Page 2
-CONTENTS­SECTION A
1.0
1.1
1.2
1.3
1.4
1.5
2.0
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
4.0
4.1
4.2
4.3
4.4
5.0
5.1
5.2
5.3
6.0
7.0
8.0
9.0
9.1
31-28-054
Compliance
Notices
Certificates
of
Conformity
General
Product
Information
General
Requirements
Delivery
& Pre-installation
Checks Warranty Location & Positioning Fuel
Supply -General Fuel Fuel
Storage
Tank
Single
Pipe
System -Gravity
Feed
Two
Pipe
System
Pressurised
Ring
Main
System
Pipework
and
Fittings
Electrical
Supply
Air
Supply
Minimum
Space
Requirements
Air
Distribution
System
Flue
System Ins
talla
tion
Packaging
& Siting
Flooring Minimum
Clearances Assembly Flue Installation
Oil Installation &
Connection
Electrical Installation &
Connection
Air
Distribution
Installation
Warm
Air
Registers
Heater
Control
Installation Commissioning Pre-Test Ignition Air
Distribution
System
Hand
Over
Servicing
.
Planned
Servicing
Servicing
Procedure
- Major
Component
Parts
Servicing -
Recommissioning
Fault
Diagnosis
by
Flow
Charts
Wiring
Diagrams
by
Model
and
Burner
Type
Technical
Data
Reference
Documents -Standards,
Codes
of
Practice
Parts
Listing
Page No.
3 4
4
5
5
7
8 8
9 9
9
12 12 12 12
13
14 14
15
19 19 19 19 19 20 20 20
21 21 21
22
23 25
27 27 27 28
29
31
32
35 38
41 42
03.96/ PM / CE (1)
Page 3
SECTIONB
Warranty
Registration
Burner Information
Manual
Timer
Information
Manual
SECTION C
10.0 Introduction
10.1
Commissioning/hand
over
10.2 Servicing
10.3 Start
up
procedure
10.4 Stop
procedure
10.5
Shutdown
procedure
10.6 Ventilation
only
10.7 Lockout situations
10.8 Contact Information
ILLUSTRATIONS
Fig 1 Exploded
view
Fig 2 - 8 Fuel
systems
and
storage
Fig 9
-19
Flue
systems
Fig
20
Heater
control
panel
Fig
21
Time clock controls
Fig
22
Fan
and
limit
thermostat
Fig
23 -25
Fan
and
motor
configurations
Fig
26 -31
Fault diagnosis flow charts
Section A - Page No.
6
10-11
16-18
22 22
23 24
32-34
2
Page 4
1.0 Compliance notices
The
Pakaway
range
of oil fired
Cabinet
Heaters
detailed
herewith
is
manufactured
by
Benson
Environmental
Limited
within
a strictly controlled
quality
environment
within
the
parameters
of
ISO
900l.
The
Pakaway
AH
range
has
been
independently
tested
and
assessed,
and
has
been
found
to
meet
The Essential
Requirements
of
the
following
European
Directives.
Machinery
Directive
(89/392/EEC)
Low Voltage Directive
(73/23/EEC & 93/68/EEC)
Electromagnetic Compatibility Directive
(89/336/EEC & 91/31
/EEC)
Product
Liability Directive
(65/374/EEC)
The
manufacturer
has
taken
reasonable
and
practical
steps
to
ensure
that
Pakaway
Cabinet
Heaters
are safe
and
without
risk
when
properly
used. These heaters
should
therefore
only
be
used
in
the
manner
and
for
the
purpose
for
which
they
were
intended,
and
in
accordance
with
the
recommendations
detailed herewith. The
heaters
have
been
designed,
manufactured,
assembled,
inspected,
and
tested,
with
safety
and
quality
in
mind,
there are certain basic
precautions
which
the
installer
and
user
should
be
aware
of,
and
they
are
strongly
advised
to
read
the
appropriate
sections of
the
information
pack
accompanying
the
heater,
prior
to installation
or
use.
Benson
Environmental
Limited
supports
an
new
products
being
supplied
to
their
customers
with a comprehensive
information
pack; this
dearly
defines
mandatory
instructions for
the
safe
installation, use,
and
maintenance,
of the appliance(s).
Where
proprietary
items
are
incorporated
into
Benson
Environmental
Ltd
products,
detailed
information
and
instructions are also
provided
as
part
of
the
information
pack.
It
is
the
responsibility of
the
installer, owner, user,
or
hirer, of
such
products
supplied
by
Benson
Environmental
Ltd, to
ensure
that
they
are familiar
with
the
appropriate
information/manuals,
supplied
by
the
manufacturer,
and
that
they
are
suitably
aware
of
the
purpose
of
the
manuals
and
the
safety instructions. In
addition,
operators
must
be
suitably
trained
in
the
use of
the
appliance
so as to
ensure
its
continued
safe
and
efficient use.
Benson
Environmental
Ltd
has a commitment
to
continuous
improvement,
and
therefore
reserves
the
right
to
amend
or
change
the
specification of
the
Pakaway
AH
Cabinet
Heater
range
subject to
compliance
with
the
appropriate
European,national
and
local regulations.
Contained
within
the
text
of
the
manua
l,
the
words
'Caution'
and
'Warning'
are
used
to
highhght
certain points.
Caution is
used
when
failure to follow
or
implement
the
instruction(s)
can
lead
to
premature
failure
or
damage
to
the
heater
or
its
component
parts.
Warning is
used
when
failure to
heed
or
implement
the
instruction(s)
can
lead
to
not
only
component
damage,
but
also
to a
hazardous
situation
being
created
where
there
is a
risk
of
personal
injury.
The
Pakaway
AH
range
of
gas
fired
cabinet
heaters
conform
to
the
following
harmonised
standards; BS
EN 292
-
Part
1 : 1991
Safety of
Machinery
- Basic Concepts, General Principles for Design
Basic
terminology, methodology
3
Page 5
BS
EN 292 -
Part
2:
1991
Safety of Machinery - Basic Concepts, General Princi pIes for Design
Technical
Principles
and
Specifications
BS
EN 60204 - Part 1 : 1993
Safety of Machinery - Electrical
Equipment
for Machines
Specification
for
General
Requirements
BS
EN 60335 -
Part
1 : 1988
Safety
of
Household
and
Similar Electrical Appliances
General
Requirements
BS
EN 55014 - 1993
Limits
and
methods
of
measurement
of
radio
disturbance
characteristics
of
electrical
motor-operated
and
thermal
appliances
for
household
and
similar
purposes, electric tools
and
similar electric
apparatus
prEN
50165 - 1995
Electrical
Equipment
of non-electric heating appliances for
household
and
similar
purposes,
safety requirements
1.1 Certificates
of
conformity
Certificates
are
available
from
the
Quality
Control
Department
at
Benson
Environmental
Limited.
1.2 General product information
The
Pakaway
AH
models
have
an
output
range
from approximately 30kW to 293kW,
and
are
available
in
a configuration
that
will allow for floor
mounting
only.
The
Pakaway
units
can
suit
either
ducted
applications,
or
be
used
as free
blowing
units,
but
each
heater
must
be
connected to its
own
individual
open
flue.
Each heater is fitted with a forced
draught
burner
which
has
been
test fired
and
pre-set
prior
to
dispatch. The safety functions of the
burner
are
by
way
of a fully sequential control box fitted to
the burner.
Note
Neither
asbestos
nor
soft
soldered
joints are
used
in the
construction
or
manufacture
of
the
Pakaway
range
of Cabinet Heaters . The materials selected for
use
can
withstand
the mechanical,
chemical,
and
thermal
stresses
which
they will be subject to
during
foreseen
normal
use
when
installed in accordance with the manufacturers recommendations.
4
Page 6
1.3 General requirements
Caution
Ensure
that
the
fuel s
upply
is in accordance
with
th e
manufacturer's
recommendations
and
is as
stated
on
the
appliance
data
plate.
Installation,
commissioning,
and
servicing
must
only
be
carried
out
by
appropriately
qualified
and
competent
persons.
Warning
Unauthorised
modifications
to
the
appliance,
or
departure
from
the
manufacturers
guidance
on
intended
use,
or
installation
contrary
to
the
manufacturers
recommendations
may
constitute
a
hazard
.
Note
To
ignore
the
warning
and
caution
notices,
and
to
ignore
the
advice
from the
manufacturer
on
installation,
commissioning,
servicing,
or
use, will
jeopardise
any
applicable
warranty,
moreover,
such a situation
could
also
compromise
the safe
and
efficient
running
of
the
appliance
itself,
and
thereby
constitute a hazard.
The
installation
of
the
appliance
must
meet
all
the
relevant
European,
national,
and
local
criteria. (See sections 3
and
9).
Prior
to installation
the
following
points
should
be
considered;
a)
The
position
of
the
heater
for the
optimum
efficient
distribution
and
circulation
of
warm
air
b)
The
position
of
the
heater
relative to the
route
of
the flue
c)
The
position
of
the
heater
relative to
the
supply
of
fuel
d)
The
position
of
the
heater
relative to the electrical services,
and
if
appropriate,
any
additional
controls.
e)
The
position of
the
heater
relative to the
supply
of
fresh
air
f)
The
position of
the
heater
relative to service
and
maintenance
requirements
Caution
The
heater
must
not
be
installed
within
an
area
where
the
conditions
are
unsuitable,
e.g.
where
the
atmosphere
is
highly
corrosive,
has a high
degree
of
salinity,
or
where
high
wind
velocities
may
affect
burner
operation.
Suitable protection
should
be
provided
for
the
appliance
when
it is
located in a
position
where
it
may
be
susceptible to external
mechanical
damage
from; for
example,
fork lift trucks,
overhead
cranes etc.
1.4
Delivery
and pre-installation checks
The
heater
is
supplied
wrapped
in
heavy
duty
protective
polythene. On
receipt
of
the heater,
the
following checks
should
be
carried out;
a) The
model
is as
per
order
b)
That
it is
undamaged
c)
That
it is
suitable
for
the
fuel
supply
d)
That
it is
suitable
for
the
electrical
supply
5
Page 7
Fig 1 -
Exploded
View
6
Page 8
If
any
of these
points
are
not
satisfied
then
contact
should
be
made
with
the
Sales Office
at
Benson
Environmental
Ltd as
soon
as possible
by
telephoning
01547-528534. In the case of claims
for
damage,
this
must
be
reported
in
writing
within
24
hours
of delivery,
in
order
to
comply
with
insurance
criteria.
1.5 Warranty
The
heater
is
supplied
with
a 2
year
warranty
made
up
as follows; first
year
covering
parts
and
labour,
and
second
year
covering
parts
only. In
addition
to this there is also a 10
year
time related
warranty
on
the
combustion
chamber/ heat
exchanger. The
warranty
commences
from the
date
of
dispatch
from
the
manufacturer,
and
is
subject
to
the
terms
detailed
within
the
Benson
Environmental
Ltd '
conditions
of
business'.
Note (i)
The
warranty
may
be
invalidated
if -
a)
The
warranty
registration / commissioning
card
has
not
been
completed
and
returned
to
Benson
Environmental
Ltd
b) The installation is
not
in accordance
with
the
general
requirements
of this
manual
c)
The
flue
arrangement
and
air
supply
for
the
heater
are
not
in
accordance
with
the
manufacturers
recommendations,
codes of practice,
or
similar
standards
d) Air flow
through
the
heater
is
not
in
accordance
with
the
manufacturers
technical specifications
e) Internal wiring
on
the heater
has
been tampered
with
or
unauthorised
service/repairs
undertaken
f)
The
main
electrical
supply
input
to the
heater
has
been
interrupted
during
the
heating
mode
g) The
heater
has
been
subject to
and
affected
by
the
ingress of
water
in
any
form
h) The heater is
not
operated
at the rating(s) laid
down
in the manufacturers technical specifications
i)
The
heater
has
not
been
operated
or
used
\vithin
the
normal
scope of its
intended
application
j)
The
manufacturer's
recommended
minimum
service requirements
have
not been complied
with
Note
(ii)
All
warranty
claims
must
contain
the
following
information
to
enable
processing
to
take
place; (1)
heater
model
(2)
heater
serial
number
(3)
order
reference/date
of
order,
together
with
full
installation
details
(name
and
address)
(4)
details
or
symptoms
of
fault (5) instaHers
name
and
address.
