IMPORTANT SAFETY INFORMATION! SAVE THESE INSTRUCTIONS!
Read the entire contents of this manual before using this product. Failure
to follow the instructions and safety precautions in this manual can result in
EUROPEAN USERS
400V 50Hz SUPPLY DETAILS ARE
INCLUDED WITH ELECTRICAL
CONTROL BOX. DISREGARD SUPPLY
WIRING DETAILS IN THIS MANUAL
serious injury or death. Make sure all other operators also read this manual.
Keep this manual near the product for future reference. By proceeding
with installation and operation, you agree that you fully understand the
contents of this manual and assume full responsibility for product use.
Power Unit Serial # ____________________
Max Operating Pressure XPR-12: 2060 psi,
XPR-15: 2350 psi
DANGER!
Disconnect Power
Before Servicing
WARRANTY VOID IF DATA PLATE IS REMOVED
PN 5905950
XPR-18: 2580 psi.
This information is required when calling for parts or warranty issues.
PRODUCT WARRANTY
Our comprehensive product warranty means more than a commitment to you; it’s also a commitment to the value of your
new BendPak lift. For full warranty details and to register your new lift contact your nearest BendPak dealer or visit
http:/ / www.bendpak.com/support/warranty/
What is NOT covered under this warranty:
a. Any failure that results from Purchaser’s abuse, neglect or failure to operate, maintain or service product in
accordance with instructions provided in the owner’s manual(s) supplied.
b. Any damage caused by overloading lift beyond rated capacity.
c. Items or service normally required to maintain the product, i.e. lubricants, oil, etc.
d. Items considered general wear parts such as rubber pads, lifting cables, etc. unless wear or failure is a direct result
of manufacturer defect due to material and/or workmanship.
e. Any component damaged in shipment or any failure caused by installing or operating lift under conditions not in
accordance with installation and operation guidelines or damaged by contact with tools or surroundings.
f. Motor or pump failure caused by rain, excessive humidity, corrosive environments or other contaminants.
g. Rusted components due to improper maintenance or corrosive environments.
h. Cosmetic defects that do not interfere with product functionality.
i. Damage due to incorrect voltage or improper wiring.
j. Any incidental, indirect, or consequential loss, damage or expense that may result from any defect, failure or
malfunction of BendPak Inc. product.
k. All electrical components (excluding power unit) are guaranteed for one year against defects in workmanship and/or
materials when the lift is installed and used according to specifications.
NOTE:
Every effort has been taken to ensure complete and accurate instructions have been included in this manual, however, possible product
updates, revisions and or changes may have occurred since this printing. BendPak Ranger reserves the right to change specications
without incurring any obligation for equipment previously or subsequently sold. Not responsible for typographical errors.
California Proposition 65. This product can expose you to chemicals including styrene and vinyl chloride which are on the list of
over 900 chemicals identied by the State of California to cause cancer, birth defects or reproductive harm. Always use this product in
accordance with BendPak’s instructions. For more information, visit
www.p65warnings.ca.gov.
2
Page 3
IMPORTANT NOTICE
Do not attempt to install this lift if you have never been
trained on basic automotive lift installation procedures.
Never attempt to lift components without proper lifting
tools such as forklift or cranes. Stay clear of any moving
parts that can fall and cause injury. These instructions
must be followed to ensure proper installation and operation of your lift. Failure to comply with these instructions
can result in serious bodily harm and void product warranty. Manufacturer will assume no liability for loss or
damage of any kind, expressed or implied resulting from
improper installation or use of this product.
PLEASE READ ENTIRE MANUAL
PRIOR TO INSTALLATION
DEFINITIONS OF
HAZARD LEVELS
Identify the hazard levels used in this manual with the
following denitions and signal words:
OWNER’S RESPONSIBILITY
To maintain the lift and user safety, the responsibility of
the owner is to read and follow these instructions:
t Follow all installation and operation instructions.
t Make sure installation conforms to all applicable Local,
State, and Federal Codes, Rules, and Regulations;
such as State and Federal OSHA Regulations and
Electrical Codes.
t Carefully check the lift for correct initial function.
t Read and follow the safety instructions. Keep them
readily available for machine operators.
t Make certain all operators are properly trained, know
how to safely and correctly operate the unit, and are
properly supervised.
t Allow unit operation only with all parts in place and
operating safely.
t Carefully inspect the unit on a regular basis and
perform all maintenance as required.
t Service and maintain the unit only with authorized or
approved replacement parts.
t Keep all instructions permanently with the unit and
all decals on the unit clean and visible.
Watch for this symbol: It Means: Immediate hazards
which will result in severe personal injury or death.
Watch for this symbol: It Means: Hazards or unsafe
practices which could result in severe personal
injury or death.
Watch for this symbol: It Means: Hazards or unsafe
practices which may result in minor personal injury,
product or property damage.
BEFORE YOU BEGIN
Receiving:
The shipment should be thoroughly inspected as soon as it
is received. The signed bill of lading is acknowledgement by
the carrier of receipt in good condition of shipment covered
by your invoice. If any of the goods called for on this bill of
lading are shorted or damaged, do not accept them until the
carrier makes a notation on the freight bill of the shorted or
damaged goods. Do this for your own protection.
NOTIFY THE CARRIER AT ONCE if any hidden loss or
damage is discovered after receipt and request the carrier
to make an inspection. If the carrier will not do so, prepare
a signed statement to the effect that you have notied the
carrier (on a specic date) and that the carrier has failed to
comply with your request.
IT IS DIFFICULT TO COLLECT FOR LOSS OR DAMAGE
AFTER YOU HAVE GIVEN THE CARRIER A CLEAR
RECEIPT. File your claim with the carrier promptly. Support
your claim with copies of the bill of lading, freight bill,
invoice, and photographs, if available. Our willingness to
assist in helping you process your claim does not make
BendPak responsible for collection of claims or replacement of lost or damaged materials.
t I have visually inspected the site where the lift is to
be installed and veried the concrete to be in good condition and free of cracks or other defects. I understand that
installing a lift on cracked or defective concrete could
cause lift failure resulting in personal injury or death.
t I understand that a level oor is required for proper
installation and level lifting.
Please read entire manual prior to installation. Do not
operate this machine until you read and understand
all the dangers, warnings and cautions in this manual.
For additional copies or further information, contact:
BendPak Inc. / Ranger Products
1645 Lemonwood Dr.
Santa Paula, CA. 93060
1-805-933-9970
www.bendpak.com
t I understand that I am responsible if my oor is of
questionable slope and that I will be responsible for all
charges related to pouring a new level concrete slab if
required and any charges.
t I understand that Bendpak lifts are supplied with
concrete fasteners meeting the criteria of the American
National Standard “Automotive Lifts - Safety Requirements
for Construction, Testing, and Validation” ANSI/ALI
ALCTV-2011, and that I will be responsible for all charges
related to any special regional structural and/or seismic
anchoring requirements specied by any other agencies
and/or codes such as the Uniform Building Code (UBC)
and/or International Building Code (IBC).
t I assume full responsibility for the concrete oor and
condition thereof, now or later, where the above equipment model(s) are to be installed. Failure to follow danger,
warning, and caution instructions may lead to serious personal injury or death to operator or bystander or damage
to property.
t I understand that BendPak lifts are designed to be
installed in indoor locations only. Failure to follow installation instructions may lead to serious personal injury or
death to operator or bystander or damageto property or
lift.
Failure to follow danger, warning, and caution
instructions may lead to serious personal injury or death
to operator or bystander or damage to property.
INSTALLER / OPERATOR
PROTECTIVE EQUIPMENT
Personal protective equipment helps makes installation and operation safer, however, it does not take
the place of safe operating practices. Always wear
durable work clothing during any installation and/or
service activity. Shop aprons or shop coats may also
be worn, however loose tting clothing should be
avoided. Tight tting leather gloves are recommended
to protect technician hands when handling parts. Sturdy
leather work shoes with steel toes and oil resistant soles
should be used by all service personnel to help prevent
injury during typical installation and operation activities.
Eye protection is essential during installation and operation activities. Safety glasses with side shields, goggles,
or face shields are acceptable. Everyday eyeglasses only
have impact resistant lenses, they are not safety glasses.
Back belts provide support during lifting activities and are
also helpful in providing worker protection. Consideration
should also be given to the use of hearing protection if
service activity is performed in an enclosed area, or if
noise levels are high.
THIS SYMBOL POINTS OUT IMPORTANT SAFETY INSTRUCTIONS WHICH IF NOT FOLLOWED
COULD ENDANGER THE PERSONAL SAFETY AND/OR PROPERTY OR YOURSELF AND OTHERS
AND CAN CAUSE PERSONAL INJURY OR DEATH. READ AND FOLLOW ALL INSTRUCTIONS IN
THIS MANUAL BEFORE ATTEMPTING TO OPERATE THIS MACHINE.
5
Page 6
INTRODUCTION
1. Carefully remove the crating and packing materials.
CAUTION! Use care when cutting steel banding material
as items may become loose and fall, causing injury.
2. Check the voltage, phase, and proper amperage
requirements for the motor shown on the motor plate.
Wiring MUST be performed by a certied electrician only.
IMPORTANT SAFETY INSTRUCTIONS
Read these safety instructions entirely.
