Production and Quality
Bendix Delivers On Time and In Sequence,
While Maintaining World-Class Quality
Problems with a Bendix module will not be part of your
morning production meetings. By fully testing sub-systems
within a module, we can help ensure product quality levels
remain at or above their historic levels of 5.0 sigma. In over
six years of production, over a quarter-million ICM-style
modules shipped to customers have reached OEM’s on
time and in sequence.
Our proactive attitude, formidable Six-Sigma infrastructure
— 250 Green Belts, 25 Black Belts and two Master Black
Belts* — and full company support continually improves our
modules offering.
Reclaim 5,000 ft2of Floor Space
Typically, sub-assembly stations, inventory presentation and
valve build-up areas require 5,000 ft2of valuable shop floor
space. When you source a module through Bendix, that
space can be reallocated to main production or prep’d
for model change. Plant expansions (est. $3/sq ft) and
machinery relocation (>$100,000) can be avoided, especially
during unfavorable industry cycles.
Bendix Quality: All The Way Down The Line
Bendix is driven by meticulous and exacting standards which
enable us to set new records for customer quality year
after year, including:
• Freightliner Masters of Quality Award Winner
(1999, 2002, 2003, 2004)
We have achieved world-class safety ratings measured in
TCIR and LWDCIR consecutively since 2003. And, in
addition, our facilities continue to earn significant quality
certifications such as:
• Elyria, OH: Certified ISO9001:2000 and ISO 14001
• Frankfort, KY; Huntington, IN; Acuña, MX:
Certified TS16949 and ISO 14001
EXAMPLE DAYS OF INVENTORY
Component-Based Modular
Manufacturing Manufacturing
In-transit 5.0 3.0
Components 14.0 .0
WIP .5 .0
Finished Goods 1.0 0.5
TOTAL DAYS 20.5 3.5
Dollars Material/unit $800 $800
Daily build rate 100 100
TOTAL INVENTORY $1,640,000 $280,000
INVENTORY REDUCTION ($1,360,000)
A solid benefit your Materials Manager will enjoy.
To date, we have shipped over 250,000 modules
and every one has been on time and in sequence.
Reduce Your Inventory By $1,360,000
BENDIX JIT DELIVERY PERFORMANCE
PPM
500
400
300
200
100
0
2005 2004 2003 2002 2001 2000
* Six-Sigma certificates as of 12/31/05.