BENSON HEATING G20 I2H, G31 I3P User Instructions

Page 1
BENSON CABINET
HEATER
NATURALGAS (G20 I2H) PROPANE GAS (G31 I
3
P)
I N S T A L L A T I O N C O M M I S S I O N I N G
S E R V I C I N G
U S E R I N S T R U C T I O N S
July 2010
Issue 11
THIS MANUAL SHOULD BE LEFT WITH THE END USER . TO ENSURE SERVICE AND MAINTENANCE INFORMATION IS AVAILABLE ON SITE
Page 2
1.0 Compliance Notices 4
1.1 Certificates of Conformity 5
1.2 General Product Information 5
1.3 General Requirements 5
1.4 Delivery & Pre inspection 6
1.5 Warranty 6
2.0 Location & Positioning 7
2.1 Gas Supply 9
2.2 Electrical Supply 9
2.3 Air Supply 9
2.4 Minimum Space Requirements 12
2.5 Air Distribution System 12
2.6 Flue System 13
2.7 Flue Installation 17
3.0 Installation 17
3.1 Packaging & Siting 17
3.2 Flooring 17
3.3 Minimum Clearances 17
3.4 Assembly 17
3.5 Gas Installation & Connection 18
3.6 Electrical Installation & Connection 18
3.7 Air Distribution Installation 18
3.8 Warm Air Registers 18
3.9 Heater Control Installation 19
4.0 Commissioning 19
4.1 Pre test 19
4.2 Ignition 20
4.3 Air Delivery System 22
4.4 Hand Over 22
5.0 Servicing 23
5.1 Planned Servicing 23
5.2 Servicing procedure Major Components 23
5.3 Service Re commissioning 27
6.0 Fault Diagnosis By Flow Chart 28
7.0 Wiring Diagrams 30
8.0 Technical Data 36
CONTENTS
8.1 Cabinet Range Technical Data 39
9.0 Reference Documents Standards & Codes of Practice 43
9.1 Parts Listing 44
Page 3
~ C O N T E N T S ~
S E C T I O N 1
1.0 Compliance Notices 4
1.1 Certificates of Conformity 5
1.2 General Product Information 5
1.3 General Requirements 5
1.4 Delivery & Pre-installation Checks 6
1.5 Warranty 6
2.0 Location & Positioning 7
2.1 Gas Supply 9
2.2 Electrical Supply 9
2.3 Air Supply 9
2.4 Minimum Space Requirements 12
2.5 Air Distribution System 12
2.6 Flue System 13
2.7 Flue Installation 13
3.0 Installation 16
3.1 Packaging & Siting 16
3.2 Flooring 16
3.3 Minimum Clearances 16
3.4 Assembly 16
3.5 Gas Installation and Connection 17
3.6 Electrical Installation & Connection 17
3.7 Air Distribution Installation 17
3.8 Warm Air Registers 17
3.9 Heater Control Installation 18
4.0 Commissioning 18
4.1 Pre-Test 18
4.2 Ignition 19
4.3 Air Delivery System 21
4.4 Hand Over 21
5.0 Servicing 22
5.1 Planned Servicing 22
5.2 Servicing Procedure - Major Component Parts 22
5.3 Servicing - Re-commissioning 25
6.0 Fault Diagnosis By Flow Charts 26
7.0 Wiring Diagrams by Model and Burner Type 28
8.0 Technical Data Net Efficiency Calculations 35
8.1 Benson Cabinet Range Data 36
9.0 Reference Documents Standards, Codes of Practice 39
9.1 Parts Listing 40
S E C T I O N 2
10.0 Introduction
10.1 Commissioning/hand over
10.2 Servicing
10.3 Start up procedure
10.4 Stop procedure
10.5 Shutdown procedure
10.6 Ventilation only
10.7 Lockout situations
10.8 Contact Information
I L L U S T R A T I O N S Page No Exploded view 8 Flue Systems 14-15 Fan and Motor Configurations 23 Fault Diagnosis Flow Charts 26 Wiring Diagrams 28
Any reference made to Laws, Standards, Directives , Codes of Practice or other recommendations governing the application and installation of heating appliances and which may be referred to in Brochures, Specifications, Quotations, and Installation, Operation and Maintenance manuals is done so for information and guidance purposes only and should only be considered valid at the time of the publication. Benson Heating cannot be held responsible from any matters arising from the revision to or introduction of new Laws, Standards, Directives, Codes of Practice or other recommendations.
IMPORTANT NOTICE TO INSTALLERS
Installers should satisfy themselves that the gas pipework installation is carried out in accordance with all current legislation, Codes of Practice and recommendations .
Additionally it may be necessary to protect the gas valves which form part of the heater or burner assembly from potential pipe contamination particularly, but not exclusively , where copper gas pipework is used.
In instances where copper pipework is to be used for all or part of a gas pipework installation, including short length final connections then we advise that installers consult with gas supplier or provider and satisfy themselves what additional precautions may be necessary
Page 4
1.0 Compliance notices
The Benson Gas fired Cabinet Heaters detailed herewith are manufactured by Benson Heating Within a strictly controlled quality environment within the parameters of ISO 9001. These instructions are only valid if the following country code is on the appliance GB. IE. If this code is not present on the appliance, it is necessary to refer to the technical instructions which will provide the necessary information concerning the modification of then appliance to the conditions of use for the country.
The Benson range has been tested and assessed for compliance with the following European Directives.
Gas Appliance Directive (90/396/ EEC) Machinery Directive (89/392/EEC) Low Voltage Directive (73/23/EEC) & (93/68/EEC) Electromagnetic Compatibility Directive (89/336/EEC & 91/31/EEC)
Product Liability Directive (65/374/EEC) The manufacturer has taken reasonable and
practical steps to ensure that Benson Cabinet Heaters are safe and without risk when properly used. These heaters should therefore only be used in the manner and purpose for which they were intended, and in accordance with the recommendations detailed herewith.
The heaters have been designed, manufactured, assembled, inspected, and tested, with safety and quality in mind, there are certain basic precautions which the installer and user should be aware of, and they are strongly advised to read the appropriate sections of the information pack accompanying the heater, prior to installation or use.
Benson Heating supports all new products being supplied to their customers with a comprehensive information pack; this clearly defines mandatory instructions for the safe installation, use, and maintenance, of the appliance(s).
Where proprietary items are incorporated into Benson Heating products, detailed information and instructions are also provided as part of the information pack.
It is the responsibility of the installer, owner, user, or hirer, of such products supplied by Benson Heating, to ensure that they are familiar with the appropriate information/ manuals, supplied by the manufacturer, and that they are suitably aware of the purpose of the manuals and the safety instructions. In addition, operators must be suitably trained in the use of the appliance so as to ensure its continued safe and efficient use.
Benson Heating has a commitment to continuous improvement, and therefore reserves the right to amend or change the specification of the Cabinet Heater range subject to compliance with the appropriate European, national, and local regulations.
Contained within the text of the manual, the words 'Caution' and 'Warning' are used to highlight certain points.
Caution is used when failure to follow or implement the instruction (s) can lead to premature failure or damage to the heater or its component parts.
Warning is used when failure to heed or implement the instruction (s) can lead to not only component damage, but also to a hazardous situation being created where there is a risk of personal injury.
NOTE THE WARRANTY REGISTRATION CARD SUPPLIED WITH THE HEATER MUST BE COMPLETED AND RETURNED TO BENSON HEATING ON COMPLETION OF COMMISSIONING
Warranty claims made without this condition being fulfilled will not be processed
The Benson range of Gas fired Cabinet Heaters conform to the following harmonised standards;
Page 5
BS EN 1020 Requirements for non domestic gas fired forced convection air heaters for space heating incorporating a fan to assist transportation of combustion air and/or combustion products.
BS EN 292 - Part 1 : 1991 Safety of Machinery - Basic Concepts, General Principles for Design Basic terminology, methodology
BS EN 292 - Part 2 : 1991 Safety of Machinery - Basic Concepts, General Principles for Design Technical Principles and Specifications
BS EN 60204 - Part 1 : 1993 Safety of Machinery - Electrical Equipment for Machines Specification for General Requirements
BS EN 60335 - Part 1 : 1988 Safety of Household and Similar Electrical Appliances General Requirements
BS EN 55014 - 1993 Limits and methods of measurement of radio disturbance characteristics of electrical motor-operated and thermal appliances for household and similar purposes, electrical tools and similar electric apparatus
BS EN 50165 - 1997 Electrical Equipment of non-electric heating appliances for household and similar purposes, safety requirements
1.1 Certificates of conformity
Certificates are available from the Quality Control Department at Benson Heating.
Notified body Pin reference is 63AQ0533.
1.2 General product information
The Benson range of indirect gas fired forced convection heaters have an output range from approximately 29.3 kW to 381.0 kW and are available in a configuration that will allow for down flow, horizontal, floor mounting, or above ground level on purpose built steel supports.
The units can suit either ducted applications,
or be used as free blowing units, but each heater must be connected to its own individual open flue.
Each heater is fitted with a forced draught burner which has been test fired and pre-set prior to despatch. The safety functions of the burner are by way of a fully sequential control box fitted to the burner.
Note
Neither asbestos nor soft soldered joints are used in the construction or manufacture of the Benson range of Cabinet Heaters. The materials selected for use can withstand the mechanical, chemical, and thermal stresses which they will be subject to during foreseen normal use when installed in accordance with the manufacturers recommendations
.
1.3 General requirements
Caution
Before installation, check that the local distribution conditions, nature of gas and pressure, and the current state adjustment of the appliance are compatible.
Installation, commissioning, and servicing must only be carried out by appropriately qualified and competent persons.
Warning Unauthorised modifications to the appliance, or departure from the manufacturers guidance on intended use, or, installation contrary to the manufacturers recommendations may constitute a hazard.
Note To ignore the warning and caution notices, and to ignore the advice from the manufacturer on installation, commissioning, servicing, or use, will jeopardise any applicable warranty, moreover, such a situation could also compromise the safe and efficient running of the appliance itself, and thereby constitute a hazard.
The installation of the appliance must meet all the relevant European, national, and local criteria. (See sections 3 and 9). Prior to installation the following points should be considered;
Page 6
a) The position of the heater for the optimum efficient distribution and circulation of warm air b) The position of the heater relative to the route of the flue c) The position of the heater relative to the supply of gas d) The position of the heater relative to the electrical services, and if appropriate, any additional controls. e) The position of the heater relative to the supply of fresh air
f) The height if applicable at which the heater is to be mounted and potential stratification / circulation problems. g) The position of the heater relative to service and maintenance requirements
Caution The heater must not be installed within an area where the conditions are unsuitable, e.g. where the atmosphere is highly corrosive, has a high degree of salinity, or where high wind velocities may affect burner operation. Suitable protection should be provided for the appliance when it is located in a position where it may be susceptible to external mechanical damage from; for example, fork lift trucks, overhead cranes etc.
1.4 Delivery and pre-installation checks
The heater is supplied wrapped in heavy duty protective polythene. On receipt of the heater, the following checks should be carried out; a) The model is as per order
b) That it is undamaged c) That it is suitable for the fuel supply d) That it is suitable for the electrical supply If any of these points are not satisfied then
contact should be made with the Sales Office at Benson Heating as soon as possible by telephoning 01547-528534. In the case of claims for damage, this must be signed for as damaged and reported in writing within 24 hours of delivery, in order to comply with insurance criteria
1.5 Warranty
The heater is supplied with a 2 year warranty made up as follows; first year covering parts and labour, and second year covering parts only. In addition to this there is also a 10 year time related warranty on the combustion chamber/heat exchanger. The warranty commences from the date of despatch from the manufacturer, and is subject to the terms detailed within the Benson Heating 'conditions of business'.