Faulty
parts
must
be
returned
to
the
Knighton
Spares
Department,
the
address
of
which
is
provided
on
the
back
cover
of
this
manual
and
section
10.8 .
Any
such
parts
will
undergo
inspection
to verify the
claim. Replacement
parts
supplied
prior
to this
may
be
charged,
and
a
credit
supplied
upon
subsequent
validation
of
the
warranty
claim. Consumable
items
are
specifically
not
included
within
the
scope of the warranty.
Note
(iii)
Notification
is
required
immediately
a fault is
suspected.
The
manufacturer
will
not
accept
responsibility for
any
additional
damage
that
has
been
caused,
expense
incurred,
or
consequential
loss resulting from
any
failure of
the
heater(s).
7
Page 9
2.0 Location/positioning
Warning
All of
the
basic criteria
must
be satisfied
prior
to
commencing
installation
and
commissioning,
additionally, the
Cabinet
Heater
must
be
positioned
and
installed
so
as
to
comply
with
all
the
relevant
standards
and
guidelines
(see section 9.0), as well
as
meeting
national
and
local fire
regulations
and
insurance
criteria, especially if it is
proposed
that
that
heater
is to be installed
within
a special risk area (e.g.
where
petrol
engined
vehicles are
stored
or
parked,
wher
e cellulose
spraying
takes place,
where
woodworking
machinery
is
operated,
etc,).
Indirect fired heaters
must
not
be located in
hazardous
areas, however, it is permissible for the
heater
to
supply
air to
such
areas.
The heater
must
not be installed within
an
environment
where
there is a high concentration of
chlorides, fluorides, salts,
or
other
aggressive
or
volatile chemicals/
compounds. Nor
should
the
heater
be positioned
where
the
burner
could
be adversely affected
by
high
winds
or
draughts
.
The location
chosen
for the
heater
must
allow
for the fitting of
an
effective flue system. The
location
must
also allow for
adequate
clearance for the air supply,
return
air circulation, oil supp]y,
electrical supply, whilst also
providing
good
and
safe
working
access.
The heater
must
be installed
on
a flat
and
level surface
made
from non-combustible material,
which
is sufficiently
robust
to
withstand
the
weight
of the he
ater
and
any
ancillary
equipment.
Any
combustible material adjacent to the heater
or
flue
system
must
be so placed
or
shielded
so
that
its surface
temperature
does
not
exceed 65°C.
In areas
where
it is
proposed
that
more
than
one
heater is to be installed, a general
scheme
of
circulation
should
be
drawn
up
and
maintained,
thereby offering the best heat distribution.
All
Pakaway
Cabinet Heaters are fitted
with
a pressure relief facility, this is
incorporated
into
the design of the flue gas exit duct. Care
should
therefore be taken in siting service connections
and
controls well
away
from the pressure relief vent.
Warning
Under
no circumstances
must
the pressure relief be restricted, blocked,
or
have
the free exit of
exhaust
gas
impaired
or
re-directed .
2.1
Fuel supply - general
The
Pakaway
AH
range
of oil fired cabinet heaters are all
manufactured
and
pre-set for
use
with
35 second gas oil delivered to the
burner
via a suitable
piped
system
from the oil storage tank.
The constraints of the application will, to a large extent,
determine
whether
it is preferable to
use a single
pipe
gravity
feed
system, or
whether
the
two
pipe
pumped
system
is
more
appropriate.
Where
more
than
one
appliance
is to
share a common
supply
it will be necessary to
use
a pressurised
ring
main
system. All
pipework
must
be constructed
and
installed
so
that
it
does
not
permit
the ingress of air.
The
contruction,
size,
and
position
of
the
oil
storage
tank
must
take
account
of
the
current
regulations, as well as
suiting
the requirements of the installation.
Note
Please refer to figures 2 - 8 for
additional
information.
Caution
On
pumped
systems
always
check
that
the
pump
is correctly
set
up
prior
to
running, and
always
ensure
that
valves
are
open
allowing a free flow of oil
through
the
system
.
8
Page 10
2.2 Fuel
In
order
to
promote
trouble free
operating
it is necessary
that
the
oil
within
the
storage
tank
and
oil line
does
not
fall
below
the
cold
filter plugging point (cfpp), in this
country
and
with
class 0
fuel (also referred to as
gas
om,
the
critical
temperature
is -4°C for
the
summer
grade.
The
cfpp
critical
temperature
for
the
winter
grade
is -12°
e.
If
summer
grade
fuel is
stored
for
winter
use
in
areas
prone
to
severe
frosts
and
low
temperatures
it will be necessary to
insulate
or
even
heat
the
supply
tank
and
pipework.
Note
The
fuel
supplier
should
be
contacted
prior
to installation
so
that
any
requirements
concerning
delivery,
transport,
storage
and
use
can
be
addressed
before
work
commences
.
Warning
The
pump
pressure
must
not
exceed a
maximum
of 0.4 bar, this is
because
beyond
this
point
gas
is liberated from
the
oil.
2.3 Storage tank
Any
externally
painted
steel
storage
tank
to
BS
799
part
5 1987 is
required,
and
must
include
the
following;
- a fuel level
gauge
(not
made
from glass)
- a
vent
pipe
with a diameter
greater
than
that
of
the
filler
and
featuring a weather
proof
termina
tion
- a
sludge
valve
-
an
outlet
valve
situated
at
the
opposite
end
of the
tank
to the
sludge
valve
- a filler
pipe
connection
situated
at
the
opposite
end
to the
outlet
valve
The size of
the
storage
tank
must
take
account
of the
estimated
consumption
and
any
quantity
price
breaks
offered
by
the oil supplier.
It
is preferable to install the
tank
outside,
however, if this
is
not
practicable
and
the
tank
has
to
be
installed
indoors
advice
must
be
sought
about
its siting,
especially so far as fire
regulations
are
concerned.
If
a
separate
fire resistant
chamber
cannot
be
provided
for
indoor
installations, a
catchment
pit
with
a capacity ten
percent
greater
than
that
of
the
storage
tank
must
be
provided
. Storage
tanks
can
if
necessary
be
sited
on
a roof,
but
this is
subject
to
special
regulations
as
well
as
local
authority
approval
and
compliance
with
fire
regulations,
reference to
BS
5410
part
2 1978 is
strongly
suggested.
It
is
advisable
to
leave
the
tank
unpainted
on
the
inside,
but
to
paint
the
outside
with
a
proprietary
grade
of
anti-corrosive
paint. A galvanised
or
open
topped
tank
is
strictly
not
allowed.
If
a
medium
density
polyethylene
oil
tank
is to
be
used
then
it
must
be
OFTEC certified to OFS
T-100. Local, national,
European
and
fire
regulations
must
also be
complied
with.
2.4
Single
pipe
system
(gravity feed)
For
installation
where
the
oil
tank
is
200mm
or
more
above
the
level
of
the
fuel
pump
the
principle
of
gravity
feed
may
be used.
The
draw
off
point
for
the
supply
to the
burner
must
not
be
positioned
any
lower
than
100mm
above
the
bottom
of
the
tank.
Where a return
valve
is fitted
this
must
be
tamper
proof
to
prevent
inadvertent
operation.
9
Page 11
Drain
Valve
Fuel
Tank
lilled
to facilitate drainage
Vent
Pipe
Isolating
Air
Nozzles
Fusible
a--+--c::l"'---t
Link
Fire
Burner
Filler
Valve
Valve
Fig
2.
Typical
arrangement
of
oil storage
tank
and
single
pipe
system
1.
Gate valve
2.
In-line tilter
3. Pump
4.
Reliet valve
5.
Pressure gauge
6. Pressure reducing valve
7.
Return to tank
7
I
.- ----I
Note:
1. Pump duty and pipe sizing depend upon
application.
If
no
doubt contact our
Technical Department.
2. Pressure reducing
vatve
6 must be set to
give a maximum outlet pressure
of
4 p
.s.
i.
2
Fig
3.
Pressurised
oil feed
system
Warning: Before starting the burner make sure that the return pipeline
Is
not clogged; any
obstruction would cause the pump seals to break.
0
A '
..
I[
t -
.,'.
Y
n
::~:
y"ifD"
Nole: All burners are despatched suitable
for
gravity feed installations.
Fig
4.
Burner
oil
pump
details
for
heater
models
100 to 600 -
Oil
Lines
H=D
iff
erence
of
level; L=Length of the suction line; I.D.=Intemal diameter of the oil pi
pes.
~
L melres
H
-
--
m
1.0. 1.0.
--
---
-
Bmm
10mm
- I
.=--==
-=:.
1
----
0.5
10
20
-
--
I
-
1
20
40
--
-
-=-'
1.5
40
80
2
60
100
E
'"
J:
>i
'"
E
I
0
I
0
I i
~"I:.
10
Page 12
Fig 5.
,-----r
~
f----IH
f--
-.-
: -
---=
--'
---
r
LmetrH
H
1.0 .
m
1.0.
Smm
10mm
0
35
100
0.5
30
100
1
25
100
1.5 20
90
2
15
70
3
8
30
3.5
6
20
The
pump suction should not exceed a
maximum of 4
matre.
(13ft). Beyond Ihls
limit gas
is
released from the oil.
OH
line.
musl
be
complelely alrtighL
The
return
line
Ihould
terminate
within
the
oil tank at the same level
IS
the
sucllon
line; in this case a non-return valve
Is
not
requi red. Should, however, the return /ine
terminate
ovef
the fuel
~evel,
a non-return valve
is
essential.
This solution, however, is less safe
than
the
previous one, due to the possibility
of
leakage
of
the
valve.
Priming the
pump
: start the
burner
and
await
priming.
Should
lock-out
occur
prior
to
the
ar
rival
01
the fuel, wait at least 20
seconds
before repeating the operation.
Burner
oil
pump
details
for
heater
models
100 to 600 -
Oil
Lines
1l=Differ
ence
of level;
L=Lcn
gth
of the
suction
line; I.D .=
lnternal
diameter
of
the oil
pip
es.
Fig
6.
~
L
I
1~1
H
I.D.8mm
t.D.10mm
0.315"
0.394"
p
m
It
m
II
m
ft
lL
II·[CJ
:J
0.5
l'
6" 5
16
10 33
1
3'
0"
10 33
20
66
~
1.5
4' 6" 15
49 30
99
2
6'
0" 20
66
40
130
The
dimension
P should
not
exceed 4m (13'),
v
to avoid damage to the pump seal
s.
Burner
oil
pump
details
for
heater
mode
ls 800 &
tooo
-
Gravity
Feed
from
the
bottom
of
the
oil-storage
tank
l-1
=Diffe re n
ce
in height; L=To
tall
eng
th
of
su ction line,
including
the
vertical le
ngth
wit
hin
the
tank
Fig
7.
The
dtmen
sio
n P
shoutd
nol
exceed
4m (13'),
to
avoid damage
to
the
pump
seals.