IMPORTANT NOTICE
Do not attempt to install this lift if you have never been trained on basic automotive lift installation procedures.
Never attempt to lift components without proper lifting tools such as forklift or cranes.
Stay clear of any moving parts that can fall and cause injury.
• Read and understand all instructions and all safety
warnings before operating lift.
• Care must be taken as burns can occur from touching
hot parts.
• Do not operate equipment with a damaged cord or if the
equipment has been dropped or damaged until it has
been examined by a qualied service person.
• Do not let a cord hang over the edge of the table, bench,
or counter or come in contact with hot manifolds or
moving fan blades.
• If an extension cord is necessary, a cord with a current
rating equal to or more than that of the equipment should
be used. Cords rated for less current than the equipment
may overheat. Care should be taken to arrange the cord
so that it will not be tripped over or pulled.
• Always unplug equipment from electrical outlet when not
in use. Never use the cord to pull the plug from the outlet.
Grasp plug and pull to disconnect.
• Let equipment cool completely before putting away.
Loop cord loosely around equipment when storing.
• To reduce the risk of re, do not operate equipment near
open containers of ammable liquids (gasoline).
• Adequate ventilation should be provided when working
on operating internal combustion engines.
• Keep hair, loose clothing, ngers, and all parts of body
away from moving parts. Keep feet clear of lift when lowering. Avoid pinch points.
• DANGER! To reduce the risk of electric shock, do not
use on wet surfaces or expose to
rain. The Power Unit used on this
lift contains high voltage. Disconnect
power at the receptacle or at the circuit
breaker switch before performing any
electrical repairs. Secure plug so that
it cannot be accidentally plugged in
during service. or mark circuit breaker switch so that it cannot be accidentally switched on during service.
• BendPak requires all operators to read and be familiar
with ANSI/ALI ALIS Safety Requirements for Installation and Service of Automotive Lifts.
• ALWAYS WEAR SAFETY GLASSES. Everyday eyeglasses only have impact resistant lenses, they are not
safety glasses.
• Consider work environment. Keep work area clean.
Cluttered work areas invite injuries. Keep areas well lit.
• Guard against electric shock. This lift must be grounded
while in use to protect operator from electric shock.
Never connect the green power cord wire to a live
terminal. This is for ground only.
• Only trained operators should operate this lift. All nontrained personnel should be kept away from the work
area. Never let non-trained personnel come in contact
with, or operate lift.
• DO NOT override self-closing lift controls.
• Clear area if vehicle is in danger of falling.
• ALWAYS make sure the safeties are
engaged before attempting to work on or
near a vehicle.
• WARNING! RISK OF EXPLOSION. This
equipment has internal arcing or sparking parts which
should not be exposed to
ammable vapors. This machine should not be located
in a recessed area or below oor level.
• MAINTAIN WITH CARE. Keep lift clean for better and
safer performance. Follow manual for proper lubrication
and maintenance instructions. Keep control handles
and/or buttons dry, clean and free from grease and oil.
• Check for damaged parts. Check for alignment of moving parts, breakage of parts or any condition that may
affect operation of lift. Do not use lift if any component is
broken or damaged.
• NEVER remove safety related components from the lift.
Do not use lift if safety related components are missing
or damaged.
• STAY ALERT. Use common sense and watch what you
are doing. Remember, SAFETY FIRST.
SAVE THESE INSTRUCTIONS!
6
Page 7
TOOLS REQUIRED
t Rotary Hammer Drill or Similar
t 3/4” Masonry Bit
t Hammer
t 4 Foot Level
t Open-End Wrench Set: SAE/Metric
t Socket And Ratchet Set: SAE/Metric
t Hex-Key / Allen Wrench Set
t Large Crescent Wrench
t Large Pipe Wrench
t Crow Bar
t Chalk Line
t Medium Flat Screwdriver
t Tape Measure: 25 Foot Minimum
t Needle Nose Pliers
IMPORTANT NOTICE
These instructions must be followed to ensure proper installation and operation of your lift. Failure
to comply with these instructions can result in serious bodily harm and void product warranty.
Manufacturer will assume no liability for loss or damage of any kind, expressed or implied resulting
from improper installation or use of this product.
PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION
STEP 1
(Selecting Site)
Before installing your new lift, check the following.
1. LIFT LOCATION: Always use architects plans when
available. Check layout dimension against oor plan
requirements making sure that adequate space if available.
2. OVERHEAD OBSTRUCTIONS: The area where the
lift will be located should be free of overhead obstructions such as heaters, building supports, electrical lines
etc.
3. DEFECTIVE FLOOR: Visually inspect the site where
the lift is to be installed and check for cracked or defective concrete.
A level oor is suggested for proper use and
installation and level lifting. If a oor is of questionable
slope, consider a survey of the site and/or the possibility
of pouring a new level concrete slab.
t DO NOT install or use this lift on any asphalt surface or any surface other than concrete.
t DO NOT install or use this lift on expansion seams or on cracked or defective concrete.
t DO NOT install or use this lift on a second / elevated oor without rst consulting building architect.
CONCRETE
SPECIFICATIONS
4. OPERATING TEMPERATURE. Operate lift only
between temperatures of 41° -104° F.
5. Lift is designed for INDOOR INSTALLATION ONLY.
Outdoor use is prohibited.
LIFT MODEL CONCRETE REQUIREMENTS
12,000 Lb Models: 6.5” Min. Thickness 3,000 PSI
15,000 Lb Models: 8” Min. Thickness 3,000 PSI
18,000 Lb Models: 8” Min. Thickness 3,000 PSI
STEP 2
(Floor Requirements)
All models MUST be installed on 3,000 PSI concrete only,
This lift must be installed on a solid level concrete
floor with no more than 3-degrees of slope. Failure
to do so could cause personal injury or death.
IMPORTANT NOTE:
BendPak lifts are supplied with installation instructions and concrete fasteners meeting the criteria as prescribed
by the American National Standard "Automotive Lifts - Safety Requirements for Construction, Testing, and
Validation" ANSI/ALI ALCTV-2011. Lift buyers should contact qualied persons regarding any special regional structural and/or seismic anchoring requirements specied by any other agencies and/or codes such as the Uniform
Building Code (UBC) and/or International Building Code (IBC).
7
conforming to the minimum requirements shown above.
New concrete must be adequately cured for at least
28 days minimum.
Page 8
When removing the Lift from shipping angles, pay close attention as the Posts can
slide and can cause injury. Prior to removing the Bolts, make sure the Posts are held
securely by a Forklift, Shop Crane, or some other heavy lifting device.
PARTS INVENTORY
Be sure to take a complete inventory of parts prior to beginning installation.
Time of Full Rise: 45 Seconds 45 Seconds 45 Seconds 45 Seconds
Max Load Per Arm: 3,750 Lbs. / 1701 Kg.3,750 Lbs. / 1701 Kg.4,500 Lbs. / 2041 Kg4,500 Lbs. / 2041 Kg
Emission sound pressure at Operator Position < 70 dB(A)
* An optional bolt-on top extension for column raises the overhead bar an additional 24”. Must be ordered from factory at time of order.
** For CE compliant countries see errata sheet included with control panel.
The design, material and specications are subject to change without notice.
XPR-15CLXPR-15CL-192 XPR-18CLXPR-18CL-192
(*)
187.7” / 4768 mm.
165" / 4191 mm. (*)
187.7” / 4768 mm.
10
Page 11
CLEARANCES
XPR-12CL/15CL/18CL
APPROACH
LIFT HEIGHT CLEARANCE NOTE: There must be a 1” MIN distance from top of Lift to nearest obstruction.
11
Page 12
STEP 3
(Preparing the Posts)
COMPLETE THE FOLLOWING
PRIOR STANDING UP POSTS.
1. Slide the Lift Head up the Post to aid in Pulley (also
sometimes called Cable Sheaves) removal and Equalizer
Cable routing. (See Fig 3.1)
Fig 3.1
Slide
Lift Head
upwards
Fig 3.4
Threaded cable
end from other
side of Lift.
NOTE: Post hidden for clarity. Powerside Post shown.
4. Install the Nipple and Elbow Cylinder Fittings in the
Cylinder Ports. Pay attention when installing the Elbow
Fittings to ensure that each Fitting points towards the
side of the Post that the Hose Retainer Clips are located on. Use Thread Sealant on NPT Threads only.
(See Fig 3.5 and Fig. 3.6)
Cable routed up
and across
Overhead
Assembly to
opposite carriage.
2. Temporarily remove the Cable Sheaves located at
the inside bottom of each Post. (Fig. 3.2)
Fig 3.2
Remove cable
sheaves
3. Route the Button end of the Cable around the bottom
sheave and secure at the carriage lock plate located
inside each Lift Head. Route Threaded End of Cable upwards
through the bottom of the carriage (See Fig 3.8)
Leave excess cable on top of the Lift Head until further steps
are required (See Fig. 3.3 and Fig. 3.4).
Fig 3.3
Threaded end of cable
routed up through
carriage towards
Overhead Assembly
mounting
Fig 3.5
Notice that
the hose clips
are offset for
Hydraulic Hose
routing
Elbow Fitting must
be turned towards
hose clips for
Hydraulic Hose
routing
Fig 3.6
Nipple Fitting
-04 NPT x -04F NPT
5550112
Elbow Fitting
-04 NPT L x -04 JIC
5550113
NOTE: Portions of Carriage and Column cut away for clarity
Use Thread Sealant with NPT threads only.
