
Installation, Operation and Maintenance Manual
MAN-01-10-93-0722-EN Rev. 0
July 2019
Rack Mount Front Panel with New Touch Panel
Replacement and Firmware Download Procedure

Installation, Operation and Maintenance Manual
MAN-01-10-93-0722-EN Rev. 0
Table of Contents
Section 1: Tools and Equipment
Section 2: Procedure
2.1 M124 Rack Mount Replacement Kit Installation Instruction ..................................2
2.2 M250 Rack Mount Replacement Kit ......................................................................4
2.3 Firmware Download Procedure ............................................................................6
Table of Contents
July 2019
Table of Contents
I

Section 1: Tools and Equipment
July 2019
Installation, Operation and Maintenance Manual
Section 1: Tools and Equipment
WARNING
Failure to follow instructions for proper installation may result in errant information being
displayed or may damage the display.
Software:
• Computer with windows 7 and above
• ABM Commander software
• CD with Coprocessor rmware
Hardware:
• RJ12 cables and Serial adapter (DB9-RJ12)
• USB to Serial
• Retainer remover
• Flathead and Philips head type screwdrivers
MAN-01-10-93-0722-EN Rev. 0
NOTE:
Make sure all software and hardware are already installed properly and ready to perform any of
the following steps to do rmware download.
1
Tools and Equipment

Installation, Operation and Maintenance Manual
MAN-01-10-93-0722-EN Rev. 0
Section 2: Procedure
The purpose of this procedure is to replace the existing LCD display on M124 Rack Mount
enclosure to a New Touch Panel display.
Parts needed:
• Rack Mount front panel with new Touch Panel cutout dimensions (VA37901-1)
• M124 Touch Panel (VA001-667-58)
• M124 Touch Panel Shade cover (VA001-667-59)
• CD with M124 upgrade Network Master rmware (VA38629)
• CD with M250 upgrade Network Master rmware (VA38633)
2.1 M124 Rack Mount Replacement Kit
Installation Instruction
Section 2: Procedure
July 2019
Step 1. Turn off the Network Master
Step 2. Remove all cables, and connector that currently connected to LCD Panel on
Rack Mount front panel
Step 3. Replacing the Rack Mount front panel
— Remove 4 Philip screws. Refer to Figure 1
— Remove the front panel with old display attached
Figure 1
Procedure
2

Section 2: Procedure
July 2019
Step 4.
Figure 2
Installation, Operation and Maintenance Manual
MAN-01-10-93-0722-EN Rev. 0
— Replace new front panel with New Touch Panel attached
— Reconnect all cables and connector, make sure to follow the power label on
the display for proper power connection. Refer to Figure 2
NOTE:
Move current cable on second Coprocessor from PORT2 RS422 RS485 to PORT1 PORT3 RS232.
Refer to Figure 3.
Figure 3
3
Procedure