L
H
I.D
. Smm
t.D.
l0mm
0.315"
0.394"
m II m
It
m
It
0
0
32 105
70
230
0.5
l ' 6"
28
92
62
200
1
3'
0"
24
79
55
180
1.5
4' 6"
20
65
48
157
2
6' 0"
16
52
40
130
3
9' 0" 7
23
25
83
3.5
10' 6"
-
-
10 33
Burner
oil
pump
details
for
heater
models
800 & 1000 -
Gravity
Feed
over
the
top
of
the
oil-storage
tank
H=Differen.ce in
height;
L= Total len
gth
of suction
line, i
ncludi
ng
the
vertical
length
within
the
t,lnk
Fig
8.
The p
ump
suction
must
not
exceed 4m
(13');
beyond
Ihis value
the
pump
becomes
noisy.
The
return valve
must
terminate at the same
level
as
the
foot
valve, otherwise the pump may
become
air-locked.
H =Difference
In
heigh!; L =T otat length of
suction line,
including
the vertical length
within
the
tank.
Burner
oil
pump
details
for
heater
models
800 & 1000 -
Suction
Feed
II :;Difference
in height; L
;::;:
Totallength
of
suction
line,
includin
g
tlw
vertical
length
within
the
tank
11
Page 13
Caution
If
the
valve is closed
when
the
pump
is
running
the oil pressure can be increased sufficiently so
as to cause
damage
to the seals within the
pump.
The return oil should preferably be discharged through an elbow onto a tank plate situated within
the tank, this
should
be positioned so as not to introduce air
or
air bubbles into the
draw
off pipe.
2.5 Two pipe system
This is used
where
the oil storage tank is lower than the
pump.
Access for the fuel feed to the
burner
should
be via a suitable
tapping
made
in the top of the tank,
and
the fuel feed pipe
should
extend to
not
less than
lOOmm
above the bottom of the tank. A none return valve
with
a metal to
metal seat
should
be fitted, especially if the return
pipework
is terminated at a level above the
draw
off tube.
The
none
return valve
must
be removable for service
and
maintenance purposes,
and
the
return
pipe
from the
pump
must
therefore
be
extended
down
into the tank to the
same
level as the
suction pipe. The presence of a
tamper
proof isolating valve fitted within the return
pipe
is only
required if there is a risk that oil will
siphon
out
of the tank if the return pipe is disconnected at the
pump
during
maintenance
or
servicing
and
if the none return valve has been omitted.
2.6 Pressurised ring main system
This
system
is
used
to
supply a number
of
units from a
common
storage tank. A booster
pump
is
used
to
provide
the
pressure
storage tank. A booster
pump
is
used
to
provide
the pressure to
push
the oil
around
the ring main
and
back to the tank. Pressure reducing valves
should
be fitted
on
the delivery
pipe
to each heater to ensure that
the
pressure at the
burner
pump
is less
than
6 psi.
Caution
The internal by-pass
plug
must
be
removed
from the
pump
when
used
in a pressurised ring
main application.
2.7 Pipework and fittings
Caution
Galvanised
pipework
and
fittings
must
not
be
used.
All joints
must
be
sealed
properly,
if
necessary
using
PTFE
tape
or
other
approved
sealing media. The
pipework
must
be
effectively
sealed so as to
prevent
the ingress
of
air.
It
is advisable to check all
pipework
prior
to installation to
ensure
that there is no loose debris or
scale present. Black iron pipes can be
hammered
to assist in the removal
of
these contaminants.
Note
The oil feed to each heater
must
be fitted
with
a fire check valve
and
isolating valve. The fire
check valve
must
be
operated
by
way
of a fusible link positioned so
that
it is above the burner.
2.8 Electrical supply
Wiring external to the cabinet heater
must
be installed in accordance
with
any
local, national,
and
European
regulations, as well as meeting
the
appropriate
requirements
of
lEE regulations .
The
means
of
connection
to
the
main
electrical
supply
must
allow
for
complete
electrical
isolation
of
the heater(s), furthermore, in the case of heaters wired for a three
phase
supply, the
12
Page 14
supply
should
only
be
used
to
serve
the heater(s) .
The
position of
the
isolation
switch
must
be
such
that
it is adjacent to the heater(s)
and
easily accessible
at
all times,
additionally
the
isolator itself
must
have
a contact
separation
of
not
less
than
3mm
(as
per
BS
5991 clause 20.2).
The
main
isolator
fuse ratings are
detailed
on
the
appliance
data
plate.
Warning
Ensure
that
the electric
and
oil
supplies
are
turned
off before
any
electrical
work
is carried
out
on
the heater.
Ensure
that
wiring
cannot
make
contact
with
any
surfaces liable to be subject to high
temperatures
or
where
the
insulation
of
the
wiring
could
be
impaired
as a result of
such
contact.
All
Pakaway
cabinet heaters
must
be
earthed.
Caution
The
main
electrical
supply
must
not
be
switched
off
or
disconnected
as a
method
for
stopping
the
heater,
the
exception to this is in
an
emergency,
or
during
servicing,
when
the
heat
exchanger
has
been
allowed
to cool sufficiently to
prevent
any
damage
from occurring.
Claims
for
damage
will
not
be
considered
if
they
have
resulted
from incorrect
wiring
or
the
incorrect
use
of
the
heater.
2.9
Air
supply
Provision
must
be
made
for
the
existence
of
an
air
supply
for both
combustion
and
ventilation.
It
is a
requirement
that
the
area
where
the air
heater
is located
must
have a
permanent
air
vent
of
negligible resistance direct to the
outside
air. Such air vents
must
be
positioned so as
not
to
become
blocked
or
flooded,
nor
should
they
be placed so as to introduce
undesirable
matter
(e.g. flammable,
volatile,
or
aggressive
chemicals/
compounds
or
potentially
hazardous
or
harmful
substances)
either direct from the outside,
or
through
their proximity to
an
adjacent extraction system.
The criteria necessary for establishing the
minimum
size of
natural
vents
is detailed below;
Position
of
vent
Low level
(inlet)
High
level
(outlet)
Area
of
vent
direct
to
outside
540cm
2
+ 4.5cm
2
per
kW of
rated
input
per
heater
270cm
2
+ 2.25cm2
per
kW of
rated
input
per
heater
Where
mechanical ventilation is
used
it is a
requirement
that
the
inlet is
of
the
mechanical type,
and
the
outlet
is
either
mechanical
or
natural.
Caution
Systems of ventilation
that
employ
mechanical extraction
and
natural
inlet
must
not
be
used.
Furthermore,
where
the air
supply
is
by
way
of a mechanical
means
the inlet
must
be
positioned
at
low
level
and
be
capable
of
providing a minimum
throughput
as
detailed
in
section
8 of this
manual.
The
natural
extraction
air
vents
must
have a minimum
area as
per
above,
and
it is
strongly
recommended
that
natural
extraction
vents
are
situated
at
high level. Additionally,
an
automatic
control interlocked to the
burner
must
be
fitted to
ensure
burner
shutdown
in
the
event
of
air
flow
failure
or
restriction.
If
the
heater
is to
be
installed
within
its
own
separate
building
or
plant
room, the
above
details
do
still apply, as
does
the
requirement
for
minimum
space.
13
Page 15
2.10
Minimum
space requirements
The
minimum
space
requirements
for single
and
multiple
heater
applications
are
detailed
in
section 3.3
later
within
this
manual.
2.11 Air distribution
system
All materials
used
within the construction of the delivery
and
return
air
ducts
must
not
represent
a fire
hazard
and
should
be
made
from thermally inert materials . The selection of materials
must
take
account
of the
environment
into
which
the
heater
and
its
air
delivery
system
is expected to
work,
it
must
also
take
account
of
the
stresses
and
loadings
placed
upon
it
during
its
normal
working
life.
Where
interjoist spaces are
used
to route
ducting
these
must
be lined with fire resistant
insulation material.
In installations
where
forced recirculation is a feature, a full
and
unobstructed
return
air
path
to
the
heater(s)
must
be
provided,
with
return
air
grilles connected
by
ducting
directly to the
return
air
inlet
on
the heater. The limit for recirculation
should
not
be greater
than 85% recirculated
air
to 15%
fresh air.
Where
the
heater
is installed within a
compartment
or
plant
room the
return
air
and
discharge air
arrangement
must
be
such
that
the
air
circulation fan does
not
interfere with the operation of the
flue.
The
return
air intake
and
warm
air
outlet
should
therefore be fully
ducted
to
and
from the
heater
respectively, within the
compartment
or
plant
room.
If
the inlet air is
ducted
to the outside,
then
the lowest
edge
of the inlet air
duct
must
be
at
least 500mm above the
outside
floor or
ground
level, it
must
also be fitted with
an
access point(s) to allow for cleaning
and
servicing to occur. The
openings
in the
structure
of the
plant
room,
through
which
the
duct
work
passes
must
be
of fire
resistant material
and
constructed to
prevent
the likelihood of
any
fire from
spreading
.
In
ducted
applications the
ductwork
must
be
designed
so as to give a static pressure within the
limits
stated
in section 8 of this manual.
It
should
be
noted
that
if
the static
pressure
is too
high
,
nuisance
shut-down
will occur
when
the
heater
goes
out
on
the
overheat
limit thermostat, if the
static
pressure
is too low, then
damage
can
be
caused to the fan
motor
.
Warm
air
outlets
on
ducted
applications
must
be
such
that
they
cannot
be
closed
or
become
blocked,
which
again
would
lead
to
an
increase in static
pressure
and
nuisance
shut-down.
The
outlets
must
not
be sited so
that
warm
air
can
be
discharged
onto
combustible materials, if necessary,
guard
rails
should
be
used
to
ensure
that
effected areas are
kept
clear. Return air intakes
must
not
be
located so
that
potentially harmful
or
hazardous
contaminated
air can be
drawn
into the system.
14
Page 16
2.12 Flue
system
Warning
It
is essential
that
the
products
of
combustion
are flued to the
outside
of the building. Each
heater
must
have its
own
separate flue,
with
a flue
diameter
of not less than is detailed in section 8
within this manual. The
minimum
vertical length of flue
must
not be less than 3m. The flue
should
rise vertically,
and
the
number
of
bends
should
be
kept
to a minimum.
It
is strongly
advised
that
BS
5854; 1980,
and
BS
5440;
parts 1 and
2,
are
used as consultative
documents
,,,,hen considering
flue requirements.
Care
should
be taken to
ensure
that the flue terminal is
not
situated in a high pressure area, the
proximity of buildings
and
other obstacles which will influence this
must
be taken into account,
preferably at the design stage. See figures 9 -
19.
Provision
must
be
made
for the disconnection of the flue for inspection
and
service requirements,
and
it
is
strongly advised that
where
bends
are fitted inspection covers are included.
The materials from which the flue
is
constructed
must
be
non-combustible, resistant to internal
and
external corrosion,
and
be
capable
of
withstanding
the stresses
and
loadings associated
with
normal use.
When
designing
the
flue
system
the
prevention
of
the
formation
and
entrapment
of
condensation
must
be a key consideration. Twin wall
or
insulated systems are
recommended
as
they tend to inhibit the formation of condensates. Where condensation is
unavoidable
traps
should
be
included
to
encourage
the
condensates
to flow freely to a
point
from
which
they
may
be
released, preferably into a gully. The condensate
pipe
from
the
flue to the disposal
point
must
be
made
from corrosion resistant
pipe
of
not
less
than
25mm internal
diameter
.
If
the flue passes
through
a wall, ceiling,
or
roof
made
from combustible material then it has to
be sleeved so as to
provide a minimum
of a 25mm void between the exterior of the flue
and
the
internal
wall
of
the
sleeve. The
maximum
permitted
temperature
of
any
adjacent
combustible
material is 65°C.
The position of the flue
and
its terminal
should
be
such
that it does not
impair
the combustion
process.
It
should
terminate in
an
exposed position so as to allow the escape
and
dissipation of
the
flue gases
without
risk of their re-entering the
property
through
windows,
ventilation ports, etc.
The flue
should
extend
to
at
least 1m above the height
of
any
object
within
3.5m of the terminal.