Note (i)
The warranty may be invalidated if ­a) The warranty registration/commissioning
card has not been completed and returned to Benson Heating
b) The installation is not in accordance with the general requirements of this manual
c) The flue arrangement and air supply for the heater are not in accordance with the manufacturers recommendations, codes of practice, or similar standards
d) Air flow through the heater is not in accordance with the manufacturers technical specifications
e) Internal wiring on the heater has been tampered with or unauthorised service or repairs undertaken
f) The main electrical supply input to the heater has been interrupted during the heating mode
g) The heater has been subject to and affected by the ingress of water in any form
h) The heater is not operated at the rating(s) laid down in the manufacturers technical specifications
i) The heater has not been operated or used within the normal scope of its intended application
Page 7
j) The manufacturer's recommended minimum service requirements have not been complied with Note (ii) All warranty claims must contain the following information to enable processing to take place; (1) Heater model (2) Heater serial number (3) Order reference/date of order, together with full installation details (name and address) (4) Details or symptoms of fault (5) Installers name and address.
Faulty parts must be returned to the Knighton Spares Department, the address of which is provided in Section 2 of this manual. Any such parts will undergo inspection to verify the claim. Replacement parts supplied prior to this may be charged, and a credit supplied upon subsequent validation of the warranty claim. Consumable items are specifically not included within the scope of the warranty.
Note (iii) Notification is required immediately a fault is suspected. The manufacturer will not accept responsibility for any additional damage that has been caused, expense incurred, or consequential loss resulting from any failure of the heater(s).
2.0 Location / Positioning
Warning
All of the basic criteria must be satisfied prior to commencing installation and commissioning, additionally, the Cabinet Heater must be positioned and installed so as to comply with all the relevant standards and guide lines (see section 9.0), as well as meeting national and local fire regulations and insurance criteria, especially if it is proposed that the heater is to be installed within a special risk area (e.g. proximity to where petrol engined vehicles are stored or parked, where cellulose spraying takes place, where woodworking machinery is operated, etc,).
Indirect fired heaters must not be located in hazardous areas, however, it is permissible for the heater to supply air to such areas.
The heater must not be installed within an environment where there is a high concentration of chlorides, fluorides, salts, or other aggressive or volatile chemicals / compounds. Nor should the heater be positioned where the burner could be adversely affected by high winds or draughts.
The location chosen for the heater must allow for the fitting of an effective flue system. The location must also allow for adequate clearance for the air supply, return air circulation, oil supply, electrical supply, whilst also providing good and safe working access. The heater must be installed on a flat and level surface made from non­combustible material, which is sufficiently robust to withstand the weight of the heater and any ancillary equipment. Any combustible material adjacent to the heater or flue system must be so placed or shielded so that its surface temperature does not exceed 65
o
C.
In areas where it is proposed that more than one heater is to be installed, a general scheme of circulation should be drawn up and maintained, thereby offering the best heat distribution.
All Benson Heaters are fitted with a pressure relief facility, this is incorporated into the design of the flue gas exit duct. Care should therefore be taken in siting service connections and controls well away from the pressure relief vent.
Warning Under no circumstances must the pressure relief be restricted, blocked, or have the free exit of exhaust gas impaired or re-directed.
Page 8
Page 9
2.1 Gas supply - general
The Benson range of gas fired cabinet heaters are all manufactured and pre-set for use with natural gas or LPG classified under the categories, based upon the destination of the heater see section 8.0
The heater must be compatible with the gas supply, and each heater must be installed with a separate approved isolating gas cock positioned adjacent to and upstream of the union between the service pipe and the heater.
The gas supplier should have been contacted to confirm that the supply feed (pipework and metering) is capable of delivering the required dynamic volume of gas, thereby ensuring that the minimum burner pressure can be achieved. Consideration should have also been given to the pressure drop on single and multiple heater installations, and the affect that such installations will have upon other plant sharing the gas supply.
If it is necessary to fit a gas booster, the controls must include a low pressure cut-off switch which must be fitted on the supply side of the booster. It is also a requirement that the gas supplier is contacted prior to the fitting of the unit.
Note
Reference to the Institute of Gas Engineers publication UP-1 and UP-2 together with BS6891 is strongly advised.
Service and Installation pipework must be of a diameter equal to or greater than the inlet connection on the heater, all joints must be sealed using an approved sealing compound, and the system purged and tested for soundness.
2.2 Electrical supply
Wiring external to the cabinet heater must be installed in accordance with any local, national, and European regulations, as well as meeting the appropriate requirements of IEE regulations. The means of connection to the main electrical supply must allow for complete electrical isolation of the heater, furthermore,
in the case of a unit wired for a three phase supply, the supply should only be used to serve the heater itself and no other plant or equipment. The position of the isolation switch must be such that it is adjacent to the heater and easily accessible at all times. In addition, the isolator itself must have a contact separation of not less than 3mm as per BS5991 clause 20.2. The Control Fuse ratings are detailed on the appliance data plate.
Warning Ensure that the electric and gas supplies are turned off before any electrical work is carried out on the heater. Ensure that wiring cannot make contact with any surfaces liable to be subject to high temperatures or where the insulation of the wiring could be impaired as a result of such contact.
All Cabinet Heaters must be earthed. Caution
The main electrical supply must not be switched off or disconnected as a method for stopping the heater, the exception to this is in an emergency, or during servicing, when the heat exchanger has been allowed to cool sufficiently to prevent any damage from occurring. Claims for damage will not be considered if they have resulted from incorrect wiring or the incorrect use of the heater.
2.3 Air supply
Consideration must be given to the provision of air for the purposes of combustion and ventilation of the heated space, plant room or enclosure where heaters are to be installed
Note
It is strongly recommended that BS 6230 :
2005 is referred to for further information concerning ventilation requirements Where mechanical ventilation is used it is a requirement that the inlet is of the mechanical type, and the outlet is either mechanical or natural.
Page 10
2.3.1 Heaters installed within the heated space
Where heaters are installed within the space to be heated (I.e. not a plant room or enclosure Combustion air or heater related ventilation air
Will not be required if
The design air change rate of the heated space is 0.5 air changes per hour or greater The design air change rate may be satisfied by natural infiltration or by mechanical ventilation
Combustion and General ventilation will be required if The design air change rate of the heated space is less than 0.5 air changes per hour
Where the heated space has an air change rate of less than 0.5 air changes per hour then it will be necessary to provide either natural ventilation openings to the heated space (section 2.3.1.1. refers) or the mechanical ventilation of the heated space (section 2.3.1.2. refers)
2.3.1.1 Natural Ventilation Openings to the Heated Space
If the heated space design air change rate is less than 0.5 air changes per hour then provision for low level natural ventilation openings will only be necessary The minimum free area of the low level natural ventilation opening shall be
 2cm
2
for each kW of rated heat input
The low level natural ventilation opening should be situated on an external wall and be within 1000 mm of floor level for natural gas and ideally at floor level for l.p.g gas installations but in any event no higher than 250 mm.
The table in the next column provides specific data for each heater model as -
2.3.1.2 Mechanical Ventilation to the Heated Space
In the event that the heated space has a design air change of less than 0.5 air changes per hour and that installer prefers to mechanically ventilate the heated space rather than provide ventilation openings then
-
 The heated space needs to be
mechanically ventilated so that the design air change is 0.5 air changes or greater.
 It is a requirement that the mechanical
ventilation shall be of the ’input’ type with either natural or mechanical extraction.
 Systems of mechanical extraction with
a natural inlet shall not be used
 It is necessary to provide an automatic
means to safely inhibit heater(s) operation should mechanical air supply fail for any reason
Minimum Free Area of
ventilation opening
High Level Low Level
cm2 cm2
100 None 64 125 None 79 150 None 97 200 None 127 250 None 160 300 None 193 400 None 257 500 None 291 600 None 386 700 None 460
800 None 515 1000 None 623 1200 None 769 1300 None 847
Model
Page 11
2.3.2. Heaters Installed within a Plant Room or Enclosure
A plant room means a room housing the heater plant and probably other items of building service plant and would generally have generous space for maintenance
An enclosure is where the heater is installed within a compartment or confined area where space is limited
Where heaters are installed within a plant room or enclosure then provision for both combustion air and air for general ventilation will be required by means of high and low level ventilation openings (sections 2.3.2.1 refers to plant room applications and sections 2.3.2.2 refers to enclosure applications).
Alternatively the plant room or enclosure may be mechanically ventilated (section 2.3.2.3 refers)
2.3.2.1 Natural Ventilation Openings to Plant Rooms
For plant room applications the minimum free area of ventilation opening shall be
 At high level 2 cm
2
for each kW of
rated heat input
 At low level 4 cm
2
for each kW of rated
heat input
The high level ventilation opening should be sited on an external wall and positioned as high as is practical and always within the top 15% of the wall height
The low level natural ventilation opening should be situated on an external wall and be within 1000 mm of floor level for natural gas and ideally at floor level for l.p.g gas installations but in any event no higher than 250 mm.
The table below provides specific data for each heater model as -
2.3.2.2 Natural Ventilation Openings to
Enclosures
For enclosure applications the minimum free area of ventilation opening shall be
 At high level 5 cm
2
for each kW of
rated heat input
 At low level 10 cm
2
for each kW of
rated heat input

The high level ventilation opening should be sited on an external wall and positioned as high as is practical and always within the top 15% of the wall height
The low level natural ventilation opening should be situated on an external wall and be within 1000 mm of floor level for natural gas and ideally at floor level for l.p.g gas installations but in any event no higher than 250 mm. The table below provides specific data for each heater model as
Minimum Free Area of
ventilation opening
High Level Low Level
cm2 cm2
100 64 128
125 79 158
150 97 194
200 127 254
250 160 320
300 193 386
400 257 514
500 291 582
600 386 722
700 460 920
800 515 1030 1000 623 1246 1200 769 1538 1300 847 1694
Model
Page 12
2.3.2.3 Mechanical Ventilation to a Plant Room or Enclosure
In the event that the installer prefers to mechanically ventilate the plant room or enclosure rather than provide ventilation openings then -
 The plant room or enclosure needs to
be mechanically ventilated at the rate of 4.14 m
3
/h of fresh air per kW or
rated heat input.
 It is a requirement that the mechanical
ventilation shall be of the ’input’ type with either natural or mechanical extraction. Where mechanical extraction is selected then the extraction rate should be 5%-10% less than the input rate.
 Systems of mechanical extraction with
a natural inlet shall not be used
 It is necessary to provide an automatic
means to safely inhibit heater(s)
operation should mechanical air supply fail for any reason

The table below provides specific data for each heater model as -
2.4 Minimum space requirements
The minimum space requirements for single and multiple heater applications are detailed in section 3.3 later within this manual.