NOTE
FOR XPR-12CL/15CL/18CL-192 MODELS FIT
EXTENSION WELDMENTS TO POST ASSEMBLY
IN THIS STEP FOR EASE OF INSTALLATION
AND BOLT TOGETHER AS SHOWN ON PAGE 13
WITH M10 HARDWARE.
12
Page 13
Fig 3.7
M10
Hex Nut
M10
Spring Lock
Washer
Fig 3.8
6. Route both Hoses in their respective Posts PRIOR to
standing up the Posts. When routing the Hydraulic Hose
through the Posts, make sure to route them through the
Retaining Clips welded inside each Post. Make sure
that the Hose is clear of any moving parts. It may be
M10 Hex
Head Bolt
M10 Flat
Washer
necessary to tie the Hose clear of obstructions by using
nylon tie straps or wire. Refer to Step 10.
BE SURE TO ROUTE THE HYDRAULIC HOSES
THROUGH THE RETAINING CLIPS WELDED
INSIDE EACH POST.
EQUALIZER CABLE ROUTING
THREADED
BUTTON
END
END
CABLE
13
Page 14
HOSE ROUTING
Side of Post
14
Page 15
FLOOR PLAN
A
APPROACH
Power
Unit
ModelACapacity
XPR-12CL155” / 3937 mm 12,000 lbs
XPR-15CL155” / 3937 mm 15,000 lbs
XPR-18CL155” / 3937 mm 18,000 lbs
STEP 4
(Site Layout)
1. Decide which side of the Lift will be the approach side.
2. Determine where the Power Unit will be located. The
POWER SIDE Post has the Power Unit Mounting Bracket
attached to the side.
3. Use the chart on page 13 to determine which Lift width
layout you would like to use.
4. Once a location is determined, use a carpenters chalk
line to layout an alignment line for the Post locations. Keep
all dimensions square within 1/8” (3mm) or Lift malfunctions
can occur. (See Fig 4.1)
5. After the Post locations are properly marked, use chalk
or crayon to make an outline of the Posts on the oor
at each Post location using the Post Base Plates as a
template.
6. CHECK ALL DIMENSIONS TWICE and make sure that
the layout is perfectly square.
CHALK LINE
USE BASE PLATE EDGES TO ALIGN POSTS
15
Fig 4.1.
Page 16
STEP 5
(Installing The POWERSIDE Post)
NOTE:
BENDPAK LIFTS ARE SUPPLIED WITH INSTALLATION
INSTRUCTIONS AND CONCRETE FASTENERS
MEETING THE CRITERIA AS PRESCRIBED BY THE
CURRENT VERSION OF THE AMERICAN NATIONAL
STANDARD "AUTOMOTIVE LIFTS - SAFETY REQUIRE
MENTS FOR CONSTRUCTION, TESTING, AND
VALIDATION" ANSI/ALI ALCTV. LIFT BUYERS
SHOULD CONTACT QUALIFIED PERSONS
REGARDING ANY SPECIAL REGIONAL,
STRUCTURAL AND/OR SEISMIC ANCHORING
REQUIREMENTS SPECIFIED BY ANY OTHER
AGENCIES AND/OR CODES SUCH AS THE UNIFORM
BUILDING CODE (UBC) AND/OR INTERNATIONAL
BUILDING CODE (IBC).
1. BEFORE PROCEEDING, double check
the measurements and verify that the bases of each Post
are aligned with the chalk lines.
2. Using the Base Plate on the POWERSIDE Post as a
guide, drill each anchor hole using a rotary hammer drill and
3/4” concrete drill-bit. To assure full holding power, do not
ream the hole or allow the drill to wobble. (See Fig. 5.1)
-
Fig 5.3
NOTE:
TO EASE INSTALLATION OF THE OVERHEAD
ASSEMBLY, IT HELPS TO KEEP THE ANCHOR
BOLTS LOOSE ON ONE OF THE POSTS UNTIL THE
OVERHEAD ASSEMBLY IS MOUNTED.
Fig 5.4
Tighten Nut
3- Turns.
Do Not Use
Impact Wrench.
Fig 5.1
3. After drilling, remove dust thoroughly from each hole
making certain that the Post remains aligned with the chalk
line.
4. Assemble the Washers and Nuts on the Anchors, then
tap into each hole with a hammer until the Washer rests
against the Base Plate. If shimming is required, make sure
to leave enough threads exposed. (See Fig. 5.2)
Fig 5.2
Tap Anchor Bolts into
each hole with a hammer
until the Washer rests against
the Base Plate.
7. Install the Left (5701662) and Right (5701661)
Foot Guards to each Post. Position the Foot Guard beneath
Washer and Nut of Anchor Bolt. (See Fig. 5.5 - 5.6).
Fig 5.5
R Foot Guard
L Foot Guard
Fig 5.6
5. Insert the shims as necessary under the Base Plate so
that when the Anchor Bolts are tightened, the Posts will be
plumb. (See Fig. 5.3)
6. With the shims and Anchor Bolts in place, tighten by
securing the Nut to the base then turning 3-5 full turns
clockwise. DO NOT use an impact wrench for this
procedure. (See Fig. 5.4)
16
Page 17
STEP 6
(Mounting The OFFSIDE Post)
STEP 8
(Mounting the Hydraulic Power Unit)
1. Position the OFFSIDE Post at the designated chalk
locations and secure to the oor following the same
procedures as outlined in STEP FIVE; Items 1-6.
NOTE:
TO EASE THE INSTALLATION OF THE OVERHEAD
ASSEMBLY, IT HELPS TO KEEP THE ANCHOR BOLTS
LOOSE ON ONE OF THE POSTS UNTIL THE
OVERHEAD ASSEMBLY IS MOUNTED.
STEP 7
(Mounting the Overhead Assembly)
NOTE:
IN ORDER TO ROUTE THE EQUALIZER CABLES
THE SHEAVES MUST BE REMOVED.
1. Remove all of the Equalizer Pulleys
(also called Cable Sheaves) in preparation of
installing the Overhead Assembly.
2. Using an appropriate lifting device, raise the Overhead
Assembly into position on top of the Posts.
1. Remove Power unit from shipping material. Attach
the Power Unit to the POWER SIDE Post. Install the
Vibration Dampener between the Power Unit and the
Power Unit Mounting Plate on the Power Side Post,
using four M8 Hex Head Bolts and Nuts supplied.
(See Fig 8.1)
Vibration
Dampener
(4X) M8 x 1.25 x 35
Hex Head Bolts,
M8 Flat Washers
and M8 Nylock Nuts
Fig 8.1
3. Bolt the Overhead Assembly to the Posts using the
10 mm Hex Bolts, Nuts and Washers.
4. YOU MUST POSITION THE SWITCH ENCLOSURE
ADJACENT POWERSIDE POST. (See Fig. 7.1)
Overhead Assembly
Microswitch Bracket
Power Side Post
Off Side Post
5. Tighten the Overhead Assembly Bolts securely.
Position Overhead
Assembly with Microswitch
Bracket adjacent to
Power Side Post
Fig 7.1
2. Fill the Reservoir with 10 WT. HYDRAULIC OIL OR
DEXRON ATF, approximately four gallons. Make sure the
funnel used to ll the Hydraulic Fluid Reservoir is clean.
Do not connect Power Unit Hydraulic Hose at this time.
3. The standard Power Unit for your Lift
is 220 VAC, 60HZ, single phase.
All wiring must be performed by a certied Electrician ONLY.
SEE WIRING INSTRUCTIONS AFFIXED TO MOTOR
FOR PROPER WIRING INSTRUCTIONS.
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
IF THE ANCHOR BOLTS WERE LOOSENED TO AID
ON THE INSTALLATION OF THE TOP TROUGH,
TIGHTEN ANCHOR BOLTS AS INDICATED IN STEP 5
ITEMS 4 – 7.
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITHOUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
17
Page 18
DO NOT RUN POWER UNIT WITHOUT OIL. DAMAGE TO POWER UNIT PUMP CAN OCCUR.
THE POWER UNIT MUST BE KEPT DRY. DAMAGE TO POWER UNIT CAUSED BY WATER OR OTHER
LIQUIDS SUCH AS DETERGENTS, ACID ETC., IS NOT COVERED UNDER WARRANTY.
OPERATE LIFT ONLY BETWEEN TEMPERATURES OF 41 °- 104° F.
ANY IMPROPER ELECTRICAL INSTALLATION MAY DAMAGE POWER UNIT
MOTOR AND RESULTING DAMAGE WILL NOT BE COVERED UNDER WARRANTY.
MOTOR CAN NOT RUN ON 50HZ WITHOUT A PHYSICAL CHANGE IN MOTOR.
USE A SEPARATE CIRCUIT BREAKER FOR EACH POWER UNIT.
PROTECT EACH CIRCUIT WITH TIME DELAY FUSE OR CIRCUIT BREAKER.
FOR 208-230 VOLT, SINGLE PHASE, USE A 25 AMP FUSE.
FOR 208-230 VOLT, THREE PHASE, USE A 20 AMP FUSE.