Flue terminals
should
be fitted
on
all flues, the terminal
must
be of the
approved
type,
and
have
outlet grilles
on
all sides giving a total free area of at least
double
that of the flue.
Caution
It
is imperative that the flue
should
be properly sealed
where
it passes
through
the roof, this can
best
be
achieved
by
using
the
approved
method
of roof flashing plate
and
cravat.
Note
It
should
be
noted
that claims
made
under
warranty
and
attributed
to the ingress of
water
may
not
be considered especially if
an
approved
method
of sealing has
not
been used,
or
if
the
design
of
the flue has
not
made
provision for possible condensation problems.
15
Page 17
- - -
-
-
Not less than 600
Not I
ess
than
600
~parapet
Greater
than
1500
I
..
..I
I
Fig
9.
Flat roof,
with
parapet
All
dimen
sions are in millimetre
s.
-y--,....-r-,-
Not
less than
600
Structure
--
~
-.-
I ..Less than
10
h2
..
/1
r-
__
------=--L-,--e-ss-----:-t-,--h-a-n-1,-:0:-::h--=-,'-----_
..
--I1
Greater
than
1500
Fig 10. Flat roof,
envelope
method
All
dimensions
are in millimetres.
Structur~e
Not
I",
thO'
_
!50
l
"Jh,
n
!
Greater than
10
h2 I I Greater
tha
~
O
hI
I
~~I~--
--
~"
Fig
11
Flat roof,
where
the
flue
outlet
is
more
than
10
heights
(h)
away
from all
structures
A
ll
dimensions
dT
e in millimetres.
Not less than
600
Parapet
-
-
~~--+-~-----------
U Less
than
1500
Fig 12. Flat roof,
with
flue close to
parapet
All
dim
ens ions
are
in
millimetres.
16
Page 18
--
;::::;-.-
Not
less
than
I
600
I
Not
Less
than
250
Fig 13. Flat roof,
with
no
parapet
All
dimen~i
o n
s
are in millimetres.
Not
Less
than
600
Structure
Fig 14. Flat roof,
with
structure
close to
flue
outlet
All
dimensions ar
e in millim e tres.
600
Not less than
Not less than
600
Fig 15.
Pitched
roof,
not
greater
than
45°
All linear
dim
ensions are in millimetres.
Dormer
window
Fig 16.
Pitched
roof,
within
1.5m
of a structure
on
roof
All
dimensions
are in millim elres .
Not
less
than
600
17
Page 19
Not
less
than
600
Not
Less
than I
1000
Dormer window
Fig 19. Pitch roof,
chimney
within
l.5m
from
dormer
window
measured
horizontally
All
dimensions
arE'
in millimetrE'S.
18
Not
less
than
1000
Not I ess
than
1000
Fig 17.
Pitched
roof, exceeding
45°
All linea r
dimensions
are
in millimetres.
Termination
on
ridge
/'../
Fig 18. Pitch roof,
internal
route,
pitch
not
exceeding
45°
and
ridge
termination
All
linear
dim
ensions
are in millimetres.
Page 20
3.0 Installation
It is strongly
advised
that
the
installer reads Section 2
and
Section 3 of this
manual
prior
to
starting
any
installation work.
It
is a requirement that only qualified
and
competent
personnel
may
undertake
instal1ation, commissioning,
and
servicing.
Warning
Always
ensure
that
the
appropriate
personal
protective
equipment
is
used.
3.1 Packaging/siting
The heater will usually be
supplied
wrapped
in heavy
gauge
polythene, non-assembled
parts
will be
supplied
separately. Prior to installation, the assembly of
the
heater
should
be completed, it
is advisable that this is
undertaken
in
the
area
where
the
heater is scheduled to be sited.
Caution
It
is
strongly
advised
that
when
positioning
the
heater
the
lifting
eyes
are
used,
thereby
reducing the risk of
inadvertent
damage
being
occasioned to the heater.
Prior to installation the heater
must
be
correctly positioned before
any
final assembly
work
is
completed. The
bonnet
top
and
outlet nozzles
must
be securely
attached
before installation can
commence.
3.2 Flooring
The
heater
must
be
installed
on
a level
non
combustible
surface
capable
of
supporting
the
weight of the heater
and
any
ancillary equipment.
3.3
Minimum
clearances
The following
minimum
clearances (in metres)
must
be observed
when
installing the heater.
'
Model
top
lhs
rhs
front
back
AH
100 - 600
AH
700 -1000
0.9
2.0
0.9
0.9
0.9
0.9
0.5
2.0
1.35
2.0
[
3.4
Assembly
The following sub-assembly
parts
should
be assembled to allow installation to continue.
Place Nozzle Base plate
onto
the top
of
the heater, align holes,
and
secure. Fit the nozzles to the
spigots,
turning
the nozzles to give the required
approximate
direction for air flow. Adjust louvres
to
give
the
desired
angle
of
warm
air
down
flow.
Secure
nozzles
to
spigots,
when
correctly
positioned,
by
means
of drilling
and
inserting self
tapping
screws.
19
Page 21
3.5 Flue Installation
An
integral
flue
spigot
is fitted to all
Cabinet
Heaters
thereby
allowing
the
flue to
connect
directly to
the
heater. The
design
of the flue
must
ensure
that
it
can
be
disconnected to
allow
for
cleaning
and
servicing, furthermore, all of the flue section joint sockets
must
face
upwards,
and
the
seal
between
the
sections
achieved
through
mechanical
joints
or
through
the
use
of
approved
caulking
string
and
grout.
It
is
strongly
advised
that
BS
5854
and
BS
5440
parts 1 and
2 are referred
to, see also figs 9 - 19.
Where
condensation
is likely to
be a problem
provision
should
be
made
preferably
at
the
design
stage
(see section 2.11).
3.6
Oil
Installation/connection
The oil
tank
must
be
positioned so
that
there is a fall of 7.5mm (+ / - 2.5mm) for
every
30mm
away
from
the
outlet
and
towards
the
sludge/
drain
valve,
which
must
be sited
at
the
lowest
point
in
the tank.
If
the
tank
is
positioned
on
supports
then
there must
be
an
adequate
protective layer
between
tank
and
support
to
prevent
damage
or
deterioration
through
corrosion.
It
is
strongly
suggested
that
reference is
made
to
BS
5410;
part
2;
1978.
It
is also
suggested
that
the installer is
familiar
with
the
detail
and
requirements
contained
within
sections
2.1
through
to section 2.6 of
this
manual
prior
to
commencing
installation.
Warning
Prolonged
exposure
and
contact
with
Gas Oil can result in
the
natural
oils
being
removed
from
the
skin, sensitisation can
result
in dermatitis.
Always
ensure
that
the
appropriate
personal
protective
equipment
is
used.
3.7 Electrical Installation/connection
Pakaway
cabinet
heaters
are available
either
for 415V 50Hz
3PH
or
230V 50Hz
1PH
supplies
depending
upon
the
model
specified.
It
is
recommended
that
reference is
made
to
the
wiring
diagrams
contained
within
section 7 of
this
manual
prior
to
installation
or
connection
to
the
supply. The
electrical
supply
must
be
as
specified
and
suitable
for
the
heater,
and
must
be
run
within
conduit
to a
point
adjacent to
the
heater,
and
be
terminated
to
provide
an
isolation
point
that
will
prevent
remote
or
inadvertent
activation. Cables,
conduit,
and
fittings
that
are
used
to
make
the
connection
between
the
isolator
and
the
heater
must
conform
to
the
appropriate
lEE
regulations. All
heaters
are
supplied
fused
and
pre-wired, all
must
be earthed. Final connections
for
any
additional
external controls
must
be
completed
on
site,
and
must
be carried
out
according
to lEE regula tions .
Separate
user
information
is
provided
for the
time
control
unit
and
the
burner,
and
forms
part
of
the
product
information
pack
which
accompanies
every
heater
when
dispatched
(see section
B).
Warning
Always
isolate from
the
electrical
supply
before
commencing
work
on
the heater.
Always
ensure
that
the
appropriate
personal
protective
equipment
is
used.
20
Page 22
3.8 Air Distribution Installation
The
materials
selected
must
be
of
low
heat
capacity,
and
it is
preferable
that
all
warm
air
ductwork
is thermally insulated. Where
ducting
may
be subject to deterioration from exposure to
moisture
or
high
humidity
material selection
and
insulation are
prime
considerations. Joints
and
seams
must
be air tight
and
fastened securely
and
designed to remain so,
even
when
operating
at
high
temperatures. Adequate
support
must
be
designed into the layout of the
ductwork
to
ensure
that
the
integrity of the
seams
and
joints is maintained. The
support
must
be
independent
and
separate
from
the
heater
and
the
ducting,
to
allow
for free
movement
during
expansion
and
contraction. Where
ducting
passes
through
walls
or
partitions
sufficient clearance
must
be left,
irrespective of
any
fire
stop
requirement, to allow for expansion
and
contraction. Failure to
adhere
to these
latter
two
points
can result
in
the
generation
and
transmission of excess noise.
Where
ducting
is installed in concrete flooring a
permanent
membrane
must
be
used
to isolate the
ducting
from the corrosive effect of the alkaline salts within the concrete. Care
should
be taken to
ensure
that soft insulation material does not become compressed
and
thereby lose its effectiveness.
3.9 Warm Air Registers
In
order
that vertical
temperature
gradients are minimal thereby
providing
a more even heat
distribution, it is preferable to install
warm
air registers at low wall levels
or
at floor level,
with
the
size, number,
and
position
commensurate
with
the
requirement of the application.
To
minimise
noise levels the registers
should
be set
away
from corners, a
good
seal
between
the register f
rame
and
the wall is important, particularly
on
high
level positions, if unsightly staining
through
warm
air
/particulate
deposition is to
be
avoided
.
3.10 Heater Control Installation Warning
Isolate heater from mains before
undertaking
any
electrical work.
All Cabinet Heaters are
manufactured
with
the following controls pre-wired
and
installed. See figs
13
and
14.
(a)
On/
off switch
(b)
Ventilation/heat
switch
(summer/winter
switch)
(c)
Manual!
automatic switch (d) Thermostat (e)
Time clock
(f)
Frost
stat
All
of
the
above
controls
are
located
on a removable
panel
which
when
separated
from
the
heater
can
be re-positioned so as to offer a remote facility. However, to facilitate this, it is necessary
to
order
and
fit
an
electrical panel cover
and
front
panel
blanking plate to the heater
in
place
of
the
control unit.
21
Page 23
4.0
Commissioning
Note
It
is a requirement that only suitably qualified
and
competent personnel are allowed to
undertake
the commissioning of the heater.
It
is also strongly recommended that prior to commissioning the
engineer
familiarises
himself
with
the
information
contained
within
the
information
pack
that
accompanies
the
heater,
the
heater
itself,
and
with
the
specific
requirements
of
the
installation/ application. The following checks
should
be carried
out
after the familiarisation process.
Warning
All Cabinet
Heaters
undergo
a rigorous test
programme
prior to being dispatched, whilst
such
a
programme
does
involve pre-commissioning
and
setting
up
the heater to
operate
efficiently
and
well within its
designed
operational limits, this
does
not
mean
that
on
site commissioning is less
important
than
might
otherwise
be
the case . The idiosyncrasies of each installation can
only
ever
be
allowed
for,
through
the
use
of
thorough
on
site
commissioning
carried
out
by
trained
and
experienced personnel
equipped
with
the correct tools
and
apparatus.
Note
It
is strongly
recommended
that
equipment
used
for the
sampling
and
analysis of flue gases is
accurate to within
+ / -
0.1 % and
maintained
so that it
is
regularly calibrated.