2.5 Air distribution system
All materials used within the construction of the delivery and return air ducts must not represent a fire hazard and should be made from thermally inert materials. The selection of materials must take account of the environment into which the heater and its air delivery system is expected to work, it must also take account of the stresses and loadings placed upon it during its normal working life Where interjoist spaces are used to route ducting these must be lined with fire resistant insulation material. In installations where forced recirculation is a
Minimum Free Area of
ventilation opening
High Level Low Level
cm2 cm2
100 159 318 125 198 396 150 244 488 200 317 634 250 400 800 300 483 966 400 643 1286 500 726 1452 600 965 1930 700 1152 2304
800 1287 2574 1000 1558 3116 1200 1922 3844 1300 2118 4236
Model
MODEL
Mechanical
Ventilation Rate for
Plant Room or
Enclosure
125 164 150 202 200 262 250 331 300 400 400 533 500 601 600 799 700 954
800 1066 1000 1290 1200 1592 1300 1753
100 132
M3/h
Page 13
feature, a full and unobstructed return air path to the heater(s) must be provided, with return air grilles connected by ducting directly to the return air inlet on the heater. The limit for recirculation should not be greater than 85% recirculated air to 15% fresh air.
Where the heater is installed within a enclosure or plant room the return air and discharge air arrangement must be such that the air circulation fan does not interfere with the operation of the flue. The return air intake and warm air outlet should therefore be fully ducted to and from the heater, respectively, within the compartment or plant room.
If the inlet air is ducted to the outside, then the lowest edge of the inlet air duct must be at least 500 mm above the outside floor or ground level, it must also be fitted with an access point (s) to allow for cleaning and servicing to occur. The openings in the structure of the plant room, through which the ductwork passes must be of fire resistant material and constructed to prevent the likelihood of any fire from spreading. In ducted applications the ductwork must be designed so as to give a static pressure within the limits stated in section 8 of this manual. It should be noted that if the static pressure is too high, nuisance shut-down will occur when the heater goes out on the overheat limit thermostat, if the static pressure is too low, then damage can be caused to the fan motor.
Warm air outlets on ducted applications must be such that they cannot be closed or become blocked, which again would lead to an increase in static pressure and nuisance shutdown. The outlets must not be sited so that warm air can be discharged onto combustible materials, if necessary, guard rails should be used to ensure that effected areas are kept clear. Return air intakes must not be located so that potentially harmful or hazardous contaminated air can be drawn into the system.
2.6 Flue system
It is essential that the products of combustion are flued to the outside of the building. Each heater must have its own separate flue, with a flue diameter of not less than is detailed in section 8 within this manual. the minimum vertical length of flue must not be less than 3m. The flue should rise vertically, and the number of bends should be kept to a minimum.
Flue pipe should be supported at intervals not exceeding 1.8mtrs
Flue pipes below a height of 2 m should be guarded against the possibility of being accidentally touched when hot by personnel
It is strongly advised that BS 5854; 1980, and BS 5440; parts 1 and 2, are used as consultative documents when considering flue requirements. Care should be taken to ensure that the flue terminal is not situated in a high pressure area, the proximity of buildings and other obstacles which will influence this must be taken into account, preferably at the design stage. See figures 2-12.
Provision must be made for the disconnection of the flue for inspection and service requirements, and it is strongly advised that where bends are fitted inspection covers are included. The materials from which the flue is constructed must be non-combustible, resistant to internal and external corrosion, and be capable of withstanding the stresses and loadings associated with normal use. When designing the flue system the prevention of the formation and entrapment of condensation must be a key consideration. Twin wall or insulated systems are recommended as they tend to inhibit the formation of condensates. Where condensation is unavoidable traps should be included to encourage the condensates to flow freely to a point from which they may be released, preferably into a gully. The condensate pipe from the flue to the disposal point must be made from corrosion resistant pipe of not less than 25 mm internal diameter.
Page 14
If the flue passes through a wall, ceiling, or roof made from combustible material then it has to be sleeved so as to provide a minimum of a 25 mm void between the exterior of the flue and the internal wall of the sleeve. The maximum permitted temperature of any adjacent combustible material is 65
o
C.
The position of the flue and its terminal should be such that it does not impair the combustion process. It should terminate in an exposed position so as to allow the escape and dissipation of flue gases without risk of their re-entering the property through windows, ventilation ports, etc,. The flue should extend to at least 1m above the height of any object within 3,5m of the terminal. Flue terminals should be fitted on all flues with a diameter of 200 mm or less. The terminal must be of the approved type, and have outlet grilles on all sides giving a total free area of at least double that of the flue.
Caution
It is imperative that the flue should be properly sealed where it passes through the roof, this can best be achieved by using the approved method of roof flashing plate and cravat.
Note
It should be noted that claims made under warranty and attributed to the ingress of water may not be considered especially if an approved method of sealing has not been used, or if the design of the flue has not made provision for possible condensation problems
Page 15
Not less than 600mm
Not less than 600mm
Greater than 1500mm
Parapet
Not less than 600mm
Less than 10 h
Greater than 1500mm
H
1
H
2
2
Less than 10 h
1
Flat roof with parapet
Flat roof envelope method
Structure
Not less than 250mm
2
Greater than 10 h
1
H
1
H
2
Structure
Flat roof where the flue height is more than 10 Heights (H) away from all structures
Structure
Not less than 600mm
Less than 1500mm
Flat roof with flue close to parapet
Page 16
Not less than 600mm
Less than 1500m
m
Structure
Flat roof with structure close to flue outlet
Pitched roof not greater than 45°
Not less than 600mm
Not greater than 45
°
Not less tha
n
600mm
Not less than 600mm
Not less than 250mm
Flat roof with no parapet
Page 17
2.7 Flue Installation
An integral flue spigot is fitted to all Cabinet Heaters thereby allowing the flue to connect directly to the heater. The design of the flue must ensure that it can be disconnected to allow for cleaning and servicing, furthermore, all of the flue section joint sockets must face upwards, and the seal between the sections achieved through mechanical joints or through the use of approved caulking string and grout. It is strongly advised that BS 5854 and BS 5440 parts 1 and 2 are referred to, see also figs 2-12.
Where condensation is likely to be a problem provision should be made preferably at the design stage (see section 2.5).
3.0 Installation
It is strongly advised that the installer reads Section 2 and Section 3 of this manual prior to starting any installation work. It is a requirement that only qualified and competent personnel may undertake installation, commissioning, and servicing.
Warning
Always ensure that the appropriate personal protective equipment is used.
3.1 Packaging/siting
The heater will usually be supplied wrapped in polythene, non assembled parts will be supplied separately. Prior to installation, the assembly of the heater should be completed, it is advisable that this is undertaken in the area where the heater is scheduled to be sited.
Caution
It is strongly advised that when positioning the heater the lifting eyes are used, thereby reducing the risk of inadvertent damage being occasioned to the heater.
3.2 Flooring
The heater must be installed on a level non combustible surface capable of supporting the weight of the heater and any ancillary equipment.
3.3 Minimum clearances
The following minimum clearances (in millimeters) must be observed when installing the heater.
3.4 Assembly
The following sub-assembly parts should be assembled to allow installation to continue.
(a) Vertical Nozzled Models
For free blowing applications it will be necessary to complete the final assembly before continuing with the installation. The bonnet top with nozzle spigots should be attached to the heater and secured. The nozzles should then be pushed home on the spigots and positioned to provide the desired airflow.
Ensure louvres are adjusted outwards and ensure blades are not resonating
The nozzles should be securely fixed in their desired position on completion of commissioning.
(b) Horizontal Nozzled Models
Remove packaging and secure the 90
o
Duct Outlet to the outlet on the heater using the bolts supplied. Secure the nozzle spigot plate to the duct outlet using the bolts and prevailing torque nuts provided. Fit the securing brackets to each of the outlet nozzles, and lift the complete heater assembly and position on the pre-sited purpose built supports. Finish off the assembly by fitting and securing the outlet nozzles to the spigots by way of previously fitted brackets.
Model Size Front Rear Lhs Rhs
100 -150 500 700 150 150 200 - 300 500 1,000 150 150 400 - 500 600 1,200 150 150
600 600 1,500 150 150
700 900 1,500 150 150 800 - 1000 900 2,000 400 400 1200-1300 900 2,000 500 500
Page 18
3.5 Gas Installation/Connection
Service pipework must terminate at an approved gas cock, and be adjacent to the position of the heater. The connection to the heater can be made by way of either an approved flexible coupling, or rigid connection. Threaded connections must comply with ISO288/1 or ISO 7/1, further information concerning the accepted practice in European countries is detailed in the June 1995 version of prEN 1020 annex A7 The diameter of the pipework from the cock to the burner connection must not be less than the diameter of the burner connection inlet. (see section 8 ) The installation must be purged and tested for soundness prior to commissioning.
Always ensure that the appropriate personal protective equipment is used.
3.6 Electrical Installation/Connection
Benson cabinet heaters are available either for 415V 50Hz 3PH or 230V 50Hz 1PH supplies depending upon the model specified.
It is recommended that reference is made to the wiring diagrams contained within section 7 of this manual prior to installation or connection to the supply. The electrical supply must be as specified and suitable for the heater, and must be run within conduit to a point adjacent to the heater, and be terminated to provide an isolation point that will prevent remote or inadvertent activation. Cables, conduit, and fittings that are used to make the connection between the isolator and the heater must conform to the appropriate IEE regulations.
All heaters are supplied fused and pre-wired, all must be earthed.
Final connections for any additional external controls must be completed on site, and must be carried out according to IEE regulations. Separate user information is provided for the time control unit and the burner, and forms part of the product information pack which accompanies every heater when despatched.
Warning
Always isolate from mains electrical supply before commencing work on the heater. Always ensure that the appropriate personal protective equipment is used.
3.7 Air Distribution Installation
The materials selected must be of low heat capacity, and it is preferable that all warm air ductwork is thermally insulated. Where ducting may be subject to deterioration from exposure to moisture or high humidity material selection and insulation are prime considerations. Joints and seams must be airtight and fastened securely and designed to remain so, even when operating at high temperatures. Adequate support must be designed into the layout of the ductwork to ensure that the integrity of the seams and joints is maintained.
The support must be independent and separate from the heater and the ducting, to allow for free movement during expansion and contraction.
Where ducting passes through walls or partitions sufficient clearance must be left, irrespective of any fire stop requirement, to allow for expansion and contraction Failure to adhere to these latter two points can result in the generation and transmission of excess noise. Where ducting is installed in concrete flooring a permanent membrane must be used to isolate the ducting from the corrosive effect of the alkaline salts within the concrete. Care should be taken to ensure that soft insulation material does not become compressed and thereby lose its effectiveness.
3.8 Warm Air Registers
In order that vertical temperature gradients are minimal thereby providing a more even heat distribution, it is preferable to install warm air registers at low wall levels or at floor level, with the size, number, and position commensurate with the requirement of the application.
Page 19
To minimise noise levels the registers should be set away from corners, additionally, a good seal between the register frame and the wall is important, particularly on high level positions, if unsightly staining through warm air/ particulate deposition is to be avoided.
3.9 Heater Control Installation
Warning
Isolate heater from mains before undertaking any electrical work.
Unless specified all Cabinet Heaters from 100 to 1300 are manufactured and supplied with a CP2 Control as standard .
The following controls fitted and pre-wired (a) On/standby switch (b) Ventilation/heat switch (summer/winter switch) (c) Manual/automatic switch (d) Thermostat (e) Time clock (f) Frost stat
A CP4 Controller is available as an option
All of the above controls are located on a removable panel which when separated from the heater can be re-positioned so as to offer a remote facility. However, to facilitate this, it is necessary to order and fit an electrical panel cover and front panel blanking plate to the heater in place of the control unit.
