BUTTON.
6. Turn GAS COCK HANDLE to "on" position and turn DIAL ASSEMBLY to desired position. The main burner will then ignite.
PILOT BURNER ADJUSTMENT:
1. Remove pilot adjustment cap. Adjust pilot key, allowing flame to completely envelop the end 3/8" of the Thermocouple.
2. Adjust pilot burner air shutter (if provided) to obtain a soft blue flame. MAIN BURNER ADJUSTMENT (Gas Input):
1. To adjust main burner flame, turn screw under GAS COCK HANDLE in either direction to regulate flow of gas to main burner. To Recalibrate Thermostat:
a. Allow heater to set without the burner on for at least 30 minutes to allow the water temperature within the tank to reach its equilibrium point. b. Turn the DIAL ASSEMBLY until the main burner ignites. c. Slowly turn the DIAL ASSEMBLY until the main burner is extinguished. d. Plac e a Thermometer in the hot water flowing from the nearest faucet e. If the DIAL ASSEMBLY setting is within 10° of the water temperature, recalibration is not necessary. f. If the temperature variation is greater than 10°, recalibration may be effected by adherence to the following steps;
g. Remove DIAL ASSEMBLY GAS COCK HANDLE and ORNAMENTAL COVER, (to remove Ornamental Cover, unsnap at base, lift out and up),
and loosen (do not remove) screw. Hold STOP while screw is loosened, taking care not to move TEMPERATURE ADJUSTING SCREW.
h. Hold TEMPERATURE ADJUSTING SCREW and turn STOP until water temperature setting coordinates with that of the thermometer. i. Hold TEMPERATURE ADJUSTING SCREW and STOP and tighten screw. j. Replace ORNAMENTAL COVER, GAS COCK HANDLE , DIAL ASSEMBLY.
Poor contact between the Thermocouple Lead and the Magnet Assembly may cause the Valve to be inoperative even when the pilot is in proper adjustment and position; if so, the contact points should be cleaned and tightened. This is accomplished by removing the Thermocouple and care fully cleaning the parts that make contact with the Magnet Assembly. CAUTION: When reassembling and tightening the Thermocouple Nut, only a small (3 or 4 inch) wrench is necessary. Run nut down as far as possible with the fingers. Set lock washer by making an additional 1/4 to 1/2 turn with wrench.
Thermocouple Connection
7 LSQ
Page 8
FILTER
SYSTEMS
GENERAL - Making coffee with any of the Blickman filter systems is as simple as it is quick. First, carefully follow the
operating instructions on pg. 3-4, then pick up the specific directions below which apply to your filter.
TRI-SAVER SYSTEM
LOADING FILTER - Be sure your filter is thoroughly clean before using. Spread the coffee grounds evenly
in the bottom of the filter. (No filter paper is required.) Lock spreader plate in place on filter. CARE OF FILTER - The Tri-Saver filter is durably constructed and will give you long, uninterrupted
service with reasonable care. Avoid striking or hitting your Tri-Saver against the receptacle that is used for emptying the grounds. Flush out the old coffee grounds with hot water.
CLEANING FILTER - Clean your Tri-Saver thoroughly with hot water after each brewing operation. At the end of the day, or at frequent intervals, fill a sink half full of hot water containing approximately one teaspoonful of any good free-rinsing detergent per gallon and submerge the filter. Push the filter in an upward and downward motion, so that the water will flow through the filter plates, cleaning them thoroughly. Daily care will keep your filter clean and will assure perfect coffee flavor.
IF, FOR ANY REASON, YOUR TRI-SAVER FILTER DOES NOT GIVE YOU VERY SATISFACTORY RESULTS, COMMUNICATE WITH US OR YOUR DEALER PROMPTLY. YOU WILL RECEIVE PROMPT SERVICE AND FURTHER INSTRUCTIONS SHOULD ANY BE REQUIRED.