FOR 380-440 VOLT, THREE PHASE, USE A 15 AMP FUSE.
STEP 9
1. Install Safety Assemblies onto each respective Post.
(See Figs 9.1 - 9.2). Only Powerside Safety Weldment has
a Handle.
2. From the Off Side Post, insert the non-looped end of
the safety cable through the hole located to the right of the
Off Side Safety Weldment. (See Fig 9.3)
3. Route the Cable under the sheave and route it towards
the Overhead Assembly. (See Fig 9.4)
Fig 9.1
(Installing the Safeties and Safety Cable)
Torsion
Spring
Safety
Clevis
Pin
Cotter
Pin
Power Side
Safety Weldment
Fig 9.2
Torsion
Spring
Cotter
Pin
Safety
Handle
Safety
Clevis
Pin
4. Route the Cable through the Overhead Assembly’s
Safety Sheave(s) and across the Lift. (See Figs 9.5)
5. Route the Cable the same way on the Power Side
going back down the Post.
6. Route the cable over the Top Welded Pin on the
Safety Handle. Insert the cable end through the hole on
the Threaded Pin. (See Fig 9.6)
7. Pull the slack out the safety cable and keep tension
on the cable as Nuts are being tightened. Tighten jam
Nuts on either side of the Cable keeping the Cable
centered to the hole to secure it into place. (See Fig 9.6)
Off Side Safety
Weldment
Rotor
Clip
18
Page 19
ENSURE THAT BOTH THE POWER SIDE & OFF
SIDE SAFETIES ENGAGE PROPERLY PRIOR TO
LIFT OPERATION.
NOTE:
MAKE SURE TO KEEP THE SAFETY CABLE
CENTERED WHEN TIGHTENING JAM NUTS
ON SAFETY.
Fig 9.3
Fig 9.4
Slip looped end
over bottom pin
Insert non-looped
end of Safety
Cable through
hole in Post
Rotor Clip
Fig 9.5
Fig 9.6
NOTE: Top Plate cut away for clarity
Route Safety
Cable the
hole in the
Threaded
Pin
Safety
Cable
Route Safety
Cable over the
Top Pin of the
Power Side
Safety Weldment
Safety Sheave
Route Safety Cable
under Off Side
Safety Sheave and
up towards Overhead
Assembly
NOTE: Post cut away for clarity
Tighten jam
nuts ensuring
Safety Cable is
centered in hole
19
Page 20
STEP 10
(Installing Hydraulic Hoses)
1. Install the Bulkhead Tee Fitting into the Power Side
Post. The through hole is located approximately 90 inches
from the oor on the back wall of the Power Side Post.
STEP 11
(Routing the Equalizer Cables)
2. Connect the Power Side Cylinder Hose to the Tee
Fitting. Be sure to route the Hose through the retainer clips
inside the Posts.
3. Route the Off Side Cylinder Hose (Crossover Hose)
up through the Post and across the Overhead Assembly,
down the Post and connect it to the Bulkhead Tee Fitting.
(See Fig 10.1)
Power Side Post
Power
Unit
Hose
Crossover
Hose
Bulkhead
Fitting
Power
Side Hose
Fig 10.1
WHEN THE CABLE ADJUSTING NUTS BOTTOM OUT
ON THE THREADED END OF THE CABLE
CONNECTOR AND THERE IS STILL SLACK IN THE
CABLES, THE CABLES HAVE STRETCHED BEYOND
THE SAFE USEFUL LENGTH AND NEED TO BE
REPLACED WITH FACTORY APPROVED CABLE
ASSEMBLIES. DO NOT PLACE WASHERS, SPACERS
OR OTHER DEVICES TO “SHORTEN” THE
EFFECTIVE CABLE LENGTH AS DAMAGE TO THE
LIFT OR INJURY TO PERSONS MAY OCCUR.
Refer to illustrations on Page 11.
1. Raise and lock each Carriage approximately 28”
above the ground. (See Fig. 11.1)
Fig 11.1
WHEN ROUTING THE HYDRAULIC HOSE
THROUGH
THE POSTS, MAKE SURE TO ROUTE THROUGH
THE HOSE CLIPS WELDED INSIDE EACH POST.
MAKE SURE THAT THE HOSE IS CLEAR OF ANY
MOVING PARTS. IT MAY BE NECESSARY TO TIE
THE HOSE CLEAR BY USING NYLON
TIE STRAPS OR WIRE.
Route Crossover
Hose through
hose clips
Microswitch
wire clips
Fig 10.2
MAKE SURE THAT THE SAFETY LOCKS ON EACH
POST ARE FULLY ENGAGED BEFORE ATTEMPTING
TO ROUTE EQUALIZER CABLES AND/OR HOSES.
CARRIAGES MUST BE EQUAL HEIGHT FROM THE
FLOOR BEFORE PROCEEDING.
2. With the Carriages locked at 28” off the oor, route the
Equalizer Cables up to the Top Trough.
3. Route the cables through the sheave brackets and
reinstall the sheaves. (See Fig. 11.2)
Note: The sheaves should have been removed in Step 6.
4. Insert the threaded end of the cable through the
hole on top of the carriage. Place M22 washer and M22
Nylock Nut on threaded cable end. Tighten Cable Nuts
until taut, checking that both cables have equal tension.
(See Fig 11.3)
20
Page 21
Fig. 11.2
Sheave
Brackets
Sheaves
STEP 12
(Installing Overhead Micro Switch)
Equalizer
Cables
MICROSWITCH WIRE MUST BE RUN THROUGH
CLIPS IN POST AND OVERHEAD ASSEMBLY.
FAILURE TO DO SO CAN CAUSE DAMAGE
TO LIFT OR TO VEHICLES.
1. Install the Overhead Microswitch as shown below. Be
sure to keep wire clear of moving parts. (See Fig.12.1)
Fig. 11.3
Threaded cable
end comes down
from Overhead
Assembly and
into hole on top of
carriage plate.
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
Threaded
Cable End
Nylock
Nut
Microswitch
(with Cover)
Microswitch
Box
Note: Second Microswitch for 3 phase wired units ONLY.
3 phase Microswitch Kit can be found in the Power Unit
shipping box.
2. Route Microswitch wire though the hole in Power Side
Post with rubber grommet and position the wiring loosely
along the side of the Safety Cover. (See Fig. 12.2)
Fig. 12.1
Fig. 12.2
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITHOUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR AT
POWER PANEL AND CANNOT BE RE-ENERGIZED
UNTIL ALL MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
Power Side
Safety Cover
Safety Release
Handle
21
Page 22
3. Route wire up through Post and across Overhead
Assembly through hole in Overhead Assembly into the
Microswitch box. (See Fig. 12.3)
Microswitch
Wire
2. Install the 90° Fitting w/ O-ring into the Power Port of
the Power Unit. Use teon tape on the pipe ttings ONLY.
Connect Power Unit Hose Assembly to the 90° w/O-ring
tting on Power Unit.
3. Connect other end of Power Unit Hydraulic Hose
assembly to the Bulkhead Fitting. (See Fig. 13.2)
Microswitch
Wire Clips
Fig. 12.3
STEP 13
(Installing Power Unit Assembly
and Power Side Safety Cover)
POWER UNIT HYDRAULIC HOSE MUST BE ROUTED
THROUGH THE HOSE CLIPS IN POWER SIDE
SAFETY COVER. FAILURE TO DO SO CAN RESULT
IN PERSONAL INJURY OR DAMAGE TO THE LIFT.
1. With Power Side Safety Cover loosely positioned,
route the Power Unit Hydraulic Hose along the side of the
Power Side Safety Cover. (See Fig. 13.1)
Fig. 13.2
Power
Side
Post
Power
Hose
4. After Safeties have been adjusted and checked for
proper operation, install and tighten Power Side Safety
Cover and Off Side Safety Cover Mounting Screws.
(See Fig. 13.3 and 13.4)
Fig. 13.3
Mounting
Screw
Crossover
Hose
Bulk-
head
tting
Power
Side
Hose
Power Side
Safety Cover
Power
Unit Hose
Assly
wiring for
Microswitch
Power Side
Safety Cover
Fig. 13.1
22
Hoses and wiring not shown.
Fig. 13.4
Mounting
Screw
Hoses and wiring not shown.
Off Side
Safety Cover
Page 23
STEP 14
(Installing the Lift Arms)
1. Place the Lift Arm Assemblies in the Lift Heads.
2. Install the Lift Head Pin into the Lift Head and through
the holes in the Arm Assembly. (See Fig. 14.1)
Lift Head
Pin
Snap
Ring
3. Install the Snap Ring into the groove in the Lift Head
Pin on under side of the Lift Head. (See Fig. 14.2)
Lift Head
Pin
Lift Head
Pin
Lift Head
Snap
Ring
Fig. 14.1
Lift Head
Pin
THE ARM RESTRAINT GEARS MUST BE
POSITIONED PROPERLY. CONFIRMATION OF
PROPER GEAR ENGAGEMENT MUST BE MADE
PRIOR TO THE OPERATION OF THE LIFT.
PERIODIC INSPECTION IS REQUIRED. FAILURE
TO INSPECT THE ARM RESTRAINT GEARS ON ALL
FOUR ARMS PROPERLY CAN RESULT IN DAMAGE
TO THE VEHICLE OR INJURY AND/OR DEATH.