The controls for Horizontal Cabinets are supplied as remote option.
4.0 Commissioning
It is a requirement that only suitably qualified and competent personnel are allowed to undertake the commissioning of the heater.
It is also strongly recommended that prior to commissioning the engineer familiarises himself with; the information contained within the information pack that accompanies the heater, the heater itself, and with the specific requirements of the installation /application.
Warning
All Cabinet Heaters undergo a rigorous test programme prior to being despatched, whilst such a programme does involve pre­commissioning and setting up the heater to operate efficiently and well within its designed operational limits, this does not mean that on site commissioning is less important than might otherwise be the case.
Note It is strongly recommended that equipment used for the sampling and analysis of flue gases is accurate to within +/- 0.1% and maintained so that it is regularly calibrated.
4.1 Commissioning - Pretest
Check to ensure electrical safety, and inspect and check the installation, testing for leaks. (a) Ensure that the electrical supply is turned off.
(b) Ensure that the gas supply is turned off. (c) Check that all panels and fasteners are
secure and in place. (d) Check that the heater is installed so that it
is square and that the support is adequate. (e) Ensure that warm air delivery outlets are
open and that ducting is adequately supported.
(f) Ensure that if filter assemblies are fitted that they are secure and correctly located.
(g) Check that air inlets are clear and that return air paths are adequate.
(h) Ensure that the flue is secure, adequately supported, and that the various joints are properly sealed.
(i) Check that condensate trap and drain facilities are adequate.
(j) Check that there is provision for flue gas sampling and that this sample point can be plugged and sealed after commissioning.
Page 20
(k) Check that fan and limit stat settings have not been disturbed and are as follows
100/700 800/1000 Range
Fan on - 60oC Fan on - 50
o
C
Overheat limit -100oC Overheat limit -100
o
C
Fan off - 30oC Fan off - 30
o
C
Also check that the white button (automatic) is pulled outward and that the red button (reset) is pushed inwards to the reset position. See fig 15.
(l) Remove lower panel and check motor and fan drive system for integrity of joints, check pulley alignment, fan rotation, and belt tension (see section 5.2 and figs 17 and 18).
(m) Ensure that the burner is securely attached to the heater.
(n) Test for electrical earth continuity between the heater, oil pipe work, and mains supply.
ANALOGUE TYPE
(o) Turn on main electrical supply, select the following switch settings On/Standby - Standby Heat/Ventilation - Ventilation Manual/Automatic - Manual
OPTIMISED TYPE
Press FAN /Enter The fan will start enabling fan direction etc to be verified. Reset on/standby switch to standby position
(p) Turn mains electrical supply to off, replace and secure lower louvered panel covering fan and motor assembly.
(q) Set room thermostat and time clock to 'demand' positions.
4.2 Commissioning - Ignition
Warning
Do not proceed with commissioning unless all the criteria detailed within sections 4.0 and 4.1 have been satisfied.
(a) Ensure that the electrical supply is turned off.
(b) Ensure that the gas supply is turned off. (c) Select the following switch settings on the
heater
ANALOGUE TYPE
On/Standby - Standby Heat/Ventilation - Heat Manual/Automatic - Automatic
(d) Turn on main electrical supply. (e) Select 'on' position for heater on/standby
switch. OPTIMISED TYPE (f) Prog 0000 Enter 1TEMP key in an operating temp and Enter Press RUN 3 times to return to main screen Press OVER button Select 1 OVERIDE then select 1 and key in 01 hour override this will allow enough time to commission the heater safely
(g) Check for the following burner sequence
Interval Operand
1 <5s Combustion air damper actuated, burner fan motor initiates purge cycle... 2 <40s Pilot valve opens ignition transformer provides spark for pilot ignition...
-------- E I T H E R -------- 3 >40s Ignition failure caused by gas
starvation resulting in burner lock­ out/shut-down...
(g) Clear burner lockout using burner reset function.
(h) Set heater on/standby switch to standby position
(i) Open gas supply cocks Repeat steps 4.1 q, and 4.2 c,e,f.
----------- O R ---------- 3 >40s Pilot ignition... Burner ignition...
4 <60s Burner ignition cycle complete
Page 21
Note It is strongly recommended that the separate manual concerning the operational details of the burner supplied with the heater as part of the information package is studied prior to commissioning. Time intervals within the ignition sequence will vary slightly from one model to another. Warning If burner ignition is not satisfactorily accomplished, commissioning must not proceed until the reason or fault has been identified and rectified, if necessary by reference to the separate burner information or to section 6 of this manual.
( j ) Repeat steps 4.2 c,a, (k) Re-check all connections and joints for
gas soundness using an approved leak detection fluid.
(l) Remove burner cover and attach manometers to check burner pressure settings.
(m) Repeat steps 4.2 d,e,f, allowing the heater to reach thermal equilibrium.
(n) Check burner pressure settings are in line with the data as per section 8.1 (if adjustment is necessary refer to separate burner information within section B)
Note (i)
The figures quoted in section B are independent test figures based upon zero flue resistance. On completion mark the gas valve
adjustment screw with paint/sealant to prevent tampering with valve
(o) Adjust room thermostat to its highest setting, and allow the heater to continue to fire.
(p) Gradually reduce the temperature setting on the room thermostat until the burner shuts down, (@ < ambient) and then gradually increase the temperature setting on the thermostat until heat is called for, (@ > ambient) and the burner automatically re-fires.
(q) Re-set time clock to a minimum off period, checking that the burner shuts down,
and then automatically re-lights once the minimum off period has elapsed (Separate information on the time clock is contained within the information package supplied with the heater).
(r) Check fan and limit stat by depressing and holding in the fan motor overload re-set button, located on the heater electrical panel. The time between the fan stopping and burner shut down should be noted, once the burner has shut down the overload on the motor should be released. If the time interval between fan stop and burner shut down is greater than 90 seconds further checks should be made. These are as follows:
(i) Check settings on fan and limit stat are correct,for heater type ie, fan on 60
o
C, fan
off 30
o
C, limit 100oC.
On completion delete any override settings on optimised control and return temperature settings to customer requirements
(ii) Check that the position of the unit is correct, ie, equi-distant between heat exchanger body and heat shield panel. (iii) Check integrity of unit, ensuring that neither the bi-metallic strip nor its casing is damaged.
(s) Undertake flue gas analysis using approved and calibrated analysing equipment recording data on the commissioning card, ie, CO, CO
2
, net and gross flue temperatures. Record mains gas, and burner head pressure, ambient temperature, barometric pressure, and complete percentage efficiency calculation using the formula detailed in section 8.
Note (ii) The burner air and gas pressure settings should be only very finely adjusted to achieve a CO
2
reading of 9.3% (+/- 0.1%).
Note (iii) The net efficiency must not be lower than 79% for heaters fitted with a modulating or hi / lo burner. In other cases the net efficiency level must not be lower than 84%
Page 22
Note (iv) All Cabinet Heaters are test fired and pre­commissioned as part of the manufacturing process, if however, during on site commissioning the data are found to be not in accordance with the manufacturers data, then the following action is recommended. * Re-check all readings and calculations. * Adjust burner as per manufacturers instructions. * Consult Benson Heating Technical Department. (t) Complete commissioning card and provide operating instructions for the user, high-light the fact that the manufacturer recommends that in the interests of safety and efficiency the heater is serviced on a regular basis only by qualified and competent persons.
The completed commissioning card must be returned to Benson Heating Service Department immediately after the satisfactory completion of commissioning, failure to do so can invalidate any subsequent warranty claim.
(u) Set all controls to the requirements of the
user
.
4.3 Commissioning - air delivery system
On free blowing applications the integrity of the fastenings on the heater top and outlet nozzles must be checked . Final adjustment for the direction of the air flow from the nozzle hoods should be made.Ensure louvres are adjusted
outwards and ensure blades are not resonating
and the hoods should be secured in the required position by drilling through the two holes provided in the hood outer ring and fastened in place using self tapping screws . Caution On ducted applications it is necessary that the system is balanced in order to optimise the efficiency of the heater and the air distribution and delivery system. Failure to balance the system can result in fan motor overloading and premature component failure, it can also result in an inefficient heating/ventilation system.
(a) Check that the amount of fan produced air volume is in accordance with the heater specification, if the volume is too great the fan can be overloaded. Ensure that the running current is as per that stated on the heater data plate. Alternatively, the static pressure should be measured at the start of the ductwork to confirm that it is within the permissible tolerance.
(b) If the current drawn is greater than the stated running current, in most probability this will be caused by insufficient static pressure within the ductwork, in which case system resistance should be increased through the introduction of a damper placed as close to the start of the ductwork as possible, thereby resulting in a reduction in drawn current. The damper should be adjusted until the current is in accordance with that stated on the data plate.
(c) If the current drawn is too low the duct outlet grilles will require opening to reduce static pressure and increase air volume, if this is not the case overheat cut outs can be caused.
The Fan Belts must be rechecked on completion of commissioning ensuring that the tension is correct and the pulleys are in alignment
4.4 Commissioning - hand over
(a) Upon full and satisfactory completion of commissioning, a record of commissioning information (contact, date, etc) should be left with the heater, a copy of which must also be forwarded to Benson Heating Service Dept.
(b) The commissioning engineer must ensure that the user is familiar with the safe and efficient use of the heater, detailing the function of all controls and main components.
(c) The user should be made aware of the following in particular
(i) Lighting, shutdown, and operational information. (ii) Safety features, data plate, and labeling. (iii) The requirement for regular inspection ­especially if the heater is within a more demanding environment - and the need for
Page 23
regular servicing carried out by competent and qualified persons.
Caution
After approximately 100 hours of running, the tension of the fan belts must be checked to ensure that they are correct and that they have not stretched. See section 5.2 for further instructions
5.0 Servicing
Warning
Servicing must be carried out on a regular basis, the maximum interval between services being 1 year. It is a requirement that only suitably qualified and competent persons are allowed to undertake servicing.
Before any maintenance or servicing work is carried out the heater must be shut down and allowed to cool, and have the gas and electric supplies to it turned off at the gas cock and isolator respectively.
Caution
Certain component parts are factory sealed and are designed so as to be tamper proof. Usually such items do not require servicing, and therefore should not be tampered with. Failure to comply with this can invalidate any warranty, and can also lead to premature failure. The following parts fall within this category: room thermostat, time clock, frost thermostat, sequential controller, and fan and motor.
Additionally, the fan and limit stat has been factory set, and must not be re-set without formal consent from the manufacturer.
Reference should be made to the separate information covering the operational details of the burner and timer.
Only approved spare/replacement parts can be fitted, failure to comply with this can compromise the safe and efficient running of the heater, and can also invalidate any warranty claim.
5.1 Planned Servicing
In order to maintain the efficient operation of the heater it is recommended that the following planned servicing and preventative
maintenance programme is adopted by the user. Quarterly Inspection (a) Visual inspection of the burner (b) Clean and check ionisation probes (c) Check overheat safety is operational
Bi-Annual Inspection (a) As per quarterly inspection, plus... (b) Combustion check
Annual Inspection (a) As per half year inspection, plus. (b) Heat exchanger and cleaning (c) Electrical connections (d) Main fan motor (e) Main fan assembly (f) Pulleys (g) Fan belts (h) Gas supply (i) Burner (j) Air delivery system (k) Flue (l) Report
5.2 Servicing Procedure - Major Component Parts
Flue
A visual inspection should be carried out to ensure that the flue remains adequately supported, both internally as well as externally, and that the various joints are effectively sealed.