8LSQ
BREW 'N TOSS FILTER PAPER
FILTER PAPER - Be certain you have the correct size paper for your Brew 'n Toss paper holder. LOADING FILTER - Swing three wire handles up and out of the wire basket. Set a single sheet of filter paper into
basket and swing back the three handles to hold the paper firmly in place. Spread coffee evenly over bottom of filter paper and set filter in top of urn.
CLEANING FILTER - Remove basket, dump filter paper and grounds into waste receptacle and rinse wire basket.
NOTE: Cloth bag may also be used in brew 'n toss basket. Urn furnished standard with bale-type ring with cloth bag.
Page 9
TROUBLE CAUSE REMEDY
NOTE REGARDING LEAKS: Leak may not be at loca tion where drip first appears as drip may be due to condensation.
A LEAKS
Wipe leak dry, then use urn and observe whether leak reappears and its exact location.
A -1 Leak around stem of water inlet valve.
TROUBLE SHOOTING
A-2
Leak around gauge glass.
A -1 Packing around valve stem not tight or no longer service-able.
A-2 Gauge glass packing not ti ght or no longer
serviceable.
A -1 Tighten packing nut. If leak still occurs, remove packing nut and replace packing.
A-2 Tighten upper & lower gauge glass packing nut depending on where leak
occurs. If leak continues, replace gauge glass washers.
Unscrew upper fittings.
Remove old washers and slip new ones in at each end. Replace glass
and tighten nuts.
A-3
Faucet Drips.
A-4
Fittings leak at body of urn.
A-5 Leak at point where electric
heating element plug screws
into body.
A-3 Tomlinson inserts are worn and must be
replaced.
A-4. 1
Jam nut is loose.
A-4. 2
Threads not adequately sealed.
A-5
Threads not adequately sealed.
A-3
Disassemble faucet and replace insert.
A-4. 1 Tighten jam nut. If this does not stop leak, proceed as outlined in the next
step A-4. 2
A-4. 2 Remove fitting. Clean threads in urn and on fitting. Apply fresh sealer and
reassemble fitting to urn making sure jam nut is firmly tight.
A-5
See remedy A-4. 2 above.
9 LSQ
Page 10
TROUBLE SHOOTING (Cont'd.)
TROUBLE CAUSE REMEDY
A-6 Leaks in urn body other than
at fittings.
A-7 Water leaks or sprays out
through top of urn.
A-6
Pin holes or cracking of metal due to insulation action of lime
or other abuse of urn. A-7.1
Water compartment overfilled through oversight or because of leaky water
inlet valve.
A-7.2
Excessive heat is applied to urn. This is a rare cause, and is usually due to excessive steam pressure in steam heated urns, or an improperly adjusted electric thermostat in
electrically heated urns.
A-6
Body leaks are best repaired at the factory. If soldering is attempted in the field, metal must be thoroughly cleaned. Use only a flux made specially for stainless steel and then neutralize completely. DO NOT
WELD OR BRAZE ! ! !
A-7.1 Draw off excess water from water compartment by opening hot
water faucet. Never fill to a level higher than uppermost mark on water gauge glass. Water expands with heat and can cause an overfilled condition. To check whether overflowing is due to leaking water inlet valve, proceed as follows: Shut off heating unit to urn. (Check cannot be made accurately if water is boiling.) Close water inlet valve firmly and note accurately water level in gauge glass. If water level rises after a period of time, a leaky water inlet valve is indicated. Remove valve bonnet, unscrew stem and install new
valve disc. A-7.2
If steam pressure is considerably in excess of that for which urn was ordered, install reducing valve to cut pressure down to that recommended for urn. Or, control heat, input by fuel control valve. On electric urns, adjust
thermostat as shown on page 5.
B FILTERING AND BREWING
B-1
Filtering through Tri-Saver
is slow.
10 LSQ
B-1. 1 Too fine grind prevents normal filtration.
B-1. 2 Filter clogged because not cleaned regularly and according to instructions. Extenders in coffee may also cause
clogging.
B-1. 3
Soft water used.
