Bayou Breeze W003535705 Installation & Assembly (Base)

Page 1
Label Picture Description QTY
A Base 1
B Right Tube 1
Caution : You must read this before you proceed
HANGING CHAIR BASE
Picture
Page 2
C Left Tube 1
D Middle Tube 1
E Lower Pole 1
F Upper Pole 1
Label Picture Description QTY
Hex Bolt
(M8x65mm)
3
Hex Bolt
(M8x55mm)
2
Hex Bolt
(M8x15mm)
6
Washer (M8) 12
Nut (M8) 4
Cap (M8) 12
Hanging Part 1
Spring 1
Safety Line(with
Carabiner
1
Page 3
Rubber Ring 1
Spanner (M8) 2
Before Beginning
Assembly:
Page 4
Step 1
Place the Base(A) and Middle Tube(D) on a clean, non-marring surface. Insert Middle Tube(D) into the Base(A) as pictured.
Overview
This Hanging Chair Base has multiple parts and may require up to 30 minutes to assemble. To give you an overview of the Hanging Chair Base parts, the above picture is to help you put the various parts into perspective. Please read through the instructions below to familiarise yourself with the parts and steps before assembly.
FRONT FACING
Upper Pole (F)
Lower Pole (E)
Middle Tube (D)
Base (A)
Right Tube (B)
Left Tube (C)
Base (A)
Middle Tube
Page 5
Step 2
Step 3
Place the Base(A), Right Tube(B) and Left Tube(C) on a clean, non-marring surface. One by one insert Right Tube(B) and Left Tube(C) into the Base(A).
Attach Right Tube(B) and Left Tube(C) to Base(A) using Bolts() and Washers(), with Spanner().
Do not fully tighten the Bolts.
Base (A)
Left Tube (C)
Washer
(④)
Side Tube (B)
Base
Bolt
(③)
Right Tube (B)
Page 6
Step 4
Step 5
Insert Lower Pole(E) into Base(A), turn the Lower Pole(E) and align mounting positions. Attach Lower Pole(E) to Base(A) using Bolts() and Washers() on one side, and using Washers() and Nuts() on the other side; tighten with Spanners().
Do not fully tighten the Bolts.
Attach Right Tube(B) and Left Tube(C) to Middle Tube(D) using Bolt() and Washer() on one side, and using Washer() and Nut() on the other side; tighten with Spanners().
Do not fully tighten the Bolts.
Bolt ()
Washer ()
Right Tube (B)
Base (A)
Washer ()
Nut ()
Middle Tube
Lower Pole
Base (A)
Left Tube (C)
Page 7
Step 6
Step 7
Insert Hanging Part() into the top of Upper Pole(F). Then insert the Spring() into the Hanging Part ().
Move the Rubber Ring() down the Lower Pole(E) until it is flush with the top of the Base(A).
Upper Pole (F)
Hanging Part ()
Spring
( ⑧)
Lower Pole (E)
Base (A)
Base (A)
Rubber Ring ()
Page 8
Step 8 Step 9
Insert the Carabiner on the Safety Line() into the Base(A), and screw up the Carabiner. Your Hanging Chair Base is ready for use.
This Hanging Chair Base can only be used on a flat, level surface.
Insert the Upper Pole(F) into Lower Pole(E) and align mounting positions. Attach Upper Pole(F) to Lower Pole(E) using Bolt() and Washer() with Spanner().
Now, tighten all Bolts and Nuts at all joints sequential manner.
Place Caps() on Bolts and Nuts().
Upper Pole (F)
Lower Pole (E)
Base (A)
Safety Line (⑨)
Page 9
Step 10
Lift the Basket and hang the Iron Chain on the Spring of the Hanging Chair Base. Use the Safety Rope to lock up the middle rattan warp at the bottom of the Basket as shown above. Screw up the Carabiner to secure the Basket
Note: This Step should be completed with 2 adults.
Page 10
Page 10 OF 10
Loading...