Fig 20 -
Heater
Control
Panel
J80lATE
COVER
OFF
VENTILATE MANUAL
~
~
D
ON
Fig 21 - Time Clock
Controls
Reset Button
Manual Switch Summer
and
Winter Time Setting
Enter Switching
Times
Input Times
Weekdays flash
Enter Weekday
I s
Enter minutes
22
Page 24
4.1
Commissioning
- Pretest
Check
to
ensure
electrical safety,
and
inspect
and
check
the
oil
installation,
testing
for leaks.
(a)
Ensure
that
the electrical
supply
is
turned
off.
(b)
Ensure that the oil
supply
is
turned
off.
(c)
Check
that
all panels
and
fasteners are secure
and
in place.
(d) Check
that
the heater is installed so
that
it is
square
and
that
the
support
is adequate.
(e)
Ensure
that
warm
air delivery outlets are
open
and
that
ducting
is
adequately
supported.
(f) Ensure that
if
filter assemblies are fitted that they are secure
and
correctly located.
(g) Check
that
air inlets are clear
and
that return air paths are adequate.
(h) Ensure that the flue is secure, adequately supported,
and
that the various joints are properly sealed.
(i) Check
that
condensate
trap
and
drain
facilities are adequate.
(j)
Check
that
there is provision for flue gas
sampling
and
that this
sample
point
can
be
plugged
and
sealed after commissioning.
(k) Check
that
fan
and
limit
stat
settings
have
not
been
disturbed
and
are as follows
fan
on
60
°C overheat limit fan off Also check
that
the
white
buttom
(automatic) is pulled
outward
and
that
the red
button
(reset)
is
pushed
inwards
to
the
reset position. See fig
15.
(1)
Remove lower panel
and
check
motor
and
fan
drive
system for integrity
of
joints, check pulley
alignment, fan rotation,
and
belt tension (see section 5.2
and
figs 23,
24
and
25).
Fig 22-
Fan
and
Limit
Thermostat
23
Page 25
Fig 23
Fan and Motor
Assemblies
Fig
25
(m) Ensure
that
the
burner
is securely
attached
to the heater.
(n) Test for electrical
earth
continuity
between
the heater, oil
pipework,
and
mains
supply.
(0)
Turn on
main
electrical supply, select the following switch settings
on/off
on
heat/ventilation
ventilation
manual/automatic
manual
The fan will
start
enabling fan direction etc to be verified. Reset
on/
off
switch
to off position.
(p) Turn
mains
electrical
supply
to off, replace
and
secure
lower
lourved
panel
covering fan
and
motor
assembly
.
(q) Set room
thermostat
and
time clock to
'demand'
positions.
24
Page 26
4.2
Commissioing -Ignition
Warning
Do
not
proceed
with
commissioning
unless
all
the
criteria
detailed
within
sections 4.0
and
4.1
have
been
satisfied.
(a)
Ensure that the electrical
supply
is
turned
off.
(b) Ensure
that
the oil
supply
is
turned
off.
(c)
Select the following switch settings
on
the heater
oo/oH
off
heat
I ventila tion
heat
manual!
automatic automatic
(d) Turn
on
main
electrical
supply
.
(e)
Select
'on'
position for heater
onloff
switch.
(f)
Check for the following
burner
sequence
I
Interval
Operand
1 <5s
Combustion
air
damper
actuated,
burner
fan
motor
initiates
purge
cycle
...
2
Solenoid valve opens, ignition transformer provides
spark
for pilot ignition
...
<ISs
E
IT
HER
I
I
,
3
>15s
Ignition failure caused
by
oil starvation
I I
resulting in
burner
lock-outl
shut-down
...
(g) Set heater
onloff
switch to 'off' position
(h) Attach oil manifold (bleed screw
and
pressure gauge)
(i)
Open
oil
supply
valves
and
bleed
air
from
pipework
and
adjust
burner
oil pressure as datailed
in
burner
manual
(section
B)
(j) Repea t steps
4.1 q and
4.2
c,
e,
f.
3
4
>15s <20s
OR
Burner ignition.
..
flame detection
...
Burner ignition cycle complete.
Note
It
is
strongly
recommended
that the separate
manual
concerning the operational details of the
burner
supplied with the heater as
part
of the information package
is
studied prior to commissioning.
Time intervals
within
the ignition sequence will
vary
slightly from
one
model to another.
Warning
If
burner
ignition is
not
satisfactorily accomplished, commissioning
must
not
proceed until
the
25
Page 27
reason
or
fault
has
been
identified
and
rectified, if necessary
by
reference to
the
separate
burner
information
or
to section 6 of this
manual.
(k) Repeat
steps
4.2 c,a,
(l)
Repeat
steps
4.2 d,e,f,
allowing
the
heater
to reach
thermal
equilibrium.
(m)
Adjust
room
thermostat
to its highest setting,
and
allow
the
heater
to
continue
to fire.
(n)
Gradually
reduce
the
temperature
setting
on
the
room
thermostat
until the
burner
shuts
down,
(@
°C <
ambient)
and
then
gradually
increase
the
temperature
setting
on
the
thermostat
until
heat
is called for,
(@
°C > ambient)
and
the
burner
automatically
re-fires.
(0)
Re-set
time
clock to a
minimum
off
period,
checking
that
the
burner
shuts
down,
and
then
automatically
re-lights once
the
minimum
off
period
has
elapsed
. (Separate information
on
the
time clock is
contained
within
the
information
package
supplied
with
the heater).
(p)
Check
fan
and
limit
stat
by
depressing
and
holding
in the fan
motor
overload
re-set
button,
located
on
the
heater
electrical
panel.
The
time
between
the fan
stopping
and
burner
shut
down
should
be
noted,
once the
burner
has
shut
down
the
overload
on
the
motor
should
be
released.
If
the
time interval
between
fan
stop
and
burner
shut
dmvn
is
greater
than
90
seconds
further
checks
should
be
made.
These are as follows :
(i)
Check settings
on
fan
and
limit
stat
are correct, ie, fan
on
60°C, fan off 30°C, limit 100°C.
(ii)
Check
that
the position of the
unit
is correct, ie,
equi-distant
between
heat
exchanger
body
and
heat
shield panel.
(iii) Check integrity of unit,
ensuring
that
neither
the
bi-metalic
strip
nor
its casing is
damaged.
(q)
Undertake
flue
gas
analysis
using
approved
and
calibrated
analysing
equipment
recording
data
on
the
commissioning
card, ie,
CO,
C02,
net
and
gross flue
temperatures.
Record
burner
oil
pump
pressure,
ambient
temperature,
barometric
pressure,and
smoke
reading
(0
- 1
Baccarach scale).
Note
(i)
The
burner
air
and
oil
pressure
settings
should
be
only
very
finely
adjusted
to achieve a C02
reading
of 12.5% (+ / - 0.5%
).
Note
(ii)
The
gross efficiency
must
be
approximately
80
percent.
Note
(iii)
All
Cabinet
Heaters
are
test fired
and
pre-commissioned
as
part
of
the
manufacturing
process, if
however,
during
on
site
commissioning
the
data
are
found
to
be
not
in
accordance
with
the
manufacturers
data,
then
the
following action is
recommended
:
* Re-check all
readings
and
calculations.
*
Adjust
burner
as
per
manufacturers
instructions.
*
Consult
Benson
Environmental
Ltd Technical
Department.
(r)
Complete
commissioning
card
and
provide
operating
instructions for the user, high-light the
fact
that
the
manufacturer
recommends
that
in
the
interests of safety
and
efficiency
the
heater
is
serviced
on a regular
basis
only
by
qualified
and
competent
persons.
The
completed
commissioning
card
must
be
returned
to
Benson
Environmental
Ltd
Service
Department
immediately
after
the
satisfactory
completion
of commissioning, failure to
do
so can
invalidate
any
subsequent
warranty
claim.
(s) Set all controls to the
requirements
of
the
user.
26
Page 28
4.3
Commissioning -air
delivery
system
Caution
On
ducted
applications
it is
necessary
that
the
system
is
balanced
in
order
to
optimise
the
efficiency of the heater
and
the air distribution
and
delivery system. Failure to balance the
system
can
result
in fan
motor
overloading
and
premature
component
failure,
it
can
also
result
in
an
inefficient
heating/ventilation
system.
(a)
Check
that
the
amount
of
fan
produced
air
volume
is
in
accordance
with
the
heater
specification, if the
volume
is too great
the
fan can be overloaded.
Ensure
that
the
running
current
is as
per
that
stated
on
the
heater
data
plate. Alternatively, the static pressure
should
be
measured
at the start
of
the
ductwork
to confirm
that
it
is within the permissible tolerance.
(b)
If
the
current
drawn
is greater
than
the stated
running
current, in most probability this will be
caused
by
insufficient static
pressure
within
the
ductwork,
in
which
case system resistance
should
be increased
through
the introduction of a
damper
placed as close to the start of the
ductwork
as possible, thereby resulting in a reduction in
drawn
current. The
damper
should
be
adjusted until the current is in accordance
with
that
stated
on
the data plate.
(c)
If
the
current
drawn
is too
low
the
duct
outlet
grilles will require
opening
to
reduce
static
pressure
and
increase air
volume
,
if
this is
not
the case overheat
cut
outs
can
be
caused.
4.4
Commissioning -hand
over
(a)
Upon
full
and
satisfactory
completion
of
commissioning, a record
of
commissioning
information (contact, date, etc)
should
be left
with
the heater, a copy of which
must
also be
forwarded
to Benson Environmental Ltd Service Department.
(b) The commissioning engineer
must
ensure
that the
user
is familiar with the safe
and
efficient
use
of
the
heater, detailing the function of all controls,
and
main
components.
(c)
The
user
should
be
made
aware
of
the following in particular
(i)
Lighting,
shutdown,
and
operational information.
(ii) Safety features,
data
plate,
and
labelling.
(iii) The
requirement
for regular inspection - especially if the heater is within a more
demanding
environment -and
the need for regular servicing, carried
out
by
competent
and
qualified persons.
(d) Section C 'User Instructions'
should
be left
with
the
customer
upon
satisfactory completion
of
the commissioning
and
hand-over.
Caution
After approximately
100
hours
of running, the tension of the fan belts
must
be checked to ensure
that
they are correct
and
that they have
not
stretched. See section 5.2 for further instructions.
5.0
Servicing
Warning
Servicing
must
be carried
out
on
a regular basis, the
maximum
interval
between
services being
1 year. It is a
requirement
that
only
suitably
qualified
and
competent
persons
are
allowed
to
undertake
servicing.
Before
any
maintenance
or
servicing
work
is carried out,
the
heater
must
be
shut
down
and
allowed
to cool,
and
have
the
oil
and
electric
supplies
to
it
turned
off
at
the
supply
valve
and
isolator
respectively.
27
Page 29
Caution
Certain
component
parts
are factory sealed
and
are
designed
so as to
be
tamper
proof.
Usually
such
items
do
not
require
servicing,
and
therefore
should
not
be
tampered
with. Failure to
comply
with
this
can
invalidate
any
warranty,
and
can
also
lead
to
premature
failure.
The
foDowing
parts
fall
within
this category:
room
thermostat,
time
clock, frost
thermostat,
sequential
controller,
and
fan
and
motor.
Additionally,
the
fan
and
limit
stat
has
been
factory set,
and
must not be re-set
without
formal
consent
from Benson
Environmental
Ltd.
Reference
should
be
made
to
the
separate
information
covering
the
operational
details of the
burner
and
timer.
Only approved spare/replacement parts can be fitted, failure
to
comply with this can compromise
the safe and efficient running
of
the heater, and can also invalidate any warranty claim.
5.1 Planned Servicing
In
order
to
maintain
the
efficient
operation
of the
heater
it is
recommended
that
the following
planned
servicing
and
preventative
maintenance
programme
is
adopted
by
the
user.