B-1. 1 Have coffee supplier match sample grind packed with Tri-Saver
filter. If sample is lost, write factory for another.
B-1. 2 Follow instructions on plate attached to Tri-Saver filter, or see page
8. Clogged filter can be cleaned by soaking overnight or several nights in water with a good detergent. Avoid using coffees with
extenders as it may not be possible to dean these out.
B-1. 3 Water may be "conditioned" but not softened. Slows up leeching
and destroys coffee taste.
Page 11
TROUBLE SHOOTING (Cont'd.)
TROUBLE CAUSE REMEDY
B-2
Coffee too strong.
B-3
Coffee muddy, fines in brew.
B-4
Coffee too weak.
B-2
Insufficient amount of water used to
brew batch or too much coffee used.
B-3 Too many fines in coffee grounds. Also
water may not be hot enough. Or re-
pouring through coffee grounds.
B-4. 1 Grind too coarse, all flavoring matter not
extracted.
B-4. 2 Tri-Saver filter is damaged, permitting
water to pass through through too quickly
for full flavor extraction.
B-4. 3
Incorrect proportion of water to coffee.
B-2 Use proper proportion of water to coffee. If Tri-Saver filters are used, you
generally find it practical to use more water than with other methods to obtain a given strength. Experiment will show best proportion of water to
coffee to suit your patrons' tastes.
B-3 Have supplier furnish coffee with as little fines as possible as these are,
difficult to filter out. Always use water at proper temperature when brewing. Avoid repouring through coffee grounds. Follow operating
instructions.
B-4. 1 Use the correct grind for your method of filtering. For Tri-Saver filters,
have your supplier match grind sample furnished with urn.
B-4. 2 Examine filter for dents or damage due to abuse. If damaged, return to
factory for repair.
B-4. 3
See B-2 above.
B-4. 4
Water not at proper temperature.
C HEATING SYSTEM, STEAM URNS
C-1 Urn does not heat up, or
heats very slowly.
C-1. 1 Steam not reaching urn because inlet or
outlet valve is shut.
C-1. 2 Strainers and/or Steam trap in steam line
may be clogged. C-1. 3 Steam pressure at urn is too low. C-1. 3
B-4. 4
Do not brew coffee unless water is at proper brewing temperature.
C-1. 1
Be sure both steam inlet and outlet valves are open.
C-1. 1a
Check 115 Volt Electric Power
C-1. 2
Check and clean strainers and/or trap in steam line.
First, check pressure at urn location to be sure it corresponds to that for which urn was ordered. If pressure is low, increase boiler pressure so that urn will receive sufficient heat for proper operation. If this cannot be done. urn may have to be returned to
factory to have larger steam coils installed.
Page 12
TROUBLE SHOOTING (Cont'd.)
transferred to water.
TROUBLE CAUSE REMEDY
C-1. 4 Lime deposits on interior insulate heating
coils and prevent heat from being
C-1. 5 Thermostats may be cutting off steam
supply before boiling point is reached.
C-1. 6
Solenoid on steam line not
opening.
D HEATING SYSTEM, ELECTRIC URNS
D-1 Urn does not heat up or heats
very slowly.
D-1. 1
Power may be off.
D-1. 2
Thermostat may be out of adjustment.
C-1. 4 Clean out urn. Hard lime deposits may require factory cleaning. Install
water conditioner to prevent lime deposits.
C-1. 5
Adjust thermostats as per instructions on page 6.
C-1. 6 Check and see if solenoid coil is energized. If coil is energized, pin
inside solenoid is stuck in closed position. Disassemble solenoid and clean pin and seat. (A rebuilding kit containing a new pin diaphragm is
available from the factory or authorized service company.)
NOTE: Before making any adjustments to thermostat, shut off power.
After adjustments have been made. turn on power.
D-1 1 Make sure power switch & thermostat is turned on. If this does not
work, check to make sure that power line to urn has not been turned
off at some other point in the building or that fuse in line is not blown.