4. Place each Gear Ring against the Lift Head Pin and
align the holes in the Gear Ring with the threaded holes
in the Arm Ears. Ensure that the teeth on the Gear Ring
mesh smoothly with the teeth on the gears of the Lift
Head. (See Fig. 14.3)
Lift Head
Pin
Arm Restraint
Gear Ring
Snap
Ring
Fig. 14.2
Arm Ear
Fig. 14.3
5. Verify the operation of the Arm Restraints by pulling
up on the key ring of the arm restraint pin. Pivot the arms
back and forth and test the operation of the Arm Restraint
Pin in various positions. (See Fig. 14.4)
6. Ensure that the Lift Arms do not move when a force
of approximately 100 pounds or less is applied laterally to
the fully extended Arms.
threaded holes
Fig. 14.4
23
Page 24
NOTE:
EACH ARM RESTRAINT ASSEMBLY MUST BE
INSPECTED BEFORE EACH AND EVERY TIME
THE LIFT IS OPERATED.
DO NOT OPERATE THE LIFT IF ANY OF THE
FOUR ARM RESTRAINT SYSTEMS ARE
NOT FUNCTIONING PROPERLY.
REPLACE ANY BROKEN COMPONENTS OR
COMPONENTS WITH BROKEN TEETH ONLY WITH
AUTHORIZED OR APPROVED REPLACEMENT PARTS.
24
Page 25
CARRIAGE STOP BOLT INSTALLATION
YOU MUST RE-INSTALL TOP CARRIAGE-STOP BOLT (SHOWN BELOW). TIGHTEN CARRIAGE-STOP
BOLT TO 2-3 FT.-LBS. OF TORQUE UPON FINAL INSTALLATION INSPECTION.
THESE INSTRUCTIONS MUST BE FOLLOWED TO ENSURE PROPER INSTALLATION
AND OPERATION OF YOUR LIFT. FAILURE TO COMPLY WITH THESE INSTRUCTIONS CAN RESULT
IN SERIOUS BODILY INJURY AND/OR DEATH AND/OR VOID PRODUCT WARRANTY.
MANUFACTURER WILL ASSUME NO LIABILITY FOR LOSS OR DAMAGE OF ANY KIND, EXPRESSED
OR IMPLIED RESULTING FROM IMPROPER INSTALLATION OR USE OF THIS PRODUCT.
25
Page 26
DO NOT PERFORM ANY MAINTENANCE OR INSTALLATION OF ANY COMPONENTS
WITHOUT FIRST ENSURING THAT ELECTRICAL POWER HAS BEEN DISCONNECTED
AT THE SOURCE OR PANEL AND CANNOT BE RE-ENERGIZED UNTIL
ALL MAINTENANCE AND/OR INSTALLATION PROCEDURES ARE COMPLETED.
IMPORTANT POWER-UNIT
INSTALLATION NOTES
n DO NOT run Power Unit with no oil. Damage to pump can occur.
n The Power Unit must be kept dry. Damage to Power Unit caused by water or other liquids such as
detergents, acid etc., is not covered under warranty.
n Improper electrical hook-up can damage motor and will not be covered under warranty.
n Motor can not run on 50HZ without a physical change in motor.
n Use a separate breaker for each power unit.
n Protect each circuit with time delay fuse or circuit breaker.
n For 208-230 volt, single phase, use a 25 amp fuse.
n For 208-230 volt, three phase, use a 20 amp fuse.
n For 380-440 volt, three phase, use a 15 amp fuse.
Installation and adjustment.
DO NOT attempt to raise vehicle until a thorough operation check has been completed.
ALL WIRING MUST BE PERFORMED BY A CERTIFIED ELECTRICIAN ONLY.
SEE WIRING INSTRUCTIONS AFFIXED TO
MOTOR FOR PROPER WIRING INSTRUCTIONS.
2626
Page 27
27
Page 28
STEP 15
(Power Unit Connection)
1. Have a certied, licensed Electrician run the power
supply to motor. Refer to the data plate found on the motor
for proper power supply and wire size.
RISK OF EXPLOSION!
This equipment has internal arcing or parts that may spark
and should not be exposed to ammable vapors. Motor
should not be located in a recessed area or below oor
level. NEVER expose motor to rain or other damp
environments. DAMAGE TO MOTOR CAUSED BY
WATER IS NOT COVERED UNDER WARRANTY.
STEP 16
(Lift Start Up / Final Adjustments)
DURING THE START-UP PROCEDURE, OBSERVE
ALL OPERATING COMPONENTS AND CHECK
FOR PROPER INSTALLATION AND ADJUSTMENT.
DO NOT ATTEMPT TO RAISE VEHICLE
UNTIL A THOROUGH OPERATIONAL CHECK
HAS BEEN COMPLETED.
1. Make sure the power unit reservoir is full with four
(4) gallons of 10-WT hydraulic oil or Dexron automatic
transmission uid.
NOTE:
CAUTION NEVER OPERATE THE MOTOR ON LINE
VOLTAGE LESS THAN 208V. MOTOR DAMAGE
MAY OCCUR WHICH IS NOT COVERED UNDER
WARRANTY. HAVE A CERTIFIED ELECTRICIAN
RUN APPROPRIATE POWER SUPPLY TO MOTOR.
SIZE WIRE FOR 25 AMP CIRCUIT. SEE MOTOR
OPERATING DATA TABLE. USE SEPARATE CIRCUIT
FOR EACH POWER UNIT. PROTECT EACH CIRCUIT
WITH TIME DELAY FUSE OR CIRCUITBREAKER.
FOR SINGLE PHASE 208-230V, USE 25 AMP FUSE.
THREE PHASE 208-240V, USE 25 AMP FUSE. FOR
THREE PHASE 400V AND ABOVE, USE 15 AMP
FUSE. ALL WIRING MUST COMPLY WITH NECK AND
ALL LOCAL ELECTRICAL CODES.
Fig 15.1
2. Apply light axle grease to the inside of the Posts
where the Slide Blocks glide.
3. Test the Power Unit by pressing the Up Push Button.
If the motor sounds like it is operating properly, raise the
Lift and check all hose connections for leaks. If the motor
gets hot or sounds peculiar, stop and check all electrical
connections.
4. Before proceeding, double-check to make sure all
cables are properly positioned within the grooves of ALL
sheaves. Make sure all cable sheave retaining pins and/or
clips are secure.
5. Check to make sure that all Safety Locks are cleared and
free.
6. Continue to press the Up Button to raise Lift until the
cables get taut and the Lift starts to move.
7. KEEP HANDS AND FEET CLEAR. Remove hands
and feet from any moving parts. Keep feet clear of Lift when
lowering. Avoid pinch points.
8. Check all MAIN SAFETY LOCKS to make sure they
move freely and spring back to the lock position when
released. Lubricate all SAFETY PIVOT points with light
spray-oil.
9. Cycle the Lift up and down a few times to ensure that
the Safety Locks are engaging uniformly and that the Safety
Release mechanisms are functioning. Re-adjust if
necessary.
28
Page 29
POST-INSTALLATION CHECK-OFF
n Posts properly shimmed and stable
n Anchor Bolts tightened
n Pivot / Sheave Pins properly attached
n Electric power supply conrmed
n Cables adjusted properly
n Safety Locks functioning properly
n Check for hydraulic leaks
n Oil level
n Lubrication of critical components
n Check for overhead obstructions
n All Screws, Bolts, and Pins securely fastened
n Surrounding area clean
n Operation, Maintenance and Safety Manuals
on site.
n Perform an Operational Test with a typical vehicle
NOTE:
There will be initial stretching of the cables and/or with
increased loads. Adjust the cables as outlined above
a week after rst use, then every three to six months
thereafter depending on usage and/or to compensate
for stretch.
STEP 18
(Bleeding)
THE LIFT WILL MOVE DOWN WHEN BLEEDING
MAKE SURE ALL EQUIPMENT, PERSONNEL,
HANDS AND FEET ARE CLEAR
BEFORE BLEEDING
1. After electrical power is connected and Hydraulic
Fluid reservoir is full, press Up Button to raise Lift.
STEP 17
(Lubrication)
1. After installation and start up has been completed,
lubricate lift components as described below.
(See Fig. 17.1)
2. Continue raising until Lift Cylinders fully extend to
full height. DO NOT continue pressing button after Lift
reaches full height. Damage to motor can occur if
continued.
3. Lower the Lift only HALF WAY by pressing the
SAFETY RELEASE handle inward then pressing in the
DOWN lever on the Power Unit.
4. With the Lift at half height, slowly loosen the BLEED
SCREWS located at the top of each Hydraulic Cylinder
to bleed trapped air. DO NOT completely remove bleed
screws. Re-tighten after trapped air has escaped. (See
Fig. 18.1)
5. Lower the lift completely by pressing the SAFETY
RELEASE handle inward then pressing the DOWN lever
on power unit. Wait ve minutes and repeat bleeding
process one additional time.
Fig. 18.1
Cylinder
Bleed
Screw
Fig. 17.1
DO NOT
completely
remove
Bleed Screw.
One full turn
should purge
trapped air.