Quarterly Inspection
(a)
Visual
inspection
of
the
burner
(b)
Clean
and
check
spark
electrode
(c)
Clean
and
check
photo
cell
(d)
Check
overheat
safety is
operational
Bi-Annual Inspection
(a)
As
per
quarterly
inspection,
plus
...
(b)
Combustion
check
(c)
Smoke
test
Annual
Inspection
(a)
As
per
half
year
inspection,
plus
...
(b)
Heat
exchanger
and
cleaning
(c)
Electrical
connections
(d)
Main
fan
motor
(e)
Main
fan
assembly
(f)
Pulleys
(g)
Fan belts
(h)
Oil
supply
including
filter
(i)
Burner
(j)
Air
delivery
system
(k)
Flue
(1)
Report
28
Page 30
5.2 Servicing Procedure - Major Component Parts
Flue
A visual inspection
should
be carried
out
to
ensure
that the flue remains adequately
supported,
both
internally as well as externally,
and
that the
various
joints are effectively sealed. Inspection
covers,
where
fitted,
should
be
removed
and
the flue checked to see
whether
cleaning is required.
If
inspection
covers
are
not
fitted
the
gas
exit
duct
and
flue
spigot
will
provide
not
only
an
indication of the cleanliness of the flue,
but
will also enable access for cleaning. The presence of the
flue terminal
should
be checked.
If
a condensate
trap
and
drain
facility is fitted this
should
be checked to ensure that it continues
to function correctly,
and
the
drainage
of condensates is
not
impaired.
Main Fan Motor
Remove access panel.
Dust
and
other
foreign
matter
should
be
cleaned
by
blowing
over
with
compressed air
and
through
the use of a soft bristle
brush
and
cloth. Solvent wipes
may
be
used
to
remove
heavy
soiling from
the
motor
casing. Traces
of
surplus
lubricants
spreading
from
the
bearings
should
also be cleaned away. Where motors are fitted
with
grease nipples bearings
should
be lubricatd
with
the correct
grade
of lubricant. Motors
which
do
not
have grease nipples feature
sealed bearings
which
are lubricated
during
manufacture
for their life.
The electrical connections
should
be checked as follows. The cover to the terminal box
should
be
removed
by
undoing
the
screws
which
secure
it.
Check
connections
for signs of corrosion,
tightness,
and
ensure
that
there
are
no
stray
strands
which
could
form a
short
circuit.
Clean,
tighten,
and
replace as necessary. Replace cover
and
secure.
Main Fan
Remove
dust
and
other
foreign
matter
by
blowing
off
with
compressed air
or
through
the
use
of
a soft bristle brush. Check
that
the
bearings
do
not
show
signs of excessive wear.
It
should
be
noted
that
these
bearings
do
not
require
lubricating.
If
the
bearings
require
replacing
the
following
procedure
should
be followed. (a) Remove belt(s). (b) Loosen set screw
on
eccentric collar
and
tap
the collar in the
opposite
direction to fan rotation.
(c)
Remove collar
and
bearing.
(d) Check shaft for alignment
and
straightness.
(e)
Locate the
bearing
in its seat
and
place
on
the shaft
with
the
cam
facing outwards.
(f)
Fit the eccentric collar
and
engage the cams.
(g) Tighten initially by rotating,
and
then by
tapping
in the direction of the fan rotation.
(h) Replace fasteners
and
secure.
(i) Turn
by
hand
to ensure free fan rotation.
Pulleys
Check pulleys for alignment using a straight edge,
if
necessary reposition either
or
both
of the
pulleys
and
the fan motor. Check for excessive
wear
within
the
root
and
sides of the grooves,
and
check for
any
other
signs of
wear
or
damage,
if necessary replace the pulley as follows.
(a) Release tension
on
belts
and
remove.
(b) Release the
taper
locks
by
slackening the securing screws by several complete turns.
29
Page 31
(c)
Fully
remove
one
screw
from
the
taper
lock,
and
having
oiled it,
insert
into
the
threaded
jacking point. (d) Tighten screw until the taperlock is free. (e)
Remove taperlock
and
pulley.
(f)
Fit taperlock in
new
pulley,
and
provisionally position
on
the shaft.
(g) Remove the screw from the jacking point,
and
tighten
both
screws in their
clamping
points
until the pulley can just be
moved
on
the shaft
by
hand.
(h) Align pulleys using a straight edge,
and
by
gradual
alternative tightening of the screws
clamp
in position.
(i)
Refit belts
and
check for the correct
amount
of tension.
Fan Belts
Check belts for signs of
wear
. Frayed
or
split belts
must
be replaced using belts with a
common
batch
code. Belt
tension
must
be
checked,
and
if
on
multi-belt
units
it is
found
that
one
belt
contains
more
slack than its accompanying belts, then all the belts on the
unit
must
be
replaced,
again using a
common
batch code. Replacement
and
tensioning is carried
out
as follows.
Note
The
maximum
displacement
at
the
mid
point
of
the top
edge
of the belt
must
not
be greater
than
16mm
per
metre of span,
when
a force of 3kg is
applied
in a
plane
perpendicular
to the belt.
(a) Loosen fan
motor
securing bolts
on
chassis.
(b) Loosen fan
motor
slide
adjustment
bolt.
(c)
Slide fan
motor
towards
fan to slacken belts.
(d) Replace belts, pull fan
motor
away
from fan until belts are tight.
(e)
Tighten
adjustment
bolt to hold motor.
(f)
Tighten fan securing bolts
ensuring
that the fan is
square
and
that
the pulleys are aligned.
(g) Check belt tension,
making
final
adjustments
as necessary.
(h) Tighten
and
clamp
fasteners to hold fan
motor
in position.
Heat Exchanger
The
heat
exchanger
requires a visual
inspection
at
least
once
per
year,
this
should
be
accompanied
by
cleaning.
It
is
recommended
that
a flue
brush
and
vacuum
cleaning are
used
to
facilitate this. Access to the heat exchanger is
gained
through
the removal of the rear
upper
panel
and
heat shield. Servicing
and
cleaning
should
be
performed
as follows.
(a) Remove brass
nuts
and
cover from heat exchanger
end
assembly to expose heat exchanger tubes.
(b) Remove
any
accumulated deposits from the tubes
by
pushing
through
the full length
with
a
flue
brush
.
(c)
The flue
brush
should
be
withdrawn
so as to pull
any
deposits back into the
bottom
of the flue
box
where
they can then be
removed
by
using a vacuum
cleaner.
(d) Particular attention
should
be
paid
to the
upper
internal surfaces of the tubes,
where
through
convection heavier deposition is likely to occur.
(e)
Any
deposits which
may
have
accumulated
within
the combustion
chamber
can be removed
with a vacuum
cleaner once the
burner
is removed.
30
Page 32
Note
It
is
most
important
that a build
up
of
deposits
is
not
allowed
to
occur
as this
can
have
an
adverse
effect
upon
the
efficiency
of
the
heater
and
reduce
the life
of
the
heat
exchanger.
(f)
The
heat
exchanger
and
combustion
chamber
should
be
visually
inspected
for
signs
of
splits,
cracks,
and
distortion.
If
the
condition
of
the
heat
exchanger
gives
cause
for
concern
the
Service
Department
at
Benson
Environmental
Ltd
should
be
advised
pending a more
detailed
examination.
(g) All
gaskets
should
be
checked
to
ensure
that
they
continue
to
provide a gas
tight
seal, if
there
is
an
element
of
doubt
then they
should
be
replaced.
Electrical
Supply
All
connections
must
be
checked
to
ensure
that
they
are
secure,
and
free
from
corrosion.
Terminals
and
connections
should
also
be
checked to
ensure
that
no
stray
strands
are
bridging
terminals. Electrical
continuity
should
also
be
checked.
Oil
Supply
The
oil
supply
pipework,
tank,
and
fittings
should
all
be
inspected
to
ensure
that
they
are
free
from corrosion,
and
to
ensure
that
where
brackets
have
been
fitted these
remain
secure
and
offer
adequate
support.
The
oil filter
should
be
replaced
with a new
one,
and
the
system
should
be
checked
for leaks.
If
the
oil level is
such
as to
allow
removal
of
any
sludge
or
other
contaminants
from
the
tank
this
too
should
be
undertaken,
particularly
if
there
have
been
problems
of
poor
firing
associated
with
contaminants
reaching
the burner.
Note
Any
waste
oil
or
sludge
must
be
disposed
of
correctly.
Never
dispose
of
it
by
dumping
or
tipping
it
down
drains
or
into
water
courses
where
ground
water
can
become
polluted
and
environmental
damage
caused.
Burner
Service
requirements
for
the
burner
fitted to
the
cabinet
heater
are
covered
in
the
separate
manual
prepared
by
the
burner
manufacturer.
Note
It
is
most
important
that
the
burner
is
serviced
regularly
and
in
accordance
with
the
manufacturers
instructions.
Air
Delivery
System
A
visual
inspection
should
be
undertaken
to
ensure
that
the
air
delivery
system
is
in
good
order,
that
it
remains
adequately
supported
and
that
the
various
joints are effectively sealed.
Report
A full
and
detailed
service
report
should
be
prepared,
it is
advised
that
the
report
is
not
completed
until
the
heater
has
been
re-commissioned,
where
upon
the
completed
report
can
then
be
run
through
with
the user.
5.3
Service
Re-commissioning
The
heater
must
be
re-commissioned
as
follows;
as
per
section
4.1
through
to
section
4.4
inclusive. This
must
be
regarded
as a necessary
part
of
the
heater
service
by
the
servicing engineer.
31
Page 33
6.0 Fault
Diagnosis
Fig 26
-
Burner fails
II
to run
-
~
Room
r---
Thermostat
Check
Controls
Timer
~
Heat/Ventilate
No
Demand
r---
Switch
On/Off
Switch
~
No
Power
Check
Isolator
Check
Fuses
Burner
Lockout
Fan/Limit Thermostat
Fig 27
-
Fuel Feed Incorrect
I
Check
that
the
Oil
Pressure
is
Correct
I
Check
that
the
.
Head
of
Grav
ity
is Sufficient
'--
Check tha t the Suction Lift is
not
too
great
(two
pipe
systems)
I---
Burner starts
ignition
sequence,
but
fails to
light
and
lockout
occurs
-
-
Fuel!