D-1. 2
To check this and adjust thermostat, see instructions on page 5.
12LSQ
D-1. 3 Lime deposits insulate heating elements
preventing heat from being transferred to
water.
D-1. 4 Heating elements are burned out
because urn has been operated without water or with insufficient water. Elements may be burned out also because of heavy lime deposits, or because of
natural service life limitations.
D-1. 3 Clean out urn. Hard lime deposits may require factory cleaning. Install
water conditioner to prevent lime deposit.
D-1. 4 Electrician can check with instruments to determine whether elements
are burned out. If the/are, shut off power to urn. Drain water from jacket. Remove coffee liner nearest control box to provide access to inner tank and heating elements. Disconnect cables attached to heating elements. Caution: Thermostat, capillary tube and bulb clamped must be undamped by pulling them off. Do not cut capillary tube. Allow capillary tube and bulb to remain within urn. Unscrew plugs on which heating elements are mounted and replace with new heating element assembly ordered from factory. To prevent heating element burn outs, never operate urn without water. Do not permit
water to boil out.
Page 13
TROUBLE SHOOTING (Cont'd.)
13
LSQ
TROUBLE CAUSE REMEDY
E MISCELLANEOUS
E-1 Loud rumbling noises when
water is boiling.
E-2 Water compartment overfills,
or water level rises when not
desired.
E-3 Water in urn jacket gauge is
discolored with coffee.
D-1. 5 Thermostat may be defective if it can not
be adjusted as suggested under D-1. 2
above.
E-1 Lime scale due to hard water or foreign
matter in water supply is agitated by boiling resulting in continual impact
against urn walls.
E-2.1
Water inlet valve left open.
E-2.2 Water inlet valve does not shut off flow of
water completely because of faulty
washer.
E-3.1 Urn liner has been overfilled allowing
some coffee to seep into urn jacket.
D-1. 5
Shut off power, remove thermostat and replace.
E-1 Shut off heat. Drain water from urn and clean out interior of urn by
removing liner. If trouble is due to lime, install water conditioner. If due to considerable amount of foreign particles in water supply,
check "Y" strainer in supply line.
E-2.1
Be sure water inlet valve is closed when not refilling.
E-2.2 Shut off main water valve in line immediately before urn. Remove
valve bonnet, unscrew valve stem and replace valve disc.
E-3.1
Drain jacket water and replace with fresh water. Avoid overfilling liner.
E-4
Gauge does not register.
E-3.2 Leak at urn liner fitting allows coffee to
seep into water jacket.
E-4 Air is trapped in gauge tube because of
clogged vent at top of gauge. Liquid cannot enter tube to proper indicating
level.
E-3.2 To check whether leak exists at urn liner fitting, drain off all liquid from
liner through coffee faucet. Dry liner thoroughly. Fill urn jacket with water and allow to stand for about an hour. If there is a leak between the liner and the jacket at liner fitting, water will appear in the liner. To
correct, install new liner.
E-4 For all coffee gauges and water gauges, make sure vent hole
at top of gauge is not clogged.
Page 14
TROUBLE SHOOTING (Cont'd.)
Close this gas cock. This gas cock should only be opened in the
TROUBLE CAUSE REMEDY
F HEATING SYSTEM, GAS URNS
F-1
Gas does not come on.
F-2
Gas does not shut off.
F-3
Gas flame floating.
F-1.1
Open burner gas cocks.
F-1.2
Safety pilot out.
F-1.3 Thermostat may be out of adjustment.
F-2. 1
Manual by -pass gas cock is open.
F-2. 2 Thermostat is set too high.
F-3. 1 Gas orifice and air mixer plate
improperly adjusted.
F-1.1
Gas cocks to burners closed.
F-1.2
Relight safety pilot.
F-1.3 To check this and adjust thermostat, see instructions on page 7.
F-2. 1
event of a power failure. You may then use this to feed gas to
the burners manually until power is restored.