2929
Page 30
OPTIONAL EQUIPMENT INSTALLATION
3030
Page 31
OPTIONAL AND STANDARD ACCESSORIES
Optional Equipment available through your Authorized BendPak Dealer.
Telescoping Screw Pad
Frame Cradle Pad
31
Page 32
STEP 19
(Operation Instructions)
OWNER/EMPLOYER RESPONSIBILITIES
• Shall maintain the periodic inspection and maintenance
records recommended by the manufacturer or ANSI/ALI
ALOIM:2008 (R2013), American National Standard for
Automotive Lifts-Safety Requirements for Operation,
Inspection and Maintenance.
The Owner/Employer:
• Shall ensure that lift operators are qualied and that they
are trained in the safe use and operation of the lift using
the manufacturer’s operating instructions; ALI/SM 10-01,
ALI Lifting it Right safety manual; AL-ST-17 ALI Safety Tips
card; ANSI/ALI ALOIM:2008 (R2013), American National
Standard for Automotive Lifts-Safety Requirements for Operation, Inspection and Maintenance; ALI/WL Series, ALI
Uniform Warning Label Decals/Placards; and in the case
of frame engaging lifts, ALI/LP-GUIDE, Vehicle Lifting
Points/Quick Reference Guide for Frame Engaging Lifts.
• Shall establish procedures to periodically inspect the lift
in accordance with the lift manufacturer’s instructions or
ANSI/ALI ALOIM:2008 (R2013), American National Standard for Automotive Lifts-Safety Requirements for Operation, Inspection and Maintenance; and The Employer shall
ensure that lift inspectors are qualied and that they are
adequately trained in the inspection of the lift.
• Shall establish procedures to periodically maintain the lift
in accordance with the lift manufacturer’s instructions or
ANSI/ALI ALOIM:2008 (R2013), American National Standard for Automotive Lifts-Safety Requirements for Operation, Inspection and Maintenance; and the Employer shall
ensure lift maintenance personnel are qualied and that
they are adequately trained in the maintenance of the lift.
• Shall display the lift manufacturer’s operating
instructions; ALI/SM 10-01, ALI Lifting It Right safety
manual; AL-ST-17 ALI Safety Tips card; ANSI/ALI ALOIM:2008 (R2013), American National Standard for Automotive Lifts-Safety Requirements for Operation, Inspection and Maintenance; and in the case of frame engaging
lifts, ALI/LP-GUIDE, Vehicle Lifting Points/Quick Reference
Guide for Frame Engaging Lifts; in a conspicuous location
in the lift area convenient to the operator.
• Shall provide necessary lockout/tagout means for energy
sources per ANSI Z244.1-2016, Safety Requirements for
the Lockout/Tagout of Energy Sources, before beginning
any lift repairs.
• Shall not modify the lift in any manner without the prior
written consent of the manufacturer.
32
Page 33
LIFT OPERATION SAFETY
• DAILY inspect your lift. Never operate if it malfunctions
or if it has broken or damaged parts. Use only qualied
lift service personnel and genuine BendPak parts to make
repairs.
• THOROUGHLY train all employees in use and care of
lift, using manufacturer’s instructions and “Lifting It Right”
and “Safety Tips” supplied with the lift.
• NEVER allow unauthorized or untrained persons to
position vehicle or operate lift.
• PROHIBIT unauthorized persons from being in shop
area while lift is in use.
• NEVER overload lift. Capacity of lift is shown on
nameplate affixed to the lift.
• DO NOT stand in front of the vehicle while it is being
positioned in lift bay.
• DO NOT hit or run over lift arms or adapters. This could
damage lift or vehicle. Before driving vehicle into lift bay,
position arms and adapters to provide unobstructed
entrance onto lift.
• DO NOT block open or override self-closing lift controls;
they are designed to return to the “Off ” or Neutral position
when released.
• DO NOT permit anyone on lift or inside vehicle when it is
either being raised or lowered.
• ALWAYS keep area around lift free of tools, debris,
grease and oil.
• DO NOT remove or disable arm restraints.
• ALWAYS remain clear of lift when raising or lowering
vehicles.
33
Page 34
LIFT OPERATION SAFETY (CONT’D)
• ALWAYS load vehicle on lift carefully. Position the lift
adapters to contact at the vehicle manufacturer’s recommended lift points. Raise lift until adapters contact vehicle.
Check adapters for secure contact with vehicle. Raise lift
to desired working height. (See Fig.19.1)
Fig. 19.1
WHEN LOWERING THE LIFT PAY CAREFUL
ATTENTION THAT ALL PERSONNEL AND
OBJECTS ARE KEPT CLEAR. ALWAYS KEEP A
VISUAL LINE OF SITE ON THE LIFT
AT ALL TIMES. ALWAYS MAKE SURE THAT
ALL LOCKS ARE DISENGAGED. IF ONE OF THE
LOCKS INADVERTENTLY LOCKS UPON DESCENT
THE VEHICLE MAY DISMOUNT CAUSING
PERSONAL INJURY OR DEATH.
•ALWAYS use safety stands when removing or installing
heavy components.
• DO NOT go under raised vehicle if safety locks are not
engaged.
VISUALLY CONFIRM THAT ALL PRIMARY
SAFETY LOCKS ARE ENGAGED BEFORE
ENTERING WORK AREA. SUSPENSION
COMPONENTS USED ON THIS LIFT ARE
INTENDED TO RAISE AND LOWER LIFT ONLY
AND ARE NOT MEANT TO BE LOAD
HOLDING DEVICES. REMAIN CLEAR OF
ELEVATED LIFT UNLESS VISUAL
CONFIRMATION IS MADE THAT ALL PRIMARY
SAFETY LOCKS ARE FULLY ENGAGED AND THE
LIFT IS LOWERED ONTO THE SAFETY LOCKS,
REFER TO INSTALLATION/OPERATION MANUAL
FOR PROPER SAFETY LOCK PROCEDURES
AND/OR FURTHER INSTRUCTION.
TO AVOID PERSONAL INJURY AND/OR PROPERTY
DAMAGE, PERMIT ONLY TRAINED PERSONNEL TO
OPERATE LIFT. AFTER REVIEWING THESE
INSTRUCTIONS, PRACTICE USING LIFT CONTROLS
BY RUNNING THE LIFT THROUGH A FEW UNLOADED
CYCLES BEFORE LOADING VEHICLE ON LIFT.
ALWAYS LIFT THE VEHICLE USING ALL
FOUR ADAPTERS. NEVER RAISE JUST ONE END,
ONE CORNER, OR ONE SIDE OF VEHICLE.
Fig. 19.2
• NEVER LEAVE LIFT IN ELEVATED CONDITION
unless all Safety Locks are engaged.
• AVOID excessive rocking of vehicle while on lift.
• ALWAYS CLEAR AREA if vehicle is in danger of falling.
• ALWAYS REMOVE tool trays, stands, etc. before
lowering lift.
• ALWAYS RELEASE safety locks before attempting to
lower lift.
• ALWAYS POSITION the lift arms and adapters to
provide an unobstructed exit before removing vehicle from
lift area.
Fig. 19.3
34
Page 35
LIFT OPERATION SAFETY (CONT’D)
TYPICAL LIFTING POINTS
TO RAISE THE LIFT
1. Before Loading: Lift must be fully lowered and service
bay clear of all personnel before the vehicle is brought on
lift with the swing arms set to the full drive-thru position.
2. Loading: Swing arms under vehicle and position
adapters at vehicle manufacturer’s recommended lift
points. Use height extenders or optional frame-cradle
adapters when necessary to ensure good contact.
(See Fig 19.2 - 19.3)
3. Some vehicles may have the manufacturer’s Service
Garage Lift Point locations identied by triangle shape
marks on the undercarriage (reference ANSI/SAE J2184-
1992). Also, there may be a label located on the right front
door jamb area showing specic vehicle lift points.
4. Position vehicle for proper weight distribution arms
under vehicle to allow adapters to contact at the
manufacturer’s recommended pick up points.
MANY SPECIALTY OR MODIFIED VEHICLES
CANNOT BE RAISED ON A TWO-POST FRAME
ENGAGING LIFT. CONTACT VEHICLE
MANUFACTURER FOR RAISING
OR JACKING DETAILS.
5. If the specic vehicle lift points are not identied, refer
to the VEHICLE CENTER OF BALANCE instructions
found on our website at:
http://www.bendpak.com/support/balancing-safety/
6. Push the Raise Button to rotate the control switch on
the Power Unit.
NOTE:
ALLOW (2) SECONDS BETWEEN MOTOR STARTS.
FAILURE TO COMPLY MAY CAUSE MOTOR BURNOUT.
7. Stop before making contact with vehicle. Check arm
restraint pins for engagement. If required, slightly move
arm to allow restraint gear and pawl to mesh. DO NOT
hammer arm restraint pin down as this will damage the
restraint gear teeth.
8. Raise vehicle until tires clear the oor.
9. Stop and check adapters for secure contact at vehicle
manufacturer’s recommended lift points.
10. Continue to raise to desired height only if vehicle is
secure on lift.
35
Page 36
LIFT OPERATION SAFETY (CONT’D)
11. DO NOT go near or under a raised vehicle if all four
adapters are not in secure contact with vehicle at vehicle
manufacturer’s recommended lift points.
