Bettis Upgrade Kit Installation Instructions - NEMA Enclosure Door Manuals & Guides

Page 1
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
July 2019
NEMA Enclosure Door with New Touch Panel
Replacement and Firmware Download Procedure
Page 2
Page 3
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Table of Contents
Section 1: Tools and Equipment
Section 2: Procedure
2.1 Firmware Download Procedure ............................................................................4
July 2019
Table of Contents
i
Page 4
Section 1: Tools and Equipment
July 2019
Section 1: Tools and Equipment
WARNING
Failure to follow instructions for proper installation may result in errant information being displayed or may damage the display.
Software:
Computer with windows 7 and above
ABM Commander software.
CD with rmware.
Hardware:
RJ12 cables and Serial adapter (DB9-RJ12)
USB to Serial
Retainer remover
Flathead and Philips head type screwdrivers.
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
NOTE:
Make sure all software and hardware are already installed properly and ready to perform any of
the following steps to do rmware download.
1
Tools and Equipment
Page 5
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Section 2: Procedure
The purpose of this procedure is to replace the existing LCD display on M124 Nema enclosure to a New Touch Panel display.
Parts needed:
NEMA door enclosure with new Touch Panel cutout dimensions (VA38628)
M124 Touch Panel (VA001-667-58)
M124 Touch Panel Shade cover (VA001-667-59)
CD with upgrade Network Master rmware
Step 1. Turn off the Network Master
Step 2. Remove all cables that currently connected to LCD Panel on enclosure door
Step 3. Replacing the NEMA enclosure door
Remove both retainers on the door hinge. Refer to Figure 1
Remove both door rods. Refer to Figure 1
Remove door from the enclosure
Section 2: Procedure
July 2019
Figure 1
Procedure
2
Page 6
Section 2: Procedure
July 2019
Step 4.
Figure 2
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Install new NEMA enclosure door with new Touch Panel attached
Reconnect both door rods. Refer to Figure 2
Reconnect both retainers. Refer to Figure 2
Figure 3
Reconnect all cables and connector, make sure to follow the power label on
the display for proper power connection. Refer to Figure 3
3
Procedure
Page 7
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
NOTE:
Move current cable on second Coprocessor from PORT2 RS422 RS485 to PORT1 PORT3 RS232. Refer to Figure 4.
Figure 4
Section 2: Procedure
July 2019
Turn on the Network Master
2.1 Firmware Download Procedure
Computer and software requirements:
1. Laptop or other computer equipment with Windows 98 or later and one RS-232 serial port.
2. Engineering RJ12 cable with DB9 adapter.
3. ABM Commander for Windows V1.45
Application software requirements:
M124 Network master software files to be downloaded:
M124N110.ABM for one Modbus master module located in slot 1 of each chassis.
LCD124_4.ABM for one Modbus master module located in slot 2 of each chassis.
Procedure
4
Page 8
Section 2: Procedure
July 2019
Download Procedure for Modbus master:
1. Turn off power to master to be upgraded. Power may remain on the other chassis.
2. Remove CoProcessor from the PLC rack slot 1 (first module beside the main CPU).
3. Insert the “Clear All” jumper onto the 2-pin header.
4. Insert the module back into the rack.
5. Cycle power to the master on and then off.
6. Again, remove the CoProcessor form the rack.
7. Remove the “Clear All” jumper and place on only one pin of the 2-pin header.
8. Insert the module back into the rack.
9. Connect RJ12 cable end to Port 1 of the Coprocessor and the DB9 end to the PC.
10. Turn on power.
11. Open ABM Commander application on the PC.
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Figure 5
12. Click Continue
Figure 6
5
Procedure
Page 9
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
13. Click Facts and Basic
Figure 7
Section 2: Procedure
July 2019
14. Click System_Stats
Figure 8
Procedure
6
Page 10
Section 2: Procedure
July 2019
15. Click Del
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Figure 9
16. Enter 1 and Click OK
Figure 10
7
Procedure
Page 11
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
17. Click Yes
18. Click New
Figure 11
Section 2: Procedure
July 2019
Figure 12
Procedure
8
Page 12
Section 2: Procedure
July 2019
19. Navigate to rmware le by Double Click on
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
Figure 13
20. Select File per Model
First Coprocessor’s le
For M124 Model use this le M124NXXX.ABM
For M250 Model use this le M250_XXX.ABM
Second Coprocessor’s le
For M124 Model use this le LCD124_X.ABM
For M250 Model use this le M25MBPXX.ABM
Third and Fourth Coprocessor’s share the same le
For M124 Model use this le M124MBXX.ABM
For M250 Model use this le M250MBXX.ABM
21. Click Start Download and Click Yes to conrm download
9
Procedure
Page 13
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
22. When download is nished, click “SaVe” menu item at the top of the window. The message 1 program saved should be displayed
Figure 14
Section 2: Procedure
July 2019
Procedure
10
Page 14
Section 2: Procedure
July 2019
23. Click in the “Command Line” box at the bottom of the window and then type
Installation Instructions
MAN-01-10-93-0721-EN Rev. 0
AUTOSTART 1,1,9600 and hit Enter key
Figure 15
24. Click StoP Before Programming the next Coprocessor.
25. Disconnect programming cable and reconnect network interface cable to Port 1 of the Coprocessor.
26. Move the mode switch on the main PLC processor to the “RUN” mode.
27. Cycle power to the master. The process for this master is complete.
28. Repeat the same process for the second PLC chassis in the network master box.
Short version with no pictures
1. Click SYstem_Stats
2. Click Del, Enter 1, OK, Yes
3. Click New
4. Choose a le
5. Start Download
6. Click SaVe
7. Do Autostart 1,1,9600
8. Stop
11
Procedure
Page 15
Page 16
For complete list of sales and manufacturing sites, please visit
www.emerson.com/actuationtechnologieslocations or contact us at info.actuationtechnologies@emerson.com
World Area Configuration Centers (WACC) offer sales support, service, inventory and commissioning to our global customers. Choose the WACC or sales office nearest you:
NORTH & SOUTH AMERICA
19200 Northwest Freeway Houston TX 77065 USA T +1 281 477 4100
Av. Hollingsworth 325 Iporanga Sorocaba SP 18087-105 Brazil T +55 15 3413 8888
ASIA PACIFIC
No. 9 Gul Road #01-02 Singapore 629361 T +65 6777 8211
No. 1 Lai Yuan Road Wuqing Development Area Tianjin 301700 P. R. China T +86 22 8212 3300
MIDDLE EAST & AFRICA
P. O. Box 17033 Jebel Ali Free Zone Dubai T +971 4 811 8100
P. O. Box 10305 Jubail 31961 Saudi Arabia T +966 3 340 8650
24 Angus Crescent Longmeadow Business Estate East P.O. Box 6908 Greenstone 1616 Modderfontein Extension 5 South Africa T +27 11 451 3700
EUROPE
Holland Fasor 6 Székesfehérvár 8000 Hungary T +36 22 53 09 50
Strada Biffi 165 29017 Fiorenzuola d’Arda (PC) Italy T +39 0523 944 411
www.emerson.com
©2019 Emerson. All rights reserved.
The Emerson logo is a trademark and service mark of Emerson Electric Co. All other marks are property of their respective owners.
The contents of this publication are presented for information purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available on request. We reserve the right to modify or improve the designs or specifications of our products at any time without notice.
Loading...