F.2. 2 To check this and adjust thermostat, see instructions on page 7.
F-3. 1 Adjust orifice and air mixer plate or contact local gas company
to adjust.
Page 15
PARTS
15LSQ
HOW TO ORDER
When ordering replacement parts for your equipment, it is important that you give your dealer or us the SERIAL NUMBER of your urn and, if possible, the date of purchase. Also give catalog number and size of urn. The serial number will be found stamped in the upper part of the urn body at the right side as you face the urn or on data plate of electric urns. A minimum charge of $15.00 will be made on all orders for spare parts when placed through factory.
Blickman Equipment Corporation
2017 KERRIGAN AVENUE. UNION CITY, N.J. 07087 (201) 867-8100
Page 16
JANUARY,
1998
LSQ PART# ID.# DESCRIPTION
LSQ
SERIES
LSQ-101 61900 THERMOSTAT. D-18 LSQ-104 60420 CONTACTOR. 50 AMP/240V LSQ-107 HEATER, 2500W -230V, LSQ-107A 60725 HEATER, 2500W -230V, SPECIAL BEND
LSQ-108 60770 HEATER, 3000W -230V LSQ-108A 60771 HEATER, 3000W-230V, SPECIAL BEND LSQ-109 60760 HEATER, 3750W -230V LSQ-109A 60761 HEATER, 3750W -230V. SPECIAL BEND LSQ-110 20330 BASKET, BREW N TOSS, 3 GAL, AT/CR LSQ-111 20340 BASKET. BREW N TOSS, 6 GALLON LSQ-112 20320 BASKET, BREW N TOSS, 10 GALLON LSQ-113 22320 FILTER PAPER, 3 GAL, #303, AT/CR, 500/CSE LSQ-114 22330 FILTER PAPER. 6 GAL. #604, AT/CR/MB, 500/CS LSQ-115 22340 FILTER PAPER. 10GAL, #705, AT/CR/MB, 500/CS LSQ-116 25520 URN BAGS, 3 GALLON (DZ) LSQ-120 22660 GAUGE SHEILD CAP, LARGE HOLE, THREA DED LSQ-121 22845 GAUGE SHIELD LOWER FERRULE LSQ-122 22770 GAUGE SHIELD ASSM.10-W/CAP & FER LSQ-123 22810 GAUGE SHIELD ASSM, 16" W/CAP & FER LSQ-124 22830 GAUGE SHIELD ASSM, 19" W/CAP & FER. LSQ-125 LSQ-126 LSQ-127
GAUGE GLASS, 3 GAL, 9-15/16" GAUGE GLASS. 6 GAL. 15-15/16"
GAUGE GLASS, 10 GAL. 18-15/16", MINI-BREW LSQ-128L 22910 GAUGE GLASS WASHERS, LOWER (DZ) LSQ-128U 22900 GAUGE GLASS WASHERS. UPPER (DZ) LSQ-129 22170 FAUCET.TYPE ES, TOMLINSON, (BLACK) LSQ-131 22180 FAUCET. SEAT CUPS LSQ-131A 22050 FAUCET. HANDLE. #13SLBE-1. BLACK LSQ-131C 21995 FAUCET. BONNET, BLK PLASTIC LSQ-131D 22075 FAUCET. SPRING LSQ-131E 22140 FAUCET. STEM, NEW STYLE LSQ-131G 22122 FAUCET, REPAIR KIT, BLACK. (ES) LSQ-132 25160 DIAL THERMOMETER (BREW ZONE) LSQ-136 23090 KNOB, COVER LSQ-148 22840 GAUGE SHIELD HOLDER, BLACK PLASTIC
20430 20430 BRUSH.LINER 20440 20440 BRUSH. GAUGE GLASS 22575 22575 LEG INSERT, ADJUSTABLE. CHROME PLATED
61278 SOLENOID REPAIR KIT. REFILL, ASCO
PRICES ARE SUBJECT TO CHANGE WITHOUT NOTICE!
Loading...