12. Repeat entire loading and raising procedures if
required.
VISUALLY CONFIRM THAT ALL PRIMARY SAFETY
LOCKS ARE ENGAGED BEFORE ENTERING WORK
AREA. SUSPENSION COMPONENTS USED ON THIS
LIFT ARE INTENDED TO RAISE AND LOWER LIFT
ONLY AND ARE NOT MEANT TO BE LOAD HOLDING
DEVICES. REMAIN CLEAR OF ELEVATED LIFT
UNLESS VISUAL CONFIRMATION
IS MADE THAT ALL PRIMARY SAFETY LOCKS ARE
FULLY ENGAGED AND THE LIFT IS LOWERED ONTO
THE SAFETY LOCKS, REFER TO INSTALLATION /
OPERATION MANUAL FOR PROPER SAFETY.
13. Lower lift onto safety locks.
• DO NOT enter work area or go under vehicle if safety
locks are not engaged.
• CLEAR AREA if vehicle is in danger of falling.
WHEN LOWERING THE LIFT PAY CAREFUL
ATTENTION THAT ALL PERSONNEL AND
OBJECTS ARE KEPT CLEAR. ALWAYS KEEP A
VISUAL LINE OF SITE ON THE LIFT AT ALL TIMES.
ALWAYS MAKE SURE THAT ALL LOCKS ARE
DISENGAGED. IF ONE OF THE LOCKS
INADVERTENTLY LOCKS ON DESCENT THE LIFT
AND/OR VEHICLE MAY DISRUPT CAUSING
PERSONAL INJURY OR DEATH.
TO LOWER THE LIFT
1. Remove all tools or other objects from the lift area.
2. Raise lift off safety locks.
3. Push safety lock release handle fully and hold.
4. Push LOWERING valve handle to lower. Note: Both
SAFETY LOCK release and LOWERING valve handles
must be held down simultaneously to lower lift. Do not
override self-closing lift controls.
5. Remain clear of lift when lowering vehicle. Observe
pinch point warning decals.
• DO NOT position yourself between a wall and the lift.
If the vehicle falls in that direction, you may be severely
injured or killed.
• Before attempting to lift pickup trucks or other truck
frame vehicles, be sure that:
t Vehicle frame is strong enough to support its weight and has not been weakened by
modication or corrosion.
t Vehicle individual axle weight does not exceed
one-half lift capacity.
t Adapters are in secure contact with frame at vehicle manufacturers recommended lift points.
t Vehicle is stable on lift and the center of gravity is
NOT off balance.
t The overhead switch bar will contact the highest
point on the vehicle.
WHILE USING LIFT
• Avoid excessive rocking of vehicle while on lift.
• Always use safety stands as needed or when removing or installing heavy components.
6. Remove adapters from under vehicle and swing arms
to full drive-thru position before moving vehicle.
7. If lift is not operating properly, DO NOT use until
adjustment or repairs are made by qualied lift service
IF YOU ARE NOT COMPLETELY FAMILIAR WITH
AUTOMOTIVE LIFT MAINTENANCE PROCEDURES;
STOP AND CONTACT THE MANUFACTURER FOR
INSTRUCTIONS. TO AVOID PERSONAL INJURY,
PERMIT ONLY QUALIFIED PERSONNEL
TO PERFORM MAINTENANCE ON
THIS EQUIPMENT.
personnel.
36
Page 37
LIFT OPERATION SAFETY (CONT’D)
MAINTENANCE INSTRUCTIONS
• Always keep bolts tight. Check periodically.
• Always keep lift components clean.
• Always if oil leakage is observed, call local service
representative.
• Always call local service representative if electrical
problems develop.
• Always replace ALL FAULTY PARTS before lift is put
back into operation.
• Daily: Make a visual inspection of ALL MOVING PARTS and check for excessive signs of wear.
• Daily: Check safety locks to ensure they are in good
operating condition.
• Daily: Check cables and sheaves for wear. Replace
worn parts as required with genuine BendPak parts.
• Daily: Inspect adapters for damage or excessive wear. Replace as required with genuine BendPak
parts.
• Weekly: Lubricate all sheave and rollers with general
purpose oil.
• Weekly: Check all cable connections, bolts and pins
to ensure proper mounting.
• Monthly: Lubricate locking latch shafts. Push latch
handle several times for oil to penetrate pivot points.
• Every 3 Months: Check anchor bolt torque. Anchors
should be torqued to 90 ft/lbs.
• Semi-Annually: Check uid level of lift power unit and
rell if required per lift installation instructions.
• Replace all caution, warning or safety related decals
on the lift if unable to read or missing. Reorder labels
from BendPak.
• Refer to ANSI/ALI ALOIM booklet for periodic
inspection checklist and maintenance log sheet.
Before lifting the vehicle, make sure it is neither front nor rear heavy. See image below.
Center of balance should be midway between adapters.
37
Page 38
TO RAISE LIFT
t Read operating and Safety manuals before using lift.
t Always lift a vehicle according to the manufacturers recommended lifting points.
t Position Vehicle between Posts.
t Adjust swing arms so that the vehicle is positioned with the center of gravity midway between pads.
t Use truck adapters as needed. Never exceed 9” of Pad height.
t NEVER use lift pad assemblies without rubber slip over pads in place.
t Raise the vehicle by depressing button until the vehicle just lifts off the ground. Re-check to make sure
the vehicle is secure and all locking pins are lock in place.
t Raise vehicle to desired height. Lower vehicle onto nearest safety,
t Always ensure safeties are engaged before any attempt is made to work on or near vehicle.
TO LOWER THE LIFT
t First raise the lift clear to the safeties.
t Release safeties by pulling on the safety handle.
t Be sure tool trays, stands or personnel are cleared from under the vehicle.
t Lower vehicle by activating lowering handle on power unit.
t Before removing vehicle from lift; position lift arms and supports to provide an unobstructed exit.
t NEVER, drive over lift arms.
MAINTENANCE
UNLESS STATED OTHERWISE, ALL MAINTENANCE CAN BE PERFORMED BY THE
OWNER/EMPLOYER AND DOES NOT REQUIRE TRAINED LIFT SERVICE PERSONNEL.
BEFORE PERFORMING ANY MAINTENANCE ON YOUR LIFT, MAKE SURE IT IS COMPLETELY DISCONNECTED
FROM POWER. IF YOUR ORGANIZATION HAS TAGOUT/LOCKOUT POLICIES, MAKE SURE TO IMPLEMENT
THOSE PROCEDURES AFTER CONNECTING TO THE POWER SOURCE.
t Monthly. Check all arm adjusting locks for proper operation.
t Monthly. Check all cables connections, bolts and pins to ensure proper mounting and torque.
t Monthly. Visually inspect safeties for proper operation.
t Monthly. Lubricate Posts with grease.
t Monthly. Inspect all anchors bolts and retighten if necessary.
t Monthly. Check all Posts for squareness and plumb.
t Monthly. Inspect all pivot arms pins making sure they are properly secure.
t Monthly. Check equalizer cable tension, and adjust if necessary.
t Monthly. If lift is equipped with over head cut-off switch, check for proper operation.
1. WARNING!: If cement anchor bolts are loose or any component of the lift is found to be defective,
DO NOT USE THE LIFT!!
2. Never operate the lift with any person or equipment below the vehicle.
3. Never exceed the rated lift capacity.
4. Always ensure the safeties are engaged before any attempt is made to work on or near the vehicle.
5. Never leave lift in elevated position unless the safeties are engaged.
6. Do not permit electric motor to get wet! Motor damage caused by dampness is not covered under warranty.
NEVER LIFT ANY VEHICLE IN ANY MANNER WITH LESS THAN ALL FOUR (4) ARMS. RATED CAPACITY OF
EACH LIFT ARM IS NO GREATER THAN ONE FOURTH (1/4) OF THE OVERALL LIFT CAPACITY.
38
38
Page 39
WIRE ROPE INSPECTION AND MAINTENANCE
t Lifting cables should be replaced every three - ve years or when visible signs of damage are apparent. DO NOT
USE LIFT WITH DEFECTIVE / WORN CABLES.
t Lifting cables should be maintained in a well-lubricated condition at all times. Wire rope is only fully protected when
each wire strand is lubricated both internal and external. Excessive wear will shorten the life of the wire rope. The factory
suggested wire rope lubricant that penetrates to the core of the rope and provides long-term lubrication between each
individual strand is 90-WT gear oil or ALMASOL® Wire Rope Lubricant. In order to make sure that the inner layers of the rope
remain well lubricated, lubrication should be carried out at intervals not exceeding three months during operation.
t All sheaves and guide rollers in contact with the moving rope should be given regular visual checks for surface wear
and lubricated to make sure that they run freely. This operation should be carried out at appropriate intervals generally not
exceeding three months during operation. For all sheave axles, the factory recommends standard wheel bearing grease.
For all sheaves and/or guide rollers, the factory recommends 90-WT gear oil or similar heavy lubricant applied by any
method including pump / spray dispensing, brush, hand and/or swabbing.
.
HOW OFTEN TO INSPECT
t Lifting cables should be visually inspected at least once each day when in use, as suggested by American Petroleum
Institute (API) RP54 guidelines.
t Any lifting cables that have met the criteria for removal must be immediately replaced.