Air
Probl
em
-
Check
Burner
Air
Setting/
Bleed
System
Air
in
System
Check
that
the
By-pass
Plug
is
Present
,I Possible Fuel
I
Contamination
r----
-
~
Restricted Fuel Feed
Check
Valves/
Fuel
Feed/
Filter/
Nozzle
for
Blockages
and
Restrictions
-
~~ ~-
\
No
Spark
Check
Control
Check
Efectrode
1---------1
1-------1
32
Page 34
Fig
28
Burner
gives
a
Too
Much
Air
sparky flame
-
Air
/Fuel
Mix
,--------
r-
-
Ratio Incorrect
r---
;--
r-
r------
r---
I
L-
Fuel Feed
r- r-
Restricted
~
Adjust Air
I
Damper
I
Check for Air in Fuel Line
I
Check Fuel Press
Check Nozzle
Check Filter
Check Fuel Lines
Check Valves
Fig
29
,-------
Check Oil Press
,---
Insufficient Combustion
Air
~
Check Air Damper
Check Nozzles
I---
Burner
gives
a
smokey
flame
Poor Combustion
r-
Check if Correctly Fitted
I Check if Correct
Size
Check if Damaged
or
Worn
'---
-
-
-
Inadequate
Flue
Draught
I
Check Flue
33
Page 35
Fig 30
Burner
giving
excessive
noise
Check Burner
-
Fan
Motor
I--
L--
Suction Lift Too Great
r--
Check Burner
011
e----'---
Pump
Foreign
Matter
in
Fan
Worn / Dry Bearing
Insecure Burner Fan
Water in Fuel Line
Fuel Feed Restriction
Adjust
Warm Air
F
ig
30 Check for
High
Discharge
and
Warm Air Short Circuit
Level
of
System
I--
-
Cool Air Inlet
Resistance
Accordingl y
Fan
and
limit
regularly
go
to
lockout
f-
Insufficient Air
-
Flow
over
the
Heat
Exchanger
Limit Control
"----
Incorrectly Set
,--
~
,----
Check Fan
and
Motor Assembly
-
L--
-
Reset to 100" C
I---
Check
Outlet
Grilles are
not Closed or Severely Restricted
Check Filter System is Clear
Check Pulleys
f------
are Secure
Check for no
I----
Loose Contacts
ICheck for Belt
Slip
i-
Fan
and/or
Motor
not
up
to
f------
Correct Speed
Check Fan
and
I----
Motor are Secure
Check that Fan is not
Blocked
or
I---
Restricted
Check that Impeller is
not
Slipping
I---
34
Page 36
--
VJ
CJl
-
~t.;;-;A~
-,
111, - I- I I
,
GENERAL
NOTE-ANY
INTERLOCK
DESIGNED
TO
SIIITCH
OR
CONTROL
BURNER
S
UCH
AS
TJME-SIIIC~
DAMPER
OR
1.0
FAN
INTERLOCK
ETC
,
FAN
KEY:-
IT
MUST BE
VOLTAGE
FREE
AND
IIIRED
IN SERIES IIIlH
N -
BROliN
K -
PIN
K
CONTROL AND
LIMIT
INSTRUHENTATION
,
U -
BLUE
o -
ORANGE
C
c~
G -
GREEN
P -
PURPLE
I
II
I;'·'
II -IIHITE
Y -
YELLOV
A
R -
RED
B -
BLACK
M -
MAGENTA
GR -GREY
I
C>
~
~-
1----------------------
1-
--~~~~rr------l
CONTROL
PANEL
l '
TIM[
SVlTCH
DAY
STAT
I I
! i
I
I % E
un
I
G/Y
I
tfH
~
zO
zl
c::
rl
,
I
,
---I
I'
I
POWER
SUPPLY
L
____
'_HE_AT_'
_____
'A_UTD'
________
4
___
J i
hlAIH
fA~
t.lOTORi
POIJER SUPPL Y 2301,1 I PHA
SE
50
Hz
MUST
BE
TAKEN
FROM
THE
SIIITCHED
S
IDE
OF A FUSED [SOLA
TOR.
IMPDRTANT:-THE ISCLATOR
MUST
NOT
BE
OPENED
,---
UNTIL
H£ C
ONTROL
ON / OFr
SIJlTCH
HAS
BEEN
SVITCHED
TO
THE
OFF
BURNER
{BURNER
NEUTRA~
U I I I
POSlTJON
AND
THE
rAN
OVERRUN
HAS
CON'NECfjQNS
BURNER
EARr'~
~
BEEN SATISFlED (APPROX, 15 MIN
S),
BURNER
LIVE
• N
L
__
_
ALL
IItRING
TO
iE
2~/20
UN..
ESS
OTHERIiISE
STATED
>
,-------I----W
' I I I I
~:~~
0120
Q::1Ct::lz
>
"">15151"'1
'V
[NT'
I
~
I
~
III
~ROST
S
TAT
~
-
~
'"
~~~
:"l
p
,....
0
='
0
.....
.....
0
...
-
~
C')
~
rJl
CC s:::
"1
='
rt>
"1
rJl
N
W
0
-<
,....
"!j
::r
01
0
::t
N
3:
0
Q.
rt>
rJl
-
>
::t
I
,....
0
p
>
::t
I
01
0 0
"I
.
0
~
~.
""'t
~
.
==
~
0
~.
~
~
""'t
~
3
rJ}
Page 37
- - -
:'I
o
ID:-
N
N -
BROI.'N
K -
PlNK
U -
BLU£
o -
ORANGE
G -
GREEN
P -
PURPLE
o
~~M~A;~
I.' -
I.'HITE
Y -
YELLDI.'
GENERAL
NOTE
-ANY
INTERLOCK
DESIGNED
TO
S
l.'lTCH
OR
CONTROL
BURNER
:s
R -
RED
B -
BLACK
---
-
SUCH
AS
TIH
E-SII
ICH,
DAMPER
OR
I.D FAN
INTERLOCK
ETC.
LlMIT
FAN
o
M -
,~AG£NTA
GR
-
GREY
MUST
BE
VOLTAGE
FREE
AND
IIIRED
IN
SER
IES
IIITH
.....
CONT
ROl
AND
LIMIT
INSTRUMENTAT
ION.
.....
o
....
-
~
--·-----------l
o
--
. I
I
CONTROL
PANEL
DA
Y S
TAT
. I
[Jl
O:l
C
".
'"I
:s
~"~,
11
,1
J
,1,~
i
~
I'D
p~~~®
I-----
-
E~R~C~A~E-L-
-
------,
;j:l
zl==>lo::l:-
~
.....
"'"
Ul
~
.
~
G/!
-<
VJ
~
:7'
2
G/!
G~Y
~
~_ ~Y
Ul
om'
IIII
"~
W
Q\
I
z l
zlo
3
t·
'HEAT'
-
~
L
_.__________J
I
> 1
lod>ISI~!o:
l
q
:'"''
I
'AUTO'
a:::lodz
'VE
NT'
~~
,---
BURNER
{BURNER
NEUTRA~
.
U I I
CONNECTIONS
BURNER
EARTH
-;-ltCL
L~::~V~
N
~
L:=-+-
r;,:;;
F
AN
M~TOR
I
I I
L......--
'1
~G/
y
(0
!
L_'::::::_~
I
(5
0
Ll
L2
L3 N E
IIIII~
-~i~-t
I I I I I I I I 1 I
I I : :
~_}
! ! : L
I
I I
L__
__
I
L______
L
___
___
_
o
::t:
N
a:
o
0-
I'D
CIl
-
~
I
N
o
....
0
>
::t:
I
0\
o
o
POWER
SUPPLY
POIIER
SUPP
LY
415V 3 PHA
SE
50
Hz
MUST
BE
TAKEN
FR
OM
THE
SIJ
fTCHEO
SIDE
or
A
FUSED
ISOLATOR.
IMPDRTANT:-
THE
ISO
LA
TOR MUS T NO
T
BE
OPENED
UNTIL
THE
CONTROL ON/
OFF
SIJ
ITCH
HAS
BEEN
SIIIfCHED
TO
THE
OFF
POSITroN AND THE
FAN
OVERRUN
HAS
BEEN SATISrJ
ED
(APPROX
15
HINS).
ALL
"IRING
TO
BE
2<1.20
UI
USS
OTHEWISE
STATE
D
Page 38
7.0.3
On/Off
Oil
Fired
Riello
Burner
415V
3ph
50Hz
Model
AH-700
I I
I I
I I
I I
I I
L
0«6
iIII/;a
II
___________
~
L _
,wt'OIH
AH
T.
-To-(
ISIli."
TQSt
IIJ
ST
~
r
fl[
[J'['f:
D
I
}Hll
:r< C
()tllfa.
I)
Vorf
WITCH
.... s 1((/<f$1J lrCt€ D
TO
rt4[Wf
FOS]
flOt
",,"
0 I
t<
f
o'H
Ov[R3IJ,
~~
n TS V. lI
srrrD
(
,.pP~ilJl. ; 5
14 'N'S
)
-
P(M
-
C~A..'~
!j
l
-F"tJi<l".E
-
H.l
LJV
! -
~~ACIi(
Ul-(j~y
~illl...l.U.!.L
-
...
"1
l~rl.~~OC~
t[Sl(,l<~
10
S',1
I1C"
~ (C~,
tJ
....
~
S'J!1i
_s
TI~-~"'-:CI1.
(I
"Of'{
II ~ I
~ r~ I "'(~ Ir~
(Ie
oe.H
t!
V'1'
''::,[ r.
([
"-
0
\I:~.£O
: .. u_'u
"
11~
CO
..
I~
1l.
.... ~ U" U ,"'SlliV!ilrirA 't[)l
-------------l
ELECTRICAL PAN
EL
I
I
tr~
I
I ( r r .
I r 1 r I
: : : : ~ __ __
}
POWER
SUPPLY
: : : l
______
f'DIO[R
S~pt
r
"
',,)
P-<Aii:
:tl
ltl
,
.....
-----
--
IlUS
T
J(
'_EN
rI!:~
l '«: l
....
l1
t I"{ O
1.....-
_ _
__
__
5J [0[
11 "
'uS(D 1$1"' 01
1..... ---
------
7.0.4 HiILo
Oil
Fired
Riello
Burner
415V
3ph
50Hz
Models
AH-800 - AH-I000
fj l l:!ill
-'-
\ll..!..[ -
....
~
Il"'..
(l)
tH.
:)o(C 10
S\lJIC
~
0" {
Ool'
.
~
..,;:,
SoI[IoI "~
'11C: ·~"'
I~H.
~'O'
II
UIo ;
"I
lo..Jtl1: [Ie
ou~l
I(
~
~
1.
:[
11,((
~
1o'
1J'{~
I.
M:91iS
...
liM
(·
3Io"11Q.
" 0 U "P
~H"
,111('" " ,o.
" ,
L
___________
-l
L_
!U
-
.....
....
L
>-
0.<
c -
~"
...
·\.
1oil
C
J·tJf-a
~
- an
" -
-oc
..
(.I'!__
"'
I'VI:1'I.£
' · !'['. l e
...
1 -
-'<0:
c.P.
CX
t
" ,
• I r I
!'t9I;.Rt
ANI
- 1
""
rm,.
..
llJf
",SI
1(1
1
II!:
O'(/C.;: 1 1
11
LNl ll II!< [
[N
It!).
1)
iIf1
)'f
S\lI1~
I
POWER
SUPPLY
I : : :
W.S
.('h,'i1.l
1l00{9
1G lioClJf
~,,~nl:JN
....~ , .... rM!
DV'O"""~
ItI.
S
I!H"
Sllllsr;u (AP"fIQ.
I~
M
INS)
; l
~~~~~~=
}
;>QV(R
~UI'f'.y
'
15V)
~
~[
~
"'I
I
L.
__ - - - - -
-.tiT
t[ , ..( ...
rlt()o
I~ ~"II(Iit
J
fl
U
"'i.1Il~
TO
!II:
W~
l.H..!n
OU(&\lIY
S'AI(,
~~
~-=--
==
SIt(
Oi
A fuseD
J~!l..l
o;!
37
Page 39
--
~
MODEL
AHIOO
AH150
AH200
AH300
AH400
I
kW/hr
29.3 44.0
58.6 88.0
117.2
HEAT OUTPUT
Btu/hr
100,000 150,100 200,000 300,000 400,000
HEAT INPUT
kW/hr
36.3 54.9 73.2 109.8 146.8
(GROSS)
Btu /
hr
125,000
187,500 250,000 375,000 500,000
I
FUEL CONSUMPTION
Imp
gall/hr
0.76 1.14 1.52 2.28 3.
04
Gas Oil (Class
0,35
Sec)
litre /
hr
3.5 5.2
I
6.9
10.4
13.8
Reillo
40
Riello
40
Riello
40
Riello 40 I
Riello
40
BURNER TYPE
G5 G5 G10
G10
G20
OIL NOZZLE USGPH
.75x80'
'S
1.0x60"S 1.35x60"S 2.0x60
"S
2.75x60'
'S
Danfoss Danfoss Danfoss Danfoss Danfoss
OIL PRESSURE
psi
150
180
180 180 180
bar
10.0
12.2
12.2 12.2
12.2
I
-
HEAD
SETTING
I
at
Zero
Flue Resistance
Number
2.0 4.0 2.5 5.0 2.5
AIR SHUTTER SETTING
Number
3.5
5.0 3.5 5.0 8.5
at Zero Flue Resistance
OIL
CONNECTION
BSP
3
!