Inspection covers, where fitted, should be removed and the flue checked to see whether cleaning is required If inspection covers are not fitted the flue gas exit duct and flue spigot will provide not only an indication of the cleanliness of the flue, but will also enable access for cleaning. The presence of the flue terminal should be checked. If a condensate trap and drain facility is fitted this should be checked to ensure that it continues to function correctly, and the drainage of condensates is not impaired.
Main Fan Motor
Remove access panel, dust and other foreign matter should be cleaned by blowing over with compressed air and through the use of a soft bristle brush and cloth. Solvent
Page 24
Motorised Fan
Assembly
100-300
Fan and Motor
Assembly
400-700
Fan and Motor
Assembly 800-1300
Page 25
Turbulator Positions in Heat Exchanger 200-250-300 Gas Cabinets 13 off
Turbulator Positions in Heat Exchanger 400-500 Gas Cabinets 18 off
Turbulator Positions in Heat Exchanger 600-700 Gas Cabinets 22 off
Turbulator Positions in Heat Exchanger 800-1000 Gas Cabinets 24 off
Turbulator Positions in Heat Exchanger 1200-1300 Gas Cabinets 28 off
Page 26
wipes may be used to remove heavy soiling from the motor casing. Traces of surplus lubricants spreading from the bearings should also be cleaned away. Where motors are fitted with grease nipples bearings should be lubricated with the correct grade of lubricant. motors which do not have grease nipples feature sealed bearings which are lubricated during manufacture for their life. The electrical connections should be checked as follows. The cover to the terminal box should be removed by undoing the screws which secure it. Check connections for signs of corrosion, tightness, and ensure that there are no stray strands which could form a short circuit. Clean, tighten, and replace as necessary. Replace cover and secure
Main Fan
Remove dust and other foreign matter by blowing off with compressed air or through the use of a soft bristle brush. Check that the bearings do not show signs of excessive wear. It should be noted that these bearings do not require lubricating. If the bearings require replacing the following procedure should be followed.
(a) Remove belt(s). (b) Loosen setscrew on eccentric collar and tap collar in the opposite direction to fan rotation. (c) Remove collar and bearing. (d) Check shaft for alignment and straightness. (e) Locate the bearing in its seat and place on the shaft with the cam facing outwards. (f) Fit the eccentric collar and engage the cams. (g) Tighten initially by rotating, and then by tapping in the direction of the fan rotation. (h) Replace fasteners and secure. (i) Turn by hand to ensure free fan rotation.
Pulleys
Check pulleys for alignment using a straight edge, if necessary reposition either or both of the pulleys and the fan motor. Check for excessive wear within the root and sides of the grooves, and check for any other signs of
wear or damage, if necessary replace the pulley as follows. (a) Release tension on belts and remove. (b) Release the taper locks by slackening the securing screws by several complete turns. (c) Fully remove one screw from the taper lock, and having oiled it, insert into the threaded jacking point. (d) Tighten screw until the taperlock is free. (e) Remove taperlock and pulley. (f) Fit taperlock in new pulley, and provisionally position on the shaft. (g) Remove the screw from the jacking point, and tighten both screws in their clamping points until the pulley can just be moved on the shaft by hand. (h) Align pulleys using a straight edge, and by gradual alternate tightening of the screws clamp in position. (i) Refit belts and check for the correct amount of tension.
Fan Belts
Check belts for signs of wear. Frayed or split belts must be replaced using belts with a common batch code. Belt tension must be checked, and if on multi-belt units it is found that one belt contains more slack than its accompanying belts, then all the belts on the unit must be replaced, again using a common batch code. Replacement and tensioning is carried out as follows.
Note
The maximum displacement at the mid point of the top edge of the belt must not be greater than 16mm per metre of span, when a force of 3kg is applied in a plane perpendicular to the belt.
(a) Loosen fan motor securing bolts on chassis. (b) Loosen fan motor slide adjustment bolt. (c) Slide fan towards fan to slacken belts. (d) Replace belts, pull fan motor away from fan until belts are tight. (e) Tighten adjustment bolt to hold motor. (f) Tighten fan securing bolts ensuring that the fan is square and the pulleys aligned. (g) Check belt tension, making final adjustments as necessary. (h) Tighten and clamp fasteners to hold fan motor in position.
Page 27
Heat Exchanger
The heat exchanger requires a visual inspection at least once per year, this should be accompanied by cleaning. It is recommended that a flue brush and vacuum cleaner are used to facilitate this. Access to the heat exchanger is gained through the removal of the rear upper panel and heat shield. Servicing and cleaning should be performed as follows.
(a) Remove brass nuts and cover from heat exchanger end assembly to expose heat exchanger tubes. (b) Remove any accumulated deposits from the tubes by pushing through the full length with a flue brush. (c) The flue brush should be withdrawn so as to pull any deposits back into the bottom of the flue box where they can then be removed by using a vacuum cleaner. (d) Particular attention should be paid to the upper internal surfaces of the tubes, where through convection heavier deposition is likely to occur. (e) Any deposits which may have accumulated within the combustion chamber can be removed with a vacuum cleaner once the burner is removed.
Note It is most important that a build up of deposits is not allowed to occur as this can have an adverse effect upon the efficiency of the heater and reduce the life of the heat exchanger.
(f) The heat exchanger and combustion chamber should be visually inspected for signs of splits, cracks, and distortion (g) All gaskets should be checked to ensure that they continue to provide a gas tight seal, if there is an element of doubt then they should be replaced.
If the condition of the heat exchanger gives cause for concern the Service Department at Benson Heating should be advised pending a more detailed examination.
Electrical Supply
All connections must be checked to ensure that they are secure, and free from corrosion. Terminals and connections should also be checked to ensure that no stray strands are bridging terminals. Electrical continuity should also be checked.
Gas Supply
The gas supply pipework, and fittings should all be inspected to ensure that they are free from corrosion, and to ensure that where brackets have been fitted these remain secure and offer adequate support. The system should be soundness tested in accordance with Institute of Gas Engineers recommendations detailed in UP-1 and UP-2.
Burner
Service requirements for the burner fitted to the cabinet heater are covered in the separate manual prepared by the burner manufacturer.
Note It is most important that the burner is serviced regularly and in accordance with the manufacturers instructions.
Air Delivery System
A visual inspection should be undertaken to ensure that the air delivery system is in good order, and that it remains adequately supported and that the various joints are effectively sealed.
Report
A full and detailed service report should be prepared, it is advised that the report is not completed until the heater has been re­commissioned, where upon the completed report can then be run through with the user.
5.3 Service Re-commissioning
The heater should be re-commissioned as follows, as per section 4.1 through to section
4.4 inclusive. This must be regarded as a necessary part of the heater service by the servicing engineer.
Page 28
No Power
No Dema nd
Check Isolator
Check On/Off Switch
Check Fuses
Check Thermostat
Burner fails to Run
Check Timer
Check Overheat
Check Voltage
Check Control Box and Burner
Check for Lockout
Check Air Pressure Switch
Check Burner Motor
Check Flame Probe
Fan Starts but
Burner
g
oes to
Lockout
Check Gas
Supply
Ign ition
Failure
Ensure G as C ock is
Open
Ensure start Gas
Valve Opens
Air in Gas Feed
Faulty Air Pressure
Switch
Purge Air
Check as per
Burner Manual
Faulty Electrode
Check Gap
Check Insulation
Fa ulty Ign itio n
Transformer
Check Control Box
Check HT Lead and Connector
Control Box Fault
Page 29
Burner lights on start gas
but fails to
establish
main
flame
Check Gas
supply
Excess Air Check that flue
Gas CO is as
advised
A
djust damper
to suit
Check Inlet
Gas Pressure
Check Flame
Probe
Low Gas
Pressure
Check Main
Burner Gas
Pressure
Signal
Position
Check
Controls
Check
Burner
Check
Control
Check Low
Flame Switch
is On
Check Slow
Acting Valve
Burner starts
but excess
temperature
shuts down the
burner on
overheat
lockout
Insufficient air
passing over
Heat Exchanger
Check air to
inlet is no t
restricted
Resistance
too hig h
Remove
Obstruction
Clean Filters
Check Outlet
Grilles a re O p e n
Check Nozzles
are Open
High Return (inlet )
Air Temperature
Faulty or
incorrectly set Fan
Limit Control
Fan Belt
Slipp in g
Impe llo r Slipp in g
Check for
wa rm air
short circuit
to Ai r Inlet
Reset Fan
Limit
Control
Adjust and or
replace Belts
Tighten
Cou p lin g s
Reset Nozzles
away from
adjac e nt walls
Page 30
Wiring Diagram 20-45-419
100-300 ON/OFF Riello Gas or Oil Fired Burner SC³-FM 230/50/1ph
10A MCB
Page 31
Wiring Diagram 20-45-421
400-500 ON/OFF Riello Gas or Oil Fired Burner SC³-FM 230/50/1ph
6A MCB
Page 32
Wiring Diagram 20-45-423
200-1000 ON/OFF Riello Gas or Oil Fired Burner SC³-FM 415/50/3ph
6A MCB
Page 33
Wiring Diagram 20-45-420
100-300 ON/OFF Riello Gas or Oil Fired Burner Remote SC³-SZ 230/50/1ph
Page 34
Wiring Diagram 20-45-422
400-500 ON/OFF Riello Gas or Oil Fired Burner Remote SC³-SZ 230/50/1ph
Page 35
Wiring Diagram 20-45-424
200-1000 ON/OFF Riello Gas or Oil Fired Burner Remote SC³-SZ 415/50/3ph
Page 36
Wiring Diagram 20-45-181
100-300 ON/OFF Riello Gas or Oil Fired Burner Remote CP2 230/50/1ph
10A MCB
Page 37
6A MCB
Wiring Diagram 20-45-182
400-500 ON/OFF Riello Gas or Oil Fired Burner Remote CP2 230/50/1ph
Page 38
Wiring Diagram 20-45-183
200-1000 ON/OFF Riello Gas or Oil Fired Burner Remote CP2 415/50/3ph
6A MCB
Page 39
Wiring Diagram 20-45-311
100-300 ON/OFF Riello Gas or Oil Fired Burner Remote CP4 230/50/1ph
10A MCB
Page 40
Wiring Diagram 20-45-312
400-500 ON/OFF Riello Gas or Oil Fired Burner Remote CP4 230/50/1ph
6A MCB
Page 41
Wiring Diagram 20-45-313
400-1000 ON/OFF Riello Gas or Oil Fired Burner Remote CP4 415/50/3ph
6A MCB
Page 42
Wiring Diagram 20-45-439
200-1000 HI/LOW Riello Gas or Oil Fired Burner Remote SC³-MZ 415/50/3ph
Page 43
Page 44
Appliance Type B
23
PIN / report no 0063AQ0533
Country Approved Gas Category
AT,BG,CH,CY,CZ,DK,EE,ES,FI,GB,GR,HR,
IE,IT,IS,LT,LV,NO,PT,RO,SE,SI,SK,TR
I2H
BE,CZ,NL,FR,DE,IE,IT,ES,CH,PT,GB,SE,
SK,SL,PT,PL,TR
I3P
PL,LU,DE,RO
I2E
NL
I
2L
BE
I
2E(R)B
FR
I
2ESi
PL
I
2LS
PL
I
2LW
8.0 Technical Data
Page 45
Natural Gas (G20 I2H) Cabinet Heater
The minimum allowable pre-purge time requires calculating [BS EN1020:1998 clause 6.38]. To do this only Carbon Dioxide CO
2
figure needs to be measured.