WHEN TO REPLACE LIFTING CABLES DUE TO BROKEN WIRES
t Lifting cables should be removed from service when you see six randomly distributed broken wires within any one lay
length, or three broken wires in one strand within one lay length.
CENTER WIRE
STRAND
ONE LAY LENGTH
WIRE
WIRE ROPE
CORE
OTHER REASONS TO REPLACE LIFTING CABLES
t Corrosion that pits the wires and/or connectors.
t Evidence of kinking, crushing, cutting, bird-caging or a popped core.
t Wear that exceeds 10% of a wire’s original diameter.
t Evidence of heat damage.
HOW TO FIND BROKEN WIRES
t The rst step is to relax your rope to a stationary position and move the pick-up points off the sheaves. Clean the
surface of the rope with a cloth — a wire brush, if necessary — so you can see any breaks.
t Flex the rope to expose any broken wires hidden in the valleys between the strands.
t Visually check for any broken wires. One way to check for crown breaks is to run a cloth along the rope to check for
possible snags.
t With an awl, probe between wires and strands and lift any wires that appear loose. Evidence of internal broken wires
may require a more extensive rope examination.
3939
Page 40
Safe Lift Operation
It is your responsibility to operate your lift safely.
Lift training should include, but not be limited to, the following:
• Proper positioning of the vehicle on the lift arms. (See manufacturers minimize wheel base loading requirements.)
• Use of the operating controls.
• Understanding the lift capacity.
• Proper use of jack stands or other load supporting devices.
• Proper use, understanding and visual identication of safety lock devices and their operation.
• Reviewing the safety rules.
• Proper housekeeping procedures (lift area should be free of grease, oil, tools, equipment, trash, and other debris).
• A daily inspection of the lift should be completed prior to its use. Safety devices, operating controls, lift arms and other
critical parts should be inspected prior to using the lift.
• All maintenance and repairs of the lift should be completed by following the manufacturer’s requirements. Lift repair
parts should meet or exceed OEM specications. Repairs should only be completed by a qualied lift technician.
• The vehicle manufacturer’s recommendations should be used for spotting and lifting the vehicle.
Other important safety rules include:
• It is important that you know the load limit. Never overload the lift. If you are unsure what the load limit is, check the
data plate found on one of the Lift Posts or contact the manufacturer.
• Make sure any vehicle you put onto the lift is balanced. Always use the manufacturer’s recommended lifting points.
• Always make sure you have proper overhead clearance. Additionally, check that attachments (vehicle signs, campers,
antennas, etc.) are not in the way.
• Be sure that prior to the vehicle being raised, the doors, trunk, and hood are closed securely.
• Prior to being raised, make sure there is no one standing closer than six feet from the lift.
• After positioning the vehicle on the lift runways, set the emergency brake, make sure the ignition is off, the doors are
closed, overhead obstructions are cleared, and the transmission is in neutral.
• Double check that the automatic chock devices are in position and then when the lift is raised, observe the chocks.
• Put pads or adapters in the right position under the contact points that have been recommended.
• The lift should be raised just until the vehicle’s wheels are about one foot off the ground. If contact with the vehicle is
uneven or it appears that the vehicle is not sitting secure, carefully lower the lift and readjust.
• Always consider potential problems that might cause a vehicle to slip, i.e., heavy cargo, undercoating, etc.
• Pay attention when walking under a vehicle that is up on the hydraulic lift.
4040
Page 41
• Do not leave the controls while the lift is still in motion.
• Do not stand directly in front of the vehicle or in the bay when vehicle is being loaded or driven into position.
• Do not go near vehicle or attempt to work on the vehicle when being raised or lowered.
• Remain clear of lift when raising or lowering vehicle.
• Do not rock the vehicle while on the lift or remove any heavy component from vehicle that may cause excessive weight
shift.
• Do not lower the vehicle until people, materials, and tools are clear.
• Make sure the safeties are engaged and lowered on to the safety ladders before any attempt is made to work on or near a
vehicle.
• Some vehicle maintenance and repair activities may cause the vehicle to shift. Follow the manufacturer’s guidelines
when performing these operations. The use of jack stands or alternate lift points may be required when completing
some repairs.
• READ AND UNDERSTAND all safety warning procedures before operating lift.
• KEEP HANDS AND FEET CLEAR. Remove hands and feet from any moving parts. Keep feet clear of lift when lowering.
Avoid pinch points.
• ONLY TRAINED OPERATORS should operate this lift. All non-trained personnel should be kept away from work area. Never
let non-trained personnel come in contact with, or operate lift.
• USE LIFT CORRECTLY. Use lift in the proper manner. Never use lifting adapters other than what is approved by the manufacturer.
• Do not override self-closing lift controls.
• CLEAR AREA if vehicle is on danger of falling.
• STAY ALERT. Watch what you are doing. Use common sense. Be aware.
• CHECK FOR DAMAGED PARTS. Check for alignment of moving parts, breakage of parts or any condition that may affect
its operation. Do not use lift if any component is broken or damaged.
• Never remove safety related components from the lift. Do not use lift if safety related components are damaged or missing.
• When the lift is being lowered, make sure everyone is standing at least six feet away.
• Be sure there are no jacks, tools, equipment, left under the lift before lowering.
• Always lower the vehicle down slowly and smoothly.
41
41
Page 42
If your lift is not functioning correctly, you must take it out of service until it is fixed.
All repair work must be performed by qualified personnel. If your organization has Lockout/Tagout
policies, implement them after connecting the Lift to the power source.
LIFT WILL NOT RAISE
POSSIBLE CAUSE
1. Air in oil, (1,2,8,13)
2. Cylinder binding, (9)
3. Cylinder leaks internally, (9)
4. Motor run backward under pressure, (11)
5. Lowering valve leaks, (3,4,6,10,11)
6. Motor runs backwards, (7,14,11)
7. Pump damaged, (10,11)
8. Pump won’t prime, (1,8,13,14,3,12,10,11)
9. Relief valve leaks, (10,11)
10. Voltage to motor incorrect, (7,14,11)
REMEDY INSTRUCTION
1. Check for proper oil level. . . . . . . . . . . . . . . . . . . . . . . . . . The oil level should be up to the bleed screw
12. Check wall outlet voltage and wiring . . . . . . . . . . . . . . . . . . Make sure unit and wall outlet is wired properly.
IMPORTANT
If a vehicle becomes stranded in the air, follow all operation instructions as shown on pages 33 - 38.
If, after observing that all mechanical locks are released and the lift still fails to move following all standard operating procedures, immediately stop using the lift and contact the factory or a factory-approved service center for further
instructions.
4444
Page 45
LIFT WILL NOT STAY UP
POSSIBLE CAUSE
1. Air in oil, (1, 2, 3)
2. Check valve leaks, (6)
3. Cylinders leak internally, (7)
4. Lowering valve leaks, (4, 5, 1, 7, 6)
5. Leaking ttings, (8)
REMEDY INSTRUCTIONS
1. Check oil level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . The oil level should be up to the bleed screw in the
reservoir with the lift all the way down.
2. Oil seal damaged and cocked . . . . . . . . . . . . . . . . . . . . . . . Replace oil seal around pump shaft.
8. Check complete hydraulic system for leaks. . . . . . . . . . . . . . Tighten all hydraulics ttings and inspects all hoses.
45
Page 46
Capacity
*
varies based
on model
Capacity
*
varies based
on model
46
Page 47
J not used
47
Page 48
48*49505152535455565758596061
Page 49
Page 50
Page 51
Page 52
Page 53
Page 54
Page 55
Page 56
Page 57
Page 58
Page 59
Page 60
Page 61
Page 62
XPR-12CL
12K Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175405-00000 to 99999-99999-99999
XPR-12CL-LWB
12K Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175406-00000 to 99999-99999-99999
XPR-12CL-192
12K Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175407-00000 to 99999-99999-99999
XPR-12CL-LWB-192
12K Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175415-00000 to 99999-99999-99999
XPR-15CL
15 Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175408-00000 to 99999-99999-99999
XPR-15CL-192
15 Cap. / Clearfloor / Two-Post Lift
Serial Numbers 5175410-00000 to 99999-99999-99999
Declaration of Conformity
The equipment which accompanies this declaration is in conformity with EU Directive:
2006/42/EC Machinery Directive
Manufacturer
BendPak Inc.
1645 Lemonwood Dr
Santa Paula Ca, 93060
USA
A copy of the Technical file for this equipment is available from:
CCQS UK Ltd., Level 7, Westgate House, Westgate Rd., London W5 1YY UK
Description of Equipment
Two-Column Vehicle Service Lift
A sample of this machinery has been presented to Notified Body number 1105.
CCQS UK Ltd., Level 7, Westgate House, Westgate Rd., London W5 1YY UK
Who have issued an EC type-examination certificate number CE-GB-20150427-01-5A dated 2015.12.10.
The equipment in respect of which this declaration is made conforms to the example to which that certificate relates, and that certificate
remains valid.
This declaration of conformity is issued under the sole responsibility of the manufacturer.
The following harmonised standards have been used:
EN1493:2010 Vehicle Lifts
Authorised signatory of manufacturer
Signature:
Name of signatory: Jeffrey S. Kritzer
Position in company: Senior Vice President of Marketing and Sales