~
3/
s
3/
s
3/
H
3/
s
AVAILABLE OUTLET
pa
63 63
125
75
150
PRESSURE Ins WG 0.25
0.25
0.5
0.3 0.6
-
-
AH500
AH600
AH700
146.5 175.8 205.2
500,000 600,000 700,000
183.2 219.6
256.5
625,000 750,000 875,000
I
3.80 4.56 5.32
17.3
20.7 24.2
Riello
40
Riello
40
Riello
G20S
G20S
I
RL28.1
2.0x60"S
3.5x60('S
4.0x45"S 2.5x60
"S
Danfoss
Danfoss Danfoss
165 180 180
11.2
12.2 12.2
3.5
6.0
-
L/F
3
L/F
4
-
H/F
5.5
H/F7
3/
x
3/
S
3/
s
175 200 200
0.7
0.8
0.8
AH800
AHIOOO
I
, I
234.5
293.0
800,000 1000,000
293.0
366.4
1000,000 1250,000
6.08 7.60
27.6
34.5
Riello Riello
RL28 RL38
2.0x60"S
2 off
I
3.5x60"S 3.5x60"S Danfoss
I
Danfoss
180
170
12.2
11.5
-
-
:
-
-
I
3/
S
3/
s
I
125
150
0.5
0.6
-
--
00
•
o
~
~
~
~
(j
>
~
t--4
Z
tTj
1-3
~
>
Z
~
tTj
I
C)
~
Vl
o
....
-
Page 40
VJ
'D
MODEL
AHIOO
AH150 AH200
AH300 AH400
AH500 AH600
AH700
I
AH800
AHIOOO
i
NOZZLE DISCHARGE VELOCITY
m / sec
ft/min
6.5 128
8.67 1708
6.57 1294
6.04 1190
7.62
1500
8.0
1575
9.52
1875
9.90
1950
7.46
1469
9.56
1883
I
AIR
THROW
(approx)
m
ft
14
45
18 60
18 60
16 52
21 70
23 75
27 90
27
90
23 75
,
29 95
AIR DELIVERY
m
3
/
hr
fP /
min
1,911 1,125
I
2,548
1,500
3,694 2,175
5,096 3,000
7,644 4,500
10,701
6,300
12,740
7,500
13,249
7,800
13,589
8,000
17,411
10,250
TEMPERATURE
RISE
THROUGH
HEATER (nominal)
°C
of
40
72
50 90
50 90
50 90
50 90
50 90
50 90
50
90
50 90
50 90
SOUND
LEVEL Dba
64
I
64
I
72
72
74
I
76 78
I
I
78
78 80
COMBUSTION CHAMBER
INTERNAL PRESSURE
I
mm
2 3 4 4 6 6
I
6
I
10
5
9
FLUE RESISTANCE
Min
mbar
Max
mbar
-0.2
0.6
-0.2
0.6
-0
.2
0.6
-0
.2
0.6
-0.2
0.6
-0.2
0.6
-0.2
0.6
-0
.8
3.0
I
-0.8
1.6
-0.8
2.5
GROSS FLUE TEMPERATURE
(20°C AMBIENT)
°C
235
270
I
260 295 270 340 275 280
260 320
~
~
~
~
(j
>
~
~
Z
tTj
~
~
>
Z
~
tTj
C")
~
t/J
o
....
-
I
Page 41
~
MODEL
AHIOO
AHISO
AH200
AH300 AH400
I
AHSOO
AH600 AH700
AH800
AHIOOO
FL
UE
DIAMETER
ELECTRICAL SUPPLY
R
UN
NING
CURRENT
RATED
INP
UT
WEIGHT
mm
Amperes
kW
kg
Ib
s
125
230V
Iph
50H z
2.5
0.63
208 458
125
230V
Iph
50H z
2.5
0.63
208 458
150
230V
Iph
50H z
6.0
1.1
I
407 H97
175
230V
Iph
50Hz
7.2
1.3
407 H97
175
415V
3ph
50Hz
3.9
1.5
496
1093
175
415V
3p
h
50Hz
4.9
2.4
5
11
112
6
175
415V
3p
h
50Hz
7.6
2.98
550
1212
225
415V
3ph
50Hz
H.2
2.98
572
1262
225
415V
3ph
50Hz
8.5
4.1
707
1558
225
415V
3ph
50
Hz
9.0
5.5
780
1720
~
~
~
~
(j
>
0:1
1-01
Z
tTj
~
~
>
Z
CJ
tTj
I
C')
~
rJl
o
....
......
Page 42
9.0 Reference Information
Details of
how
to obtain copies of the publications listed below are available from:
The
Standards
Engineer, Engineering
Department,
Benson Environmental Ltd.
Doc
/ Ref
Title / Subject
BS
5410
BS
EN
292
BSEN
60204
BS
EN 60335
BS
EN 55014
BS
EN 50165
BS
5854
BS799
OFTEC
BS
715
BS
5440
BS
5440
BS799
ISO 228/1
Part
1;
1977
and
part
2;
1978
Code
of Practice for Oil Firing
Parts 1
and
2;
1992
Safety of Machinery Part
1;
1993
Safety of Machinery - Electrical
Part
1;
1988
Safety of Electrical Appliances 1993
Electromagnetic Compatibility 1995
Safety of Electrical
Equipment
1980 Code
of Practice -
Flues/Flue
Structures
Part
5;
1987
Oil Burning
Equipment
- Oil Tanks
OFS T-100 Polyethylene Oil Storage Tanks
1993 Metal Flue Pipes
and
Fittings
Part
1;
1990
Specification/Installation of Flues Part
2;
1989
Ventilation Requirements Gas Appliances Part
2;
1987
Oil Burning
Equipment
- Burners
(See also
BS
2779
and
BS
5380)
Pipe Threads Seals
and
Couplings
41
I
Page 43
9.1 Parts Listing
Part/Description
100
150
200
300
Heat
exchanger assy
Cabinet
bonnet
assy Stack box assy Heat
shield side panel
Front
bottom
panel
Front
top
panel
Back top
panel
Heat
shield front panel
Heat
shield back
panel
Expansion spacer Fluebox cover assy Rear air inlet
btm
panel Overload Contactor Fan/limit
thermostat
Fan/limit
stat
gasket
Heat
exchanger cover plate
Burner
plate gasket Pressure relief gasket Motorised fan Fan restrictor Digital time clock Thermostat
room/
frost
Rocker switch -
red
neon
Rocker switch -
dual Rocker switch 12-way terminal block Fuse
holder Fuse 6-way terminal block Nozzle
outlet
assy Tray spigot assy Exit
duct
cover plate gskt Fan Fan pulley Fan taperlock Motor Motor pulley Motor taperlock Belt Fire check valve Stud
coupling Adaptor Appliance
manual
Support
bracket Oil Filter Nozzle Nozzle (US Gal) Burner
I
31-28-056 31-20-113
31-28-078
31-28-060 (2) 31-28-075 31-28-073 31-28-083 31-28-061 31-28-062
31-27-111
(2) 31-28-058 31-20-107 28-11-053 28-11-057 28-60-021
20-33-549 31-28-052 31-28-080 31-28-080 28-09-001 31-30-017 28-15-030 28-16-031 28-40-072
28-40-073
28-40-074
A 20-09-136
28-07-050 28-07-049
28-03-007 31-20-128
(2)
31-30-176
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A 28-30-102 29-00-094 29-00-166 31-28-054 31-30-095
(2) 29-15-017 27-00-413
N/A
29-99-452
common common common common
(2)
common
common common common common common
(2)
common common common common common common
common
common
common common
N/A common common common common common common
common
common
common 31-30-167
(2) common N/A N/A N/A N/A N/A N/A N/A
I
N/A common common
common common common
(2) common 27-00-418
N/A
common
31-24-056
31-20-019 31-24-074 31-24-054 (2)
31-24-057
31-24-059 31-24-060 31-24-061
31-24-062
common
(2) 31-27-126 31-20-012 28-11-056
common common common
20-30-207
31-40-156 31-27-121
(2) 28-09-002 31-30-016
common common common common common common common common common 31-30-167
(2)
31-30-177 N/A N/A N/A N/A N/A N/A N/A N/A common common common common common
(2) common 27-00-427 N/A 29-99-453
common common
31-27-123
common
(2) common common common common common common
(2) common common
28-11-055
common common common common common common common
(2) N/A common
-
common common common common common common common common common
(3) 31-30-178 N/A N/A N/A N/A
-
N/A N/A N/A N/A common common common common common
(2) common 27-00-032 N/A common
I
(2)
denotes 2 off -
(3)
denotes 3 off -
(4)
denotes 4 off
42
Page 44
400 500
600 700
800
1000
31-27-114
common
31-27-058 31-27-094
31-29-031
common
31-27-098
common
31-27-046
31-27-045
31-29-025
common
common
common
common
31-27-048
common common
31-27-105 (2)
common
(2) 31-27-060 (2)
common
(2)
31-29-017 (2)
common
(2)
31-27-110
common
31-27-075
common
1
31-29-020
common
31-27-073
common
common
31-27-091
31-29-012
common
31-27-083
common
common
common
31-29-015
common
31-27-061
common common
31-27-092
31-29-011
common
-
31-27-062
common common
common
31-29-014
common
common
(2)
common
(2)
common
(2)
common
(2)
common
(2)
common
(2)
common
common common
31-29-040
common
common
31-10-106
common
31-20-102
common
31-29-021
common
-
28-11-053 28-11-056 28-11-055
common
28-11-111
common
common
common
common common
common
common
-
common
common
common
28-60-023
common
common
common
20-31-036
common common
common common
common common
common common
-I
common common
31-27-121
common common
31-29-046
common common
common
(2)
common
(2)
common
(2) 20-33-068 (2)
common
(2)
common
(2)
N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A
common
common
common
common
common
common
.-
common
common
common
common
common
common
common
common
common
common common
common
-
common
common
common common
common
common
common
common
common
common
common
common
common
common common common
common
common
common
common
common common common
common
-
28-07-048
common common
common
common
common
common
common
common common
common
common
31-30-159 (3)
common
(4)
common
(4)
common
(4) 31-30-157 (4)
common
(4)
31-27-120 31-27-119 31-27-072
common
~.
31-29-050
common
N/A
N\A
N\A
31-29-045
common
common
28-09-003
common
28-09-004
common
28-09-043
common
28-65-075
common
28-65-075
-.
common
28-65-049
-
28-65-054
N/A
N\A N/A
N\A
28-66-136
28-66-137
-
28-10-127 28-10-015 28-10-120
common
28-10-026
28-10-021
28-65-070 28-65-071 28-65-071
common
28-65-042
28-65-073
N/A
28-66-025 28-66-025
common
28-66-028
28-66-038
09-19-110 (2)
common
(2)
09-19-134 (2)
common
(2)
09-16-120 (3)
common
(4)
common
common
common
common common
common
common common
common
common common
common
common common common
common
common
common
common common common
common
common
common
common
(2)
common
(2)
common
(2)
common
(2)
common
(2)
common
(2)
29-15-012
common
common
common
29-15-020
common
-
27-00-044
27-00-078
27-00-054
27-00-079 27-00-078
common
N/A
N\A
N\A
N\A
27-00-032
~
common
-
29-99-454
common
29-99-455
29-99-456 29-99-457
29-99-458
43
Page 45
BENSON
ENVIRONMENTAL LIMITED
LUDLOW ROAD, KNIGHTON, POWYS LD7 1LP
Telephone: 01547 528534 Facsimile: 01547 520399
Loading...