E.G. on a model 300 the calculated minimum time is = 203.6 / ((100 / CO2) + 1) If the measured CO
2
is 9.7%
Then 100 / 9.7 = 10.3
10.3 + 1 = 11.3 Therefore minimum pre-purge time is = 203.6 / 11.3 = 18.0 seconds The calculation to be conducted is given below for all models:
Model 100 Minimum pre-purge time = 241.4 / ((100 / CO2) + 1) Model 125 Minimum pre-purge time = 193.8 / ((100 / CO2) + 1) Model 150 Minimum pre-purge time = 157.9 / ((100 / CO2) + 1) Model 200 Minimum pre-purge time = 310.1 / ((100 / CO2) + 1) Model 250 Minimum pre-purge time = 245.5 / ((100 / CO2) + 1) Model 300 Minimum pre-purge time = 203.6 / ((100 / CO2) + 1) Model 400 Minimum pre-purge time = 212.9 / ((100 / CO2) + 1) Model 500 Minimum pre-purge time = 188.5 / ((100 / CO2) + 1) Model 600 Minimum pre-purge time = 181.0 / ((100 / CO2) + 1) Model 700 Minimum pre-purge time = 151.6 / ((100 / CO2) + 1) Model 800 Minimum pre-purge time = 231.4 / ((100 / CO2) + 1) Model 1000 Minimum pre-purge time = 191.2 / ((100 / CO2) + 1) Model 1200 Minimum pre-purge time = 293.2 / ((100 / CO2) + 1) Model 1300 Minimum pre-purge time = 263.7 / ((100 / CO2) + 1)
The pre-purge time must then be measured. If the measured pre-purge time is lower than the calculated time STOP and contact Benson Heating.
Page 46
Propane (G31 I
3P
) Cabinet Heater
The minimum allowable pre-purge time requires calculating [BS EN1020:1998 clause 6.38]. To do this only the Carbon Dioxide CO
2
figure needs to be measured.
E.G. on a model 125 the calculated minimum time is = 490.7 / ((300 / CO2) + 2.01) If the measured CO
2
is 11.2%
Then 300 / 11.2 = 26.79
26.79 + 2.01 = 28.8 Therefore minimum pre-purge time is = 490.7/28.8 = 17.0 seconds The calculation to be conducted is given below for all models:
Model 100 Minimum pre-purge time = 611.2 / ((300 / CO2) + 2.01) Model 125 Minimum pre-purge time = 490.7 / ((300 / CO2) + 2.01) Model 150 Minimum pre-purge time = 399.9 / ((300 / CO2) + 2.01) Model 200 Minimum pre-purge time = 785.2 / ((300 / CO2) + 2.01) Model 250 Minimum pre-purge time = 621.5 / ((300 / CO2) + 2.01) Model 300 Minimum pre-purge time = 515.4 / ((300 / CO2) + 2.01) Model 400 Minimum pre-purge time = 539.0 / ((300 / CO2) + 2.01) Model 500 Minimum pre-purge time = 477.3 / ((300 / CO2) + 2.01) Model 600 Minimum pre-purge time = 458.2 / ((300 / CO2) + 2.01) Model 700 Minimum pre-purge time = 383.9 / ((300 / CO2) + 2.01) Model 800 Minimum pre-purge time = 585.9 / ((300 / CO2) + 2.01) Model 1000 Minimum pre-purge time = 484.0 / ((300 / CO2) + 2.01) Model 1200 Minimum pre-purge time = 735.4 / ((300 / CO2) + 2.01) Model 1300 Minimum pre-purge time = 667.5 / ((300 / CO2) + 2.01) The pre-purge time must then be measured. If the measured pre-purge time is lower
than the calculated time STOP and contact Benson Heating.
Page 47
q1 is the heat of the dry products of combustion (% of heat released per unit volume of gas) q2 is the heat of the water vapour contained in the products of combustion ( % of heat re-
leased per unit volume of gas) c1 is the mean specific heat of the dry products of combustion (in MJ / m
3
K)
t1 is the average combustion air temperature (in
0
C)
t2 is the average temperature of the products of combustion (in
0
C)
Hi is the net calorific value of the gas at 1013 mbar and 15
0
C , dry (in MJ / m3)
Hs is the gross calorific value of the gas at 1013 mbar and 15
0
C , dry (in MJ / m3)
Vf is the volume of dry products of combustion per unit volume of gas (in m
3
)
Vf is calculated from the volume of CO
2
(V CO2) produced by the combustion of 1m3 of gas
(see table below), and from the CO
2
content of the products of combustion (V CO2,M)
V CO
2
Vf = ------------------ x 100 V CO
2
M
Ref. Gas G110 G120 G20 G25 G30 G31 V CO2 0.26 0.32 1 0.86 4 3 The net efficiency E (net) (in %) is given by: E (net) = 100 - ( q1+ q2 )
where and t2 - t1 Hs - Hi q1 = C1 x Vf ------------ x 100 q2 = 0.077 ------------ (t2 - t1 ) Hi Hi
Note The required net efficiency must not be less than 84%
On heaters that are fitted with modulating or Hi / Lo burners the testing is carried out with the appliance adjusted to give the minimum rate, and the following formula is used.
10 ( Qn - Qmin ) Emin > E n - ---------------------- in % Qn Qn is the nominal heat input
Qmin is the minimum obtainable heat input En is the net efficiency determined by the Notified Body
Note The minimum net efficiency for appliances fitted with modulating or Hi / Lo burners must not be less than 79%.
MODEL 100 125 150 200
HEAT
OUTPUT
kW/hr
Btu/hr
29.16
99,500
36.21
123,500
43.32
147,800
57.96
197,800
HEAT INPUT
(GROSS)
KW/hr Btu/hr
35.40
120,800
44.09
150,500
54.10
184,500
70.31
239,900
NETT EFFICIENCY % 91.49 91.21 88.93 91.54
GROSS EFFICIENCY % 82.4 82.2 80.1 82.4
NAT GAS
CONSUMPTION
M3/hr
Ft
3
/hr
3.34 118
4.19 148
5.09 180
6.68 236
BURNER TYPE RIELLO GS5 GS5 GS5 GS10
NAT GAS BURNER PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
2.3
0.9
2.5
1.0
3.6
1.4
2.5
1.0
NAT GAS MINIMUM GAS INLET PRESSURE Mbar 17.5 17.5 17.5 17.5
NAT GAS HEAD SETTING(zero flue resistance) Number 1 3 5 2
NAT GAS AIR SETTING (zero flue resistance) Number 2.8 3 4.5 2.2
GAS
CONSUMPTION
PROPANE
M3/hr Ft
3
/hr
L/h
1.4 51
5.3
1.8 63
6.6
2.1 76
7.9
2.8
101
10.6
LPG BURNER PRESSURE (zero resistance cover fitted)
Mbar
Ins WG
TBA 4.9
1.9
TBA 4.1
1.64
LPG MINIMUM GAS INLET PRESSURE Mbar 37.0 37.0 37.0 37.0
LPG HEAD SETTING (zero flue resistance) Number TBA 3 TBA 2
LPG AIR SHUTTER SET (zero flue resistance) Number TBA 4.2 TBA 2.6
GAS CONNECTION RC½ RC½ RC½ RC½
AVAILABLE OUTLET
PRESSURE
Pascals Ins WG
75
0.3
100
0.4
100
0.4
75
0.3
NOZZLE DISCHARGE
VELOCITY
M/sec Ft/min
5.73
1124
4.53 888
4.53 888
6.57
1288
AIR THROW
(APPROX)
Mtrs
Ft
14 45
14 45
14 45
17.1 55
AIR
DELIVERY
M3/sec
Ft
3
/min
0.61
1300
0.71
1500
0.71
1500
1.03
2180
TEMPERATURE RISE
THROUGH HEATER
Deg C
Deg F
39 70
41.9 76
50.3 90
46.3 83
SOUND LEVEL Dba 67 69 69 72
COMBUSTION CHAMBER (press) Mbar 0.21 0.21 0.21 0.24
FLUE
RESISTANCE
Min Mbar
Max Mbar
-0.2
0.6
-0.2
0.6
-0.2
0.6
-0.2
0.6
FLUE DIAMETER Mm 125 125 125 150
ELECTRICAL SUPPLY Standard 230/1/50 230/1/50 230/1/50 230/1/50
RATED INPUT KW 0.55 0.55 0.55 1.1
FUSED ISOLATOR SIZE Amps 16 16 16 20
RUNNING CURRENT Amps 3.2 4.8 4.8 6
ELECTRICAL SUPPLY Optional N/A N/A N/A 415/3/50
RATED INPUT KW N/A N/A N/A 0.75
FUSED ISOLATOR SIZE Amps N/A N/A N/A 16
RUNNING CURRENT Amps N/A N/A N/A 2.2
ELECTRICAL PROTECTION IP 20 20 20 20
WEIGHT Kg 196 196 196 241
AIR NOZZLE SIZE Ins 9.4 9.4 9.4 9.4
NOZZLE AMOUNT No 2 2 2 2
FLUE TEMPERATURE (GROSS) @ 200C Ambient 200 205 253 200
8.1 Technical Data
Page 48
MODEL 250 300 400 500
HEAT
OUTPUT
kW/hr
Btu/hr
73.00
249,000
86.05
293,600
117.02
399,300
132.16
450,900
HEAT INPUT
(GROSS)
KW/hr
Btu/hr
88.83
303,000
107.12
365,500
142.78
487,200
161.23
550,100
NETT EFFICIENCY % 91.26 89.21 91.02 91.03
GROSS EFFICIENCY % 82.2 80.3 82.0 82.0
NAT GAS
CONSUMPTION
M3/hr
Ft
3
/hr
8.5
300
10.1 359
13.6 480
15.3 541
BURNER TYPE RIELLO GS10 GS10 GS20 GS20
NAT GAS BURNER PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
4.1
1.6
5.3
2.1
4.0
1.6
4.6
1.8
NAT GAS MINIMUM GAS INLET PRESSURE Mbar 17..5 17.5 17.5 17.5
NAT GAS HEAD SETTING (zero flue resistance) Number 3 5 3 5
NAT GAS AIR SETTING (zero flue resistance) Number 3.6 6 3.2 4.2
GAS
CONSUMPTION
PROPANE
M3/hr
Ft
3
/hr
L/h
3.6
128
13.4
4.2
150
15.7
5.9
207
21.8
7.4
262
27.6
LPG BURNER PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
TBA TBA TBA TBA
LPG MINIMUM GAS INLET PRESSURE Mbar 37.0 37.0 37.0 37.0
LPG HEAD SETTING (zero flue resistance) Number TBA TBA TBA TBA
LPG AIR SHUTTER SET (zero flue resistance) Number TBA TBA TBA TBA
GAS CONNECTION RC½ RC½ RC¾ RC¾
AVAILABLE OUTLET
PRESSURE (STD)
Pascals Ins WG
100
0.4
100
0.4
137
0.55
150
0.6
NOZZLE DISCHARGE
VELOCITY
M/sec Ft/min
5.91
1159
5.91
1159
7.55
1481
6.98
1369
AIR THROW
(APPROX)
Mtrs
Ft
17.1 55
17.1 55
20.2 65
20.2 65
AIR
DELIVERY(STD)
M3/sec
Ft
3
/min
1.39
2950
1.39
2950
2.15
4550
2.65
5620
TEMPERATURE RISE
THROUGH HEATER
Deg C
Deg F
42.8 77
49.8 90
45.1 81
44.5 81
SOUND LEVEL Dba 72 72 74 75
COMBUSTION CHAMBER (press) Mbar 0.24 0.34 0.56 0.88
FLUE
RESISTANCE
Min Mbar
Max Mbar
-0.2
0.6
