
ASSEMBLY AND INSTALLATION
INSTRUCTIONS
WARNING: BE SURE TO SHUT OFF POWER AT THE MAIN FUSE OR CIRCUIT
BREAKER BOX BEFORE INSTALLING OR SERVICING THIS FIXTURE.
NOTE: Before installing, consult local electrical codes for wiring and grounding requirements.
Handle
Screw
Screw Driver
Fixture
Headless Screw
Socket Holder
Ball Nut
Set Screw
Fixture Wire
Wire Nut
Grounding Wire
Post
1. Unscrew the ball nuts and remove the socket holder from the fixture.
2. Pull out the wires and grounding wire from the post. Make wire connections
using the wire nuts:
---The black wire from the fixture to the black wire from the post.
---The white wire from the fixture to the white wire from the post.
---The grounding wire from the fixture to the grounding wire from the post.
Carefully tuck the wires back into the post.
3. Place the socket holder on the post, then secure it with three set screws.
4. Install a bulb (not included). See relamping label at socket area or packaging for
maximum allowed wattage.
5. Attach the fixture onto the socket holder and secure it with the ball nuts.6.
Adjust the position of the handle by using screw driver if necessary.
7. Turn on the power at the main fuse or circuit breaker box.