-0.2
0.6
-0.2
0.6
-0.2
0.6
FLUE DIAMETER Mm 150 175 175 175
ELECTRICAL SUPPLY Standard 230/1/50 230/1/50 415/3/50 415/3/50
RATED INPUT KW 1.1 1.1 1.5 2.2
FUSED ISOLATOR SIZE Amps 20 20 16 16
RUNNING CURRENT Amps 7.2 7.2 3.6 5.2
ELECTRICAL SUPPLY Optional 415/3/50 415/3/50 230/1/50 230/1/50
RATED INPUT KW 0.75 0.75 1.5 2.2
FUSED ISOLATOR SIZE Amps 16 16 40 40
RUNNING CURRENT Amps 2.2 2.2 12 14
ELECTRICAL PROTECTION IP 20 20 20 20
WEIGHT Kg 243 243 330 332
AIR NOZZLE SIZE Ins 9.4 9.4 11 11
NOZZLE AMOUNT No 3 3 3 4
FLUE TEMPERATURE (GROSS) @ 200 C Ambient 210 250 210 210
Technical Data
Page 49
MODEL 600 700 800
HEAT
OUTPUT
kW/hr
Btu/hr
176.59
602,500
204.99
699,400
234.96
801,700
HEAT INPUT (GROSS)
KW/hr
Btu/hr
214.22
730,900
255.72
872,500
285.70
974,800
NETT EFFICIENCY % 91.54 90.00 91.07
GROSS EFFICIENCY % 82.4 80.2 82.05
NAT GAS
CONSUMPTION
M3/hr
Ft
3
/hr
20.2 715
23.9 844
27.0
956.5
BURNER TYPE RIELLO GS20 RS34.1 RS34.1
NAT GAS BURNER PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
5.9
2.3
7.2
2.9
7.4
2.9
NAT GAS MINIMUM INLET PRESSURE Mbar 17.5 17.5 17.5
NAT GAS HEAD SETTING (zero flue resistance) Number 6 3 3
NAT GAS AIR SETTING (zero flue resistance) Number 8 2.5 3.50
GAS
CONSUMPTION
PROPANE
M3/hr Ft
3
/h
L/h
8.5
301
31.6
10.2 361
37.9
11.7 414
43.5
LPG BURNER PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
TBA TBA TBA
LPG MINIMUM GAS INLET PRESSURE Mbar 37.0 37.0 37.0
LPG HEAD SETTING (zero flue resistance) Number TBA TBA TBA
LPG AIR SET TING (zero flue resistance) Number TBA TBA TBA
GAS CONNECTION RC1 RC1¼ RC1¼
AVAILABLE OUTLET
PRESSURE (STD)
Pascals Ins WG
175
0.7
188
0.75
125
0.5
NOZZLE DISCHARGE
VELOCITY
M/sec
Ft/min
6.13
1203
6.71
1315
6.55
1285
AIR THROW
(APPROX)
Mtrs
Ft
20.2 65
21.7 70
21.7 70
AIR
DELIVERY(STD)
M3/sec
Ft
3
/min
3.11
6600
3.4
7200
4.32
9150
TEMPERATURE RISE
THROUGH HEATER
Deg C Deg F
44.7 81
49.2 88
44.2 79
SOUND LEVEL Dba 78 78 79
COMBUSTION CHAMBER (press) Mbar 0.54 0.62 0.67
FLUE
RESISTANCE
Min Mbar
Max Mbar
-0.2
0.6
-0.4
1.6
-0.4
1.6
FLUE DIAMETER Mm 200 200 225
ELECTRICAL SUPPLY Standard 415/3/50 415/3/50 415/3/50
RATED INPUT KW 3 3 4
FUSED ISOLATOR SIZE Amps 25 25 32
RUNNING CURRENT Amps 6.5 7.5 8.4
ELECTRICAL SUPPLY Standard N/A N/A N/A
RATED INPUT KW N/A N/A N/A
FUSED ISOLATOR SIZE Amps N/A N/A N/A
RUNNING CURRENT Amps N/A N/A N/A
ELECTRICAL PROTECTION IP 20 20 20
WEIGHT Kg 525 540 630
AIR NOZZLE SIZE Ins 12.6 12.6 14.6
NOZZLE AMOUNT No 4 4 4
FLUE TEMPERATURE (GROSS) @ 200 C Ambient 200 225 205
Technical Data
Page 50
MODEL 1000 1200 1300
HEAT
OUTPUT
kW/hr
Btu/hr
283.67
967,900
349.98
1194,100
380.45
1298,100
HEAT INPUT
(GROSS)
KW/hr Btu/hr
345.88
1180,150
426.66
1455,800
470.08
1603,900
NETT EFFICIENCY % 91.08 91.09 89.88
GROSS EFFICIENCY % 82 82 80.2
NAT GAS
CONSUMPTION
M3/hr
Ft
3
/hr
33.0
1168
40.7 1437
45.8
1617
BURNER TYPE RIELLO RS34.1 RS44.1 RS44.1
NAT GAS BURNER GAS PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
11.2
4.5
7.6
3.0
NAT GAS MINIMUM INLET PRESSURE Mbar 17.5 17.5 17.5
NAT GAS HEAD SETTING zero flue resistance Number 6 TBA
NAT GAS AIR SHUTTER SET zero flue resistance Number 3.66 TBA
GAS
CONSUMPTION
PROPANE
M3/hr
Ft
3
/hr
L/h
14.36 516
54.2
16.8 595
62.4
19.0 669
70.4
LPG BURNER GAS PRESSURE
(zero resistance cover fitted)
Mbar
Ins WG
TBA TBA TBA
LPG MINIMUM GAS INLET PRESSURE Mbar 37.0 37.0 37.0
LPG HEAD SETTING zero flue resistance Number TBA TBA TBA
LPG AIR SHUTTER SET zero flue resistance Number TBA TBA TBA
GAS CONNECTION RC1¼ RC1½ RC2"
AVAILABLE OUTLET
PRESSURE (STD)
Pascals Ins WG
175
0.7
250
1
250
1
NOZZLE DISCHARGE
VELOCITY
M/sec
Ft/min
7.39
1445
8.49
1665
8.49
1665
AIR THROW
(APPROX)
Mtrs
Ft
24.8 80
31.1 100
31.1 100
AIR
DELIVERY(STD)
M3/sec Ft
3
/min
4.86
10,300
6.88
14,680
6.88
14,680
TEMPERATURE RISE
THROUGH HEATER
Deg C
Deg F
48 86
40.2 72
45 81
SOUND LEVEL Dba 81 81 81
COMBUSTION CHAMBER (press) Mbar 0.92 0.9 0.9
FLUE
RESISTANCE
Min Mbar
Max Mbar
-0.4
1.6
-0.4
1.6
-0.4
1.6
FLUE DIAMETER Mm 225 250 250
ELECTRICAL SUPPLY Standard 415/3/50 415/3/50 415/3/50
RATED INPUT KW 5.5 7.5 7.5
FUSED ISOLATOR SIZE Amps 32 64 64
RUNNING CURRENT Amps 11 17 17
ELECTRICAL PROTECTION IP 20 20 20
WEIGHT Kg 646 1090 1090 AIR NOZZLE SIZE Ins 14.6 18.5 18.5 NOZZLE AMOUNT No 4 4 4
FLUE TEMPERATURE (GROSS) @ 200C Ambient 200 206 233
Technical Data
Page 51
9.0 Reference Information
Doc/Ref Title/Subject BS EN 1020 :1998 Non Domestic Gas Fired Forced Convection Air Heaters For Space Heating
BS EN 292 Parts 1 and 2; 1992 Safety of Machinery BS EN 60204 Part 1; 1993 Safety of Machinery - Electrical BS EN 60335 Part 1; 1988 Safety of Electrical Appliances BS EN 55014 1993 Electromagnetic Compatibility BS EN 50165 1997 Safety of Electrical Equipment BS 5854 1980 Code of Practice - Flues/Flue Structures BS 6891 1988 Installation of Pipework < 28mm BS 5991 1989 Indirect Gas Fired Heaters < 2 MW BS 715 1993 Metal Flue Pipes and Fittings BS 5440 Part 1 ; 1990 Specification/Installation of Flues BS 5440 Part 2 ; 1989 Ventilation Requirements Gas Appliances ISO 7/1 (see also BS21 ) Specification for Metric Pipe Threads ISO 228/1 See also BS 2779 and BS 5380) Pipe Threads Seals and Couplings UP/1 (Replaces IM/5 & IM/16 ) Installation of Gas Appliances UP/2 (Replaces IM/7 ) Installation of Gas Appliances
Page 52
DESCRIPTION 100 125 150 200
Stackbox Assy 31-28-078 31-28-078 31-28-078 31-24-074
Flue Box Cover Assy 31-28-115 31-28-115 31-28-115 20-45-094
Fan/Limit Thermostat 28-60-023 28-60-023 28-60-023 28-60-023
Fan/ limit Stat Gasket 20-33-549 20-33-549 20-33-549 20-33-549
Burner Plate Gasket 31-28-080 31-28-080 31-28-080 30-40-156
Pressure Relief Gasket 31-28-080 31-28-080 31-28-080 31-27-121
Sight Glass 20-30-151 20-30-151 20-30-151 20-30-151
Sight Glass Holder 20-30-061 20-30-061 20-30-061 20-30-061
Sight Glass Gasket 31-28-084 31-28-084 31-28-084 31-28-084
Time Clock 28-15-008 28-15-008 28-15-008 28-15-008
Thermostat Room 28-16-031 28-16-031 28-16-031 28-16-031
Thermostat Frost. 28-16-044 28-16-044 28-16-044 28-16-044
Rocker Switch Red Neon 28-40-105 28-40-105 28-40-105 28-40-105
Rocker Switch Dual Black 28-40-106 28-40-106 28-40-106 28-40-106
Rocker Switch Black 28-40-104 28-40-104 28-40-104 28-40-104
Fuse 1ph 28-07-049 28-07-049 28-07-049 28-07-049
Motorised Fan 1ph 28-09-049 28-09-049 28-09-049 28-09-002
Fan Restrictor 31-30-017 N/A N/A 31-30-016
Nat Gas Burner c/w Gas Train 29-99-445 29-99-445 29-99-445 29-99-445
LPG Conversion Kit 30-00-882 30-00-882 30-00-882 30-00-882
Control CP4 CP4 CP4 CP4
Parts list
Page 53
DESCRIPTION 250 300 400
Stackbox Assy 31-24-074 31-27-123 31-27-123
Flue Box Cover Assy 20-45-094 20-45-094 20-45-094
Overload N/A N/A 28-11-053
Contactor N/A N/A 28-11-057
Fan/Limit Thermostat 28-60-023 28-60-023 28-60-023
Fan/ limit Stat Gasket 20-33-549 20-33-549 20-33-549
Burner Plate Gasket 30-40-156 30-40-156 31-27-121
Pressure Relief Gasket 31-27-121 31-27-121 31-27-121
Sight Glass 20-31-151 20-30-151 20-30-151
Sight Glass Holder 20-30-161 20-30-061 20-30-061
Sight Glass Gasket 31-28-084 31-28-084 31-28-084
Time Clock 28-15-008 28-15-008 28-15-008
Thermostat Room 28-16-031 28-16-031 28-16-031
Thermostat Frost 28-16-044 28-16-044 28-16-044
Rocker Switch Red Neon 28-40-105 28-40-105 28-40-105
Rocker Switch Dual Black 28-40-106 28-40-106 28-40-106
Rocker Switch Black 28-40-104 28-40-104 28-40-104
Fuse 1ph 28-07-049 28-07-049 N/A
Fuse 3ph 28-07-048 (OPT) 28-07-048 (OPT) 28-07-048
Fan 28-09-002 28-09-002 28-09-003
Fan Pulley N/A N/A 28-65-092
Motor N/A N/A 28-10-127
Motor Pulley N/A N/A 28-65-065
Belt N/A N/A 09-16-110(2)
Burner 29-99-446 29-99-446 29-99-448
LPG Conversion Kit 30-00-884 30-00-884 30-00-886
Control CP4 CP4 CP4
Page 54
DESCRIPTION 500 600 700 800
Stackbox Assy 31-27-123 20-46-307 20-46-307 20-47-425
Flue Box Cover Assy 20-45-094 20-46-310 20-46-310 20-46-310
Overload 28-11-056 28-11-055 28-11-055 28-11-054
Contactor 28-11-057 21-11-057 21-11-057 28-11-057
Fan/Limit Thermostat 28-60-023 28-60-023 28-60-023 28-60-023
Fan/ limit Stat Gasket 20-33-549 20-33-549 20-33-549 20-33-549
Burner Plate Gasket 31-27-121 31-27-121 31-29-046 31-29-046
Pressure Relief Gasket 31-27-121 20-46-354 20-46-354 20-46-354
Sight Glass 20-30-151 20-30-151 20-30-151 20-30-151
Sight Glass Holder 20-30-061 20-30-061 20-30-061 20-30-061
Sight Glass Gasket 31-28-084 31-28-084 31-28-084 31-28-084
Time Clock 28-15-008 28-15-008 28-15-008 28-15-008
Thermostat Room 28-16-031 28-16-031 28-16-031 28-16-031
Thermostat Frost 28-16-044 28-16-044 28-16-044 28-16-044
Rocker Switch Red Neon 28-40-105 28-40-105 28-40-105 28-40-105
Rocker Switch Dual Black 28-40-106 28-40-106 28-40-106 28-40-106
Rocker Switch Black 28-40-104 28-40-104 28-40-104 28-40-104
Fuse Holder 28-07-050 28-07-050 28-07-050 28-07-050
Fuse 3ph 28-07-048 28-07-048 28-07-048 28-07-048
Fan 28-09-003 28-09-004 28-09-004 28-09-043 Fan Pulley 28-65-096 28-65-105 28-65-105 28-65-074
Fan Taper lock 28-66-025 28-66-025 28-66-136 28-66-136
Motor 28-10-015 28-10-120 28-10-120 28-10-026
Motor Pulley 28-65-063 28-65-063 28-65-072 28-65-180
Motor Taper lock 28-66-125 28-65-105 28-66-028 28-66-028
V Belt 09-16-106 (2) 09-16-126 (2) 09-06-126(2) 09-16-116 (3)
Nat Gas Burner c/w Gas Train 29-99-448 29-99-449 29-99-552 29-99-552
Air Head N/A N/A 30-10-145 30-10-145
LPG Conversion Kit 30-00-886 30-00-886 30-10-423 30-10-423
Control CP4 CP4 CP4 CP4
Page 55
DESCRIPTION 1000 DESCRIPTION 1200 1300
Stackbox Assy 20-47-425
Gas Exit Duct Assy V
20-27-090 20-27-090
Flue Box Cover Assy 20-46-310
Gas Exit Duct Assy H
20-27-092 20-27-092 Overload 28-11-111 Star Delta Starter 28-11-044 28-11-045 Contactor 28-11-057 Fan/Limit Thermostat 28-60-023 Fan/Limit Thermostat 28-60-021 28-60-021 Fan/ limit Stat Gasket 20-33-549 Fan/ limit Stat Gasket 20-33-549 20-33-549 Burner Plate Gasket 31-29-046 Burner Plate Gasket 31-29-046 31-29-046 Pressure Relief Gasket 20-46-354 Pressure Relief Gasket 20-46-354 20-46-354 Sight Glass 20-30-151 Sight Glass 20-30-151 20-30-151 Sight Glass Holder 20-30-061 Sight Glass Holder 20-30-061 20-30-061 Sight Glass Gasket 31-28-084 Sight Glass Gasket 31-28-084 31-28-084 Time Clock 28-15-008 Time Clock 28-15-008 28-15-008 Thermostat Room 28-16-031 Thermostat Room 28-16-031 28-16-031 Thermostat Frost 28-16-044 Thermostat Frost 28-16-044 28-16-044 Rocker Switch Red Neon 28-40-105 Rocker Switch Red Neon 28-40-105 28-40-105 Rocker Switch Dual Black 28-40-106 Rocker Switch Dual Black 28-40-106 28-40-106 Rocker Switch Black 28-40-104 Rocker Switch Black 28-40-104 28-40-104 Fuse Holder 28-07-050 Fuse Holder 28-07-050 28-07-050 Fuse 3ph 28-07-048 Fuse 3ph 28-07-048 28-07-048 Fan 28-09-043 Fan Drive Assy (Nozzled)
Fan Drive Assy (Ducted)
28-09-087
20-27-311
28-09-087 20-27-311
Fan Pulley 28-65-074 Driven Pull ey (Nozzled)
Driven Pulley (Ducted)
28-65-049
28-65-054
28-65-049 28-65-054
Fan Taper lock 28-66-136 Taper lock Driven (Nozzled)
Taper lock Driven (Ducted)
28-66-136
28-66-019
28-66-136 28-66-019
Motor 28-10-021 Motor (Nozzled)
Motor (Ducted)
28-10-024
28-10-025
28-10-024 28-10-025
Motor Pulley 28-65-181 Drive Pulley (Nozzled)
Drive Pulley (Ducted)
28-65-047
28-65-053
28-65-047 28-65-053
Motor Taper lock 28-66-013 Taper lock Drive (Nozzled)
Taper lock Drive (Ducted)
28-66-013
28-66-042
28-66-013 28-66-042
V Belt (3) 09-16-116 V Belt (3) Ducted
V Belt (3) Nozzled
09-16-126
09-16-138
09-16-126 09-16-138
Nat Gas Burner c/w Gas Train 29-99-552 Nat Gas Burner c/w Gas Train 29-99-551 29-99-551 Air Head 30-10-145 Air Head 30-10-145 30-10-146 LPG Conversion Kit 30-10-423 LPG Conversion Kit 30-10-423 30-10-424 Control CP4 Control CP4 CP4
Page 56
S E C T I O N 2
B A S I C U S E R
I N S T R U C T I O N S
10.0 Introduction
The following information is relevant to the Gas fired Cabinet Heater range manufactured by Benson Heating. These heaters are manufactured within a strictly controlled quality system to ISO 9001.
All Benson Heating gas fired Cabinet Heaters are CE marked, having been found to satisfy the essential requirements of the following European Directives. Machinery Directive (89/392/EEC) Low Voltage Directive (73/23/EEC & 93/68/ EEC) Electromagnetic Compatibility Directive (89/336/EEC & 91/31/EEC) Product Liability Directive (65/374/EEC)
Benson Heating support all new products being supplied to their customers with a comprehensive information pack, and it is the responsibility of the owner, user, or hirer, of such products supplied by Benson Heating to ensure that operators are provided with the operator manual, and that they are suitably instructed regarding the purpose of the manual and safety instructions. In addition to this, operators must also be suitably and adequately trained in the use of the product.
Contained within the text of this manual, the words 'Caution' and 'Warning' are used to highlight certain points.
Caution is used when failure to follow or implement the instruction(s) can lead to a premature failure or damage being occasioned to the heater or its component parts.
Warning is used when failure to heed or implement the instruction(s) can lead not only to component damage, but can also lead to a hazardous situation being created where there is a risk of personal injury or death
10.1 Commissioning and hand over
Warning
As part of the commissioning programme, the commissioning engineer must go through the following with the operator. (i) Lighting, shutdown, and operational information. (ii) Safety features, data plate, and labeling. (iii) The requirement for regular inspection ­especially if the heater is within a more demanding environment - and the need for regular servicing, carried out by competent and qualified engineers.
Caution After approximately 100 hours of running, the tension on the fan belts must be checked to ensure that it is correct, and that the belts have not stretched. It is strongly advised that this is undertaken by the commissioning engineer, and not the operator
10.2 Servicing
Warning
Servicing must be carried out on a regular basis, the maximum interval between services being one year. It is a requirement that only suitably qualified and competent persons are allowed to undertake the servicing.
Benson Heating advise that the planned service schedule as detailed in section 5.1 of the Installation, Commissioning and Servicing Manual is adopted by the user.
Further details are available from either Benson Heating or from the commissioning engineer.
10.3 Start up procedure CP4 OPTION
(a) Ensure that the gas cocks are open, and that the mains electrical supply is turned on
(b) Ensure that the CP4 has been correctly programmed
(c) Ensure programme is displaying Heat On
setting
Page 57
ANALOGUE OPTION
(d) Ensure On Standby switch ON (e) Ensure heat vent switch is set for ‘heat’ (f) Check for the following burner sequence
interval o p e r a n d
1 <5s Combustion air damper actuated
fan motor initiates purge cycle...
2 <40s Pilot valve opens ignition
transformer provides spark for Pilot ignition and flame detection
3 <40s Pilot ignition and Burner ignition 4 <60s Burner ignition start cycle
complete Note
The time intervals within the ignition sequence may vary slightly between models.
(f) The burner will continue to fire until heat is no longer demanded.
10.4 Stop procedure CP4 OPTION
(a) Select standby , option 2 standby (b) The fan motor will continue to run until
heat dissipation allows the fan and limit stat to shut down the fan.
Stop procedure Analogue OPTION
a) Set switch to standby' position. (b) The fan motor will continue to run until
heat dissipation allows the fan and limit stat to shut down the fan.
Caution Do not use the main electrical isolator to turn off the heater, to do so can cause damage to the heat exchanger and combustion chamber and thereby invalidate the warranty.
10.5 Shut down procedure
(a) Follow steps 10.4 (a) and (b), when fan stops turn main electrical isolator off, and shut gas cocks
10.6 Ventilation only
CP4 OPTION
(a) Select Fan / Enter to confirm. ANALOGUE OPTION
(b) Set Heat/Ventilate switch to 'ventilate'.
10.7 Lockout situations
If either the burner or the fan and limit stat go to lockout, the lockout must be cleared manually before the ignition sequence can be re-initiated.
Caution Repeated or frequent lockouts must be investigated and their cause determined by a qualified and competent engineer.